Financier | Commitments |
---|---|
DENMARK, Govt. of | 12.50 |
IDA Credit | 163.00 |
P111153
Closed
Fredrick Nkya , John Morton
United Republic of Tanzania
August 1, 2008
(as of board presentation)
May 27, 2010
September 8, 2010
US$ 175.50 million
President's Office - Regional Administration and Local Government
2010
US$ 175.50 million
B
June 2, 2022
November 26, 2020
BANK APPROVED
Financier | Commitments |
---|---|
DENMARK, Govt. of | 12.50 |
IDA Credit | 163.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 163.00 |
IBRD + IDA Commitment | 163.00 |
Lending Instrument | |
---|---|
Grant Amount | 12.50 |
Total Project Cost** | 175.50 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Feb 1, 2020 | IDA-54600 | Int Charges | 979.71 |
Feb 1, 2020 | IDA-54600 | Int Charges | 979.71 |
Feb 4, 2020 | IDA-54600 | Int Charges | 165,819.06 |
Feb 4, 2020 | IDA-54600 | Int Charges | 165,819.06 |
Apr 15, 2020 | IDA-47270 | Int Charges | 548,923.90 |
Apr 15, 2020 | IDA-47270 | Int Charges | 548,923.90 |
Apr 15, 2020 | IDA-47270 | Int Charges | 1,478.28 |
Jul 19, 2024 | IDA-59470 | Int Charges | 2,348,480.80 |
Feb 27, 2017 | IDA-59470 | Loan Commitment | 130,000,000.00 |
May 30, 2014 | IDA-54600 | Loan Commitment | 50,000,000.00 |
May 27, 2010 | IDA-47270 | Loan Commitment | 163,000,000.00 |
Jul 15, 2023 | IDA-59470 | Int Charges | 57,832.15 |
Jul 15, 2023 | IDA-59470 | Int Charges | 2,382,330.50 |
Oct 15, 2023 | IDA-47270 | Int Charges | 24,241.63 |
Oct 15, 2023 | IDA-47270 | Int Charges | 24,241.63 |
Oct 15, 2023 | IDA-47270 | Loan Repay | 1,406,854.10 |
Oct 15, 2023 | IDA-47270 | Int Charges | 495,916.06 |
Oct 15, 2023 | IDA-47270 | Int Charges | 495,916.06 |
Apr 16, 2024 | IDA-47270 | Loan Repay | 1,378,540.10 |
Apr 16, 2024 | IDA-47270 | Int Charges | 492,254.70 |
Apr 16, 2024 | IDA-47270 | Int Charges | 492,254.70 |
Apr 15, 2024 | IDA-47270 | Loan Repay | 32,996.58 |
Aug 1, 2024 | IDA-54600 | Loan Repay | 411.26 |
Aug 2, 2024 | IDA-54600 | Int Charges | 159,127.80 |
Aug 2, 2024 | IDA-54600 | Int Charges | 159,127.80 |
Aug 2, 2024 | IDA-54600 | Loan Repay | 430,067.75 |
Jan 15, 2024 | IDA-59470 | Int Charges | 2,353,736.80 |
Jan 15, 2024 | IDA-59470 | Int Charges | 21,242.79 |
Feb 1, 2024 | IDA-54600 | Int Charges | 1,199.21 |
Feb 1, 2024 | IDA-54600 | Int Charges | 1,199.21 |
Feb 1, 2024 | IDA-54600 | Int Charges | 161,453.06 |
Feb 1, 2024 | IDA-54600 | Int Charges | 161,453.06 |
Jul 19, 2024 | IDA-59470 | Int Charges | 17,236.21 |
Oct 15, 2022 | IDA-47270 | Int Charges | 198.23 |
Oct 15, 2022 | IDA-47270 | Int Charges | 493,545.97 |
Oct 15, 2022 | IDA-47270 | Int Charges | 493,545.97 |
Feb 1, 2023 | IDA-54600 | Int Charges | 157,502.36 |
Feb 1, 2023 | IDA-54600 | Int Charges | 157,502.36 |
Feb 1, 2023 | IDA-54600 | Int Charges | 2,973.89 |
Feb 1, 2023 | IDA-54600 | Int Charges | 2,973.89 |
Apr 15, 2016 | IDA-47270 | Int Charges | 1,112.19 |
Mar 7, 2016 | IDA-54600 | Loan Disb | 11,793,000.00 |
Aug 12, 2016 | IDA-54600 | Int Charges | 130.03 |
Aug 12, 2016 | IDA-54600 | Int Charges | 130.03 |
Aug 12, 2016 | IDA-54600 | Int Charges | 48,194.20 |
Aug 12, 2016 | IDA-54600 | Int Charges | 48,194.20 |
Oct 15, 2016 | IDA-47270 | Int Charges | 555,247.25 |
Oct 15, 2016 | IDA-47270 | Int Charges | 555,247.25 |
Oct 15, 2016 | IDA-47270 | Int Charges | 4,228.47 |
Oct 15, 2016 | IDA-47270 | Int Charges | 4,228.47 |
Dec 27, 2016 | IDA-54600 | Loan Disb | 13,142,056.00 |
May 5, 2016 | IDA-47270 | Int Charges | 565,081.80 |
May 5, 2016 | IDA-47270 | Int Charges | 565,081.80 |
Feb 1, 2017 | IDA-54600 | Int Charges | 75,800.55 |
Feb 1, 2017 | IDA-54600 | Int Charges | 75,800.55 |
May 26, 2015 | IDA-47270 | Loan Disb | 9,284,269.00 |
Apr 21, 2015 | IDA-47270 | Int Charges | 507,445.88 |
Apr 21, 2015 | IDA-47270 | Int Charges | 507,445.88 |
Apr 15, 2015 | IDA-47270 | Int Charges | 13,119.32 |
Apr 15, 2015 | IDA-47270 | Int Charges | 13,119.32 |
Oct 15, 2015 | IDA-47270 | Int Charges | 14,101.99 |
Oct 15, 2015 | IDA-47270 | Int Charges | 14,101.99 |
Oct 17, 2014 | IDA-47270 | Int Charges | 2,000.20 |
Oct 17, 2014 | IDA-47270 | Int Charges | 2,000.20 |
Oct 17, 2014 | IDA-47270 | Int Charges | 564,484.70 |
Oct 17, 2014 | IDA-47270 | Int Charges | 564,484.70 |
Oct 23, 2013 | IDA-47270 | Int Charges | 11,680.38 |
Oct 23, 2013 | IDA-47270 | Int Charges | 11,680.38 |
Oct 23, 2013 | IDA-47270 | Int Charges | 399,515.22 |
Oct 23, 2013 | IDA-47270 | Int Charges | 399,515.22 |
Dec 20, 2013 | IDA-47270 | Loan Disb | 36,205,480.00 |
Apr 16, 2014 | IDA-47270 | Int Charges | 7,229.32 |
Apr 16, 2014 | IDA-47270 | Int Charges | 7,229.32 |
Apr 16, 2014 | IDA-47270 | Int Charges | 533,889.70 |
Apr 16, 2014 | IDA-47270 | Int Charges | 533,889.70 |
Apr 15, 2020 | IDA-47270 | Int Charges | 1,478.28 |
Aug 7, 2018 | IDA-54600 | Int Charges | 169,887.16 |
Jul 15, 2018 | IDA-59470 | Int Charges | 3,197.98 |
Jul 15, 2018 | IDA-59470 | Int Charges | 149,723.60 |
Oct 17, 2018 | IDA-47270 | Int Charges | 556,164.70 |
Oct 17, 2018 | IDA-47270 | Int Charges | 556,164.70 |
Jan 18, 2019 | IDA-59470 | Int Charges | 127,578.32 |
Jan 18, 2019 | IDA-59470 | Int Charges | 598,213.20 |
Oct 10, 2018 | IDA-59470 | Loan Disb | 19,819,720.00 |
Jan 18, 2019 | IDA-59470 | Int Charges | 10,293.73 |
Feb 1, 2019 | IDA-54600 | Int Charges | 2,406.91 |
Feb 1, 2019 | IDA-54600 | Int Charges | 2,406.91 |
Feb 4, 2019 | IDA-54600 | Int Charges | 165,646.90 |
Feb 4, 2019 | IDA-54600 | Int Charges | 165,646.90 |
Oct 15, 2018 | IDA-47270 | Int Charges | 991.59 |
Oct 15, 2018 | IDA-47270 | Int Charges | 991.59 |
Mar 1, 2019 | IDA-59470 | Loan Disb | 11,217,164.00 |
Jul 15, 2019 | IDA-59470 | Int Charges | 6,105.30 |
Jul 15, 2019 | IDA-59470 | Int Charges | 102,806.53 |
Jul 15, 2019 | IDA-59470 | Int Charges | 924,482.75 |
Jul 15, 2019 | IDA-59470 | Loan Disb | 12,442,327.00 |
Feb 21, 2018 | IDA-59470 | Loan Disb | 16,378,040.00 |
Feb 1, 2018 | IDA-54600 | Int Charges | 172,056.53 |
Apr 18, 2018 | IDA-47270 | Int Charges | 490.25 |
Apr 18, 2018 | IDA-47270 | Int Charges | 490.25 |
Feb 1, 2018 | IDA-54600 | Int Charges | 11,722.20 |
Feb 1, 2018 | IDA-54600 | Int Charges | 11,722.20 |
Feb 1, 2018 | IDA-54600 | Int Charges | 172,056.53 |
Apr 18, 2018 | IDA-47270 | Int Charges | 586,456.40 |
Apr 18, 2018 | IDA-47270 | Int Charges | 586,456.40 |
Jan 15, 2018 | IDA-59470 | Int Charges | 884.57 |
Jan 15, 2018 | IDA-59470 | Int Charges | 173,114.03 |
Jan 15, 2018 | IDA-59470 | Int Charges | 3,100.32 |
Jan 15, 2018 | IDA-59470 | Int Charges | 53,703.18 |
Jun 15, 2018 | IDA-59470 | Loan Disb | 6,206,111.00 |
Apr 30, 2018 | IDA-54600 | Loan Cancel | 2,392.31 |
Jul 15, 2018 | IDA-59470 | Int Charges | 249,296.55 |
Aug 7, 2018 | IDA-54600 | Int Charges | 4,588.81 |
Aug 7, 2018 | IDA-54600 | Int Charges | 4,588.81 |
Aug 7, 2018 | IDA-54600 | Int Charges | 169,887.16 |
Feb 1, 2017 | IDA-54600 | Int Charges | 6,087.39 |
Feb 1, 2017 | IDA-54600 | Int Charges | 6,087.39 |
Jun 6, 2016 | IDA-54600 | Loan Disb | 5,765,000.00 |
Jun 20, 2017 | IDA-59470 | Loan Disb | 331,165.40 |
Jun 20, 2017 | IDA-59470 | Fee Charges | 331,165.40 |
Apr 15, 2017 | IDA-47270 | Int Charges | 536,805.75 |
Apr 15, 2017 | IDA-47270 | Int Charges | 536,805.75 |
Jun 21, 2017 | IDA-54600 | Loan Disb | 10,538,470.00 |
Apr 15, 2017 | IDA-47270 | Int Charges | 6,870.48 |
Apr 15, 2017 | IDA-47270 | Int Charges | 6,870.48 |
Oct 24, 2017 | IDA-47270 | Int Charges | 3,624.36 |
Oct 24, 2017 | IDA-47270 | Int Charges | 3,624.36 |
Oct 24, 2017 | IDA-47270 | Int Charges | 566,811.25 |
Oct 24, 2017 | IDA-47270 | Int Charges | 566,811.25 |
Aug 10, 2017 | IDA-54600 | Int Charges | 10,391.05 |
Aug 10, 2017 | IDA-54600 | Int Charges | 10,391.05 |
Aug 10, 2017 | IDA-54600 | Int Charges | 128,374.53 |
Aug 10, 2017 | IDA-54600 | Int Charges | 128,374.53 |
Oct 23, 2015 | IDA-47270 | Int Charges | 542,100.30 |
Oct 23, 2015 | IDA-47270 | Int Charges | 542,100.30 |
Feb 4, 2016 | IDA-54600 | Int Charges | 7,629.13 |
Feb 4, 2016 | IDA-54600 | Int Charges | 7,629.13 |
Oct 8, 2015 | IDA-54600 | Loan Disb | 3,323,500.00 |
Apr 15, 2016 | IDA-47270 | Int Charges | 1,112.19 |
Jan 15, 2022 | IDA-59470 | Int Charges | 44.15 |
Oct 15, 2022 | IDA-47270 | Loan Repay | 59,627.77 |
Oct 15, 2022 | IDA-47270 | Loan Repay | 1,311,333.20 |
Oct 15, 2022 | IDA-47270 | Int Charges | 198.23 |
Feb 1, 2021 | IDA-54600 | Int Charges | 5,054.55 |
Feb 1, 2021 | IDA-54600 | Int Charges | 5,054.55 |
Feb 1, 2021 | IDA-54600 | Int Charges | 173,581.90 |
Feb 1, 2021 | IDA-54600 | Int Charges | 173,581.90 |
Jan 15, 2021 | IDA-59470 | Int Charges | 126,487.67 |
Jan 15, 2021 | IDA-59470 | Int Charges | 306.99 |
Jan 15, 2021 | IDA-59470 | Int Charges | 2,517,961.80 |
Jun 18, 2021 | IDA-59470 | Loan Cancel | 242,243.77 |
Jul 15, 2021 | IDA-59470 | Int Charges | 37,914.16 |
Jul 15, 2021 | IDA-59470 | Int Charges | 299.45 |
Jul 15, 2021 | IDA-59470 | Int Charges | 2,528,221.00 |
Apr 16, 2021 | IDA-47270 | Int Charges | 2,528.79 |
Apr 16, 2021 | IDA-47270 | Int Charges | 2,528.79 |
Apr 16, 2021 | IDA-47270 | Loan Repay | 1,535,873.80 |
Apr 15, 2023 | IDA-47270 | Loan Repay | 64,114.32 |
Apr 15, 2023 | IDA-47270 | Loan Repay | 1,390,715.40 |
Apr 15, 2023 | IDA-47270 | Int Charges | 493,214.78 |
Apr 15, 2023 | IDA-47270 | Int Charges | 493,214.78 |
Aug 1, 2023 | IDA-54600 | Int Charges | 161,557.44 |
Aug 1, 2023 | IDA-54600 | Int Charges | 3,694.80 |
Jan 15, 2023 | IDA-59470 | Int Charges | 38,165.69 |
Jan 15, 2023 | IDA-59470 | Int Charges | 2,297,303.80 |
Aug 1, 2023 | IDA-54600 | Int Charges | 3,694.80 |
Aug 1, 2023 | IDA-54600 | Int Charges | 161,557.44 |
Aug 1, 2021 | IDA-54600 | Int Charges | 1,154.87 |
Aug 1, 2021 | IDA-54600 | Int Charges | 1,154.87 |
Aug 1, 2021 | IDA-54600 | Int Charges | 173,586.64 |
Aug 1, 2021 | IDA-54600 | Int Charges | 173,586.64 |
Apr 15, 2022 | IDA-47270 | Loan Repay | 12,440.03 |
Jul 15, 2022 | IDA-59470 | Int Charges | 4,901.70 |
Jul 15, 2022 | IDA-59470 | Int Charges | 2,323,649.80 |
Aug 1, 2022 | IDA-54600 | Int Charges | 578.86 |
Aug 1, 2022 | IDA-54600 | Int Charges | 578.86 |
Aug 1, 2022 | IDA-54600 | Int Charges | 160,948.86 |
Aug 1, 2022 | IDA-54600 | Int Charges | 160,948.86 |
Feb 7, 2022 | IDA-54600 | Int Charges | 168,041.88 |
Feb 7, 2022 | IDA-54600 | Int Charges | 168,041.88 |
Apr 22, 2022 | IDA-47270 | Loan Repay | 1,448,354.10 |
Apr 22, 2022 | IDA-47270 | Int Charges | 531,342.94 |
Apr 22, 2022 | IDA-47270 | Int Charges | 531,342.94 |
Feb 1, 2022 | IDA-54600 | Int Charges | 1,988.64 |
Feb 1, 2022 | IDA-54600 | Int Charges | 1,988.64 |
Jan 15, 2022 | IDA-59470 | Int Charges | 2,467,866.20 |
Jan 15, 2022 | IDA-59470 | Int Charges | 25,437.71 |
Jan 15, 2022 | IDA-59470 | Int Charges | -44.15 |
Apr 16, 2021 | IDA-47270 | Int Charges | 31.99 |
Apr 16, 2021 | IDA-47270 | Int Charges | 31.99 |
Apr 16, 2021 | IDA-47270 | Int Charges | 570,193.10 |
Apr 16, 2021 | IDA-47270 | Int Charges | 570,193.10 |
Oct 15, 2021 | IDA-47270 | Loan Repay | 15,777.29 |
Oct 15, 2021 | IDA-47270 | Loan Repay | 1,500,581.90 |
Oct 15, 2021 | IDA-47270 | Int Charges | 31.58 |
Oct 15, 2021 | IDA-47270 | Int Charges | 31.58 |
Oct 15, 2021 | IDA-47270 | Int Charges | 557,262.00 |
Oct 15, 2021 | IDA-47270 | Int Charges | 557,262.00 |
May 19, 2020 | IDA-59470 | Loan Disb | 14,184,980.00 |
Oct 16, 2020 | IDA-47270 | Loan Repay | 1,515,448.90 |
Oct 16, 2020 | IDA-47270 | Int Charges | 565,933.50 |
Oct 16, 2020 | IDA-47270 | Int Charges | 565,933.50 |
Jul 16, 2020 | IDA-59470 | Int Charges | 170,129.53 |
Jul 16, 2020 | IDA-59470 | Int Charges | 25,441.48 |
Jul 16, 2020 | IDA-59470 | Int Charges | 1,965,967.80 |
Oct 15, 2020 | IDA-47270 | Loan Repay | 362.49 |
Aug 5, 2020 | IDA-54600 | Int Charges | 430.45 |
Aug 5, 2020 | IDA-54600 | Int Charges | 430.45 |
Aug 5, 2020 | IDA-54600 | Int Charges | 166,585.89 |
Aug 5, 2020 | IDA-54600 | Int Charges | 166,585.89 |
Apr 15, 2019 | IDA-47270 | Int Charges | 4,599.35 |
Apr 15, 2019 | IDA-47270 | Int Charges | 4,599.35 |
Apr 15, 2019 | IDA-47270 | Int Charges | 558,428.00 |
Apr 15, 2019 | IDA-47270 | Int Charges | 558,428.00 |
Nov 15, 2019 | IDA-59470 | Loan Disb | 28,192,032.00 |
Oct 15, 2019 | IDA-47270 | Int Charges | 1,577.12 |
Oct 15, 2019 | IDA-47270 | Int Charges | 1,577.12 |
Oct 15, 2019 | IDA-47270 | Int Charges | 552,061.50 |
Oct 15, 2019 | IDA-47270 | Int Charges | 552,061.50 |
Aug 1, 2019 | IDA-54600 | Int Charges | 1,539.11 |
Aug 1, 2019 | IDA-54600 | Int Charges | 1,539.11 |
Aug 1, 2019 | IDA-54600 | Int Charges | 166,401.50 |
Aug 1, 2019 | IDA-54600 | Int Charges | 166,401.50 |
Mar 31, 2020 | IDA-59470 | Loan Disb | 24,337,786.00 |
Jan 15, 2020 | IDA-59470 | Int Charges | 73,288.84 |
Jan 15, 2020 | IDA-59470 | Int Charges | 1,211,590.40 |
Jan 15, 2020 | IDA-59470 | Int Charges | 1,797.39 |
Name | Review | Date |
---|---|---|
Overall Implementation Progress (IP) | Satisfactory | 2020-11-09 |
Progress towards achievement of PDO | Satisfactory | 2020-11-09 |
Project Management | Satisfactory | 2020-11-09 |
Financial Management | Satisfactory | 2020-11-09 |
Monitoring and Evaluation | Satisfactory | 2020-11-09 |
Overall Safeguards Rating | Moderately Satisfactory | 2020-11-09 |
Procurement | Satisfactory | 2020-11-09 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 05-13-2021 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 0.00 | 1890687.00 | 1741000.00 |
Date | April 30, 2010 | November 26, 2020 | November 26, 2020 | |
Comment |
Increase in own-source revenue over base year | Value | 0.00 | 457.00 | 100.00 |
Date | April 30, 2010 | November 26, 2020 | November 26, 2020 | |
Comment |
Waste disposed at landfills as percent of total waste generated in LGAs | Value | 28.00 | 86.00 | 40.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
People with access to improved bus stations, terminals or lorry stands (number) | Value | 0.00 | 1278053.00 | 1266200.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Female beneficiaries | Value | 49.00 | 49.00 | 49.00 |
Date | April 30, 2010 | April 2, 2018 | June 30, 2014 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Drains constructed/rehabilitated (km) | Value | 0.00 | 42.02 | 31.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
LGAs with up-to-date strategic urban development plans (number) | Value | 0.00 | 7.00 | 7.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Non-rural roads rehabilitated or constructed to paved standard (km) | Value | 0.00 | 253.60 | 220.00 |
Date | June 30, 2009 | August 31, 2020 | November 26, 2020 | |
Comment |
Progress in preparing General Planning Schemes in LGAs | Value | 0.00 | 100.00 | 100.00 |
Date | July 1, 2014 | August 31, 2020 | November 26, 2020 | |
Comment |
Waste collection points constructed or rehabilitated (number) | Value | 0.00 | 277.00 | 255.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Amount spent on operation and maintenance as percent of total municipal expenditure (%) | Value | 8.00 | 28.00 | 20.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Number of landfills and cells constructed or improved (number of landfills, and number of cells) | Value | 0.00 | 7.00 | 7.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Percent of O&M cost for solid waste management recovered from direct fees and charges | Value | 0.00 | 84.00 | 25.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Bus stations, terminals or lorry stands constructed or improved (number, capacity) | Value | 0.00 | 11.00 | 10.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Percent of O&M cost for bus stations, terminals or lorry stands recovered from direct fees and charges | Value | 0.00 | 95.00 | 80.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Proportion of TSCP Project Monitoring and Evaluation reports by LGAs generated electronically (%) | Value | 0.00 | 100.00 | 100.00 |
Date | August 31, 2016 | November 26, 2020 | November 26, 2020 | |
Comment |
Capacity in number of vehicles | Value | 0.00 | 851.00 | 0.00 |
Date | ||||
Comment |
Number of gender-sensitive design features constructed or improved | Value | 0.00 | 29.00 | 17.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |
Proportion of project related grievances addressed. | Value | 0.00 | 100.00 | 100.00 |
Date | April 30, 2010 | August 31, 2020 | November 26, 2020 | |
Comment |