The objective of the Integrated Solid Waste Management Project for Belarus is to: (i) increase environmental benefits of integrated solid waste management in the City of Grodno through recovery and reuse of recyclable materials; and (ii) strengthen national capacity to manage hazardous wastes associated with Persistent Organic Pollutants (POPs). There are four components to the project. Component one: construction of a mechanical waste separation...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

(i) Improve environmental benefits of integrated solid waste management in Grodno through recovery and reuse of recycable materials in line with good international standards; (ii) Strengthen national capacity to manage hazardous wastes associated with POPs.

Key Details

Project Details

  • P114515

  • Closed

  • Kremena Ionkova

  • Ministry of Housing and Utilities

  • Belarus

  • April 14, 2009

  • (as of board presentation)

    June 17, 2010

  • October 6, 2010

  • US$ 69.94 million

  • Ministry of Housing and Utilities

  • Europe and Central Asia

  • 2010

  • US$ 42.51 million

  • A

  • October 12, 2023

  • June 30, 2017

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 42.51
Borrower/Recipient 27.43

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 42.51
IDA Commitment N/A
IBRD + IDA Commitment 42.51
Lending Instrument
Grant Amount N/A
Total Project Cost** 69.94

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Apr 15, 2016 IBRD-79320 Loan Disb 5,858,167.00
Mar 17, 2016 IBRD-79320 Loan Disb 866,537.00
Jul 21, 2016 IBRD-79320 Loan Disb 669,927.00
May 4, 2016 IBRD-79320 Loan Disb 515,416.44
Apr 28, 2016 IBRD-79320 Loan Disb 478,863.60
Apr 14, 2016 IBRD-79320 Loan Disb 900,000.00
Apr 15, 2016 IBRD-79320 Int Charges 17,917.47
Apr 15, 2016 IBRD-79320 Int Charges 18,858.80
Apr 15, 2016 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2016 IBRD-79320 Int Charges 1,588.01
Apr 15, 2016 IBRD-79320 Int Charges 3,725.24
Apr 15, 2016 IBRD-79320 Int Charges 7,456.18
Oct 15, 2014 IBRD-79320 Loan Disb -4,051,433.80
Oct 15, 2014 IBRD-79320 Loan Disb 4,051,433.80
Oct 15, 2014 IBRD-79320 Int Charges 298.28
Oct 15, 2014 IBRD-79320 Int Charges 318.72
Oct 15, 2014 IBRD-79320 Int Charges 149.94
Oct 15, 2014 IBRD-79320 Int Charges 510.61
Oct 15, 2014 IBRD-79320 Int Charges 572.11
Oct 15, 2014 IBRD-79320 Int Charges 1,799.50
Oct 15, 2014 IBRD-79320 Int Charges 1,150.95
Sep 30, 2014 IBRD-79320 Loan Disb 3,951,433.80
Oct 15, 2013 IBRD-79320 Int Charges 378.13
Oct 15, 2013 IBRD-79320 Int Charges 177.93
Oct 15, 2013 IBRD-79320 Int Charges 605.81
Oct 15, 2013 IBRD-79320 Int Charges 678.75
Oct 15, 2013 IBRD-79320 Int Charges 2,134.99
Oct 15, 2013 IBRD-79320 Int Charges 1,008.40
Oct 15, 2013 IBRD-79320 Loan Disb -383,750.00
Oct 15, 2013 IBRD-79320 Loan Disb 383,750.00
Apr 15, 2014 IBRD-79320 Int Charges 338.44
Apr 15, 2014 IBRD-79320 Int Charges 159.27
Apr 15, 2018 IBRD-79320 Int Charges 8,494.75
Apr 15, 2018 IBRD-79320 Int Charges 32,264.92
Apr 15, 2018 IBRD-79320 Int Charges 42,901.09
Apr 15, 2018 IBRD-79320 Int Charges 58,936.41
Apr 15, 2018 IBRD-79320 Int Charges 88,190.81
Apr 15, 2018 IBRD-79320 Loan Disb -480.00
Apr 15, 2018 IBRD-79320 Loan Disb 480.00
Oct 15, 2021 IBRD-79320 Loan Repay 213,214.36
Oct 15, 2021 IBRD-79320 Loan Repay 292,908.34
Oct 15, 2021 IBRD-79320 Int Charges 389.43
Oct 15, 2021 IBRD-79320 Int Charges 472.70
Oct 15, 2021 IBRD-79320 Int Charges 1,601.25
Apr 15, 2019 IBRD-79320 Loan Repay 8,512.50
Apr 15, 2019 IBRD-79320 Loan Repay 9,537.50
Apr 15, 2019 IBRD-79320 Loan Repay 30,000.00
Apr 15, 2019 IBRD-79320 Loan Repay 19,187.50
Oct 15, 2019 IBRD-79320 Int Charges 2,167.08
Oct 15, 2019 IBRD-79320 Int Charges 2,579.76
Oct 15, 2019 IBRD-79320 Int Charges 5,800.49
Oct 15, 2019 IBRD-79320 Int Charges 8,591.85
Oct 15, 2019 IBRD-79320 Int Charges 54,255.71
Oct 15, 2019 IBRD-79320 Int Charges 93,208.32
Oct 15, 2019 IBRD-79320 Int Charges 139,474.33
Oct 15, 2019 IBRD-79320 Int Charges 188,970.23
Oct 15, 2019 IBRD-79320 Int Charges 72,524.61
Oct 15, 2019 IBRD-79320 Int Charges 7.62
Apr 15, 2021 IBRD-79320 Int Charges 1,164.04
Apr 15, 2021 IBRD-79320 Int Charges 13,825.52
Apr 15, 2021 IBRD-79320 Int Charges 16,168.76
Apr 15, 2021 IBRD-79320 Int Charges 201.46
Apr 15, 2021 IBRD-79320 Int Charges 104.27
Apr 15, 2021 IBRD-79320 Int Charges 419.60
Apr 15, 2021 IBRD-79320 Int Charges 506.25
Apr 15, 2021 IBRD-79320 Int Charges 33,237.73
Apr 15, 2021 IBRD-79320 Int Charges 45,032.96
Apr 15, 2021 IBRD-79320 Int Charges 17,283.13
Apr 15, 2021 IBRD-79320 Int Charges 1.82
Apr 15, 2021 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2021 IBRD-79320 Loan Repay 2,500.00
Apr 15, 2021 IBRD-79320 Loan Repay 8,512.50
Apr 15, 2021 IBRD-79320 Loan Repay 9,537.50
Apr 15, 2021 IBRD-79320 Loan Repay 30,000.00
Apr 15, 2021 IBRD-79320 Loan Repay 19,187.50
Apr 15, 2021 IBRD-79320 Loan Repay 202,571.69
Apr 15, 2021 IBRD-79320 Loan Repay 61,350.34
Apr 15, 2021 IBRD-79320 Loan Repay 151,864.02
Apr 15, 2021 IBRD-79320 Int Charges 22,212.21
Oct 15, 2021 IBRD-79320 Int Charges 182.32
Oct 15, 2021 IBRD-79320 Int Charges 95.32
Oct 15, 2021 IBRD-79320 Int Charges 1,097.29
Oct 15, 2021 IBRD-79320 Int Charges 13,129.18
Oct 15, 2021 IBRD-79320 Int Charges 15,444.71
Oct 15, 2021 IBRD-79320 Int Charges 22,334.25
Oct 15, 2021 IBRD-79320 Int Charges 45,280.40
Oct 15, 2021 IBRD-79320 Int Charges 33,420.36
Oct 15, 2021 IBRD-79320 Int Charges 17,378.10
Oct 15, 2021 IBRD-79320 Int Charges 1.83
Oct 15, 2021 IBRD-79320 Loan Repay 5,313.25
Oct 15, 2021 IBRD-79320 Loan Repay 2,500.00
Oct 15, 2021 IBRD-79320 Loan Repay 8,512.50
Oct 15, 2021 IBRD-79320 Loan Repay 9,537.50
Oct 15, 2021 IBRD-79320 Loan Repay 19,187.50
Oct 15, 2021 IBRD-79320 Loan Repay 30,000.00
Oct 15, 2021 IBRD-79320 Loan Repay 202,571.69
Apr 15, 2018 IBRD-79320 Loan Repay 8,512.50
Apr 15, 2018 IBRD-79320 Loan Repay 9,537.50
Apr 15, 2018 IBRD-79320 Int Charges 427.58
Apr 15, 2018 IBRD-79320 Int Charges 1,627.19
Apr 15, 2018 IBRD-79320 Int Charges 1,919.05
Apr 15, 2018 IBRD-79320 Int Charges 6,036.33
Apr 15, 2018 IBRD-79320 Int Charges 3,860.75
Oct 15, 2019 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2020 IBRD-79320 Int Charges 1,916.01
Apr 15, 2020 IBRD-79320 Int Charges 6,403.47
Apr 15, 2020 IBRD-79320 Int Charges 50,869.12
Apr 15, 2020 IBRD-79320 Int Charges 53,541.66
Apr 15, 2020 IBRD-79320 Int Charges 73,554.17
Apr 15, 2020 IBRD-79320 Int Charges 110,064.41
Apr 15, 2020 IBRD-79320 Int Charges 149,123.45
Apr 15, 2020 IBRD-79320 Int Charges 57,231.90
Apr 15, 2020 IBRD-79320 Int Charges 408.09
Apr 15, 2020 IBRD-79320 Int Charges 1,603.20
Apr 15, 2020 IBRD-79320 Int Charges 4,336.46
Apr 15, 2020 IBRD-79320 Int Charges 800.54
Apr 15, 2020 IBRD-79320 Int Charges 6.02
Apr 15, 2020 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2020 IBRD-79320 Loan Repay 2,500.00
Apr 15, 2020 IBRD-79320 Loan Repay 8,512.50
Apr 15, 2020 IBRD-79320 Loan Repay 9,537.50
Apr 15, 2020 IBRD-79320 Loan Repay 30,000.00
Apr 15, 2020 IBRD-79320 Loan Repay 19,187.50
Apr 15, 2020 IBRD-79320 Loan Repay 202,571.69
Oct 15, 2020 IBRD-79320 Loan Repay 19,187.50
Oct 15, 2020 IBRD-79320 Loan Repay 202,571.69
Oct 15, 2020 IBRD-79320 Int Charges 510.99
Oct 15, 2020 IBRD-79320 Int Charges 262.30
Oct 15, 2020 IBRD-79320 Int Charges 1,041.98
Oct 15, 2020 IBRD-79320 Int Charges 1,250.84
Oct 15, 2020 IBRD-79320 Int Charges 4,196.80
Oct 15, 2020 IBRD-79320 Int Charges 2,851.97
Oct 15, 2020 IBRD-79320 Int Charges 33,651.87
Oct 15, 2020 IBRD-79320 Int Charges 37,284.06
Oct 15, 2020 IBRD-79320 Int Charges 51,219.91
Oct 15, 2020 IBRD-79320 Int Charges 76,644.06
Oct 15, 2020 IBRD-79320 Int Charges 39,853.78
Oct 15, 2020 IBRD-79320 Int Charges 4.20
Oct 15, 2020 IBRD-79320 Loan Repay 8,512.50
Apr 15, 2018 IBRD-79320 Int Charges 19.50
Apr 15, 2018 IBRD-79320 Int Charges 205.96
Apr 15, 2018 IBRD-79320 Int Charges 216.77
Apr 15, 2018 IBRD-79320 Int Charges 297.80
Apr 15, 2018 IBRD-79320 Int Charges 445.60
Apr 15, 2018 IBRD-79320 Int Charges 603.73
Apr 15, 2018 IBRD-79320 Int Charges 4.58
Apr 15, 2018 IBRD-79320 Int Charges 855.28
Oct 15, 2018 IBRD-79320 Int Charges 60,754.61
Oct 15, 2018 IBRD-79320 Int Charges 63,946.52
Oct 15, 2018 IBRD-79320 Int Charges 87,848.10
Oct 15, 2018 IBRD-79320 Int Charges 131,453.44
Oct 15, 2018 IBRD-79320 Int Charges 178,102.92
Oct 15, 2018 IBRD-79320 Loan Repay 5,313.25
Oct 15, 2018 IBRD-79320 Loan Repay 2,500.00
Oct 15, 2018 IBRD-79320 Loan Repay 8,512.50
Oct 15, 2018 IBRD-79320 Int Charges 1,195.15
Oct 15, 2018 IBRD-79320 Int Charges 599.82
Oct 15, 2018 IBRD-79320 Int Charges 2,297.73
Oct 15, 2018 IBRD-79320 Int Charges 2,717.43
Oct 15, 2018 IBRD-79320 Int Charges 8,997.50
Oct 15, 2018 IBRD-79320 Int Charges 5,754.67
Oct 15, 2018 IBRD-79320 Loan Repay 9,537.50
Oct 15, 2018 IBRD-79320 Loan Repay 30,000.00
Oct 15, 2018 IBRD-79320 Int Charges 68,353.86
Oct 15, 2018 IBRD-79320 Int Charges 7.20
Apr 15, 2019 IBRD-79320 Int Charges 1,177.06
Apr 15, 2019 IBRD-79320 Int Charges 593.40
Jun 17, 2010 IBRD-79320 Loan Commitment 42,506,000.00
Oct 15, 2020 IBRD-79320 Loan Repay 9,537.50
Oct 15, 2020 IBRD-79320 Loan Repay 30,000.00
Oct 15, 2020 IBRD-79320 Int Charges 103,843.05
Oct 15, 2020 IBRD-79320 Loan Repay 5,313.25
Oct 15, 2020 IBRD-79320 Loan Repay 2,500.00
Apr 15, 2021 IBRD-79320 Int Charges 1,706.27
Apr 15, 2014 IBRD-79320 Int Charges 542.24
Apr 15, 2014 IBRD-79320 Int Charges 607.52
Apr 15, 2014 IBRD-79320 Int Charges 1,911.00
Apr 15, 2014 IBRD-79320 Int Charges 1,222.23
Apr 15, 2017 IBRD-79320 Int Charges 34,205.37
Apr 15, 2017 IBRD-79320 Int Charges 36,002.43
Apr 15, 2017 IBRD-79320 Int Charges 49,459.20
Apr 15, 2017 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2017 IBRD-79320 Int Charges 5,595.51
Apr 16, 2014 IBRD-79320 Loan Disb 100,000.00
Aug 6, 2015 IBRD-79320 Loan Disb 1,088,000.00
Apr 15, 2015 IBRD-79320 Int Charges 971.40
Apr 15, 2015 IBRD-79320 Int Charges 333.06
Apr 15, 2015 IBRD-79320 Int Charges 156.72
Apr 15, 2015 IBRD-79320 Int Charges 533.63
Apr 15, 2015 IBRD-79320 Int Charges 597.89
Apr 15, 2015 IBRD-79320 Int Charges 1,880.67
Apr 15, 2015 IBRD-79320 Int Charges 1,202.85
Apr 15, 2015 IBRD-79320 Int Charges 12,699.02
Oct 15, 2015 IBRD-79320 Int Charges 1,443.53
Oct 15, 2015 IBRD-79320 Int Charges 15,240.12
Sep 18, 2015 IBRD-79320 Loan Disb 1,475,125.00
Oct 15, 2015 IBRD-79320 Int Charges 1,565.51
Oct 15, 2015 IBRD-79320 Int Charges 399.72
Oct 15, 2015 IBRD-79320 Int Charges 188.07
Oct 15, 2015 IBRD-79320 Int Charges 640.42
Oct 15, 2015 IBRD-79320 Int Charges 717.54
Oct 15, 2015 IBRD-79320 Int Charges 2,257.00
Oct 15, 2015 IBRD-79320 Loan Disb -4,264,287.00
Oct 15, 2015 IBRD-79320 Loan Disb 4,264,287.00
Nov 2, 2015 IBRD-79320 Loan Disb 1,193,286.00
Nov 30, 2015 IBRD-79320 Loan Disb 1,124,251.00
Sep 23, 2015 IBRD-79320 Loan Disb 1,701,162.10
Jan 22, 2016 IBRD-79320 Loan Disb 1,330,534.00
Apr 22, 2016 IBRD-79320 Loan Disb 1,220,205.00
Apr 15, 2016 IBRD-79320 Loan Disb -5,858,167.00
Sep 20, 2016 IBRD-79320 Loan Disb 700,000.00
Aug 25, 2016 IBRD-79320 Loan Disb 374,470.38
Oct 28, 2016 IBRD-79320 Loan Disb 700,000.00
Jun 1, 2016 IBRD-79320 Loan Disb 724,382.00
Aug 29, 2016 IBRD-79320 Loan Disb 700,000.00
Oct 31, 2016 IBRD-79320 Loan Disb 386,793.60
Jan 24, 2017 IBRD-79320 Loan Disb 900,000.00
May 26, 2017 IBRD-79320 Loan Disb 750,000.00
Jul 13, 2017 IBRD-79320 Loan Disb 700,000.00
Apr 15, 2017 IBRD-79320 Loan Disb -11,876,828.00
Apr 15, 2017 IBRD-79320 Loan Disb 11,876,828.00
Jun 27, 2017 IBRD-79320 Loan Disb 960,000.00
Jun 27, 2017 IBRD-79320 Loan Disb 719,638.10
May 22, 2017 IBRD-79320 Loan Disb 700,000.00
Apr 6, 2017 IBRD-79320 Loan Disb 500,000.00
Apr 6, 2017 IBRD-79320 Loan Disb 2,544,474.00
Apr 15, 2017 IBRD-79320 Int Charges 1,610.46
Apr 15, 2017 IBRD-79320 Int Charges 5,065.67
Apr 15, 2017 IBRD-79320 Int Charges 3,239.89
Apr 15, 2019 IBRD-79320 Int Charges 2,289.92
Apr 15, 2019 IBRD-79320 Int Charges 10,927.70
Apr 15, 2019 IBRD-79320 Int Charges 67,477.62
Apr 15, 2019 IBRD-79320 Int Charges 92,698.99
Apr 15, 2019 IBRD-79320 Int Charges 138,712.19
Apr 15, 2019 IBRD-79320 Int Charges 187,937.61
Apr 15, 2019 IBRD-79320 Int Charges 72,128.30
Apr 15, 2019 IBRD-79320 Int Charges 6,072.41
Apr 15, 2019 IBRD-79320 Int Charges 53,181.75
Apr 15, 2019 IBRD-79320 Int Charges 2,716.58
Apr 15, 2019 IBRD-79320 Int Charges 9,019.63
Oct 15, 2019 IBRD-79320 Loan Repay 2,500.00
Oct 15, 2019 IBRD-79320 Loan Repay 8,512.50
Oct 15, 2019 IBRD-79320 Loan Repay 9,537.50
Oct 15, 2019 IBRD-79320 Loan Repay 30,000.00
Oct 15, 2019 IBRD-79320 Loan Repay 19,187.50
Oct 15, 2019 IBRD-79320 Int Charges 10,205.98
Oct 15, 2019 IBRD-79320 Int Charges 67,848.37
Oct 15, 2019 IBRD-79320 Int Charges 1,099.00
Oct 31, 2017 IBRD-79320 Loan Cancel 1,629,601.10
Apr 15, 2018 IBRD-79320 Int Charges 792.61
Apr 15, 2018 IBRD-79320 Int Charges 4.60
Apr 15, 2018 IBRD-79320 Int Charges 2.30
Apr 15, 2018 IBRD-79320 Int Charges 8.67
Apr 15, 2018 IBRD-79320 Int Charges 9.70
Apr 15, 2018 IBRD-79320 Int Charges 30.50
Apr 15, 2016 IBRD-79320 Int Charges 469.95
Apr 15, 2016 IBRD-79320 Int Charges 221.14
Apr 15, 2016 IBRD-79320 Int Charges 752.94
Apr 15, 2016 IBRD-79320 Int Charges 843.59
Apr 15, 2016 IBRD-79320 Int Charges 2,653.50
Apr 15, 2016 IBRD-79320 Int Charges 1,697.14
Feb 25, 2016 IBRD-79320 Loan Disb 443,559.00
Jul 6, 2016 IBRD-79320 Loan Disb 592,023.00
Oct 15, 2016 IBRD-79320 Int Charges 1,099.10
Oct 15, 2016 IBRD-79320 Int Charges 1,231.47
Oct 15, 2016 IBRD-79320 Int Charges 3,873.50
Oct 15, 2016 IBRD-79320 Int Charges 2,477.43
Oct 15, 2016 IBRD-79320 Int Charges 1,165.03
Oct 15, 2016 IBRD-79320 Int Charges 23,875.56
Oct 15, 2016 IBRD-79320 Int Charges 651.72
Oct 15, 2016 IBRD-79320 Int Charges 322.79
Oct 15, 2016 IBRD-79320 Loan Disb -8,765,998.00
Oct 15, 2016 IBRD-79320 Loan Disb 8,765,998.00
Dec 12, 2016 IBRD-79320 Loan Disb 1,003,809.00
Nov 23, 2016 IBRD-79320 Loan Disb 1,290,835.20
Oct 15, 2016 IBRD-79320 Int Charges 26,155.38
Oct 15, 2016 IBRD-79320 Int Charges 27,529.52
Oct 15, 2016 IBRD-79320 Int Charges 37,819.34
Oct 15, 2016 IBRD-79320 Loan Repay 5,313.25
Oct 15, 2016 IBRD-79320 Loan Repay 2,500.00
Nov 28, 2016 IBRD-79320 Loan Disb 900,000.00
Jul 29, 2016 IBRD-79320 Loan Disb 409,128.72
Sep 1, 2016 IBRD-79320 Loan Disb 956,076.00
Aug 31, 2016 IBRD-79320 Loan Disb 1,045,505.60
Jan 5, 2017 IBRD-79320 Loan Disb 1,439,276.20
Jun 10, 2016 IBRD-79320 Loan Disb 380,000.00
Oct 15, 2019 IBRD-79320 Int Charges 556.86
Apr 15, 2019 IBRD-79320 Int Charges 7.57
Apr 15, 2019 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2019 IBRD-79320 Loan Repay 2,500.00
Apr 15, 2017 IBRD-79320 Int Charges 38,623.26
Apr 15, 2017 IBRD-79320 Int Charges 807.44
Apr 15, 2017 IBRD-79320 Int Charges 401.04
Apr 15, 2017 IBRD-79320 Int Charges 1,437.39
Apr 15, 2017 IBRD-79320 Int Charges 74,009.37
Apr 15, 2017 IBRD-79320 Loan Repay 2,500.00
Oct 15, 2017 IBRD-79320 Int Charges 6,606.04
Oct 15, 2017 IBRD-79320 Int Charges 24,923.69
Oct 15, 2017 IBRD-79320 Int Charges 849.42
Oct 15, 2017 IBRD-79320 Int Charges 423.21
Oct 15, 2017 IBRD-79320 Int Charges 1,601.07
Aug 22, 2017 IBRD-79320 Loan Disb 480.00
Oct 15, 2017 IBRD-79320 Int Charges 1,793.84
Oct 15, 2017 IBRD-79320 Int Charges 5,642.50
Oct 15, 2017 IBRD-79320 Int Charges 3,608.86
Oct 15, 2017 IBRD-79320 Int Charges 38,100.36
Oct 15, 2017 IBRD-79320 Int Charges 40,102.08
Oct 15, 2017 IBRD-79320 Int Charges 55,091.20
Oct 15, 2017 IBRD-79320 Int Charges 82,436.91
Oct 15, 2017 IBRD-79320 Int Charges 111,691.68
Oct 15, 2017 IBRD-79320 Loan Repay 5,313.25
Oct 15, 2017 IBRD-79320 Loan Repay 2,500.00
Oct 15, 2017 IBRD-79320 Loan Repay 8,512.50
Feb 22, 2017 IBRD-79320 Loan Disb 2,211,639.50
Sep 7, 2017 IBRD-79320 Loan Disb 334,212.12
Aug 10, 2017 IBRD-79320 Loan Disb 390,020.22
Oct 13, 2017 IBRD-79320 Loan Disb 3,840.00
Oct 24, 2017 IBRD-79320 Loan Disb 480.00
Oct 15, 2017 IBRD-79320 Loan Disb 4,558,190.50
Oct 15, 2017 IBRD-79320 Loan Disb -4,558,190.50
Apr 15, 2018 IBRD-79320 Int Charges 119,487.46
Apr 15, 2018 IBRD-79320 Int Charges 45,857.94
Apr 15, 2018 IBRD-79320 Loan Repay 5,313.25
Apr 15, 2018 IBRD-79320 Loan Repay 2,500.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2017-06-30
Counterpart Funding Satisfactory 2017-06-30
Monitoring and Evaluation Satisfactory 2017-06-30
Project Management Satisfactory 2017-06-30
Procurement Satisfactory 2017-06-30
Financial Management Satisfactory 2017-06-30
Overall Implementation Progress (IP) Moderately Satisfactory 2017-06-30
Overall Safeguards Rating Satisfactory 2017-06-30

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-19-2018
OutcomesModerately Satisfactory
Risk to Development OutcomeNegligible
Bank PerformanceModerately Satisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 10-15-2018PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Tons of waste that will not be buried in the landfill due to the new facilityValue0.0020000.0023632.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Industrial or municipal solid waste reduced or recycled under the projectValue0.0020000.0023632.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • POPs&pops waste destroyed,disposed or contained in environmentally sound mannerValue0.005751.008340.00
    DateNovember 16, 2009September 30, 2013April 30, 2018
    Comment
  • Environmentally sound disposal of priority POPs stockpilesValue0.001800.002926.00
    DateNovember 16, 2009September 30, 2013April 30, 2018
    Comment
  • Compliance with Stockholm ConventionValueCompliantCompliantCompliant
    DateNovember 16, 2009September 30, 2013April 30, 2018
    Comment
  • Valuable material sold by the new facility to users (tons)Value0.0010000.003585.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Reduced exposure of population to POPs WasteValue0.00100000.00127360.00
    DateNovember 16, 2009September 30, 2013April 30, 2018
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Percent of population aware of Grodno's solid waste separation programValue37.0080.0076.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Percent of population participating in Grodno's source separation programValue16.0080.0033.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Percent of waste recycled by weightValue5.0030.0030.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Operating Ratio of MWSTFValue0.001.001.14
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Mechanical waste separation facility operaitonalValueNoYesYes
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Amounts of POPs pesticides recovered, packaged in storage or destroyedValue0.0044867068
    DateNovember 16, 2009December 30, 2016April 30, 2018
    Comment
  • Amounts of Priority PCBs destroyedValue0.00816.00823.00
    DateNovember 17, 2009December 30, 2016April 30, 2018
    Comment
  • Plans and inventories established, laboratories upgradedValueNo long-term plan for PCB phase out. Baseline inveUpdated PCB inventoryFull implementation of curreLong-term PCB phase-out plan developed and approve
    DateNovember 16, 2009December 30, 2016April 30, 2018
    Comment
  • New and amended regulatory documentsValueGaps in national legislation for control of POPs. 5 educational events, publications, and web postinMNREP has developed: i) a regulation on maintenanc
    DateNovember 16, 2009December 30, 2016April 30, 2018
    Comment
  • % of recycling effort coverage of the city of GrodnoValue40.0080.00100.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment
  • Tons of separated waste collectedValue0.0014000.0014306.00
    DateNovember 16, 2009June 30, 2017April 30, 2018
    Comment