Financier | Commitments |
---|---|
IDA Credit | 56.60 |
P116273
Closed
Zaid Safdar , Doyle Gallegos
Ministry of Finance and Development Planning,Ministry of Finance and Economic Development of The Republic of Sierra Leone
Western and Central Africa
April 12, 2010
(as of board presentation)
January 20, 2011
April 29, 2011
US$ 56.60 million
Ministry of Information and Communications
2011
US$ 56.60 million
B
April 2, 2024
June 30, 2017
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 56.60 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 56.60 |
IBRD + IDA Commitment | 56.60 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 56.60 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jun 15, 2018 | IDA-48550 | Int Charges | 86,001.01 |
Aug 16, 2018 | IDA-48560 | Int Charges | 3,195.45 |
Aug 16, 2018 | IDA-48560 | Int Charges | 3,195.45 |
Aug 16, 2018 | IDA-48560 | Int Charges | 102,846.36 |
Aug 16, 2018 | IDA-48560 | Int Charges | 102,846.36 |
Feb 26, 2015 | IDA-48550 | Loan Disb | 222,430.22 |
Aug 15, 2015 | IDA-48560 | Int Charges | 3,167.66 |
Aug 15, 2015 | IDA-48560 | Int Charges | 3,167.66 |
Aug 15, 2015 | IDA-48560 | Int Charges | 93,874.84 |
Aug 15, 2015 | IDA-48560 | Int Charges | 93,874.84 |
Jun 15, 2015 | IDA-48550 | Int Charges | 1,739.71 |
Jun 15, 2015 | IDA-48550 | Int Charges | 1,739.71 |
Jun 15, 2015 | IDA-48550 | Int Charges | 75,534.45 |
Jun 15, 2015 | IDA-48550 | Int Charges | 75,534.45 |
Apr 13, 2015 | IDA-48550 | Loan Disb | 60,252.86 |
Jul 27, 2015 | IDA-48550 | Loan Disb | 100,483.28 |
Dec 15, 2015 | IDA-48550 | Loan Disb | 199,090.52 |
Dec 15, 2015 | IDA-48550 | Int Charges | 1,776.23 |
Dec 15, 2015 | IDA-48550 | Int Charges | 1,776.23 |
Dec 15, 2015 | IDA-48550 | Int Charges | 79,350.23 |
Dec 15, 2015 | IDA-48550 | Int Charges | 79,350.23 |
Nov 4, 2015 | IDA-48550 | Loan Disb | 138,365.19 |
Mar 25, 2016 | IDA-48550 | Loan Disb | 186,280.03 |
Mar 24, 2016 | IDA-48560 | Loan Disb | 51,105.60 |
Feb 17, 2016 | IDA-48560 | Loan Disb | 125,584.33 |
Feb 15, 2016 | IDA-48560 | Int Charges | 96,311.74 |
Feb 15, 2016 | IDA-48560 | Int Charges | 96,311.74 |
Jul 15, 2016 | IDA-48550 | Loan Disb | 121,456.79 |
Feb 15, 2016 | IDA-48560 | Int Charges | 52.54 |
Feb 15, 2016 | IDA-48560 | Int Charges | 52.54 |
Aug 30, 2016 | IDA-48560 | Loan Disb | 104,917.89 |
Jun 15, 2016 | IDA-48550 | Int Charges | 1,281.84 |
Jun 15, 2016 | IDA-48550 | Int Charges | 1,281.84 |
Jul 7, 2016 | IDA-48550 | Int Charges | 79,586.45 |
Jul 7, 2016 | IDA-48550 | Int Charges | 79,586.45 |
Dec 7, 2016 | IDA-48560 | Loan Disb | 109,343.21 |
Jan 23, 2017 | IDA-48560 | Loan Disb | 75,934.21 |
May 13, 2016 | IDA-48560 | Loan Disb | 105,000.00 |
Sep 29, 2016 | IDA-48550 | Loan Disb | 400,000.00 |
Feb 15, 2017 | IDA-48560 | Int Charges | 93,388.19 |
Feb 15, 2017 | IDA-48560 | Int Charges | 93,388.19 |
Jun 17, 2016 | IDA-48550 | Loan Disb | 301,282.12 |
Aug 15, 2016 | IDA-48560 | Int Charges | 822.90 |
Oct 2, 2014 | IDA-48550 | Loan Disb | 303,885.20 |
Dec 1, 2014 | IDA-48560 | Loan Disb | 72,253.75 |
Aug 15, 2013 | IDA-48560 | Int Charges | 18.86 |
Aug 15, 2013 | IDA-48560 | Int Charges | 18.86 |
Aug 15, 2013 | IDA-48560 | Int Charges | 491.06 |
Aug 15, 2013 | IDA-48560 | Int Charges | 491.06 |
Aug 15, 2013 | IDA-48560 | Int Charges | 101,048.99 |
Aug 15, 2013 | IDA-48560 | Int Charges | 101,048.99 |
Jul 11, 2013 | IDA-48560 | Loan Disb | 176,741.86 |
Jul 22, 2013 | IDA-48550 | Loan Disb | 171,202.23 |
Jan 7, 2014 | IDA-48550 | Loan Disb | 152,307.97 |
Oct 24, 2013 | IDA-48550 | Loan Disb | 221,694.36 |
Oct 9, 2013 | IDA-48560 | Loan Disb | 72,253.75 |
Dec 19, 2013 | IDA-48550 | Int Charges | 80,971.96 |
Dec 19, 2013 | IDA-48550 | Int Charges | 80,971.96 |
Dec 15, 2013 | IDA-48550 | Int Charges | 102.38 |
Dec 15, 2013 | IDA-48550 | Int Charges | 102.38 |
Feb 21, 2014 | IDA-48560 | Loan Disb | 168,311.62 |
Feb 15, 2014 | IDA-48560 | Int Charges | 292.35 |
Feb 15, 2014 | IDA-48560 | Int Charges | 292.35 |
Feb 15, 2014 | IDA-48560 | Int Charges | 104,252.96 |
Feb 15, 2014 | IDA-48560 | Int Charges | 104,252.96 |
Oct 10, 2013 | IDA-48560 | Loan Disb | 179,301.23 |
Mar 17, 2014 | IDA-48550 | Loan Disb | 181,987.12 |
Jan 10, 2014 | IDA-48560 | Loan Disb | 153,058.39 |
Jul 15, 2014 | IDA-48550 | Int Charges | 604.88 |
Jul 15, 2014 | IDA-48550 | Int Charges | 604.88 |
Jul 15, 2014 | IDA-48550 | Int Charges | 83,697.52 |
Jul 15, 2014 | IDA-48550 | Int Charges | 83,697.52 |
Dec 15, 2014 | IDA-48550 | Int Charges | 50.10 |
Dec 15, 2014 | IDA-48550 | Int Charges | 50.10 |
Dec 15, 2014 | IDA-48550 | Int Charges | 162.05 |
Dec 15, 2014 | IDA-48550 | Int Charges | 162.05 |
Jun 20, 2014 | IDA-48550 | Loan Disb | 277,618.30 |
Aug 15, 2014 | IDA-48560 | Int Charges | 531.41 |
Jan 13, 2022 | IDA-48550 | Int Charges | 235.39 |
Jan 13, 2022 | IDA-48550 | Int Charges | 235.39 |
Jan 13, 2022 | IDA-48550 | Loan Repay | 228,741.08 |
Dec 15, 2018 | IDA-48550 | Int Charges | 2,658.75 |
Dec 15, 2018 | IDA-48550 | Int Charges | 2,658.75 |
Dec 15, 2018 | IDA-48550 | Int Charges | 81,388.27 |
Dec 15, 2018 | IDA-48550 | Int Charges | 81,388.27 |
Feb 15, 2019 | IDA-48560 | Int Charges | 1,920.45 |
Feb 15, 2019 | IDA-48560 | Int Charges | 1,920.45 |
Feb 15, 2019 | IDA-48560 | Int Charges | 100,409.42 |
Feb 15, 2019 | IDA-48560 | Int Charges | 100,409.42 |
Jul 9, 2019 | IDA-48550 | Int Charges | 82,931.30 |
Jul 9, 2019 | IDA-48550 | Int Charges | 82,931.30 |
Jun 15, 2019 | IDA-48550 | Int Charges | 18.00 |
Jun 15, 2019 | IDA-48550 | Int Charges | 18.00 |
Jun 15, 2019 | IDA-48550 | Int Charges | 1,149.46 |
Jun 15, 2019 | IDA-48550 | Int Charges | 1,149.46 |
Aug 16, 2019 | IDA-48560 | Int Charges | 556.44 |
Aug 16, 2019 | IDA-48560 | Int Charges | 556.44 |
Aug 16, 2019 | IDA-48560 | Int Charges | 101,785.21 |
Aug 16, 2019 | IDA-48560 | Int Charges | 101,785.21 |
Jan 9, 2020 | IDA-48550 | Int Charges | 82,893.20 |
Jan 9, 2020 | IDA-48550 | Int Charges | 82,893.20 |
Dec 15, 2019 | IDA-48550 | Int Charges | 650.38 |
Dec 15, 2019 | IDA-48550 | Int Charges | 650.38 |
Feb 15, 2020 | IDA-48560 | Int Charges | 871.46 |
Feb 15, 2020 | IDA-48560 | Int Charges | 871.46 |
Feb 20, 2020 | IDA-48560 | Int Charges | 100,173.21 |
Feb 20, 2020 | IDA-48560 | Int Charges | 100,173.21 |
Jun 15, 2020 | IDA-48550 | Int Charges | 528.80 |
Jun 15, 2020 | IDA-48550 | Int Charges | 528.80 |
Jun 15, 2020 | IDA-48550 | Int Charges | 83,287.59 |
Jun 15, 2020 | IDA-48550 | Int Charges | 83,287.59 |
Aug 15, 2020 | IDA-48560 | Int Charges | 1,663.66 |
Aug 15, 2020 | IDA-48560 | Int Charges | 100,692.93 |
Aug 15, 2020 | IDA-48560 | Int Charges | 100,692.93 |
Aug 15, 2020 | IDA-48560 | Int Charges | 1,663.66 |
Dec 15, 2020 | IDA-48550 | Int Charges | 814.57 |
Dec 15, 2020 | IDA-48550 | Int Charges | 814.57 |
Dec 15, 2020 | IDA-48550 | Int Charges | 86,014.67 |
Aug 15, 2016 | IDA-48560 | Int Charges | 822.90 |
Aug 15, 2016 | IDA-48560 | Int Charges | 97,299.21 |
Aug 15, 2016 | IDA-48560 | Int Charges | 97,299.21 |
Aug 25, 2016 | IDA-48550 | Loan Disb | 56,332.37 |
Dec 15, 2016 | IDA-48550 | Int Charges | 709.51 |
Dec 15, 2016 | IDA-48550 | Int Charges | 709.51 |
Dec 15, 2016 | IDA-48550 | Int Charges | 79,840.96 |
Dec 15, 2016 | IDA-48550 | Int Charges | 79,840.96 |
Sep 15, 2016 | IDA-48550 | Loan Disb | 147,003.55 |
Feb 15, 2017 | IDA-48560 | Int Charges | 748.09 |
Feb 15, 2017 | IDA-48560 | Int Charges | 748.09 |
Mar 31, 2017 | IDA-48550 | Loan Cancel | 63,965.53 |
Mar 28, 2017 | IDA-48550 | Loan Disb | -630.15 |
Jun 14, 2017 | IDA-48560 | Loan Disb | 130,000.00 |
Mar 20, 2017 | IDA-48560 | Loan Disb | 58,961.20 |
Jun 16, 2017 | IDA-48550 | Int Charges | 80,555.66 |
Jun 16, 2017 | IDA-48550 | Int Charges | 80,555.66 |
Mar 28, 2017 | IDA-48550 | Loan Disb | -40,314.84 |
Jun 15, 2017 | IDA-48550 | Int Charges | 2,336.35 |
Jun 15, 2017 | IDA-48550 | Int Charges | 2,336.35 |
Apr 19, 2017 | IDA-48560 | Loan Disb | 876,172.50 |
Mar 28, 2017 | IDA-48560 | Loan Disb | 218,565.78 |
Aug 15, 2017 | IDA-48560 | Int Charges | 100,807.07 |
Aug 15, 2017 | IDA-48560 | Int Charges | 100,807.07 |
Aug 15, 2017 | IDA-48560 | Int Charges | 778.12 |
Aug 15, 2017 | IDA-48560 | Int Charges | 778.12 |
Jan 11, 2018 | IDA-48550 | Int Charges | 1,402.68 |
Jan 11, 2018 | IDA-48550 | Int Charges | 1,402.68 |
Jan 11, 2018 | IDA-48550 | Int Charges | 86,219.69 |
Jan 11, 2018 | IDA-48550 | Int Charges | 86,219.69 |
Jan 5, 2018 | IDA-48560 | Loan Cancel | 16,589.93 |
Feb 15, 2018 | IDA-48560 | Int Charges | 1,916.46 |
Feb 15, 2018 | IDA-48560 | Int Charges | 1,916.46 |
Feb 15, 2018 | IDA-48560 | Int Charges | 104,873.79 |
Feb 15, 2018 | IDA-48560 | Int Charges | 104,873.79 |
Jun 15, 2018 | IDA-48550 | Int Charges | 501.77 |
Jun 15, 2018 | IDA-48550 | Int Charges | 501.77 |
Jun 15, 2018 | IDA-48550 | Int Charges | 86,001.01 |
Aug 14, 2024 | IDA-48550 | Int Charges | 255.04 |
Aug 14, 2024 | IDA-48550 | Loan Repay | 217,726.52 |
Aug 14, 2024 | IDA-48550 | Int Charges | 208.66 |
Aug 14, 2024 | IDA-48550 | Int Charges | 208.66 |
Aug 14, 2024 | IDA-48550 | Int Charges | 71,305.82 |
Aug 14, 2024 | IDA-48550 | Int Charges | 71,305.82 |
Feb 15, 2024 | IDA-48560 | Loan Repay | 775.79 |
Jan 20, 2011 | IDA-48550 | Loan Commitment | 25,600,000.00 |
Jan 20, 2011 | IDA-48560 | Loan Commitment | 31,000,000.00 |
Aug 14, 2024 | IDA-48550 | Int Charges | 4,222.23 |
Aug 14, 2024 | IDA-48550 | Int Charges | 4,222.23 |
Dec 15, 2022 | IDA-48550 | Loan Repay | 7,688.95 |
Dec 15, 2022 | IDA-48550 | Loan Repay | 208,605.69 |
Dec 15, 2022 | IDA-48550 | Int Charges | 66,639.43 |
Dec 15, 2022 | IDA-48550 | Int Charges | 66,639.43 |
Feb 1, 2024 | IDA-48550 | Loan Repay | 215,984.22 |
Feb 1, 2024 | IDA-48550 | Int Charges | 148.49 |
Feb 1, 2024 | IDA-48550 | Int Charges | 148.49 |
Feb 1, 2024 | IDA-48550 | Int Charges | 72,755.93 |
Feb 1, 2024 | IDA-48550 | Int Charges | 72,755.93 |
Mar 15, 2024 | IDA-48560 | Int Charges | 92,884.45 |
Mar 15, 2024 | IDA-48560 | Int Charges | 92,884.45 |
Mar 15, 2024 | IDA-48560 | Loan Repay | 262,721.06 |
Aug 14, 2024 | IDA-48550 | Int Charges | 255.04 |
Dec 15, 2020 | IDA-48550 | Int Charges | 86,014.67 |
Feb 24, 2021 | IDA-48560 | Loan Repay | 285,884.62 |
Aug 15, 2014 | IDA-48560 | Int Charges | 531.41 |
Aug 15, 2014 | IDA-48560 | Int Charges | 105,409.01 |
Aug 15, 2014 | IDA-48560 | Int Charges | 105,409.01 |
Dec 22, 2014 | IDA-48550 | Int Charges | 80,292.98 |
Dec 22, 2014 | IDA-48550 | Int Charges | 80,292.98 |
Feb 15, 2015 | IDA-48560 | Int Charges | 96,982.76 |
Feb 15, 2015 | IDA-48560 | Int Charges | 96,982.76 |
Feb 15, 2015 | IDA-48560 | Int Charges | 725.42 |
Feb 15, 2015 | IDA-48560 | Int Charges | 725.42 |
Feb 24, 2021 | IDA-48560 | Int Charges | 2,306.61 |
Feb 24, 2021 | IDA-48560 | Int Charges | 2,306.61 |
Feb 24, 2021 | IDA-48560 | Int Charges | 105,364.82 |
Feb 24, 2021 | IDA-48560 | Int Charges | 105,364.82 |
Jul 20, 2021 | IDA-48550 | Loan Repay | 28,065.75 |
Jun 15, 2021 | IDA-48550 | Int Charges | 1,629.03 |
Jun 15, 2021 | IDA-48550 | Int Charges | 1,629.03 |
Jun 15, 2021 | IDA-48550 | Loan Repay | 47,856.63 |
Aug 17, 2021 | IDA-48560 | Int Charges | 52.77 |
Aug 17, 2021 | IDA-48560 | Int Charges | 52.77 |
Aug 17, 2021 | IDA-48560 | Int Charges | 1,812.81 |
Aug 17, 2021 | IDA-48560 | Int Charges | 1,812.81 |
Aug 17, 2021 | IDA-48560 | Loan Repay | 281,368.94 |
Aug 17, 2021 | IDA-48560 | Int Charges | 104,458.21 |
Aug 17, 2021 | IDA-48560 | Int Charges | 104,458.21 |
Jun 15, 2022 | IDA-48550 | Loan Repay | 1,001.95 |
Jun 15, 2022 | IDA-48550 | Loan Repay | 215,456.84 |
Jun 15, 2022 | IDA-48550 | Int Charges | 126.27 |
Jun 15, 2022 | IDA-48550 | Int Charges | 126.27 |
Jun 15, 2022 | IDA-48550 | Int Charges | 79,548.65 |
Jun 15, 2022 | IDA-48550 | Int Charges | 79,548.65 |
Jul 30, 2021 | IDA-48550 | Loan Repay | 156,482.55 |
Jul 30, 2021 | IDA-48550 | Int Charges | 86,842.06 |
Jul 30, 2021 | IDA-48550 | Int Charges | 86,842.06 |
Feb 15, 2022 | IDA-48560 | Int Charges | 11.54 |
Feb 15, 2022 | IDA-48560 | Int Charges | 11.54 |
Feb 15, 2022 | IDA-48560 | Int Charges | 100,708.63 |
Feb 15, 2022 | IDA-48560 | Int Charges | 100,708.63 |
Feb 15, 2022 | IDA-48560 | Loan Repay | 272,491.90 |
Feb 15, 2022 | IDA-48560 | Loan Repay | 4,711.56 |
Aug 30, 2022 | IDA-48560 | Int Charges | 1,083.38 |
Aug 30, 2022 | IDA-48560 | Int Charges | 1,083.38 |
Aug 30, 2022 | IDA-48560 | Loan Repay | 258,081.97 |
Aug 30, 2022 | IDA-48560 | Int Charges | 93,877.30 |
Aug 30, 2022 | IDA-48560 | Int Charges | 93,877.30 |
Jan 13, 2022 | IDA-48550 | Int Charges | 164.78 |
Jan 13, 2022 | IDA-48550 | Int Charges | 164.78 |
Jan 13, 2022 | IDA-48550 | Int Charges | 84,920.14 |
Jan 13, 2022 | IDA-48550 | Int Charges | 84,920.14 |
Feb 17, 2023 | IDA-48560 | Int Charges | 94,736.98 |
Feb 17, 2023 | IDA-48560 | Int Charges | 94,736.98 |
Feb 15, 2023 | IDA-48560 | Loan Repay | 7,473.87 |
Feb 17, 2023 | IDA-48560 | Loan Repay | 255,939.30 |
Feb 17, 2023 | IDA-48560 | Int Charges | 82.31 |
Feb 17, 2023 | IDA-48560 | Int Charges | 82.31 |
Jul 18, 2023 | IDA-48550 | Loan Repay | 220,289.60 |
Jul 18, 2023 | IDA-48550 | Int Charges | 79,120.16 |
Jul 18, 2023 | IDA-48550 | Int Charges | 79,120.16 |
Aug 16, 2023 | IDA-48560 | Int Charges | 10.67 |
Aug 16, 2023 | IDA-48560 | Int Charges | 10.67 |
Aug 16, 2023 | IDA-48560 | Int Charges | 93,882.48 |
Aug 16, 2023 | IDA-48560 | Int Charges | 93,882.48 |
Aug 16, 2023 | IDA-48560 | Int Charges | 78.95 |
Aug 16, 2023 | IDA-48560 | Int Charges | 78.95 |
Aug 16, 2023 | IDA-48560 | Loan Repay | 263,529.72 |
Jul 18, 2023 | IDA-48550 | Int Charges | 12,260.04 |
Jul 18, 2023 | IDA-48550 | Int Charges | 12,260.04 |
Aug 15, 2024 | IDA-48560 | Loan Repay | 2,464.78 |
Mar 15, 2024 | IDA-48560 | Int Charges | 5.49 |
Mar 15, 2024 | IDA-48560 | Int Charges | 5.49 |
Aug 15, 2024 | IDA-48560 | Loan Repay | 262,416.47 |
Aug 15, 2024 | IDA-48560 | Int Charges | 165.07 |
Aug 15, 2024 | IDA-48560 | Int Charges | 165.07 |
Aug 15, 2024 | IDA-48560 | Int Charges | 86,783.28 |
Aug 15, 2024 | IDA-48560 | Int Charges | 86,783.28 |
Feb 1, 2024 | IDA-48550 | Int Charges | 180.46 |
Feb 1, 2024 | IDA-48550 | Int Charges | 180.46 |
Name | Review | Date |
---|---|---|
Project Management | Moderately Satisfactory | 2017-06-28 |
Progress towards achievement of PDO | Moderately Satisfactory | 2017-06-28 |
Financial Management | Moderately Satisfactory | 2017-06-28 |
Monitoring and Evaluation | Moderately Satisfactory | 2017-06-28 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2017-06-28 |
Procurement | Moderately Satisfactory | 2017-06-28 |
Overall Safeguards Rating | Satisfactory | 2017-06-28 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-21-2017 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | Substantial |
Bank Performance | Substantial |
Borrower Performance | Moderately Satisfactory |
Government Performance | Moderately Satisfactory |
Implementing Agency | Moderately Satisfactory |
INDICATOR | ICR REVIEW: 05-15-2018 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | High | N/a |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | Moderately Satisfactory | N/a |
Government Performance | Moderately Satisfactory | N/a |
Implementing Agency | Moderately Satisfactory | N/a |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Volume of international traffic: International Communications (Internet, Telecoms, and Data) bandwidth per person | Value | 0 | 0 | |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Access to Internet Services (number of subscribers per 100 people) | Value | 0.00 | 0.00 | 0.00 |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Access to Telephone Services (fixed mainlines plus cellular phones per 100 people) | Value | 0.00 | 0.00 | 0.00 |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Average monthly price of wholesale international E1 capacity link from capital city to Europe | Value | 0 | 0 | |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Direct project beneficiaries | Value | 0.00 | 0.00 | 0.00 |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Sierra Leone: Volume of international traffic--International Communications (Internet, Telecoms, and Data) bandwidth per person | Value | 3 | 80.2 | 40 |
Date | November 30, 2010 | December 2, 2016 | March 30, 2017 | |
Comment |
Liberia: Volume of international traffic--International Communications (Internet, Telecoms, and Data) bandwidth per person | Value | 1 | 35 | 40 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Sierra Leone: Access to Internet Services (number of subscribers per 100 people) | Value | 0.28 | 32.00 | 2.00 |
Date | November 30, 2010 | December 2, 2016 | March 30, 2017 | |
Comment |
Liberia: Access to Internet Services (number of subscribers per 100 people) | Value | 1.50 | 30.78 | 3.00 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Sierra Leone: Access to Telephone Services (fixed mainlines plus cellular phones per 100 people) | Value | 25.00 | 80.00 | 43.00 |
Date | November 30, 2010 | December 2, 2016 | March 30, 2017 | |
Comment |
Liberia: Access to Telephone Services (fixed mainlines plus cellular phones per 100 people) | Value | 24.00 | 84.57 | 47.00 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Sierra Leone: Average monthly price of wholesale international E1 capacity link from capital city to Europe | Value | $8000 | $174.30 | $2000 |
Date | November 30, 2010 | December 2, 2016 | March 30, 2017 | |
Comment |
Liberia: Average monthly price of wholesale international E1 capacity link from capital city to Europe | Value | $8000 | $750 | less than $2000 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Sierra Leone: Direct project beneficiaries | Value | 2000000.00 | 0.00 | 3200000.00 |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Liberia: Direct project beneficiaries | Value | 700000.00 | 2950000.00 | 1400000.00 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Sierra Leone: Female beneficiaries | Value | 43.00 | 0.00 | 48.00 |
Date | November 30, 2010 | March 30, 2017 | ||
Comment |
Liberia: Female beneficiaries | Value | 45.00 | 38.75 | 50.00 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Sierra Leone: Volume of available international capacity: International Communications (Internet, Voice) bandwidth | Value | 0.30 | 80.44 | 6.00 |
Date | November 30, 2010 | December 2, 2016 | March 30, 2017 | |
Comment |
Retail Price of Internet Services (per Mbit/s per Month, in US$) | Value | 1500.00 | 180.00 | 755.00 |
Date | November 30, 2010 | December 2, 2016 | September 30, 2016 | |
Comment |
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact) | Value | 0.00 | 3.00 | 3.00 |
Date | November 30, 2010 | December 2, 2016 | March 30, 2017 | |
Comment |
Liberia: Volume of available international capacity: International Communications (Internet, Voice) bandwidth | Value | 0.07 | 62.20 | 1.12 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Retail Price of Internet Services (per Mbit/s per Month, in US$) | Value | 1200.00 | 400.00 | 500.00 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |
Impact on Telecom sector of World Bank Technical Assistance (composite score: 1- low impact to 5-high impact) | Value | 0.00 | 3.00 | 4.00 |
Date | November 30, 2010 | September 27, 2016 | September 30, 2016 | |
Comment |