FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV)

Abstract*

The objective of the Fourth National Program for Community Empowerment in Rural Areas Project for villagers in Program Nasional Pemberdayaan Masyarakat (PNPM)-rural locations Indonesia is to benefit from improved socio-economic and local governance conditions. There are four components to the project. the first component is Kecamatan grants: supports the construction of the economic and social infrastructure needed and requested by the target communities;...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

For villagers in PNPM-Rural locations to benefit from improved socio-economic and local governance conditions

Key Details

Project Details

  • P122810

  • Closed

  • Sonya Woo

  • N/A

  • Indonesia

  • May 13, 2011

  • (as of board presentation)

    July 14, 2011

  • September 1, 2011

  • US$ 531.19 million

  • B

  • December 30, 2014

  • June 30, 2014

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 531.19
Borrower/Recipient 752.42

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 531.19
IDA Commitment N/A
IBRD + IDA Commitment 531.19
Lending Instrument
Grant Amount N/A
Total Project Cost** 1283.61

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jul 15, 2018 IBRD-80790 Int Charges 6,709,305.50
Jul 15, 2019 IBRD-80790 Int Charges 9,403,593.00
Jul 15, 2017 IBRD-80790 Int Charges 5,203,674.00
Jan 15, 2018 IBRD-80790 Int Charges 5,665,856.00
Jul 15, 2016 IBRD-80790 Int Charges 3,798,155.00
Jan 15, 2017 IBRD-80790 Int Charges 4,269,531.50
Jul 15, 2013 IBRD-80790 Int Charges 42,530.00
Jul 15, 2013 IBRD-80790 Int Charges 2,561,847.50
Jan 15, 2014 IBRD-80790 Int Charges 2,360,155.20
Jul 15, 2014 IBRD-80790 Int Charges 2,161,559.00
Dec 15, 2014 IBRD-80790 Loan Disb -5,396,514.00
Jan 15, 2015 IBRD-80790 Int Charges 2,247,785.20
Dec 15, 2014 IBRD-80790 Loan Cancel 5,816,984.50
Jul 15, 2015 IBRD-80790 Int Charges 3,857.02
Jul 15, 2015 IBRD-80790 Int Charges 2,347,041.20
Jan 15, 2016 IBRD-80790 Int Charges 2,712,092.20
Jan 15, 2024 IBRD-80790 Int Charges 14,320,097.00
Jan 15, 2024 IBRD-80790 Loan Repay 13,554,624.00
Jan 15, 2024 IBRD-80790 Int Charges 193,277.28
Jul 15, 2024 IBRD-80790 Int Charges 94,024.81
Jul 15, 2024 IBRD-80790 Int Charges 13,963,365.00
Jul 15, 2024 IBRD-80790 Loan Repay 13,869,848.00
Jul 14, 2011 IBRD-80790 Loan Commitment 531,190,016.00
Jan 15, 2023 IBRD-80790 Int Charges 542,520.25
Jan 15, 2023 IBRD-80790 Int Charges 9,614,498.00
Jan 15, 2023 IBRD-80790 Loan Repay 12,924,176.00
Jul 15, 2023 IBRD-80790 Int Charges 611,895.00
Jul 15, 2023 IBRD-80790 Int Charges 12,423,873.00
Jul 15, 2023 IBRD-80790 Loan Repay 13,239,400.00
Jan 15, 2022 IBRD-80790 Int Charges 2,205,398.20
Jan 15, 2022 IBRD-80790 Loan Repay 12,293,729.00
Jul 15, 2022 IBRD-80790 Loan Repay 12,608,952.00
Jul 15, 2022 IBRD-80790 Int Charges 2,737,176.00
Jan 15, 2021 IBRD-80790 Int Charges 2,732,049.00
Jan 15, 2021 IBRD-80790 Loan Repay 11,663,281.00
Jul 15, 2021 IBRD-80790 Int Charges 2,449,733.80
Jul 15, 2021 IBRD-80790 Loan Repay 11,978,505.00
Jan 15, 2020 IBRD-80790 Int Charges 7,787,195.50
Jul 15, 2020 IBRD-80790 Loan Repay 11,400,594.00
Jul 15, 2020 IBRD-80790 Int Charges 6,772,934.00
Jan 15, 2019 IBRD-80790 Int Charges 8,592,768.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Highly Satisfactory 2014-06-28
Progress towards achievement of PDO Moderately Satisfactory 2014-06-28
Procurement Moderately Satisfactory 2014-06-28
Project Management Moderately Satisfactory 2014-06-28
Financial Management Moderately Satisfactory 2014-06-28
Monitoring and Evaluation Moderately Unsatisfactory 2014-06-28
Overall Implementation Progress (IP) Moderately Satisfactory 2014-06-28

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 01-29-2015
OutcomesModerately Satisfactory
Risk to Development OutcomeModest
Bank PerformanceModerately Satisfactory
Borrower PerformanceModerately Satisfactory
Government PerformanceModerately Satisfactory
Implementing AgencyModerately Satisfactory

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-05-2015PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeModerateN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceModerately SatisfactoryN/a
Government PerformanceModerately SatisfactoryN/a
Implementing AgencyModerately SatisfactoryN/a
Icr QualityUnsatisfactoryN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Improved HH expenditure rates and improved access to economic and social services in a minimum of 4,800 sub-districts in 2011 (impacts taken from representative sample)Value2.009.102.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    CommentThe impact evaluation was expected to cover the PNPM engagement from 2007-2012 and not only the one cycle of block grants whichwill be financed by PNPM-Rural IV. However results for this indicator are available for 2007-2010 only due to the loss of thecontrolgroup which occurred when the program reached national scale in 2009/2010. While no additional analysis will be generatedfor the period 2011-2013, the previous results are considered representative of expected project impact9.1% increase of the consumption rate of poor households in PNPM areas, compared with the Control households (based on 2011 ImpactEvaluation). No additional analysis was generated between 2011-2013 because of the loss of the Control group, which occurred whenthe project was scaled up nationally. Target exceeded.
  • EIRRs >30 % for main rural infrastructure categoriesValue39.0085.2030.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    Comment.The Small Scale EIRR (2012) confirms the following rates for main rural infrastructure categories: 85.2% for water and sanitation,120% for roads and bridges and 108% for irrigation. The last economic evaluation (prior to the Small Scale EIRR) was carried out in2005 (and not 2012 as reported in the previous ISR). It found a weighted average internal rate of return of between 35-50%. The2012 Small Scale EIRR confirms that the target was exceeded.
  • >80% satisfaction levels from beneficiaries regarding improved services and local level governance (impacts taken from representative sample).Value80.0078.6980.00
    DateJune 9, 2014June 30, 2014
    CommentBased on outcome of KDP2Reported by the Incidence of Benefits Survey (2012). Result is well within range of target.
  • Direct project beneficiariesValue49000000.0045000000.0049000000.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    CommentCumulative data confirmed by the Annual Report for 2013. However, there is a discrepancy between this figure and the QPR for endMarch 2014, which reports 32,304,204. In either case, target not achieved.
  • Female beneficiariesValue49.0050.2749.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • >85% of agreed work plans completed each yearValue95.0095.0085.00
    DateJanuary 1, 2006June 9, 2014December 31, 2012
    CommentCompletion rate for 2013 confirmed by mission carried out between Feb-March 2014. Target exceeded.
  • >70% of infrastructure works are evaluated as of high qualityValue65.0075.0070.00
    DateDecember 30, 2008June 9, 2014June 30, 2014
    CommentPNPM Rural annual reportThe Technical Evaluation (2012) reported that 82% of infrastructure works were evaluated as high quality. While the QPR for endDecember 2013 indicated a reduction in the rate (75%)-target exceeded.
  • By 2011, 90% of facilitators receive the agreed upon number of pre and in service training daysValue85.0095.0090.00
    DateJune 9, 2014June 30, 2014
    CommentTraining completed for 10,569 out of the total 11,126 Social (FK) and Technical (FT) Facilitators. Confirmed by mission carriedoutbetween Feb-March 2014. Target exceeded.
  • Min. 50% participation rate of women and poorest community members in planning and decision-making meetingsValue48.0041.0050.00
    DateJune 2, 2008June 9, 2014June 30, 2014
    Commentdata collected in 2008, 48% for women and 56% for poorest community membersAs reported in the QPR for end March 2014. Target not achieved.
  • O&M arrangements are in place and/ or functioning for >85% of infrastructure works.Value85.0090.0085.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    CommentFindings from Technical Evaluation (2012). Target exceeded.
  • By 2011, 4,500 sub-districts with completed subprojects (#/type of infrastructure works, economic, education, health, revolving loans and environmental management, etc.)Value4100.005146.004800.00
    DateJanuary 1, 2010June 9, 2014June 30, 2014
    CommentReconfirmed during ISM mission (February-March 2014). Target exceeded.
  • Through the MDG/Community Conditional Cash Transfers pilot, improvements in priority health and education indicators.Value0.034.100.03
    DateJune 9, 2014June 30, 2014
    Commentfrom PNPM Generasi 2007 baseline survey; average standardized effects for health and education targetsConfirmed by PNPM Generasi Impact Evaluation Endline Report (2012). Target exceeded.from PNPM Generasi 2007 baseline survey; average standardized effects for health and education targets
  • By 2011, >90% of local government councils provide funds and/or oversee PNPMValue70.0093.0090.00
    DateJune 9, 2014June 30, 2014
    CommentAs per budget report. Target achieved.
  • By 2012, 90% of planned facilitators positions are filled (sub-district/district levels).Value85.0096.0090.00
    DateJune 14, 2011June 9, 2014December 31, 2012
    CommentConfirmed by mission carried out between Feb-March 2014. Target achieved.
  • Audit sample size increases to min. of 20% of all sub-districts and audit results are made public.Value13.5018.5720.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    CommentResult is slightly lower but within range. Target not achieve due to delays in the submission of the audit report by Inspectorateof Kabupaten/Kota, which conducted the audit on behalf of BPKP.
  • >70% of sampled villages receive socialization material packages for PNPM in 2011 onward.Value70.00100.0070.00
    DateDecember 1, 2011June 9, 2014June 30, 2014
    CommentConfirmed by mission carried out between Feb-March 2014. Target exceeded.
  • Number of project management units established by March every yearValue350.00393.00400.00
    DateJanuary 1, 2009June 9, 2014June 30, 2014
    CommentConfirmed by NMC. Result is slightly lower than target but still within range.
  • Kecamatan Grants disbursed and accounted forValue75.0098.0080.00
    DateJanuary 1, 2009June 9, 2014June 30, 2014
    CommentConfirmed by mission carried out between Feb-March 2014. Target exceeded.
  • All oversight consultants and facilitators paid on time, in full every monthValue80.0085.0080.00
    DateJune 14, 2011June 9, 2014June 30, 2014
    CommentReported by World Bank FM team. While two of the 7 administrative regions are behind in payments--target is still achieved.