Financier | Commitments |
---|---|
IDA Credit | 75.00 |
Borrower/Recipient | 2.34 |
P120026
Closed
Yitbarek Mammo
Ministry of Finance,Ministry of Finance
May 25, 2010
(as of board presentation)
June 23, 2010
December 6, 2010
US$ 77.34 million
Community Water & Sanitation Agency,CWSA,Community Water and Sanitation Agency (CWSA)
2010
US$ 75.00 million
B
October 18, 2023
June 30, 2020
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 75.00 |
Borrower/Recipient | 2.34 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 75.00 |
IBRD + IDA Commitment | 75.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 77.34 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Apr 1, 2019 | IDA-61280 | Int Charges | 295.37 |
Apr 11, 2019 | IDA-61280 | Int Charges | 61,816.79 |
Apr 11, 2019 | IDA-61280 | Int Charges | 61,816.79 |
Apr 11, 2019 | IDA-61280 | Int Charges | 103,520.90 |
Nov 5, 2019 | IDA-61280 | Loan Disb | 7,143,256.50 |
Oct 1, 2019 | IDA-61280 | Int Charges | 1,024.06 |
Oct 1, 2019 | IDA-61280 | Int Charges | 1,024.06 |
Sep 3, 2019 | IDA-47890 | Int Charges | 1,388.32 |
Sep 3, 2019 | IDA-47890 | Int Charges | 1,388.32 |
Sep 3, 2019 | IDA-47890 | Int Charges | 253,956.34 |
Sep 3, 2019 | IDA-47890 | Int Charges | 253,956.34 |
Oct 28, 2019 | IDA-61280 | Int Charges | 111,970.78 |
Oct 28, 2019 | IDA-61280 | Int Charges | 111,970.78 |
Oct 28, 2019 | IDA-61280 | Int Charges | 187,072.20 |
Jun 9, 2020 | IDA-61280 | Loan Disb | 3,711,575.00 |
Apr 29, 2020 | IDA-61280 | Int Charges | 1,258.70 |
Apr 29, 2020 | IDA-61280 | Int Charges | 134,814.98 |
Apr 29, 2020 | IDA-61280 | Int Charges | 134,814.98 |
Apr 29, 2020 | IDA-61280 | Int Charges | 224,691.66 |
Feb 15, 2020 | IDA-47890 | Int Charges | 3,871.38 |
Feb 15, 2020 | IDA-47890 | Int Charges | 3,871.38 |
Feb 15, 2020 | IDA-47890 | Int Charges | 250,986.97 |
Feb 15, 2020 | IDA-47890 | Int Charges | 250,986.97 |
Mar 17, 2020 | IDA-61280 | Loan Disb | 4,314,812.00 |
Nov 2, 2020 | IDA-61280 | Loan Cancel | 6,014.64 |
Aug 15, 2020 | IDA-47890 | Loan Repay | 3,089.96 |
Oct 27, 2020 | IDA-61280 | Loan Disb | 76,095.94 |
Oct 6, 2020 | IDA-61280 | Int Charges | 169,046.83 |
Oct 6, 2020 | IDA-61280 | Int Charges | 169,046.83 |
Oct 6, 2020 | IDA-61280 | Int Charges | 281,856.60 |
Nov 2, 2020 | IDA-61280 | Loan Disb | 13,612.23 |
Oct 1, 2020 | IDA-61280 | Int Charges | 67.04 |
Oct 1, 2020 | IDA-61280 | Int Charges | 67.04 |
Sep 3, 2020 | IDA-47890 | Loan Repay | 875,179.10 |
Sep 3, 2020 | IDA-47890 | Int Charges | 235,679.03 |
Sep 3, 2020 | IDA-47890 | Int Charges | 235,679.03 |
May 5, 2021 | IDA-61280 | Int Charges | 177,166.17 |
May 5, 2021 | IDA-61280 | Int Charges | 177,166.17 |
May 5, 2021 | IDA-61280 | Int Charges | 295,347.12 |
Aug 17, 2021 | IDA-47890 | Int Charges | 258,368.12 |
Aug 17, 2021 | IDA-47890 | Int Charges | 258,368.12 |
Apr 1, 2021 | IDA-61280 | Int Charges | 41.61 |
Apr 1, 2021 | IDA-61280 | Int Charges | 41.61 |
Aug 15, 2022 | IDA-47890 | Loan Repay | 12,071.06 |
Mar 18, 2022 | IDA-47890 | Int Charges | 247,760.45 |
Mar 18, 2022 | IDA-47890 | Int Charges | 247,760.45 |
Mar 18, 2022 | IDA-47890 | Int Charges | 35.44 |
Mar 18, 2022 | IDA-47890 | Int Charges | 35.44 |
Mar 18, 2022 | IDA-47890 | Loan Repay | 844,350.00 |
Apr 1, 2022 | IDA-61280 | Int Charges | 5,310.34 |
Apr 1, 2022 | IDA-61280 | Int Charges | 5,310.34 |
Feb 15, 2022 | IDA-47890 | Loan Repay | 13,889.41 |
Apr 6, 2022 | IDA-61280 | Int Charges | 283,097.25 |
Apr 6, 2022 | IDA-61280 | Int Charges | 164,577.23 |
Apr 6, 2022 | IDA-61280 | Int Charges | 164,577.23 |
May 5, 2023 | IDA-61280 | Loan Repay | 705,328.25 |
May 5, 2023 | IDA-61280 | Int Charges | 575.53 |
May 5, 2023 | IDA-61280 | Int Charges | 575.53 |
May 5, 2023 | IDA-61280 | Int Charges | 959.22 |
May 5, 2023 | IDA-61280 | Int Charges | 164,451.40 |
May 5, 2023 | IDA-61280 | Int Charges | 164,451.40 |
Mar 28, 2023 | IDA-47890 | Loan Repay | 805,921.00 |
Mar 28, 2023 | IDA-47890 | Int Charges | 514.40 |
Mar 28, 2023 | IDA-47890 | Int Charges | 514.40 |
Mar 28, 2023 | IDA-47890 | Int Charges | 224,073.48 |
Mar 28, 2023 | IDA-47890 | Int Charges | 224,073.48 |
Sep 15, 2022 | IDA-47890 | Loan Repay | 792,589.00 |
Apr 30, 2018 | IDA-47890 | Loan Cancel | 3,170.91 |
Apr 13, 2018 | IDA-61280 | Loan Disb | 6,953,000.00 |
Feb 15, 2019 | IDA-47890 | Int Charges | 251,715.45 |
Feb 15, 2019 | IDA-47890 | Int Charges | 251,715.45 |
Oct 11, 2018 | IDA-61280 | Int Charges | 23,366.00 |
Oct 11, 2018 | IDA-61280 | Int Charges | 23,366.00 |
Oct 11, 2018 | IDA-61280 | Int Charges | 38,943.39 |
Feb 15, 2019 | IDA-47890 | Int Charges | 5,282.37 |
Feb 15, 2019 | IDA-47890 | Int Charges | 5,282.37 |
Jan 16, 2019 | IDA-61280 | Loan Disb | 23,852,818.00 |
Apr 1, 2019 | IDA-61280 | Int Charges | 295.37 |
Nov 3, 2023 | IDA-61280 | Int Charges | 157,300.12 |
Nov 3, 2023 | IDA-61280 | Int Charges | 262,166.84 |
Nov 3, 2023 | IDA-61280 | Loan Repay | 715,453.90 |
Nov 3, 2023 | IDA-61280 | Int Charges | 486.03 |
Nov 3, 2023 | IDA-61280 | Int Charges | 486.03 |
Apr 1, 2023 | IDA-61280 | Loan Repay | 30,259.50 |
Oct 1, 2022 | IDA-61280 | Loan Repay | 8,282.33 |
Sep 15, 2022 | IDA-47890 | Int Charges | 544.22 |
Sep 15, 2022 | IDA-47890 | Int Charges | 544.22 |
Sep 15, 2022 | IDA-47890 | Int Charges | 229,261.77 |
Sep 15, 2022 | IDA-47890 | Int Charges | 229,261.77 |
Nov 9, 2022 | IDA-61280 | Loan Repay | 694,084.70 |
Nov 9, 2022 | IDA-61280 | Int Charges | 159,644.06 |
Nov 9, 2022 | IDA-61280 | Int Charges | 159,644.06 |
Nov 9, 2022 | IDA-61280 | Int Charges | 266,073.50 |
Nov 3, 2023 | IDA-61280 | Int Charges | 810.05 |
Sep 15, 2023 | IDA-47890 | Int Charges | 10,652.69 |
Sep 15, 2023 | IDA-47890 | Loan Repay | 819,218.44 |
Sep 15, 2023 | IDA-47890 | Int Charges | 708.05 |
Sep 15, 2023 | IDA-47890 | Int Charges | 708.05 |
Sep 15, 2023 | IDA-47890 | Int Charges | 227,333.14 |
Sep 15, 2023 | IDA-47890 | Int Charges | 227,333.14 |
Sep 15, 2023 | IDA-47890 | Int Charges | 10,652.69 |
Feb 15, 2023 | IDA-47890 | Loan Repay | 29,246.76 |
May 5, 2023 | IDA-61280 | Int Charges | 274,085.72 |
Jun 28, 2017 | IDA-61280 | Loan Commitment | 45,700,000.00 |
Jun 23, 2010 | IDA-47890 | Loan Commitment | 75,000,000.00 |
Feb 15, 2024 | IDA-47890 | Loan Repay | 12,763.41 |
Feb 21, 2024 | IDA-47890 | Int Charges | 514.89 |
Feb 21, 2024 | IDA-47890 | Int Charges | 514.89 |
Feb 21, 2024 | IDA-47890 | Int Charges | 225,526.27 |
Feb 21, 2024 | IDA-47890 | Int Charges | 225,526.27 |
Feb 21, 2024 | IDA-47890 | Loan Repay | 811,044.70 |
Apr 1, 2024 | IDA-61280 | Loan Repay | 21,655.27 |
Aug 16, 2024 | IDA-47890 | Int Charges | 102.25 |
Aug 16, 2024 | IDA-47890 | Int Charges | 102.25 |
Aug 16, 2024 | IDA-47890 | Int Charges | 208,649.90 |
Aug 16, 2024 | IDA-47890 | Int Charges | 208,649.90 |
Apr 10, 2024 | IDA-61280 | Int Charges | 260,180.86 |
Apr 10, 2024 | IDA-61280 | Int Charges | 481.58 |
Apr 10, 2024 | IDA-61280 | Int Charges | 481.58 |
Apr 10, 2024 | IDA-61280 | Int Charges | 802.62 |
Apr 10, 2024 | IDA-61280 | Int Charges | 156,108.55 |
Apr 10, 2024 | IDA-61280 | Int Charges | 156,108.55 |
Oct 1, 2023 | IDA-61280 | Loan Repay | 286.02 |
Apr 10, 2024 | IDA-61280 | Loan Repay | 700,933.30 |
Aug 15, 2024 | IDA-47890 | Loan Repay | 11,614.37 |
Aug 16, 2024 | IDA-47890 | Loan Repay | 819,273.80 |
Nov 3, 2023 | IDA-61280 | Int Charges | 157,300.12 |
Mar 12, 2021 | IDA-47890 | Int Charges | 28,088.16 |
Mar 12, 2021 | IDA-47890 | Int Charges | 28,088.16 |
Mar 12, 2021 | IDA-47890 | Loan Repay | 887,242.30 |
Mar 12, 2021 | IDA-47890 | Int Charges | 331.53 |
Mar 12, 2021 | IDA-47890 | Int Charges | 331.53 |
Mar 12, 2021 | IDA-47890 | Int Charges | 262,845.56 |
Mar 12, 2021 | IDA-47890 | Int Charges | 262,845.56 |
Oct 5, 2021 | IDA-61280 | Int Charges | 172,907.90 |
Oct 5, 2021 | IDA-61280 | Int Charges | 172,907.90 |
Oct 5, 2021 | IDA-61280 | Int Charges | 291,327.62 |
Oct 1, 2021 | IDA-61280 | Int Charges | 1,887.27 |
Oct 1, 2021 | IDA-61280 | Int Charges | 1,887.27 |
Aug 15, 2021 | IDA-47890 | Loan Repay | 8,053.55 |
Aug 17, 2021 | IDA-47890 | Loan Repay | 875,247.70 |
Aug 17, 2021 | IDA-47890 | Int Charges | 496.85 |
Aug 17, 2021 | IDA-47890 | Int Charges | 496.85 |
Aug 15, 2015 | IDA-47890 | Int Charges | 5,914.92 |
Aug 15, 2015 | IDA-47890 | Int Charges | 5,914.92 |
Aug 15, 2015 | IDA-47890 | Int Charges | 228,568.84 |
Aug 15, 2015 | IDA-47890 | Int Charges | 228,568.84 |
Feb 15, 2017 | IDA-47890 | Int Charges | 248,929.02 |
Feb 15, 2017 | IDA-47890 | Int Charges | 248,929.02 |
Feb 15, 2017 | IDA-47890 | Int Charges | 761.39 |
Feb 15, 2017 | IDA-47890 | Int Charges | 761.39 |
Aug 16, 2016 | IDA-47890 | Int Charges | 260,092.81 |
Aug 16, 2016 | IDA-47890 | Int Charges | 260,092.81 |
Aug 16, 2016 | IDA-47890 | Int Charges | 287.04 |
Aug 16, 2016 | IDA-47890 | Int Charges | 287.04 |
Feb 15, 2016 | IDA-47890 | Int Charges | 126.96 |
Feb 15, 2016 | IDA-47890 | Int Charges | 126.96 |
Apr 28, 2016 | IDA-47890 | Loan Disb | 804,592.50 |
Feb 22, 2018 | IDA-47890 | Int Charges | 7,947.46 |
Feb 22, 2018 | IDA-47890 | Int Charges | 7,947.46 |
Feb 22, 2018 | IDA-47890 | Int Charges | 263,345.70 |
Feb 22, 2018 | IDA-47890 | Int Charges | 263,345.70 |
Sep 15, 2017 | IDA-47890 | Int Charges | 1,991.24 |
Sep 15, 2017 | IDA-47890 | Int Charges | 1,991.24 |
Sep 15, 2017 | IDA-47890 | Int Charges | 257,537.88 |
Sep 15, 2017 | IDA-47890 | Int Charges | 257,537.88 |
Aug 15, 2018 | IDA-47890 | Int Charges | 6,279.98 |
Aug 15, 2018 | IDA-47890 | Int Charges | 6,279.98 |
Aug 15, 2018 | IDA-47890 | Int Charges | 257,815.98 |
Aug 15, 2018 | IDA-47890 | Int Charges | 257,815.98 |
Feb 26, 2014 | IDA-47890 | Loan Disb | 23,601,414.00 |
Aug 15, 2013 | IDA-47890 | Int Charges | 446.59 |
Aug 15, 2013 | IDA-47890 | Int Charges | 446.59 |
Aug 15, 2013 | IDA-47890 | Int Charges | 62,471.48 |
Aug 15, 2013 | IDA-47890 | Int Charges | 62,471.48 |
Aug 19, 2014 | IDA-47890 | Loan Disb | 8,056,472.50 |
Aug 18, 2014 | IDA-47890 | Int Charges | 323.14 |
Aug 18, 2014 | IDA-47890 | Int Charges | 323.14 |
Feb 15, 2015 | IDA-47890 | Int Charges | 181,446.83 |
Feb 15, 2015 | IDA-47890 | Int Charges | 181,446.83 |
Feb 15, 2015 | IDA-47890 | Int Charges | 1,002.05 |
Feb 15, 2015 | IDA-47890 | Int Charges | 1,002.05 |
Aug 18, 2014 | IDA-47890 | Int Charges | 162,266.55 |
Aug 18, 2014 | IDA-47890 | Int Charges | 162,266.55 |
Feb 17, 2015 | IDA-47890 | Loan Disb | 14,408,818.00 |
Feb 15, 2014 | IDA-47890 | Int Charges | 259.84 |
Feb 15, 2014 | IDA-47890 | Int Charges | 259.84 |
Feb 15, 2014 | IDA-47890 | Int Charges | 80,105.17 |
Feb 15, 2014 | IDA-47890 | Int Charges | 80,105.17 |
Feb 19, 2016 | IDA-47890 | Int Charges | 241,871.31 |
Feb 19, 2016 | IDA-47890 | Int Charges | 241,871.31 |
Dec 9, 2015 | IDA-47890 | Loan Disb | 6,201,527.00 |
Name | Review | Date |
---|---|---|
Financial Management | Moderately Satisfactory | 2020-04-04 |
Monitoring and Evaluation | Moderately Satisfactory | 2020-04-04 |
Counterpart Funding | Satisfactory | 2020-04-04 |
Overall Implementation Progress (IP) | Satisfactory | 2020-04-04 |
Progress towards achievement of PDO | Satisfactory | 2020-04-04 |
Procurement | Moderately Satisfactory | 2020-04-04 |
Project Management | Moderately Satisfactory | 2020-04-04 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 03-23-2021 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Moderately Satisfactory |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 06-25-2021 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 0.00 | 1356340.00 | 800000.00 |
Date | June 22, 2010 | June 30, 2020 | June 28, 2017 | |
Comment |
Reliability of water supply services under the project area | Value | 0.00 | 16.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
People provided with access to "improved sanitation facilities” under the proj. | Value | 0.00 | 672676.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Communities in project area declared free of open defecation (number) | Value | 0.00 | 1052.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Water systems in project areas with ratio of revenues over O&M costs (including depreciation) >=1.0(percent) | Value | 1.00 | 0.90 | 0.00 |
Date | June 22, 2010 | February 28, 2020 | ||
Comment |
percentage of female beneficiaries | Value | 0.00 | 52.00 | 0.00 |
Date | June 22, 2010 | February 28, 2020 | ||
Comment |
Percentage of installed water supply system functional | Value | 0.00 | 100.00 | 0.00 |
Date | June 22, 2010 | February 28, 2020 | ||
Comment |
Female beneficiaries | Value | 0.00 | 52.00 | 0.00 |
Date | June 22, 2010 | May 21, 2018 | ||
Comment |
People provided with access to ?improved sanitation facilities?- rural | Value | 0.00 | 672676.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Number of people in rural areas provided with access to Improved Water Sources under the project | Value | 0.00 | 1356340.00 | 800000.00 |
Date | June 22, 2010 | June 30, 2020 | June 28, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Orphan boreholes rehabilitated | Value | 0.00 | 376.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Improved latrines constructed under the project | Value | 0.00 | 56228.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Key institutions (CWSA, MOFEP, MSWR, MMDAs) trained in the use Sector Information Systems | Value | 0.00 | 4.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Former GWCL systems transferred to communities rehabilitated | Value | 0.00 | 15.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Communities sensitized about hygiene practices and eradication of open free defecation | Value | 0.00 | 1168.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
District Assemblies operating DiMES | Value | 0.00 | 94.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
New community water systems fed from GWCL | Value | 0.00 | 9.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
New Institutional toilet facilities constructed and operational | Value | 0.00 | 568.00 | 400.00 |
Date | June 22, 2010 | June 30, 2020 | June 28, 2017 | |
Comment |
Timely submittal of clean (unqualified) FM audit reports (percent for each participating DA) | Value | 0.00 | 0.85 | 0.00 |
Date | June 22, 2010 | February 28, 2020 | ||
Comment |
New water systems based on boreholes fitted with hand pumps operational | Value | 0.00 | 1373.00 | 0.00 |
Date | June 22, 2010 | June 30, 2020 | ||
Comment |
Acceptable implementation (including safeguards) quarterly reports delivered on time (percent for each participating DA) | Value | 0.00 | 0.88 | 0.00 |
Date | June 22, 2010 | February 28, 2020 | ||
Comment |
New mechanized boreholes operational | Value | 0.00 | 58.00 | 60.00 |
Date | June 22, 2010 | June 30, 2020 | June 28, 2017 | |
Comment |
Subproject implementation in accordance with timetable in procurement plan (percent for each participating DA) | Value | 0.00 | 0.88 | 0.00 |
Date | June 22, 2010 | February 28, 2020 | ||
Comment |
New water systems for small towns operational (number) | Value | 0.00 | 75.00 | 60.00 |
Date | June 22, 2010 | June 30, 2020 | June 28, 2017 | |
Comment |