Skip to Main Navigation

Health Sustainable Development Goals Program-for-Results

Abstract*

The objective of the Health Millennium Development Goals Program-for-Results Project for Ethiopia is to Improve the delivery and use of a comprehensive package of maternal and child health services. Ethiopia's Growth and Transformation Plan (GTP) 2011-2015 has a strong focus on the Millennium Development Goals (MDGs) and gives high priority to human development. Ethiopia has made impressive progress in improving health outcomes and is among countries...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To improve the delivery and use of a comprehensive package of maternal and child health services.

Key Details

Project Details

  • P123531

  • Closed

  • Roman Tesfaye , Enias Baganizi

  • FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA

  • Ethiopia

  • February 28, 2013

  • (as of board presentation)

    February 28, 2013

  • March 29, 2013

  • US$ 100.00 million

  • Ministry of Health (MOH),Immigration and Citizenship Service (ICS)

  • Eastern and Southern Africa

  • 2013

  • US$ 100.00 million

  • B

  • Not Applicable

  • June 30, 2022

  • BANK APPROVED

  • October 18, 2023

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 100.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 100.00
IBRD + IDA Commitment 100.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 100.00

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Mar 15, 2017 IDA-52090 Int Charges 940.73
Sep 15, 2017 IDA-52090 Int Charges 226,847.80
Sep 15, 2017 IDA-52090 Int Charges 226,847.80
Feb 14, 2018 IDA-60900 Loan Disb 25,134,738.00
Feb 14, 2018 IDA-60900 Loan Disb 37,421,352.00
Mar 16, 2018 IDA-52090 Int Charges 5,556.28
Mar 16, 2018 IDA-52090 Int Charges 5,556.28
Mar 16, 2018 IDA-52090 Int Charges 248,714.66
Mar 16, 2018 IDA-52090 Int Charges 248,714.66
Jul 16, 2018 IDA-52090 Loan Disb 5,038,085.00
Jul 16, 2018 IDA-60900 Loan Disb 4,561,091.50
Sep 15, 2018 IDA-52090 Int Charges 3,399.13
Sep 15, 2018 IDA-52090 Int Charges 3,399.13
Sep 15, 2018 IDA-52090 Int Charges 243,413.50
Sep 15, 2018 IDA-52090 Int Charges 243,413.50
Jul 17, 2018 IDA-60900 Int Charges 190,891.48
Jul 17, 2018 IDA-60900 Int Charges 190,891.48
Sep 19, 2023 IDA-52090 Int Charges 319,032.20
Sep 19, 2023 IDA-52090 Int Charges 319,032.20
Jan 15, 2023 IDA-60900 Int Charges 8,533.25
Jan 15, 2023 IDA-60900 Int Charges 8,533.25
Jul 20, 2023 IDA-60900 Int Charges 15,906.71
Jul 20, 2023 IDA-60900 Int Charges 15,906.71
Dec 30, 2022 IDA-60900 Loan Cancel 36,870.60
Jul 20, 2023 IDA-60900 Loan Repay 2,334,783.20
Jul 20, 2023 IDA-60900 Int Charges 542,096.90
Jul 20, 2023 IDA-60900 Int Charges 542,096.90
Sep 15, 2023 IDA-52090 Loan Repay 15,353.66
Sep 19, 2023 IDA-52090 Loan Repay 843,977.00
Mar 18, 2024 IDA-52090 Loan Repay 836,098.00
Mar 18, 2024 IDA-52090 Int Charges 70.95
Mar 18, 2024 IDA-52090 Int Charges 70.95
Mar 18, 2024 IDA-52090 Int Charges 318,580.10
Mar 18, 2024 IDA-52090 Int Charges 318,580.10
Mar 15, 2024 IDA-52090 Loan Repay 30,786.17
Jan 15, 2024 IDA-60900 Int Charges 240.50
Jan 15, 2024 IDA-60900 Int Charges 240.50
Jan 15, 2024 IDA-60900 Int Charges 524,480.44
Jan 15, 2024 IDA-60900 Int Charges 524,480.44
Jan 15, 2024 IDA-60900 Int Charges 17,875.72
Jan 15, 2024 IDA-60900 Int Charges 17,875.72
Jan 15, 2024 IDA-60900 Loan Repay 2,308,273.80
Jan 15, 2024 IDA-60900 Int Charges -100.24
Jan 15, 2024 IDA-60900 Int Charges 100.24
Jul 15, 2024 IDA-60900 Int Charges 524,691.60
Jul 15, 2024 IDA-60900 Int Charges 524,691.60
Jul 15, 2024 IDA-60900 Int Charges 20,712.10
Jul 15, 2024 IDA-60900 Int Charges 20,712.10
Jul 15, 2024 IDA-60900 Loan Repay 2,293,087.50
May 9, 2017 IDA-60900 Loan Commitment 150,000,000.00
Feb 28, 2013 IDA-52090 Loan Commitment 100,000,000.00
Jul 15, 2021 IDA-60900 Int Charges 8,285.63
Jul 15, 2021 IDA-60900 Int Charges 8,285.63
Jul 15, 2021 IDA-60900 Int Charges 554,976.75
Jul 15, 2021 IDA-60900 Int Charges 554,976.75
Oct 27, 2021 IDA-60900 Loan Disb 3,725,883.50
Oct 27, 2021 IDA-52090 Loan Disb 13,793,062.00
Sep 7, 2021 IDA-60900 Loan Disb 411,401.25
Dec 3, 2021 IDA-60900 Loan Disb 139,343.00
Jun 16, 2022 IDA-60900 Loan Disb 389,000.00
Sep 15, 2021 IDA-52090 Int Charges 2,478.70
Sep 15, 2021 IDA-52090 Int Charges 2,478.70
Sep 15, 2021 IDA-52090 Int Charges 288,363.30
Sep 15, 2021 IDA-52090 Int Charges 288,363.30
Mar 15, 2022 IDA-52090 Int Charges 280.42
Mar 15, 2022 IDA-52090 Int Charges 280.42
Mar 15, 2022 IDA-52090 Int Charges 320,327.66
Mar 15, 2022 IDA-52090 Int Charges 320,327.66
Jul 15, 2022 IDA-60900 Int Charges 1,221.36
Jul 15, 2022 IDA-60900 Int Charges 1,221.36
Jan 15, 2022 IDA-60900 Int Charges 558,934.00
Jan 15, 2022 IDA-60900 Int Charges 558,934.00
Jul 15, 2022 IDA-60900 Int Charges 533,761.20
Jul 15, 2022 IDA-60900 Int Charges 533,761.20
Feb 4, 2022 IDA-60900 Loan Disb 135,620.10
Jan 15, 2022 IDA-60900 Int Charges 4,266.37
Jan 15, 2022 IDA-60900 Int Charges 4,266.37
Nov 16, 2022 IDA-60900 Loan Disb 2,138,292.00
Nov 4, 2022 IDA-52090 Loan Disb 1,140,760.00
Jan 15, 2019 IDA-60900 Int Charges 237,274.40
Jan 15, 2019 IDA-60900 Int Charges 237,274.40
Jan 15, 2019 IDA-60900 Int Charges 2,895.50
Jan 15, 2019 IDA-60900 Int Charges 2,895.50
Mar 15, 2019 IDA-52090 Int Charges 6,249.26
Mar 15, 2019 IDA-52090 Int Charges 6,249.26
Mar 15, 2019 IDA-52090 Int Charges 260,430.33
Mar 15, 2019 IDA-52090 Int Charges 260,430.33
Apr 3, 2019 IDA-52090 Loan Disb 2,849,899.80
Apr 3, 2019 IDA-60900 Loan Disb 12,445,534.00
Jul 15, 2019 IDA-60900 Int Charges 2,354.72
Jul 15, 2019 IDA-60900 Int Charges 266,696.66
Jul 15, 2019 IDA-60900 Int Charges 266,696.66
Jul 15, 2019 IDA-60900 Int Charges 2,354.72
Nov 17, 2014 IDA-52090 Loan Disb 26,721,884.00
Jul 23, 2013 IDA-52090 Loan Disb 6,874,280.00
Sep 15, 2022 IDA-52090 Int Charges 305,145.90
Sep 15, 2022 IDA-52090 Int Charges 305,145.90
Sep 20, 2013 IDA-52090 Int Charges 36,001.12
Sep 20, 2013 IDA-52090 Int Charges 36,001.12
Mar 20, 2014 IDA-52090 Int Charges 8,431.49
Mar 20, 2014 IDA-52090 Int Charges 8,431.49
Mar 20, 2014 IDA-52090 Int Charges 112,319.56
Mar 20, 2014 IDA-52090 Int Charges 112,319.56
Sep 15, 2014 IDA-52090 Int Charges 743.74
Sep 15, 2014 IDA-52090 Int Charges 743.74
Sep 15, 2014 IDA-52090 Int Charges 109,837.21
Sep 15, 2014 IDA-52090 Int Charges 109,837.21
Mar 15, 2015 IDA-52090 Int Charges 3,342.33
Mar 15, 2015 IDA-52090 Int Charges 3,342.33
Mar 15, 2015 IDA-52090 Int Charges 158,490.84
Mar 15, 2015 IDA-52090 Int Charges 158,490.84
Sep 15, 2015 IDA-52090 Int Charges 6,685.06
Sep 15, 2015 IDA-52090 Int Charges 6,685.06
Sep 15, 2015 IDA-52090 Int Charges 191,207.45
Sep 15, 2015 IDA-52090 Int Charges 191,207.45
Mar 16, 2016 IDA-52090 Int Charges 1,800.01
Mar 16, 2016 IDA-52090 Int Charges 1,800.01
Mar 16, 2016 IDA-52090 Int Charges 195,889.14
Mar 16, 2016 IDA-52090 Int Charges 195,889.14
Sep 15, 2016 IDA-52090 Int Charges 1,240.31
Sep 15, 2016 IDA-52090 Int Charges 1,240.31
Sep 15, 2016 IDA-52090 Int Charges 211,679.20
Sep 15, 2016 IDA-52090 Int Charges 211,679.20
Apr 11, 2016 IDA-52090 Loan Disb 3,667,317.20
Jun 30, 2016 IDA-52090 Loan Disb 1,732,961.40
Mar 15, 2017 IDA-52090 Int Charges 210,510.84
Mar 15, 2017 IDA-52090 Int Charges 210,510.84
Jun 30, 2017 IDA-52090 Loan Disb 6,545,481.00
Sep 15, 2022 IDA-52090 Int Charges 6,640.74
Sep 15, 2022 IDA-52090 Int Charges 6,640.74
Jan 20, 2023 IDA-60900 Int Charges 529,204.60
Jan 20, 2023 IDA-60900 Int Charges 529,204.60
Mar 15, 2023 IDA-52090 Loan Repay 3,467.21
Mar 15, 2023 IDA-52090 Loan Repay 863,170.00
Mar 15, 2023 IDA-52090 Int Charges 323,776.25
Mar 15, 2023 IDA-52090 Int Charges 323,776.25
Nov 17, 2022 IDA-60900 Loan Disb -26,131.28
Nov 17, 2022 IDA-60900 Loan Disb 26,131.28
Nov 14, 2022 IDA-60900 Loan Disb -26,131.63
Sep 15, 2019 IDA-52090 Int Charges 566.93
Sep 15, 2019 IDA-52090 Int Charges 566.93
Sep 15, 2019 IDA-52090 Int Charges 265,783.94
Sep 15, 2019 IDA-52090 Int Charges 265,783.94
Jan 15, 2020 IDA-60900 Int Charges 467.96
Jan 15, 2020 IDA-60900 Int Charges 467.96
Jan 15, 2020 IDA-60900 Int Charges 285,205.00
Jan 15, 2020 IDA-60900 Int Charges 285,205.00
Dec 6, 2019 IDA-60900 Loan Disb 47,247,364.00
Mar 15, 2020 IDA-52090 Int Charges 273,277.20
Mar 15, 2020 IDA-52090 Int Charges 273,277.20
Dec 6, 2019 IDA-52090 Loan Disb 3,464,166.80
Mar 15, 2020 IDA-52090 Int Charges 2,244.21
Mar 15, 2020 IDA-52090 Int Charges 2,244.21
Jun 3, 2020 IDA-60900 Loan Disb 16,502,729.00
Jul 23, 2020 IDA-60900 Int Charges 40,333.01
Jul 23, 2020 IDA-60900 Int Charges 40,333.01
Jul 23, 2020 IDA-60900 Int Charges 455,708.25
Jul 23, 2020 IDA-60900 Int Charges 455,708.25
Aug 24, 2020 IDA-60900 Loan Disb 2,894,355.20
Sep 15, 2020 IDA-52090 Int Charges 659.73
Sep 15, 2020 IDA-52090 Int Charges 659.73
Sep 15, 2020 IDA-52090 Int Charges 283,200.03
Sep 15, 2020 IDA-52090 Int Charges 283,200.03
Jan 15, 2021 IDA-60900 Int Charges 28,928.94
Jan 15, 2021 IDA-60900 Int Charges 28,928.94
Jan 15, 2021 IDA-60900 Int Charges 549,046.25
Jan 15, 2021 IDA-60900 Int Charges 549,046.25
Mar 15, 2021 IDA-52090 Int Charges 5,406.05
Mar 15, 2021 IDA-52090 Int Charges 5,406.05
Mar 15, 2021 IDA-52090 Int Charges 291,638.25
Mar 15, 2021 IDA-52090 Int Charges 291,638.25
Jun 22, 2021 IDA-60900 Loan Disb 2,724,177.80
Sep 15, 2017 IDA-52090 Int Charges 258.51
Sep 15, 2017 IDA-52090 Int Charges 258.51
Mar 15, 2017 IDA-52090 Int Charges 940.73

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Monitoring and Evaluation Moderately Satisfactory 2022-06-29
Overall Implementation Progress (IP) Moderately Satisfactory 2022-06-29
Progress towards achievement of PDO Moderately Satisfactory 2022-06-29

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 12-22-2022
OutcomesSubstantial
Risk to Development Outcome
Bank PerformanceSubstantial
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 04-19-2023PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceSatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Deliveries attended by skilled birth providersValue10.0050.0040.00
    DateMarch 30, 2012June 30, 2022December 31, 2020
    Comment
  • Deliveries attended by skilled birth providers for the bottom 3 performing regions (Afar, Oromia & Somali)Value19.0033.400.00
    DateOctober 31, 2016June 30, 2022
    Comment
  • Pregnant women receiving at least four antenatal care visits (Percentage, Custom)Value32.0043.000.00
    DateOctober 31, 2016June 30, 2022
    Comment
  • Children 12-23 months immunized with Pentavalent 3 vaccinesValue65.7081.300.00
    DateDecember 31, 2012June 30, 2022
    Comment
  • Contraceptive prevalence rateValue27.3035.000.00
    DateMarch 30, 2012June 30, 2022
    Comment
  • Contraceptive Prevalence Rate ( for Rural women only)Value32.0037.700.00
    DateOctober 31, 2016June 30, 2022
    Comment
  • Percent of pregnant women taking Iron Folic Fcid (IFA)Value42.1060.000.00
    DateOctober 31, 2016June 30, 2022
    Comment
  • Conduct immunization campaign at IDP/Refugee camp for missed vaccinationValue0.004.000.00
    DateOctober 18, 2021June 30, 2022
    Comment
  • Percent of Woredas in non emerging regions delivering vitamin A supplements to childrenValue48.00100.000.00
    DateOctober 31, 2016June 30, 2022
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Percent of births occurring in a given year registeredValue0.0020.9040.00
    DateDecember 30, 2016June 30, 2022December 31, 2021
    Comment
  • Number of nutritional operational research studies conductedValue0.004.004.00
    DateDecember 30, 2016June 30, 2022June 30, 2022
    Comment
  • Introduction of Procurement Key Performance Indicators developed by Federal Public Procurement AgencValueNoYes
    DateDecember 30, 2016June 30, 2022
    Comment
  • Percent of deaths occurring in a given year registeredValue0.0012.0025.00
    DateDecember 30, 2016June 30, 2022December 31, 2021
    Comment
  • Completion of NNP evaluationValueNoYesYes
    DateJune 27, 2017June 30, 2022June 30, 2022
    Comment
  • Strategic plan developedValueNoYes
    DateNovember 30, 2019December 30, 2022
    Comment
  • Number of joint reviews of NNP II carried outValue0.007.007.00
    DateDecember 30, 2016June 27, 2022June 30, 2022
    Comment
  • PFSA submission of Backlog audit reports and timely quality audit reports thereafterValueNoYesYes
    DateDecember 30, 2016June 30, 2022October 18, 2021
    Comment
  • Percentage of kebeles storing and transferring registration forms safelyValue0.0068.0090.00
    DateNovember 30, 2019June 30, 2022June 30, 2022
    Comment
  • Proportion of woredas with nutrition coordination platformValue0.0042.0042.00
    DateDecember 30, 2016June 27, 2022June 30, 2022
    Comment
  • Conduct catch-up campaigns to increase the uptake of essential health and nutrition services including Vitamin A, deworming, and nutrition screening in security-constrained contextsValue0.005.000.00
    DateOctober 18, 2021June 30, 2022
    Comment
  • Proportion of woredas reporting multisectoral nutrition information to national levelValue0.0042.0042.00
    DateDecember 30, 2016June 27, 2022June 30, 2022
    Comment
  • Percent of Woredas in non-emerging Regions transitioning from EOS to Community Health Days- CHDValue0.0089.000.00
    DateDecember 30, 2016June 30, 2022
    Comment
  • Percent of PHC Facilities having all drug from the MOH list of drug availableValue42.0048.0048.00
    DateDecember 30, 2016June 30, 2022October 18, 2021
    Comment
  • Developed and Implement postnatal Care Service directive to improve the quality of Postnatal serviceValueNoYesYes
    DateDecember 30, 2016June 30, 2022December 31, 2021
    Comment
  • Improve quality of adolescent servicesValueNoYesYes
    DateDecember 30, 2016June 30, 2022March 31, 2022
    Comment
  • Percent of Woreda with Functional Community Health Insurance SchemesValue23.0067.000.00
    DateJune 19, 2017June 30, 2022
    Comment
  • Undertake CBHI review every two YearsValueNoYes
    DateDecember 30, 2016June 30, 2022
    Comment
  • Devise and implement a mechanism for documenting consultationsValueNoYesYes
    DateJune 27, 2017June 30, 2022June 30, 2022
    Comment
  • Development and implementation of health sector community score cardValueNoYes
    DateJune 30, 2016June 30, 2022
    Comment
  • Health Centers reporting HMIS data in timeValue50.0096.0086.00
    DateMarch 30, 2012June 30, 2022June 30, 2021
    Comment
  • Development and implementation of Annual Rapid Facility AssessmentValueNoYesYes
    DateMarch 30, 2012June 30, 2022December 31, 2021
    Comment
  • Improved transparency of Pharmaceutical Fund and Supply Agency (PFSA) procurement processValueNoYesYes
    DateMarch 29, 2013June 30, 2022December 31, 2021
    Comment
  • People who have received essential health, nutrition, and population (HNP) servicesValue0.00103602023.900.00
    DateDecember 31, 2012June 30, 2022
    Comment
  • People who have received essential health, nutrition, and population (HNP) services - Female (RMS requirement)Value0.0045091862.000.00
    Date
    Comment
  • Number of children immunizedValue0.003171227.000.00
    DateDecember 31, 2012June 30, 2022
    Comment
  • Number of women and children who have received basic nutrition servicesValue0.0063763085.900.00
    DateDecember 31, 2012June 30, 2022
    Comment
  • Number of deliveries attended by skilled health personnelValue0.002195738.000.00
    DateDecember 31, 2012June 30, 2022
    Comment