West Africa Agricultural Productivity Program APL (WAAPP-1B)

Abstract*

The development objective of First Phase West Africa Agricultural Productivity Program Project (WAAPP1-B) for Africa is to generate and accelerate adoption of improved technologies in the participating countries' top agricultural commodity priorities areas that are aligned with the sub-region's top agricultural commodity priorities as outlined in the Economic Community of West African States Agricultural Policy (ECOWAP). There are four components...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The development objective of WAAPP1-B is to generate and accelerate adoption of improved technologies in the participating countries’ top agricultural commodity priorities areas that are aligned with the sub-region’s top agricultural commodity priorities as outlined in the ECOWAP.

Key Details

Project Details

  • P117148

  • Closed

  • Abdoulaye Toure

  • Government of Côte d'Ivoire,Burkina Faso,FEDERAL GOVERNMENT OF NIGERIA

  • Western and Central Africa

  • January 28, 2010

  • (as of board presentation)

    September 30, 2010

  • June 21, 2011

  • US$ 109.00 million

  • B

  • Not Applicable

  • December 31, 2016

  • BANK APPROVED

  • September 11, 2023

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Global Food Crisis Response Program 19.00
IDA Grant 45.00
IDA Credit 45.00
Borrower/Recipient 10.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 90.00
IBRD + IDA Commitment 90.00
Lending Instrument
Grant Amount 19.00
Total Project Cost** 119.00

Summary Status of World Bank Financing (US$ Millions) as of July 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of July 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jun 22, 2015 IDA-H6270 Loan Disb 16,588.45
Jun 22, 2015 IDA-H6260 Loan Disb 30,613.46
Jan 6, 2016 IDA-H6270 Loan Disb 143,139.80
Jun 22, 2015 IDA-H6270 Loan Disb 17,514.77
Jun 22, 2015 IDA-H6270 Loan Disb 16,036.78
Jan 25, 2016 IDA-H6270 Loan Disb 7,559.40
Jan 15, 2016 IDA-48220 Int Charges 142,432.75
Jan 15, 2016 IDA-48220 Int Charges 142,432.75
Jan 15, 2016 IDA-48220 Int Charges 294.12
Jan 15, 2016 IDA-48220 Int Charges 294.12
Jan 7, 2015 IDA-48220 Loan Disb 760,000.00
Sep 11, 2014 IDA-48220 Loan Disb 141,846.62
Sep 3, 2014 IDA-48220 Loan Disb 309,915.56
Sep 3, 2014 IDA-48220 Loan Disb 100,247.37
Mar 13, 2015 IDA-H6260 Loan Disb 32,556.69
Mar 4, 2015 IDA-H6270 Loan Disb -285,084.62
Jul 22, 2014 IDA-H6270 Loan Disb 69,552.78
Jul 15, 2014 IDA-48220 Int Charges 963.81
Jul 15, 2014 IDA-48220 Int Charges 963.81
Jul 15, 2014 IDA-48220 Int Charges 68,625.71
Jul 15, 2014 IDA-48220 Int Charges 68,625.71
Aug 20, 2014 IDA-H6260 Loan Disb 418,579.25
Jul 31, 2014 IDA-H6270 Loan Disb 70,485.86
Apr 14, 2015 IDA-H6270 Loan Disb 132,276.23
Jul 30, 2014 IDA-48220 Loan Disb 543,479.70
Mar 17, 2015 IDA-48220 Loan Disb 48,920.41
Jan 21, 2015 IDA-48220 Loan Disb 786,492.25
Feb 27, 2015 IDA-48220 Loan Disb 850,449.25
Feb 26, 2015 IDA-H6260 Loan Disb 155,239.94
Jun 26, 2015 IDA-48220 Loan Disb 682,617.06
Apr 14, 2015 IDA-H6270 Loan Disb 199,255.23
Apr 28, 2015 IDA-48220 Loan Disb 589,608.06
Apr 20, 2015 IDA-H6270 Loan Disb 612,228.44
May 6, 2015 IDA-H6270 Loan Disb 34,269.66
May 6, 2015 IDA-H6260 Loan Disb 32,510.39
May 6, 2015 IDA-48220 Loan Disb 48,755.84
May 6, 2015 IDA-48220 Loan Disb 102,850.08
Apr 23, 2015 IDA-H6260 Loan Disb 112,891.79
May 6, 2015 IDA-H6260 Loan Disb 68,580.44
Aug 19, 2015 IDA-H6270 Loan Disb 2,889.12
Aug 19, 2015 IDA-H6260 Loan Disb 17,040.77
Aug 19, 2015 IDA-48220 Loan Disb 8,670.83
Aug 19, 2015 IDA-H6270 Loan Disb 8,515.27
Aug 19, 2015 IDA-H6260 Loan Disb 5,781.71
May 27, 2014 IDA-H6260 Loan Disb 402,304.78
Mar 25, 2014 IDA-H6270 Loan Disb 24,659.54
Mar 25, 2014 IDA-48220 Loan Disb 74,008.22
Apr 23, 2014 IDA-H6270 Loan Disb 151,163.69
Feb 6, 2015 IDA-H6270 Loan Disb 75,257.73
Jul 14, 2014 IDA-48220 Loan Disb 312,232.72
Jul 15, 2014 IDA-48220 Loan Disb 210,638.28
Dec 18, 2014 IDA-H6270 Loan Disb 172,431.16
Jul 17, 2014 IDA-48220 Loan Disb 534,588.80
Jun 18, 2014 IDA-48220 Loan Disb 386,160.34
Jun 19, 2014 IDA-H6260 Loan Disb 1,175,224.20
Jun 26, 2014 IDA-H6260 Loan Disb 276,030.30
Dec 18, 2014 IDA-H6270 Loan Disb 97,614.36
Feb 12, 2015 IDA-H6260 Loan Disb 150,475.28
Dec 18, 2014 IDA-H6270 Loan Disb 78,301.66
Feb 6, 2015 IDA-H6260 Loan Disb 306,130.80
Jan 15, 2015 IDA-48220 Int Charges 930.07
Jan 15, 2015 IDA-48220 Int Charges 930.07
Jan 15, 2015 IDA-48220 Int Charges 95,509.95
Jan 15, 2015 IDA-48220 Int Charges 95,509.95
Sep 11, 2014 IDA-H6260 Loan Disb 94,583.32
Aug 6, 2014 IDA-48220 Loan Disb 588,207.10
Aug 18, 2014 IDA-48220 Loan Disb 685,377.94
Jul 18, 2014 IDA-H6260 Loan Disb 139,586.48
Aug 8, 2014 IDA-H6260 Loan Disb 387,417.53
Sep 15, 2014 IDA-H6260 Loan Disb 135,118.58
Jul 31, 2014 IDA-H6270 Loan Disb 364,471.34
Jul 31, 2014 IDA-H6270 Loan Disb 155,922.95
Sep 5, 2014 IDA-48220 Loan Disb 824,018.90
Aug 13, 2014 IDA-48220 Loan Disb 350,712.72
Feb 19, 2015 IDA-H6270 Loan Disb 58,460.13
Mar 23, 2015 IDA-H6260 Loan Disb 143,669.66
Mar 23, 2015 IDA-48220 Loan Disb 1,064,154.60
Feb 23, 2016 IDA-H6270 Loan Disb 32,864.64
Apr 22, 2016 IDA-H6260 Loan Disb 13,365.28
Mar 31, 2016 IDA-H6270 Loan Disb 171,320.88
Apr 22, 2016 IDA-H6270 Loan Disb 198,706.66
Apr 22, 2016 IDA-H6270 Loan Disb 6,678.63
Mar 1, 2016 IDA-H6270 Loan Disb 64,516.89
Mar 1, 2016 IDA-H6270 Loan Disb 51,223.37
Mar 1, 2016 IDA-H6270 Loan Disb 168,634.06
Mar 21, 2016 IDA-H6270 Loan Disb 71,357.93
Mar 1, 2016 IDA-H6270 Loan Disb 12,014.76
Mar 23, 2016 IDA-H6270 Loan Disb 180,790.36
Mar 23, 2016 IDA-H6260 Loan Disb 345,980.34
Feb 16, 2016 IDA-48220 Loan Disb 6,962.31
Apr 29, 2016 IDA-48220 Loan Disb 1,141,358.40
Feb 16, 2016 IDA-H6260 Loan Disb 4,642.47
Jul 15, 2016 IDA-48220 Int Charges 148,993.08
Jul 15, 2016 IDA-48220 Int Charges 148,993.08
Jul 15, 2016 IDA-48220 Int Charges 157.92
Jul 15, 2016 IDA-48220 Int Charges 157.92
Oct 24, 2016 IDA-48220 Loan Disb 914,852.30
Jul 5, 2016 IDA-H6270 Loan Disb 82,426.56
Nov 14, 2016 IDA-H6270 Loan Disb 58,592.30
Sep 3, 2015 IDA-H6260 Loan Disb 296,455.53
Oct 21, 2015 IDA-H6260 Loan Disb 35,686.15
Sep 22, 2015 IDA-H6260 Loan Disb 263,289.34
Oct 5, 2015 IDA-H6260 Loan Disb 973,562.70
Nov 19, 2015 IDA-H6270 Loan Disb 95,448.79
Nov 19, 2015 IDA-H6270 Loan Disb 156,981.86
Sep 2, 2015 IDA-H6270 Loan Disb 32,573.29
Sep 2, 2015 IDA-H6270 Loan Disb 159,294.75
Nov 19, 2015 IDA-H6270 Loan Disb 40,694.20
Nov 19, 2015 IDA-H6270 Loan Disb 22,053.99
Feb 2, 2016 IDA-H6270 Loan Disb 105,476.89
Feb 2, 2016 IDA-H6270 Loan Disb 37,845.21
Feb 2, 2016 IDA-H6270 Loan Disb 83,543.57
Feb 2, 2016 IDA-H6270 Loan Disb 22,545.98
Feb 5, 2016 IDA-H6270 Loan Disb 13,994.99
Nov 18, 2015 IDA-H6260 Loan Disb 14,879.46
Dec 16, 2013 IDA-H6260 Loan Disb 157,218.40
Oct 24, 2013 IDA-48220 Loan Disb 623,131.40
Oct 3, 2013 IDA-H6260 Loan Disb 219,070.47
Dec 16, 2013 IDA-H6260 Loan Disb 57,151.50
Sep 19, 2013 IDA-48220 Loan Disb 301,012.50
Sep 19, 2013 IDA-48220 Loan Disb 200,692.73
Sep 19, 2013 IDA-H6260 Loan Disb 100,052.57
Sep 19, 2013 IDA-H6260 Loan Disb 48,347.88
Sep 19, 2013 IDA-48220 Loan Disb 150,229.08
Nov 4, 2013 IDA-48220 Loan Disb 658,631.20
Oct 23, 2013 IDA-48220 Loan Disb 31,599.34
Sep 19, 2013 IDA-48220 Loan Disb 72,594.40
Sep 19, 2013 IDA-H6270 Loan Disb 50,176.51
Sep 19, 2013 IDA-H6270 Loan Disb 24,246.53
Dec 12, 2013 IDA-H6270 Loan Disb 49,189.46
Feb 10, 2014 IDA-48220 Loan Disb 704,373.20
Feb 6, 2014 IDA-48220 Loan Disb 22,250.35
Feb 5, 2014 IDA-48220 Loan Disb 194,288.73
Oct 8, 2014 IDA-H6270 Loan Disb 146,975.83
Nov 17, 2014 IDA-48220 Loan Disb 409,069.75
Oct 28, 2014 IDA-48220 Loan Disb 702,238.06
Nov 14, 2014 IDA-H6260 Loan Disb 343,216.22
Oct 21, 2014 IDA-H6260 Loan Disb 265,317.78
Oct 16, 2014 IDA-48220 Loan Disb 1,195,395.20
Sep 30, 2014 IDA-48220 Loan Disb 658,189.06
Sep 29, 2014 IDA-48220 Loan Disb 619,210.70
Sep 30, 2014 IDA-H6270 Loan Disb 160,979.20
Nov 20, 2014 IDA-48220 Loan Disb 185,145.98
Nov 20, 2014 IDA-H6260 Loan Disb 123,455.33
Dec 16, 2014 IDA-H6260 Loan Disb 242,882.48
Dec 16, 2014 IDA-48220 Loan Disb 642,630.10
Jan 13, 2015 IDA-H6270 Loan Disb 353,763.62
Dec 4, 2014 IDA-48220 Loan Disb 826,316.00
Jul 26, 2013 IDA-H6270 Loan Disb 46,221.42
Jul 15, 2013 IDA-48220 Int Charges 984.31
Jul 15, 2013 IDA-48220 Int Charges 984.31
Jul 15, 2013 IDA-48220 Int Charges 19,950.31
Jul 15, 2013 IDA-48220 Int Charges 19,950.31
Nov 24, 2014 IDA-H6270 Loan Disb 61,085.28
Aug 20, 2013 IDA-H6270 Loan Disb 45,050.78
Jul 15, 2013 IDA-48220 Loan Disb 103,378.22
Jul 15, 2013 IDA-H6260 Loan Disb 68,849.90
Aug 20, 2013 IDA-H6260 Loan Disb 95,541.63
Aug 15, 2013 IDA-48220 Loan Disb 413,550.38
Aug 15, 2013 IDA-48220 Loan Disb 373,099.70
Jul 26, 2013 IDA-H6260 Loan Disb 92,166.07
Jul 15, 2013 IDA-48220 Loan Disb 135,910.77
Nov 27, 2013 IDA-H6270 Loan Disb 54,440.76
Nov 13, 2013 IDA-H6260 Loan Disb 878,608.10
Oct 22, 2013 IDA-H6270 Loan Disb 10,474.12
Sep 12, 2013 IDA-H6260 Loan Disb 714,291.75
Aug 30, 2013 IDA-H6260 Loan Disb 418,195.80
Sep 13, 2013 IDA-48220 Loan Disb 238,547.25
Aug 20, 2013 IDA-H6260 Loan Disb 89,831.80
Aug 19, 2013 IDA-48220 Loan Disb 134,630.61
Jul 26, 2013 IDA-48220 Loan Disb 138,387.53
Sep 30, 2010 IDA-48220 Loan Commitment 45,000,000.00
Jul 15, 2024 IDA-48220 Int Charges 1,516.10
Jul 15, 2024 IDA-48220 Int Charges 1,516.10
Jul 15, 2024 IDA-48220 Loan Repay 391,972.88
Jul 15, 2024 IDA-48220 Int Charges 122.49
Jul 15, 2024 IDA-48220 Int Charges 122.49
Sep 30, 2010 IDA-H6260 Loan Commitment 30,000,000.00
Sep 30, 2010 IDA-H6270 Loan Commitment 15,000,000.00
Jan 30, 2024 IDA-48220 Int Charges 4,773.32
Jan 30, 2024 IDA-48220 Int Charges 4,773.32
Jan 30, 2024 IDA-48220 Loan Repay 392,817.50
Jan 30, 2024 IDA-48220 Int Charges 136,948.77
Jan 30, 2024 IDA-48220 Int Charges 136,948.77
Feb 19, 2015 IDA-H6270 Loan Disb 326,602.47
Sep 11, 2014 IDA-H6270 Loan Disb 47,263.30
Feb 6, 2014 IDA-H6260 Loan Disb 14,836.52
Feb 6, 2014 IDA-H6270 Loan Disb 7,413.83
Dec 19, 2013 IDA-H6270 Loan Disb 129,290.24
Feb 12, 2014 IDA-H6270 Loan Disb 64,959.32
Jan 27, 2014 IDA-H6260 Loan Disb 840,771.10
Dec 3, 2013 IDA-H6270 Loan Disb 49,662.39
Dec 3, 2013 IDA-H6270 Loan Disb 155,853.84
Dec 5, 2013 IDA-H6260 Loan Disb 467,797.38
Jan 15, 2014 IDA-48220 Int Charges 977.05
Jan 15, 2014 IDA-48220 Int Charges 977.05
Jan 15, 2014 IDA-48220 Int Charges 36,762.94
Jan 15, 2014 IDA-48220 Int Charges 36,762.94
Apr 16, 2014 IDA-H6270 Loan Disb 118,735.41
Apr 16, 2014 IDA-H6270 Loan Disb 83,832.94
Mar 11, 2014 IDA-48220 Loan Disb 788,349.90
Jan 27, 2014 IDA-48220 Loan Disb 1,591,755.40
Mar 24, 2014 IDA-48220 Loan Disb 787,579.75
Apr 16, 2014 IDA-H6270 Loan Disb 196,465.80
Apr 28, 2014 IDA-48220 Loan Disb 98,000.19
Apr 28, 2014 IDA-H6270 Loan Disb 32,653.67
Apr 28, 2014 IDA-H6260 Loan Disb 65,346.54
Mar 28, 2014 IDA-48220 Loan Disb 539,360.50
Apr 30, 2014 IDA-48220 Loan Disb 363,122.28
Apr 24, 2014 IDA-H6270 Loan Disb 75,641.62
Apr 24, 2014 IDA-H6270 Loan Disb 251,089.33
Apr 14, 2014 IDA-48220 Loan Disb 552,950.10
May 8, 2014 IDA-H6270 Loan Disb 270,206.84
May 6, 2014 IDA-H6260 Loan Disb 304,282.78
Mar 27, 2014 IDA-H6260 Loan Disb 871,622.40
May 2, 2014 IDA-H6270 Loan Disb 176,596.02
May 6, 2014 IDA-H6260 Loan Disb 329,857.00
May 5, 2014 IDA-48220 Loan Disb 318,811.00
Mar 19, 2014 IDA-H6260 Loan Disb 898,785.00
Jun 2, 2014 IDA-H6270 Loan Disb 19,460.74
Jun 3, 2014 IDA-H6260 Loan Disb 38,937.67
Jun 4, 2014 IDA-48220 Loan Disb 258,708.10
Jun 4, 2014 IDA-48220 Loan Disb 283,282.00
Jun 2, 2014 IDA-48220 Loan Disb 58,405.57
Jun 9, 2014 IDA-48220 Loan Disb 189,525.11
Mar 25, 2014 IDA-H6260 Loan Disb 49,348.68
Apr 4, 2014 IDA-48220 Loan Disb 162,231.90
May 27, 2014 IDA-H6260 Loan Disb 769,835.60
Aug 20, 2013 IDA-H6270 Loan Disb 47,914.28
Jul 11, 2013 IDA-H6270 Loan Disb 34,606.51
Aug 30, 2013 IDA-H6260 Loan Disb 265,520.70
Aug 30, 2013 IDA-H6260 Loan Disb 688,291.40
Aug 19, 2013 IDA-48220 Loan Disb 143,187.90
Dec 16, 2013 IDA-H6260 Loan Disb 717,162.10
Nov 22, 2013 IDA-48220 Loan Disb 130,887.57
Dec 16, 2013 IDA-48220 Loan Disb 85,712.22
Dec 17, 2013 IDA-48220 Loan Disb 452,263.44
Dec 17, 2013 IDA-48220 Loan Disb 254,891.92
Feb 25, 2014 IDA-H6270 Loan Disb 19,701.47
Mar 3, 2014 IDA-H6270 Loan Disb 475,460.50
Nov 27, 2013 IDA-H6270 Loan Disb 106,956.93
Nov 27, 2013 IDA-H6270 Loan Disb 42,563.18
Feb 25, 2014 IDA-H6260 Loan Disb 1,425.06
Feb 26, 2014 IDA-48220 Loan Disb 59,102.27
Feb 26, 2014 IDA-48220 Loan Disb 2,136.23
Nov 27, 2013 IDA-H6270 Loan Disb 94,588.03
Feb 25, 2014 IDA-H6260 Loan Disb 39,426.60
Jan 13, 2014 IDA-48220 Loan Disb 638,167.70
Jan 13, 2014 IDA-48220 Loan Disb 513,640.90
Feb 25, 2014 IDA-H6270 Loan Disb 712.11
Mar 4, 2014 IDA-H6260 Loan Disb 275,990.97
Dec 19, 2013 IDA-H6270 Loan Disb 38,817.43
Nov 21, 2013 IDA-H6270 Loan Disb 43,455.22
Jan 6, 2014 IDA-H6260 Loan Disb 416,427.47
Nov 21, 2013 IDA-H6260 Loan Disb 107,606.84
Nov 4, 2013 IDA-48220 Loan Disb 314,095.20
Dec 16, 2013 IDA-H6270 Loan Disb 28,558.62
Dec 16, 2013 IDA-48220 Loan Disb 235,780.45
Dec 16, 2013 IDA-H6270 Loan Disb 78,562.05
Oct 7, 2013 IDA-48220 Loan Disb 410,446.94
Jul 15, 2024 IDA-48220 Int Charges 135,126.31
Jul 15, 2024 IDA-48220 Int Charges 135,126.31
Jan 15, 2023 IDA-48220 Loan Repay 6,251.80
Jan 15, 2023 IDA-48220 Int Charges 24.88
Jan 15, 2023 IDA-48220 Int Charges 24.88
Jan 15, 2023 IDA-48220 Int Charges 130,328.99
Jan 15, 2023 IDA-48220 Int Charges 130,328.99
Jan 15, 2023 IDA-48220 Loan Repay 391,967.20
Jul 15, 2023 IDA-48220 Int Charges 13,088.81
Jul 15, 2023 IDA-48220 Int Charges 13,088.81
Jul 15, 2023 IDA-48220 Loan Repay 400,020.47
Jul 15, 2023 IDA-48220 Int Charges 137,646.42
Jul 15, 2023 IDA-48220 Int Charges 137,646.42
Jul 18, 2022 IDA-48220 Int Charges 1,120.55
Jul 18, 2022 IDA-48220 Int Charges 1,120.55
Jul 18, 2022 IDA-48220 Loan Repay 388,434.88
Jul 18, 2022 IDA-48220 Int Charges 141,293.19
Jul 18, 2022 IDA-48220 Int Charges 141,293.19
Jan 15, 2022 IDA-48220 Int Charges 151,602.60
Jan 15, 2022 IDA-48220 Int Charges 151,602.60
Jan 15, 2022 IDA-48220 Loan Repay 5,800.52
Jan 15, 2022 IDA-48220 Loan Repay 409,987.34
Jul 15, 2021 IDA-48220 Int Charges 156,189.98
Jul 15, 2021 IDA-48220 Int Charges 156,189.98
Jul 15, 2021 IDA-48220 Loan Repay 420,713.88
Jul 15, 2021 IDA-48220 Int Charges 8,315.66
Jul 15, 2021 IDA-48220 Int Charges 8,315.66
Jul 15, 2020 IDA-48220 Int Charges 776.03
Jul 15, 2020 IDA-48220 Int Charges 776.03
Jul 15, 2020 IDA-48220 Int Charges 150,530.78
Jul 15, 2020 IDA-48220 Int Charges 150,530.78
Jan 15, 2021 IDA-48220 Loan Repay 425,385.90
Jan 15, 2021 IDA-48220 Int Charges 151,111.69
Jan 15, 2021 IDA-48220 Int Charges 151,111.69
Jan 15, 2021 IDA-48220 Int Charges 3,573.45
Jan 15, 2021 IDA-48220 Int Charges 3,573.45
Jul 15, 2019 IDA-48220 Int Charges 1,500.23
Jul 15, 2019 IDA-48220 Int Charges 1,500.23
Jul 15, 2019 IDA-48220 Int Charges 153,086.02
Jul 15, 2019 IDA-48220 Int Charges 153,086.02
Jan 15, 2020 IDA-48220 Int Charges 268.87
Jan 15, 2020 IDA-48220 Int Charges 268.87
Jan 15, 2020 IDA-48220 Int Charges 152,221.23
Jan 15, 2020 IDA-48220 Int Charges 152,221.23
Jan 15, 2019 IDA-48220 Int Charges 2,941.42
Jan 15, 2019 IDA-48220 Int Charges 2,941.42
Jan 15, 2019 IDA-48220 Int Charges 150,074.12
Jan 15, 2019 IDA-48220 Int Charges 150,074.12
Nov 22, 2017 IDA-48220 Loan Cancel 236,338.81
Nov 22, 2017 IDA-48220 Loan Disb -236,284.10
Jan 2, 2018 IDA-H6270 Loan Disb -105,042.48
Nov 22, 2017 IDA-H6270 Loan Disb -75,754.21
Nov 22, 2017 IDA-H6260 Loan Disb -157,496.30
Jan 15, 2018 IDA-48220 Int Charges 157,333.78
Jan 15, 2018 IDA-48220 Int Charges 157,333.78
Jan 15, 2018 IDA-48220 Int Charges 2,308.18
Jan 15, 2018 IDA-48220 Int Charges 2,308.18
Jul 15, 2018 IDA-48220 Int Charges -172.88
Jul 15, 2018 IDA-48220 Int Charges 172.88
Jan 2, 2018 IDA-H6270 Loan Cancel 194,546.10
Jul 15, 2018 IDA-48220 Int Charges 1,952.73
Jul 15, 2018 IDA-48220 Int Charges 1,952.73
Jul 15, 2018 IDA-48220 Int Charges 155,265.90
Jul 15, 2018 IDA-48220 Int Charges 155,265.90
Nov 22, 2017 IDA-H6260 Loan Cancel 177,328.69
Jul 15, 2017 IDA-48220 Int Charges 151,270.84
Jul 15, 2017 IDA-48220 Int Charges 151,270.84
Jul 15, 2017 IDA-48220 Int Charges 1,352.83
Jul 15, 2017 IDA-48220 Int Charges 1,352.83
Aug 7, 2017 IDA-H6270 Loan Disb -9,932.85
May 4, 2017 IDA-H6260 Loan Disb -3,074.31
Jan 15, 2017 IDA-48220 Int Charges 146,815.56
Jan 15, 2017 IDA-48220 Int Charges 146,815.56
Aug 18, 2016 IDA-48220 Loan Disb 7,818.51
Aug 18, 2016 IDA-H6260 Loan Disb 5,213.38
Jan 15, 2017 IDA-48220 Int Charges 1,803.43
Jan 15, 2017 IDA-48220 Int Charges 1,803.43
Jun 3, 2016 IDA-H6260 Loan Disb 316,777.03
Nov 18, 2015 IDA-48220 Loan Disb 22,314.72
Nov 6, 2015 IDA-48220 Loan Disb 13,871.37
Nov 6, 2015 IDA-H6270 Loan Disb 4,621.95
Nov 6, 2015 IDA-H6270 Loan Disb 137,467.10
Nov 6, 2015 IDA-H6270 Loan Disb 211,093.72
Feb 12, 2016 IDA-48220 Loan Disb 304,607.78
Mar 23, 2016 IDA-H6270 Loan Disb 87,367.56
Mar 23, 2016 IDA-H6270 Loan Disb 59,555.86
Aug 19, 2015 IDA-48220 Loan Disb 25,556.05
Jul 15, 2015 IDA-48220 Int Charges 538.00
Jul 15, 2015 IDA-48220 Int Charges 538.00
Jul 15, 2015 IDA-48220 Int Charges 121,899.62
Jul 15, 2015 IDA-48220 Int Charges 121,899.62
Apr 2, 2015 IDA-H6270 Loan Disb 43,325.65
Jul 20, 2015 IDA-H6260 Loan Disb 208,998.23
May 26, 2015 IDA-H6260 Loan Disb 179,409.27
Jun 25, 2015 IDA-H6260 Loan Disb 134,702.50
Jun 2, 2015 IDA-H6270 Loan Disb 309,391.88
May 26, 2015 IDA-48220 Loan Disb 738,795.80
Jun 11, 2015 IDA-H6260 Loan Disb 97,482.01
May 8, 2015 IDA-48220 Loan Disb 734,040.30
Jul 14, 2015 IDA-48220 Loan Disb 866,313.10
Jun 22, 2015 IDA-H6270 Loan Disb 15,297.55
Jun 22, 2015 IDA-H6270 Loan Disb 4,327.92
Jun 22, 2015 IDA-48220 Loan Disb 12,988.96
Jun 22, 2015 IDA-48220 Loan Disb 48,129.59
Jun 22, 2015 IDA-48220 Loan Disb 45,911.01
May 13, 2015 IDA-H6270 Loan Disb 84,888.03
Apr 30, 2015 IDA-H6260 Loan Disb 250,630.06
May 13, 2015 IDA-H6270 Loan Disb 51,489.62
May 13, 2015 IDA-H6270 Loan Disb 45,575.07
Apr 15, 2015 IDA-48220 Loan Disb 630,119.00
Jun 22, 2015 IDA-H6260 Loan Disb 8,661.05
Jun 22, 2015 IDA-H6260 Loan Disb 32,092.80
Jan 6, 2016 IDA-H6270 Loan Disb 15,514.66
Nov 17, 2015 IDA-H6260 Loan Disb 132,401.27
Nov 17, 2015 IDA-48220 Loan Disb 152,296.16
Jun 5, 2015 IDA-48220 Loan Disb 955,629.30
Jun 9, 2016 IDA-48220 Loan Disb 20,019.48
Jun 28, 2016 IDA-H6270 Loan Disb 34,499.84
Jul 5, 2016 IDA-H6270 Loan Disb 413,432.22
Jun 20, 2016 IDA-H6270 Loan Disb 4,112.10
Jun 20, 2016 IDA-H6260 Loan Disb 8,229.14
Jul 8, 2016 IDA-H6270 Loan Disb 89,910.20
Jun 28, 2016 IDA-H6270 Loan Disb 33,586.36
Jun 28, 2016 IDA-H6270 Loan Disb 234,208.20
Jun 28, 2016 IDA-H6270 Loan Disb 15,103.34
May 12, 2016 IDA-H6260 Loan Disb 204,439.39
May 13, 2016 IDA-H6270 Loan Disb 49,145.57
May 13, 2016 IDA-H6270 Loan Disb 14,526.90
May 13, 2016 IDA-H6270 Loan Disb 25,097.85
Jun 23, 2016 IDA-H6270 Loan Disb 85,437.00
Aug 9, 2016 IDA-H6260 Loan Disb 174,564.97
Nov 7, 2016 IDA-H6270 Loan Disb 90,497.76
Jun 23, 2016 IDA-H6270 Loan Disb 51,319.51
Nov 23, 2016 IDA-H6270 Loan Disb 16,599.54
Sep 29, 2016 IDA-H6270 Loan Disb 3,070.40
Sep 29, 2016 IDA-48220 Loan Disb 10,041.54
Jul 11, 2016 IDA-H6270 Loan Disb 464,506.00
Jun 22, 2016 IDA-48220 Loan Disb 12,514.72
Sep 29, 2016 IDA-H6260 Loan Disb 6,695.70
Jun 8, 2016 IDA-H6270 Loan Disb 246,552.94
Jun 8, 2016 IDA-H6270 Loan Disb 45,002.11
Feb 17, 2016 IDA-H6270 Loan Disb 2,313.03
Feb 17, 2016 IDA-H6270 Loan Disb 39,095.90
Feb 17, 2016 IDA-H6270 Loan Disb 153,836.77
Mar 2, 2016 IDA-H6260 Loan Disb 330,317.30
Jan 28, 2016 IDA-48220 Loan Disb 1,991.69
Nov 6, 2015 IDA-H6270 Loan Disb 40,117.01
Jan 28, 2016 IDA-H6270 Loan Disb 5,925.31
Jan 26, 2016 IDA-H6260 Loan Disb 228,047.81
Jan 28, 2016 IDA-H6260 Loan Disb 15,601.66
Sep 23, 2015 IDA-48220 Loan Disb 1,448,957.80
Nov 6, 2015 IDA-H6260 Loan Disb 9,249.43
Feb 25, 2016 IDA-H6270 Loan Disb 103,475.06
Mar 31, 2016 IDA-H6270 Loan Disb 47,684.77

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2016-12-31
Counterpart Funding Satisfactory 2016-12-31
Overall Implementation Progress (IP) Satisfactory 2016-12-31
Progress towards achievement of PDO Satisfactory 2016-12-31
Financial Management Satisfactory 2016-12-31
Monitoring and Evaluation Satisfactory 2016-12-31
Project Management Satisfactory 2016-12-31

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 06-28-2017
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceSubstantial
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencySubstantial

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 09-29-2017PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeModestN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencySatisfactoryN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Direct Project beneficiairies - BFValue0.00287059.00400000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Direct Project beneficiairies - NGValue0.002296413.00200000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Direct Project beneficiaries - CIValue0.00783200.00500000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by the Project with at least 15% productivity increase over the control technology (cumlative, disag. by country) - CIValue0.0020.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by the Project with at least 15% productivity increase over the control technology (cumulative, disag. by country)- BFValue0.0020.0010.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by the Project with at least 15% productivity increase over the control technology (cumulative, disag. by country)- NGValue0.0011.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Area under improved technologies disseminated under the project - CIValue0.00346000.00150000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Area under improved technologies disseminated under the project - BFValue0.00273854.00250000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Area under improved technologies disseminated under the project - NGValue0.00420100.00500000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Processors/Producers who have adopted at least one new technology - CIValue0.00431000.00250000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Processors/Producers who have adopted at least one new technology - BFValue0.00273851.00200000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Processors/Producers who have adopted at least one new technology- NGValue0.00310000.00500000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Female beneficiariesValue0.0043.0040.00
    DateSeptember 30, 2010May 31, 2012December 30, 2016
    Comment
  • Female beneficiariesValue0.0041.0040.00
    DateSeptember 30, 2010December 30, 2016
    Comment
  • Female beneficiariesValue0.0049.0040.00
    DateSeptember 30, 2010May 31, 2012December 30, 2016
    Comment
  • Direct project beneficiariesValue0.003363797.001100000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by the Project with at least 15% productivity increase over the control technology (cumulative, disagreededby countryValue0.0096800.0034.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Area under improved technologies disseminated under the projectValue0.001032486.00900000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Processors/Producers who have adopted at least one new technologyValue0.001014851.00950000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)- BFValue0.0037.0025.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)- NGValue0.0014.0030.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scientific exchange visits - CIValue0.0017.0015.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scientific exchange visits - BFValue0.0015.0015.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scientific exchange visits - NGValue0.0012.0015.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scholarships (disaggregated by MSc and PhD) - CIValue0.0078.0055.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scholarships (disaggregated by MSc and PhD) - BFValue0.00108.00105.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scholarships (disaggregated by MSc and PhD)- NGValue0.0031.0038.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the project support - Plantain - CIValue0.0030685.0050000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the project support - Cereals - BFValue0.003922.002000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the project support - Cereals - CIValue0.003930.00800.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the project support - Cereals - NGValue0.00214394.00250000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A harmonized M & E system is established and operational in each country for data collection, analysis and reporting - CIValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A harmonized M & E system is established and operational in each country for data collection, analysis and reporting - BFValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A harmonized M & E system is established and operational in each country for data collection, analysis and reporting - NGValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the Project support - Fingerlings NGValue0.006674391.0010000000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Disbursement rate of IDA funds - NGValue0.00100.00100.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Disbursement rate of IDA funds - CIValue0.0097.00100.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Disbursement rate of IDA funds - BFValue0.0084.00100.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the Project support - Cassava-CIValue0.0031200.0015000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the Project support - Cassava- NGValue0.0018000.0030000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Demonstration plots established - BFValue0.001046.001000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Demonstration plots established - CIValue0.001000.00500.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Demonstration plots established - NGValue0.001100.00500.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Number of publications released in regional/national magazines - BFValue0.006.008.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Number of publications released in regional/national magazinesValue0.00191.0046.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country)Value0.0044.0036.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Procurement and FM activities executed in conformity with the timing of the procurement plan, the implementation manual, and IDA proceduresValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National regulations on genetic materials, fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted CIValue0.003.003.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National regulations on genetic materials, fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted- BFValue0.006.003.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National regulations on genetic materials, fertilizer and pesticides aligned to regional (ECOWAS) regulations and adopted- NGValue0.003.003.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level - CIValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level - BFValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national/regional level-CORAFValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) level- NGValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Hits for the national/regional web-based information system on agricultural technologies and research skills - BFValue0.00286.002000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Hits for the national/regional web-based information system on agricultural technologies and research skills - NGValue0.0054898.0030000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Hits for the national/regional web-based information system on agricultural technologies and research skills - CORAFValue0.00234500.00150000.00
    DateNovember 21, 2014December 22, 2016December 30, 2016
    Comment
  • Hits for the national/regional web-based information system on agricultural technologies and research skills - CIValue0.007259.005000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National/regional action plan on gender, communication, climate change developed- CORAFValue0.003.003.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National/regional action plan on gender, communication, climate change developed-BFValue0.003.003.00
    DateSeptember 30, 2014December 22, 2016December 30, 2016
    Comment
  • National/regional action plan on gender, communication, climate change developed-NGValue0.003.003.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National/regional action plan on gender, communication, climate change developed-CIValue0.003.003.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Client days of training provided (including scientistes, extension agents, etc) - CIValue0.0092700.007500.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Client days of training provided (including scientistes, extension agents, etc) - BFValue0.004111.004500.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Client days of training provided (including scientistes, extension agents, etc) - NGValue0.0010277.005500.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)-NGValue0.0020.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)-CIValue0.0013.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)-BFValue0.0011.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin - NGValue0.007.004.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin - CIValue0.003.004.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin - BFValue0.004.004.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)- CIValue0.0036.0040.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Number of publications released in regional/national magazines - CIValue0.0019.008.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Number of publications released in regional/national magazines - NGValue0.00166.0030.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - BFValue0.006.008.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - CIValue0.0036.0014.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - NGValue0.000.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated under the national/regional CARGS demonstrated by the Project in the Project areas (breakdown by technologyand country) - CORAFValue0.002.002.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National Regulations on genetic materials fertilizer and pesticides aligned to regional (ECOWAS) regulations and adoptedValue0.009.009.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Regulations for fertilizer at ECOWAS level developed and adoptedValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A system for data collection, analysis and reporting on agricultural technologies, research skills, and regional agricultural productivity established at national and regional (CORAF) levelValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Hits for the national/regional web-based information system on agricultural technologies and research skillsValue0.00281535.00187000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National/regional action plan on gender, communication, climate change developed (breakdown by country)Value0.0012.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Client days of training provided (including scientists, extension agents, agro-dealers, farmers, community members)Value0.00107038.0017500.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated/adapted by NCoS and demonstrated by the Project in the project area (breakdown by technology)Value0.0044.0036.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Technologies generated/adapted by NCoS and demonstrated in at least 3 ECOWAS countries outside the country of origin (breakdown bytechnology and by country)Value0.0014.0012.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • National demand-driven research proposals projects financed by the national Competitive Agricultural Research Grant System (CARGS)Value0.0087.0095.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scientific exchange visitsValue0.0044.0045.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Scholarships (disaggregated by MSc and PhD)Value0.00217.00198.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the project support - PlantainValue0.0030685.0050000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Multi-country research proposals financed by the regional Competitive Agricultural Research Grant System (CARGS) maintained by CORAFValue0.007.0010.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the project support - CerealsValue0.008066394.00252800.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • A harmonized M & E system is established and operational in each country for data collection, analysis and reportingValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the Project support - FingerlingsValue0.0016159502.0010000000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Disbursement rate of IDA fundsValue0.0098.24100.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Sub-projects granted with environmental management plan have implemented the plan effectivelyValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Foundation seeds and breed stock produced with the Project support - Cassava (x1,000 plants)Value0.0049000.0045000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Projects reports presented within 45 days of the end of the relevant periodValueNoYesYes
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment
  • Demonstration plots establishedValue0.003146.002000.00
    DateSeptember 30, 2010December 22, 2016December 30, 2016
    Comment