Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 147.00 |
Borrower/Recipient | 37.12 |
P112523
Closed
Mustapha Benmaamar
Ministry of Finance
April 13, 2009
(as of board presentation)
September 10, 2009
November 3, 2009
US$ 184.12 million
Roads Department of the Ministry of Regional Development and Infrastructure (RDMRDI)
2010
US$ 147.00 million
A
Not Applicable
June 30, 2016
BANK APPROVED
May 16, 2023
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 147.00 |
Borrower/Recipient | 37.12 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 147.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 147.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 184.12 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jul 15, 2024 | IBRD-77410 | Loan Repay | 2,825,242.80 |
Jul 15, 2024 | IDA-51080 | Int Charges | 115,142.45 |
Jul 15, 2024 | IDA-51080 | Int Charges | 71,290.19 |
Jul 15, 2024 | IDA-51080 | Int Charges | 71,290.19 |
Jul 15, 2024 | IBRD-77410 | Int Charges | 20,137.90 |
Jul 15, 2024 | IBRD-77410 | Int Charges | 2,805,105.00 |
Jul 15, 2024 | IBRD-77410 | Loan Repay | 114,757.21 |
Sep 10, 2009 | IBRD-77410 | Loan Commitment | 147,000,000.00 |
Jun 26, 2012 | IDA-51080 | Loan Commitment | 43,000,000.00 |
Jan 15, 2024 | IDA-51080 | Int Charges | 117,000.61 |
Jan 15, 2024 | IBRD-77410 | Int Charges | 41,440.01 |
Jan 15, 2024 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jan 15, 2024 | IBRD-77410 | Int Charges | 2,874,683.50 |
Jan 15, 2024 | IDA-51080 | Int Charges | 11,271.05 |
Jan 15, 2024 | IDA-51080 | Loan Repay | 1,026,682.20 |
Jan 15, 2024 | IDA-51080 | Loan Repay | 18,861.91 |
Jul 15, 2018 | IBRD-77410 | Int Charges | 1,360,209.00 |
Jul 15, 2018 | IDA-51080 | Int Charges | 20,136.56 |
Jul 15, 2018 | IDA-51080 | Loan Repay | 1,097,146.40 |
Jul 15, 2018 | IDA-51080 | Int Charges | 390.08 |
Jul 15, 2018 | IDA-51080 | Int Charges | 390.08 |
Jul 15, 2018 | IDA-51080 | Int Charges | 116,057.05 |
Jul 15, 2018 | IDA-51080 | Int Charges | 116,057.05 |
Jan 15, 2019 | IBRD-77410 | Int Charges | 1,767,136.00 |
Jan 15, 2019 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jan 15, 2019 | IDA-51080 | Loan Repay | 26,713.04 |
Jan 15, 2019 | IDA-51080 | Loan Repay | 268,499.47 |
Jan 15, 2019 | IDA-51080 | Loan Repay | 796,714.10 |
Jan 15, 2019 | IDA-51080 | Int Charges | 172,732.16 |
Jan 15, 2019 | IDA-51080 | Int Charges | 111,798.37 |
Jan 15, 2019 | IDA-51080 | Int Charges | 111,798.37 |
Jul 15, 2017 | IDA-51080 | Loan Repay | 3,170.41 |
Jul 15, 2017 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jul 15, 2017 | IBRD-77410 | Int Charges | 1,044,324.75 |
Jul 15, 2021 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jul 15, 2021 | IDA-51080 | Loan Repay | 262,481.94 |
Jul 15, 2021 | IDA-51080 | Loan Repay | 294,930.30 |
Jul 15, 2013 | IDA-51080 | Int Charges | 948.37 |
Jul 15, 2016 | IDA-51080 | Int Charges | 134,860.62 |
Jul 15, 2016 | IDA-51080 | Int Charges | 134,860.62 |
Jul 15, 2016 | IDA-51080 | Int Charges | 223,675.55 |
Jul 15, 2016 | IDA-51080 | Int Charges | 118.18 |
Jul 15, 2016 | IDA-51080 | Int Charges | 118.18 |
Jul 15, 2016 | IBRD-77410 | Int Charges | 719,534.00 |
Jul 15, 2016 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jul 15, 2015 | IBRD-77410 | Int Charges | 0.01 |
Jul 15, 2015 | IBRD-77410 | Int Charges | -0.01 |
Jul 15, 2015 | IBRD-77410 | Int Charges | 354,907.80 |
Jul 9, 2015 | IDA-51080 | Loan Disb | 1,186,658.80 |
Jul 15, 2015 | IDA-51080 | Int Charges | 168,696.60 |
Jul 15, 2015 | IBRD-77410 | Loan Repay | 2,585,092.20 |
Jul 15, 2015 | IBRD-77410 | Loan Repay | 354,907.80 |
Jul 15, 2015 | IDA-51080 | Int Charges | 5,480.53 |
Jul 15, 2015 | IDA-51080 | Int Charges | 5,480.53 |
Jul 15, 2015 | IDA-51080 | Int Charges | 95,737.42 |
Jul 15, 2015 | IDA-51080 | Int Charges | 95,737.42 |
Jan 15, 2017 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Nov 1, 2016 | IDA-51080 | Loan Disb | 36,000.00 |
Jul 15, 2023 | IBRD-77410 | Loan Repay | 2,600,064.80 |
Jul 15, 2019 | IBRD-77410 | Int Charges | 1,915,112.80 |
Jul 15, 2019 | IDA-51080 | Int Charges | 13,495.39 |
Jul 15, 2019 | IDA-51080 | Loan Repay | 284,512.44 |
Jul 15, 2019 | IDA-51080 | Loan Repay | 799,134.70 |
Jul 15, 2019 | IDA-51080 | Int Charges | 106,887.00 |
Jul 15, 2019 | IDA-51080 | Int Charges | 106,887.00 |
Jul 15, 2019 | IDA-51080 | Int Charges | 175,739.47 |
Jan 15, 2022 | IDA-51080 | Int Charges | 94,213.94 |
Jan 15, 2022 | IDA-51080 | Int Charges | 94,213.94 |
Jan 15, 2022 | IDA-51080 | Int Charges | 155,331.20 |
Jan 15, 2022 | IDA-51080 | Loan Repay | 300,178.38 |
Jul 15, 2022 | IBRD-77410 | Loan Repay | 2,557,751.50 |
Jul 15, 2022 | IDA-51080 | Int Charges | 1,573.61 |
Jul 15, 2022 | IDA-51080 | Loan Repay | 232,292.25 |
Jul 15, 2022 | IDA-51080 | Loan Repay | 792,326.06 |
Jul 15, 2022 | IBRD-77410 | Int Charges | 382,248.40 |
Jul 15, 2022 | IBRD-77410 | Loan Repay | 382,248.40 |
Jul 15, 2022 | IDA-51080 | Int Charges | 85,695.36 |
Jul 15, 2022 | IDA-51080 | Int Charges | 85,695.36 |
Jul 15, 2022 | IDA-51080 | Int Charges | 142,825.58 |
Jan 15, 2022 | IBRD-77410 | Int Charges | 259,660.80 |
Jan 15, 2022 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jan 15, 2022 | IDA-51080 | Loan Repay | 242,488.27 |
Jan 15, 2022 | IDA-51080 | Loan Repay | 8,219.00 |
Jan 15, 2021 | IBRD-77410 | Loan Repay | 365,448.53 |
Jan 15, 2021 | IBRD-77410 | Int Charges | 365,448.53 |
Jan 15, 2021 | IBRD-77410 | Loan Repay | 2,574,551.50 |
Jan 15, 2021 | IDA-51080 | Int Charges | 0.01 |
Jan 15, 2021 | IDA-51080 | Int Charges | 100,615.86 |
Jan 15, 2021 | IDA-51080 | Int Charges | 100,615.86 |
Jan 15, 2021 | IDA-51080 | Int Charges | 155,537.98 |
Jan 15, 2021 | IDA-51080 | Int Charges | 18,826.63 |
Jan 15, 2021 | IDA-51080 | Loan Repay | 264,206.44 |
Jan 15, 2021 | IDA-51080 | Loan Repay | 299,395.88 |
Jul 15, 2024 | IDA-51080 | Loan Repay | 849,149.44 |
Jul 15, 2024 | IDA-51080 | Int Charges | 9,077.83 |
Jul 15, 2024 | IDA-51080 | Loan Repay | 189,515.94 |
Jan 15, 2015 | IDA-51080 | Int Charges | 345.29 |
Jul 15, 2013 | IBRD-77410 | Int Charges | 412,901.70 |
Jul 15, 2017 | IDA-51080 | Loan Repay | 15,212.15 |
Jul 15, 2017 | IDA-51080 | Int Charges | 124,337.13 |
Jul 15, 2017 | IDA-51080 | Int Charges | 124,337.13 |
Jul 15, 2017 | IDA-51080 | Int Charges | 184,050.66 |
Jul 15, 2017 | IDA-51080 | Loan Repay | 1,252,646.10 |
Jul 15, 2017 | IDA-51080 | Int Charges | -5,508.33 |
Jul 15, 2017 | IDA-51080 | Int Charges | 5,508.33 |
Jan 15, 2018 | IDA-51080 | Int Charges | 123,223.78 |
Jan 15, 2018 | IBRD-77410 | Int Charges | 1,130,606.40 |
Jan 15, 2018 | IBRD-77410 | Loan Repay | 1,809,393.60 |
Jan 15, 2018 | IBRD-77410 | Loan Repay | 1,130,606.40 |
Jan 15, 2018 | IDA-51080 | Int Charges | 23,886.00 |
Jan 15, 2018 | IDA-51080 | Loan Repay | 323,674.56 |
Jan 15, 2018 | IDA-51080 | Int Charges | 184,791.69 |
Jan 15, 2018 | IDA-51080 | Loan Repay | 797,699.94 |
Jan 15, 2018 | IDA-51080 | Int Charges | 123,223.78 |
Oct 24, 2016 | IDA-51080 | Loan Disb | 171,501.60 |
May 17, 2016 | IDA-51080 | Loan Disb | 1,765,278.00 |
Jan 15, 2023 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jul 15, 2023 | IDA-51080 | Int Charges | 80,703.82 |
Jul 15, 2023 | IDA-51080 | Int Charges | 80,703.82 |
Jul 15, 2023 | IDA-51080 | Int Charges | 123,079.56 |
Jul 15, 2023 | IDA-51080 | Loan Repay | 213,056.77 |
Jul 15, 2023 | IDA-51080 | Int Charges | 30,933.73 |
Jul 15, 2023 | IDA-51080 | Loan Repay | 846,933.44 |
Jul 15, 2023 | IBRD-77410 | Int Charges | 131,416.73 |
Jul 15, 2023 | IBRD-77410 | Int Charges | 2,468,648.00 |
Jul 15, 2023 | IBRD-77410 | Loan Repay | 339,935.25 |
Jan 15, 2024 | IDA-51080 | Int Charges | 75,683.14 |
Jan 15, 2024 | IDA-51080 | Int Charges | 75,683.14 |
Jan 15, 2023 | IBRD-77410 | Int Charges | 116,780.38 |
Jan 15, 2023 | IBRD-77410 | Int Charges | 0.01 |
Jan 15, 2023 | IBRD-77410 | Int Charges | 1,860,543.90 |
Jan 15, 2023 | IDA-51080 | Int Charges | 84,297.42 |
Jan 15, 2023 | IDA-51080 | Int Charges | 84,297.42 |
Jan 15, 2023 | IDA-51080 | Int Charges | 109,701.27 |
Jan 15, 2023 | IDA-51080 | Loan Repay | 20,565.13 |
Jan 15, 2023 | IDA-51080 | Loan Repay | 198,819.94 |
Jan 15, 2023 | IDA-51080 | Loan Repay | 835,831.50 |
Oct 24, 2016 | IDA-51080 | Loan Disb | -4,760,843.00 |
Nov 1, 2016 | IDA-51080 | Loan Disb | -36,000.00 |
Jan 15, 2017 | IBRD-77410 | Int Charges | 822,559.75 |
Jan 15, 2017 | IDA-51080 | Int Charges | 216,902.45 |
Jan 15, 2017 | IDA-51080 | Int Charges | 1,249.70 |
Jan 15, 2017 | IDA-51080 | Int Charges | 130,141.48 |
Jan 15, 2017 | IDA-51080 | Int Charges | 130,141.48 |
Nov 1, 2016 | IDA-51080 | Loan Cancel | 5,310,228.50 |
Jan 15, 2016 | IDA-51080 | Int Charges | 192,808.39 |
Jan 15, 2016 | IBRD-77410 | Int Charges | 439,980.80 |
Jan 15, 2016 | IBRD-77410 | Loan Repay | 2,500,019.20 |
Jan 15, 2016 | IBRD-77410 | Loan Repay | 439,980.80 |
Jul 15, 2021 | IDA-51080 | Int Charges | 97,420.42 |
Jul 15, 2021 | IDA-51080 | Int Charges | 97,420.42 |
Jul 15, 2021 | IDA-51080 | Int Charges | 162,367.42 |
Jul 15, 2021 | IDA-51080 | Int Charges | 12,021.57 |
Jul 15, 2021 | IBRD-77410 | Int Charges | 311,745.34 |
Jul 15, 2020 | IDA-51080 | Int Charges | 6,871.16 |
Jul 15, 2020 | IDA-51080 | Loan Repay | 525,033.40 |
Jul 15, 2020 | IDA-51080 | Loan Repay | 18,996.98 |
Jul 15, 2020 | IDA-51080 | Int Charges | 99,161.93 |
Jul 15, 2020 | IDA-51080 | Int Charges | 99,161.93 |
Jul 15, 2020 | IDA-51080 | Int Charges | 147,097.00 |
Jul 15, 2020 | IBRD-77410 | Loan Repay | 1,246,290.50 |
Jul 15, 2020 | IBRD-77410 | Int Charges | 1,246,290.50 |
Jul 15, 2020 | IBRD-77410 | Loan Repay | 1,693,709.50 |
Jul 15, 2019 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jul 15, 2013 | IDA-51080 | Int Charges | 52,295.09 |
Jul 15, 2013 | IDA-51080 | Int Charges | 52,295.09 |
Jul 15, 2013 | IDA-51080 | Int Charges | 86,009.99 |
Jan 15, 2016 | IDA-51080 | Int Charges | 3,144.96 |
Jan 15, 2016 | IDA-51080 | Int Charges | 3,144.96 |
Jan 15, 2016 | IDA-51080 | Int Charges | 112,540.09 |
Jan 15, 2016 | IDA-51080 | Int Charges | 112,540.09 |
Oct 28, 2015 | IDA-51080 | Loan Disb | 5,170,407.00 |
Mar 16, 2016 | IDA-51080 | Loan Disb | 2,118,659.20 |
Jan 15, 2020 | IDA-51080 | Int Charges | 164,139.20 |
Jan 15, 2020 | IDA-51080 | Int Charges | 2,399.84 |
Jan 15, 2020 | IDA-51080 | Loan Repay | 272,157.80 |
Jan 15, 2020 | IDA-51080 | Loan Repay | 808,922.50 |
Jan 15, 2020 | IDA-51080 | Int Charges | 102,579.79 |
Jan 15, 2020 | IDA-51080 | Int Charges | 102,579.79 |
Jan 15, 2020 | IBRD-77410 | Int Charges | 1,502,666.60 |
Jan 15, 2020 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Jul 15, 2018 | IDA-51080 | Int Charges | 194,078.55 |
Jul 15, 2018 | IBRD-77410 | Loan Repay | 2,940,000.00 |
Feb 18, 2015 | IDA-51080 | Loan Disb | 4,490,050.00 |
Jan 15, 2015 | IDA-51080 | Int Charges | 80,118.84 |
Jan 15, 2015 | IDA-51080 | Int Charges | 80,118.84 |
Jan 15, 2015 | IDA-51080 | Int Charges | 133,531.34 |
Jan 15, 2015 | IBRD-77410 | Loan Repay | 323,073.34 |
Jan 15, 2015 | IBRD-77410 | Int Charges | 323,073.34 |
Jan 15, 2015 | IBRD-77410 | Loan Repay | 2,616,926.80 |
Jul 15, 2014 | IDA-51080 | Int Charges | 10,837.40 |
Jul 15, 2014 | IDA-51080 | Int Charges | 75,545.72 |
Jul 15, 2014 | IDA-51080 | Int Charges | 75,545.72 |
Jul 15, 2014 | IDA-51080 | Int Charges | 125,535.79 |
Jul 15, 2014 | IBRD-77410 | Int Charges | 303,024.16 |
Mar 27, 2014 | IDA-51080 | Loan Disb | 3,007,412.00 |
Nov 27, 2013 | IDA-51080 | Loan Disb | 3,807,927.50 |
Jan 15, 2014 | IBRD-77410 | Int Charges | 353,126.66 |
Jan 15, 2014 | IDA-51080 | Int Charges | 57,836.56 |
Jan 15, 2014 | IDA-51080 | Int Charges | 57,836.56 |
Jan 15, 2014 | IDA-51080 | Int Charges | 85,632.00 |
Jan 15, 2014 | IDA-51080 | Int Charges | 1,175.66 |
Nov 3, 2014 | IDA-51080 | Loan Disb | 4,231,345.50 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2016-06-27 |
Project Management | Moderately Satisfactory | 2016-06-27 |
Financial Management | Satisfactory | 2016-06-27 |
Monitoring and Evaluation | Satisfactory | 2016-06-27 |
Overall Implementation Progress (IP) | Satisfactory | 2016-06-27 |
Procurement | Satisfactory | 2016-06-27 |
Counterpart Funding | Satisfactory | 2016-06-27 |
Overall Safeguards Rating | Moderately Satisfactory | 2016-06-27 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 01-03-2017 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | Modest |
Bank Performance | Moderately Satisfactory |
Borrower Performance | Moderately Satisfactory |
Government Performance | Moderately Satisfactory |
Implementing Agency | Moderately Satisfactory |
INDICATOR | ICR REVIEW: 06-21-2017 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | Modest | N/a |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | Moderately Satisfactory | N/a |
Government Performance | Moderately Satisfactory | N/a |
Implementing Agency | Moderately Satisfactory | N/a |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Vehicle operating cost from Sveneti to Agara Bypass (cars, USD/km) | Value | 0.20 | 0.18 | 0.18 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Vehicle operating cost from Sveneti to Agara Bypass (trucks, US$/km) | Value | 0.76 | 0.72 | 0.72 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Direct project beneficiaries | Value | 17240.00 | 17240.00 | 17240.00 |
Date | May 3, 2012 | January 12, 2016 | June 30, 2016 | |
Comment |
Size of the total classified network | Value | 1644.00 | 1644.00 | 1644.00 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Female beneficiaries | Value | 51.00 | 51.00 | 51.00 |
Date | May 3, 2012 | January 12, 2016 | June 30, 2016 | |
Comment |
Transit time from Sveneti to the Agara Bypass | Value | 27.00 | 21.00 | 20.00 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Transit time from Sveneti to Ruisi (minutes) | Value | 12.00 | 8.10 | 9.00 |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Vehicle operating cost from Sveneti to Ruisi (cars in US$/km) | Value | 0.20 | 0.17 | 0.18 |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Vehicle operating cost from Sveneti to Ruisi (trucks in US$/km) | Value | 0.76 | 0.71 | 0.72 |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Percentage reduction in road fatality rate per 10,000 vehicles on E60 corridor from Senaki to Tbilisi. | Value | 0.00 | 43.00 | 30.00 |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Improvement in road capacity from Ruisi to Agara Bypass in passenger car space equivalent | Value | 2800.00 | 8000.00 | 8000.00 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Roads in good and fair condition as a share of total classified roads | Value | 85.00 | 91.30 | 85.00 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of E60 Corridor Senaki to Tbilisi with road safety engineering improvements (defined under TEWHIP) completed | Value | 0.00 | 100.00 | 100.00 |
Date | May 3, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Annual road safety actions undertaken as specified by the Georgian National Traffic Safety Strategy | Value | No | Yes | Yes |
Date | May 3, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Completion of framework for E60 performance based road maintenance | Value | No | Yes | Yes |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Purchase/Development of the Road Crash Database | Value | No | Yes | Yes |
Date | September 18, 2013 | June 7, 2016 | June 30, 2016 | |
Comment |
Number of km upgraded Sveneti-Agara Bypass | Value | 0.00 | 34.00 | 34.00 |
Date | May 3, 2012 | June 7, 2016 | June 30, 2016 | |
Comment |
Number of kilometers of road upgraded Sveneti-Ruisi | Value | 0.00 | 15.00 | 15.00 |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Endorsement by RD of Georgian road safety audit manuals for new and existing roads | Value | No | Yes | Yes |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
Percentage of E60 corridor Senaki to Tbilisi subject to road safety audits | Value | 0.00 | 100.00 | 100.00 |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |
All new IBRD financed road sections subject to formal road safety audit using Georgian manuals | Value | No | Yes | Yes |
Date | August 9, 2009 | June 7, 2016 | June 30, 2016 | |
Comment |