Financier | Commitments |
---|---|
IDA Credit | 19.50 |
P121779
Closed
Miriam Montenegro Lazo
The Republic of Nicaragua
November 2, 2010
(as of board presentation)
February 3, 2011
July 25, 2011
US$ 19.50 million
Ministry of the Family, Youth and Children
2011
US$ 19.50 million
C
Not Applicable
June 30, 2017
BANK APPROVED
September 12, 2023
Financier | Commitments |
---|---|
IDA Credit | 19.50 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 19.50 |
IBRD + IDA Commitment | 19.50 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 19.50 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Aug 15, 2020 | IDA-48620 | Int Charges | 65,301.10 |
Aug 15, 2020 | IDA-48620 | Int Charges | 794.48 |
Aug 15, 2020 | IDA-48620 | Int Charges | 794.48 |
Feb 15, 2019 | IDA-48620 | Int Charges | 1,367.26 |
Feb 15, 2019 | IDA-48620 | Int Charges | 1,367.26 |
Feb 15, 2019 | IDA-48620 | Int Charges | 64,711.08 |
Feb 15, 2019 | IDA-48620 | Int Charges | 64,711.08 |
Aug 15, 2019 | IDA-48620 | Int Charges | 65,857.91 |
Aug 15, 2019 | IDA-48620 | Int Charges | 65,857.91 |
Aug 15, 2019 | IDA-48620 | Int Charges | 360.02 |
Aug 15, 2019 | IDA-48620 | Int Charges | 360.02 |
Aug 15, 2023 | IDA-48620 | Int Charges | 60,651.24 |
Aug 15, 2023 | IDA-48620 | Int Charges | 60,651.24 |
Aug 15, 2023 | IDA-48620 | Int Charges | 1,137.45 |
Aug 15, 2023 | IDA-48620 | Int Charges | 1,137.45 |
Aug 15, 2023 | IDA-48620 | Loan Repay | 170,249.16 |
Aug 15, 2024 | IDA-48620 | Int Charges | 56,040.96 |
Aug 15, 2024 | IDA-48620 | Int Charges | 56,040.96 |
Aug 15, 2024 | IDA-48620 | Loan Repay | 167,938.30 |
Aug 15, 2024 | IDA-48620 | Loan Repay | 3,105.66 |
Feb 15, 2024 | IDA-48620 | Loan Repay | 397.08 |
Feb 15, 2024 | IDA-48620 | Loan Repay | 168,634.31 |
Feb 15, 2024 | IDA-48620 | Int Charges | 59,583.57 |
Feb 15, 2024 | IDA-48620 | Int Charges | 59,583.57 |
Feb 3, 2011 | IDA-48620 | Loan Commitment | 19,500,000.00 |
Feb 15, 2022 | IDA-48620 | Loan Repay | 3,304.04 |
Jun 27, 2014 | IDA-48620 | Loan Disb | 168,100.02 |
Jun 23, 2014 | IDA-48620 | Loan Disb | 141,903.66 |
Sep 2, 2014 | IDA-48620 | Loan Disb | 123,678.40 |
Feb 15, 2015 | IDA-48620 | Int Charges | 196.24 |
Feb 15, 2015 | IDA-48620 | Int Charges | 196.24 |
Feb 15, 2015 | IDA-48620 | Int Charges | 29,210.80 |
Feb 15, 2015 | IDA-48620 | Int Charges | 29,210.80 |
Dec 22, 2014 | IDA-48620 | Loan Disb | 189,671.98 |
Jan 26, 2015 | IDA-48620 | Loan Disb | 204,440.02 |
Aug 8, 2014 | IDA-48620 | Loan Disb | 407,760.00 |
Aug 15, 2014 | IDA-48620 | Int Charges | 24,339.66 |
Aug 15, 2014 | IDA-48620 | Int Charges | 24,339.66 |
Aug 15, 2014 | IDA-48620 | Int Charges | 99.74 |
Aug 15, 2014 | IDA-48620 | Int Charges | 99.74 |
Mar 30, 2015 | IDA-48620 | Loan Disb | 176,856.30 |
Jan 27, 2015 | IDA-48620 | Loan Disb | 723,060.00 |
Aug 15, 2015 | IDA-48620 | Int Charges | 376.67 |
Aug 15, 2015 | IDA-48620 | Int Charges | 376.67 |
Aug 15, 2015 | IDA-48620 | Int Charges | 39,300.17 |
Aug 15, 2015 | IDA-48620 | Int Charges | 39,300.17 |
Oct 29, 2014 | IDA-48620 | Loan Disb | 158,355.69 |
Sep 29, 2014 | IDA-48620 | Loan Disb | 407,000.00 |
Nov 12, 2014 | IDA-48620 | Loan Disb | 721,160.00 |
Aug 15, 2013 | IDA-48620 | Int Charges | 123.08 |
Aug 15, 2013 | IDA-48620 | Int Charges | 123.08 |
Aug 12, 2013 | IDA-48620 | Loan Disb | 112,870.28 |
Aug 16, 2013 | IDA-48620 | Loan Disb | 278,283.38 |
Aug 15, 2013 | IDA-48620 | Int Charges | 17,306.29 |
Aug 15, 2013 | IDA-48620 | Int Charges | 17,306.29 |
Dec 9, 2014 | IDA-48620 | Loan Disb | 249,429.98 |
Oct 1, 2013 | IDA-48620 | Loan Disb | 217,169.62 |
Feb 10, 2014 | IDA-48620 | Loan Disb | 89,999.14 |
Feb 15, 2014 | IDA-48620 | Int Charges | 64.90 |
Feb 15, 2014 | IDA-48620 | Int Charges | 64.90 |
Feb 15, 2014 | IDA-48620 | Int Charges | 22,439.78 |
Feb 15, 2014 | IDA-48620 | Int Charges | 22,439.78 |
Oct 15, 2013 | IDA-48620 | Loan Disb | 1,000,000.00 |
Aug 15, 2017 | IDA-48620 | Int Charges | 555.95 |
Aug 15, 2017 | IDA-48620 | Int Charges | 63,484.15 |
Aug 15, 2017 | IDA-48620 | Int Charges | 63,484.15 |
Aug 15, 2017 | IDA-48620 | Int Charges | 555.95 |
Oct 30, 2017 | IDA-48620 | Loan Cancel | 30,722.17 |
Aug 15, 2016 | IDA-48620 | Int Charges | 509.98 |
Aug 15, 2016 | IDA-48620 | Int Charges | 509.98 |
Aug 15, 2016 | IDA-48620 | Int Charges | 57,883.35 |
Aug 15, 2016 | IDA-48620 | Int Charges | 57,883.35 |
Oct 21, 2016 | IDA-48620 | Loan Disb | 119,879.07 |
May 31, 2016 | IDA-48620 | Loan Disb | 849,640.00 |
Feb 15, 2017 | IDA-48620 | Int Charges | 59,704.28 |
Feb 15, 2017 | IDA-48620 | Int Charges | 59,704.28 |
Jan 30, 2017 | IDA-48620 | Loan Disb | 60,436.39 |
Oct 14, 2016 | IDA-48620 | Loan Disb | 369.25 |
Sep 2, 2016 | IDA-48620 | Loan Disb | 220,320.25 |
Nov 2, 2016 | IDA-48620 | Loan Disb | 102,111.51 |
Jun 27, 2016 | IDA-48620 | Loan Disb | 378,465.28 |
Mar 24, 2017 | IDA-48620 | Loan Disb | 121,839.16 |
Jun 29, 2017 | IDA-48620 | Loan Disb | 492,506.66 |
Sep 23, 2014 | IDA-48620 | Loan Disb | 104,309.62 |
May 7, 2015 | IDA-48620 | Loan Disb | 1,478,140.00 |
May 6, 2015 | IDA-48620 | Loan Disb | 511,450.94 |
Aug 6, 2015 | IDA-48620 | Loan Disb | 1,246,660.00 |
Oct 21, 2015 | IDA-48620 | Loan Disb | 85,948.83 |
Nov 25, 2015 | IDA-48620 | Loan Disb | 1,316,700.00 |
Feb 1, 2016 | IDA-48620 | Loan Disb | 264,245.12 |
Aug 15, 2022 | IDA-48620 | Loan Repay | 168,720.90 |
Aug 15, 2022 | IDA-48620 | Int Charges | 708.22 |
Aug 15, 2022 | IDA-48620 | Int Charges | 708.22 |
Aug 15, 2022 | IDA-48620 | Int Charges | 61,372.23 |
Aug 15, 2022 | IDA-48620 | Int Charges | 61,372.23 |
Feb 15, 2023 | IDA-48620 | Int Charges | 60,379.36 |
Feb 15, 2023 | IDA-48620 | Loan Repay | 1,997.94 |
Feb 15, 2023 | IDA-48620 | Loan Repay | 168,893.95 |
Feb 15, 2023 | IDA-48620 | Int Charges | 60,379.36 |
Feb 15, 2021 | IDA-48620 | Int Charges | 1,485.38 |
Feb 15, 2021 | IDA-48620 | Int Charges | 1,485.38 |
Feb 15, 2021 | IDA-48620 | Loan Repay | 184,100.62 |
Dec 3, 2015 | IDA-48620 | Loan Disb | 234,115.89 |
Feb 15, 2016 | IDA-48620 | Int Charges | 50,364.15 |
Feb 15, 2016 | IDA-48620 | Int Charges | 50,364.15 |
Feb 15, 2016 | IDA-48620 | Int Charges | 214.68 |
Feb 15, 2016 | IDA-48620 | Int Charges | 214.68 |
Mar 11, 2016 | IDA-48620 | Loan Disb | 408,147.70 |
Feb 15, 2018 | IDA-48620 | Int Charges | 1,703.20 |
Feb 15, 2018 | IDA-48620 | Int Charges | 1,703.20 |
Feb 15, 2018 | IDA-48620 | Int Charges | 67,531.78 |
Feb 15, 2018 | IDA-48620 | Int Charges | 67,531.78 |
Aug 15, 2018 | IDA-48620 | Int Charges | 66,288.69 |
Aug 15, 2018 | IDA-48620 | Int Charges | 66,288.69 |
Aug 15, 2018 | IDA-48620 | Int Charges | 2,067.86 |
Aug 15, 2018 | IDA-48620 | Int Charges | 2,067.86 |
Mar 17, 2017 | IDA-48620 | Loan Disb | 8,204.53 |
Feb 15, 2017 | IDA-48620 | Int Charges | 62.78 |
Feb 15, 2017 | IDA-48620 | Int Charges | 62.78 |
Dec 22, 2016 | IDA-48620 | Loan Disb | 56,213.18 |
Apr 7, 2017 | IDA-48620 | Loan Disb | 49,169.69 |
May 23, 2017 | IDA-48620 | Loan Disb | 40,266.08 |
May 4, 2017 | IDA-48620 | Loan Disb | 125,885.32 |
Mar 14, 2017 | IDA-48620 | Loan Disb | 37,256.95 |
Oct 27, 2017 | IDA-48620 | Loan Disb | 115,678.98 |
Feb 15, 2021 | IDA-48620 | Int Charges | 68,548.21 |
Feb 15, 2021 | IDA-48620 | Int Charges | 68,548.21 |
Aug 15, 2021 | IDA-48620 | Int Charges | 482.61 |
Aug 15, 2021 | IDA-48620 | Int Charges | 482.61 |
Aug 15, 2021 | IDA-48620 | Loan Repay | 181,493.90 |
Aug 15, 2021 | IDA-48620 | Int Charges | 67,379.64 |
Aug 15, 2021 | IDA-48620 | Int Charges | 67,379.64 |
Feb 15, 2022 | IDA-48620 | Loan Repay | 175,696.84 |
Feb 15, 2022 | IDA-48620 | Int Charges | 65,031.43 |
Feb 15, 2022 | IDA-48620 | Int Charges | 65,031.43 |
Feb 15, 2020 | IDA-48620 | Int Charges | 430.72 |
Feb 15, 2020 | IDA-48620 | Int Charges | 430.72 |
Feb 15, 2020 | IDA-48620 | Int Charges | 65,097.51 |
Feb 15, 2020 | IDA-48620 | Int Charges | 65,097.51 |
Aug 15, 2020 | IDA-48620 | Int Charges | 65,301.10 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2017-06-14 |
Financial Management | Satisfactory | 2017-06-14 |
Monitoring and Evaluation | Satisfactory | 2017-06-14 |
Procurement | Satisfactory | 2017-06-14 |
Project Management | Satisfactory | 2017-06-14 |
Overall Implementation Progress (IP) | Satisfactory | 2017-06-14 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-22-2017 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 06-22-2018 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of families whose children had not been attending school and who now have children attending school in the selected localities | Value | 0.00 | 95.00 | 95.26 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Public preschool and primary retention rate in selected municipalities | Value | 85.00 | 90.00 | 95.00 |
Date | June 22, 2011 | September 30, 2015 | September 30, 2015 | |
Comment |
Percentage of children in primary school who are promoted to the next school year in selected localities | Value | 0.00 | 90.00 | 90.64 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families who are using local services and programs in selected localities | Value | 0.00 | 90.00 | 98.29 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of beneficiaries that are enrolled in MIFAN´s programs registered in the Management Information System of the Ministry of the Family | Value | 0.00 | 100.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of Municipalities where MIFAN is implementing the new model | Value | 0.00 | 90.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Procedures defined to receive and respond to complaints, appeals, questions and suggestions | Value | N/A | Conceptual Framework, Satisfaction Beneficiary Sur | Accomplished generated and approved |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percent of complaints and appeals attended to and resolved, according to pre-defined standards | Value | 0.00 | 80.00 | 94.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Number of new workshop modules developed | Value | 0.00 | 3.00 | 10.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of participants in workshops providing a satisfactory or higher rating to workshop for the first and second cycle | Value | 0.00 | 95.00 | 99.87 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families that have the first (initial) assessment of their basic conditions of social welfare and well-being during the first 3 months of interventions | Value | 0.00 | 95.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families improving their basic conditions of social welfare and well-being | Value | 0.00 | 90.00 | 89.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Number of technical specialists who have been certified to be trainers on the new model | Value | 0.00 | 100.00 | 192.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of participants in family counseling providing satisfactory or higher rating to the service | Value | 0.00 | 80.00 | 98.58 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Number of social promoters trained on new Social Welfare Model | Value | 0.00 | 700.00 | 899.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families that receive counseling visits in accordance with the frequency established in the interventions´ methodology | Value | 0.00 | 80.00 | 81.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of payment points for the family grants that have received a financial audit at least once a year | Value | 0.00 | 90.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
MIFAN Fiduciary unit fully staffed and functional | Value | N/A | YES | YES |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of execution of annual budget resources | Value | 0.00 | 90.00 | 87.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Design and implementation of impact evaluation | Value | N/A | Baseline and impact evaluation report completed | Base line report submitted and approved by the Ban |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Number of school days covered with rations in target municipalities | Value | 0.00 | 55.00 | 108.00 |
Date | June 22, 2011 | September 30, 2015 | September 30, 2015 | |
Comment |
Number of families who recognize themselves as indigenous attended by the Project | Value | 0.00 | 895.00 | 940.00 |
Date | December 31, 2014 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families that have completed the first cycle of educational workshops | Value | 0.00 | 100.00 | 97.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families who attend the workshops in selected municipalities | Value | 0.00 | 95.00 | 97.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families who have agreed on their Family Improvement Plan, during the first six months of intervention | Value | 0.00 | 70.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of beneficiary families whose co-responsibilities are verified and reported | Value | 0.00 | 97.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of families who are claiming the family grant in the corresponding period | Value | 0.00 | 97.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of targeted localities for which local services have been mapped | Value | 0.00 | 100.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of targeted localities for which local services mapping has been updated | Value | 0.00 | 97.00 | 100.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Number of modules of the MIFAN's Management Information System developed and implemented. | Value | 0.00 | 10.00 | 11.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Number of institutions that exchange information for the Registry of Beneficiaries | Value | 0.00 | 3.00 | 3.00 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |
Percentage of public preschool and primary education attendance in targeted areas | Value | 80.00 | 85.00 | 95.00 |
Date | June 22, 2011 | September 30, 2015 | September 30, 2015 | |
Comment |
Number of children who receive the rations in target municipalities | Value | 243000.00 | 243000.00 | 236516.00 |
Date | June 22, 2011 | September 30, 2015 | September 30, 2015 | |
Comment |
Percentage of eligible families of the Child at Risk Program that are enrolled in the Family Counseling Program | Value | 0.00 | 80.00 | 80.61 |
Date | June 22, 2011 | June 30, 2017 | June 12, 2017 | |
Comment |