Financier | Commitments |
---|---|
Borrower/Recipient | 6.00 |
IDA Credit | 40.00 |
P125506
Closed
Nicolas Perrin , Najat Yamouri
Ministry of Economy and Finance
September 18, 2012
(as of board presentation)
September 25, 2013
May 20, 2014
US$ 46.00 million
Project Implementation Unit (PIU),Steering Committee
2014
US$ 40.00 million
B
October 31, 2022
September 30, 2020
Yes
BANK APPROVED
Financier | Commitments |
---|---|
Borrower/Recipient | 6.00 |
IDA Credit | 40.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 40.00 |
IBRD + IDA Commitment | 40.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 46.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Aug 15, 2018 | IDA-53050 | Int Charges | 93,190.58 |
Jun 28, 2018 | IDA-53050 | Loan Disb | 303,049.80 |
Oct 30, 2018 | IDA-53050 | Loan Disb | 323,557.97 |
Aug 13, 2018 | IDA-53050 | Loan Disb | 265,551.10 |
Dec 26, 2018 | IDA-53050 | Loan Disb | 513,111.16 |
Oct 3, 2018 | IDA-53050 | Loan Disb | 348,647.66 |
Dec 26, 2018 | IDA-53050 | Loan Disb | 228,646.55 |
Feb 15, 2019 | IDA-53050 | Int Charges | 1,420.96 |
Feb 15, 2019 | IDA-53050 | Int Charges | 1,420.96 |
Aug 1, 2017 | IDA-53050 | Loan Disb | 534,903.80 |
Aug 17, 2017 | IDA-53050 | Int Charges | 580.64 |
Aug 17, 2017 | IDA-53050 | Int Charges | 580.64 |
Aug 31, 2017 | IDA-53050 | Loan Disb | 323,418.16 |
Nov 7, 2017 | IDA-53050 | Loan Disb | 275,120.03 |
Nov 7, 2017 | IDA-53050 | Loan Disb | 40,703.83 |
Mar 12, 2018 | IDA-53050 | Loan Disb | 212,309.40 |
Mar 12, 2018 | IDA-53050 | Loan Disb | 654,116.50 |
Jan 4, 2018 | IDA-53050 | Loan Disb | 624,608.20 |
Mar 12, 2018 | IDA-53050 | Loan Disb | 455,100.10 |
Apr 16, 2018 | IDA-53050 | Loan Disb | 372,029.22 |
Feb 15, 2018 | IDA-53050 | Int Charges | 1,360.97 |
Feb 15, 2018 | IDA-53050 | Int Charges | 1,360.97 |
Feb 15, 2018 | IDA-53050 | Int Charges | 89,307.35 |
Feb 15, 2018 | IDA-53050 | Int Charges | 89,307.35 |
May 3, 2018 | IDA-53050 | Loan Disb | 478,898.53 |
Aug 18, 2016 | IDA-53050 | Int Charges | 30,555.27 |
Aug 18, 2016 | IDA-53050 | Int Charges | 30,555.27 |
Jun 3, 2016 | IDA-53050 | Loan Disb | 142,886.10 |
Jan 24, 2017 | IDA-53050 | Loan Disb | 1,644,927.20 |
Jun 1, 2017 | IDA-53050 | Loan Disb | 502,562.12 |
Feb 16, 2017 | IDA-53050 | Int Charges | 1,381.03 |
Feb 16, 2017 | IDA-53050 | Int Charges | 1,381.03 |
Feb 16, 2017 | IDA-53050 | Int Charges | 44,842.73 |
Feb 16, 2017 | IDA-53050 | Int Charges | 44,842.73 |
Jun 1, 2017 | IDA-53050 | Loan Disb | 1,641,026.60 |
May 4, 2017 | IDA-53050 | Loan Disb | 528,764.70 |
Apr 19, 2017 | IDA-53050 | Loan Disb | 1,208,668.50 |
Apr 14, 2017 | IDA-53050 | Loan Disb | 44,629.89 |
Oct 19, 2017 | IDA-53050 | Loan Disb | 241,623.55 |
Jul 19, 2017 | IDA-53050 | Loan Disb | 1,098,252.20 |
Oct 19, 2017 | IDA-53050 | Loan Disb | 247,592.34 |
Mar 9, 2017 | IDA-53050 | Loan Disb | 92,682.19 |
Aug 17, 2017 | IDA-53050 | Int Charges | 69,393.03 |
Aug 17, 2017 | IDA-53050 | Int Charges | 69,393.03 |
Oct 13, 2017 | IDA-53050 | Loan Disb | 195,817.81 |
Aug 15, 2024 | IDA-53050 | Int Charges | 50.97 |
Aug 15, 2024 | IDA-53050 | Int Charges | 130,253.68 |
Aug 15, 2024 | IDA-53050 | Int Charges | 130,253.68 |
Aug 15, 2024 | IDA-53050 | Int Charges | 596.85 |
Aug 15, 2024 | IDA-53050 | Int Charges | 596.85 |
Feb 22, 2024 | IDA-53050 | Int Charges | 130,014.63 |
Feb 22, 2024 | IDA-53050 | Int Charges | 130,014.63 |
Feb 22, 2024 | IDA-53050 | Loan Repay | 346,966.66 |
Feb 15, 2024 | IDA-53050 | Loan Repay | 1,313.04 |
Sep 25, 2013 | IDA-53050 | Loan Commitment | 40,000,000.00 |
Aug 15, 2024 | IDA-53050 | Loan Repay | 350,851.66 |
Aug 15, 2024 | IDA-53050 | Int Charges | 50.97 |
Feb 15, 2023 | IDA-53050 | Int Charges | 131,452.42 |
Feb 15, 2023 | IDA-53050 | Int Charges | 131,452.42 |
Feb 15, 2023 | IDA-53050 | Int Charges | 2,384.75 |
Feb 15, 2023 | IDA-53050 | Int Charges | 2,384.75 |
Aug 15, 2023 | IDA-53050 | Int Charges | 130,522.32 |
Aug 15, 2023 | IDA-53050 | Int Charges | 130,522.32 |
Aug 15, 2023 | IDA-53050 | Int Charges | 435.69 |
Aug 15, 2023 | IDA-53050 | Int Charges | 435.69 |
Aug 15, 2022 | IDA-53050 | Int Charges | 460.39 |
Aug 15, 2022 | IDA-53050 | Int Charges | 460.39 |
Aug 15, 2022 | IDA-53050 | Int Charges | 126,967.61 |
Aug 15, 2022 | IDA-53050 | Int Charges | 126,967.61 |
Aug 7, 2017 | IDA-53050 | Loan Disb | 330,381.34 |
Jun 30, 2016 | IDA-53050 | Loan Disb | 245,275.80 |
Dec 12, 2016 | IDA-53050 | Loan Disb | 468,416.30 |
Sep 26, 2016 | IDA-53050 | Loan Disb | 199,125.92 |
Jun 24, 2016 | IDA-53050 | Loan Disb | 1,277,275.40 |
Jul 27, 2016 | IDA-53050 | Loan Disb | 320,925.34 |
Jan 26, 2017 | IDA-53050 | Loan Disb | 177,600.77 |
Jan 5, 2017 | IDA-53050 | Loan Disb | 298,663.34 |
Nov 2, 2016 | IDA-53050 | Loan Disb | 1,216,543.40 |
Nov 7, 2016 | IDA-53050 | Loan Disb | 561,416.44 |
Oct 17, 2016 | IDA-53050 | Loan Disb | 185,970.47 |
Aug 18, 2016 | IDA-53050 | Int Charges | 322.46 |
Aug 18, 2016 | IDA-53050 | Int Charges | 322.46 |
Aug 20, 2015 | IDA-53050 | Loan Disb | 536,003.50 |
Dec 16, 2015 | IDA-53050 | Loan Disb | 133,867.90 |
Sep 24, 2015 | IDA-53050 | Loan Disb | 325,133.12 |
Oct 19, 2015 | IDA-53050 | Loan Disb | 78,706.36 |
Dec 16, 2015 | IDA-53050 | Loan Disb | 255,385.40 |
Feb 29, 2016 | IDA-53050 | Loan Disb | 54,253.66 |
Jan 21, 2016 | IDA-53050 | Loan Disb | 139,963.30 |
Feb 10, 2016 | IDA-53050 | Loan Disb | 365,090.94 |
Feb 16, 2016 | IDA-53050 | Int Charges | 456.87 |
Feb 16, 2016 | IDA-53050 | Int Charges | 456.87 |
Feb 16, 2016 | IDA-53050 | Int Charges | 25,887.37 |
Feb 16, 2016 | IDA-53050 | Int Charges | 25,887.37 |
May 4, 2016 | IDA-53050 | Loan Disb | 58,343.08 |
Apr 18, 2016 | IDA-53050 | Loan Disb | 74,474.20 |
Oct 26, 2016 | IDA-53050 | Loan Disb | 322,120.47 |
Oct 26, 2016 | IDA-53050 | Loan Disb | 447,493.12 |
Oct 26, 2016 | IDA-53050 | Loan Disb | 423,233.30 |
Sep 19, 2014 | IDA-53050 | Loan Disb | 43,133.25 |
Jan 6, 2015 | IDA-53050 | Loan Disb | 1,964,605.50 |
Aug 18, 2014 | IDA-53050 | Int Charges | 1,604.28 |
Aug 18, 2014 | IDA-53050 | Int Charges | 1,604.28 |
Jun 30, 2015 | IDA-53050 | Loan Disb | 249,433.62 |
Apr 10, 2015 | IDA-53050 | Loan Disb | 98,844.65 |
Aug 15, 2015 | IDA-53050 | Int Charges | 2,102.71 |
Feb 15, 2020 | IDA-53050 | Int Charges | 118,357.53 |
Aug 15, 2015 | IDA-53050 | Int Charges | 2,102.71 |
Aug 15, 2015 | IDA-53050 | Int Charges | 18,025.45 |
Aug 15, 2015 | IDA-53050 | Int Charges | 18,025.45 |
Jul 27, 2015 | IDA-53050 | Loan Disb | 412,172.88 |
May 15, 2015 | IDA-53050 | Loan Disb | 1,023,494.00 |
May 5, 2015 | IDA-53050 | Loan Disb | 14,264.75 |
Jan 23, 2015 | IDA-53050 | Loan Disb | 77,055.67 |
Nov 24, 2014 | IDA-53050 | Loan Disb | 142,223.30 |
Jun 27, 2014 | IDA-53050 | Loan Disb | 1,348,739.40 |
May 20, 2014 | IDA-53050 | Loan Disb | 919,915.40 |
Feb 18, 2015 | IDA-53050 | Int Charges | 7,633.77 |
Feb 18, 2015 | IDA-53050 | Int Charges | 1,242.42 |
Feb 18, 2015 | IDA-53050 | Int Charges | 1,242.42 |
Feb 18, 2015 | IDA-53050 | Int Charges | 7,633.77 |
Feb 15, 2020 | IDA-53050 | Int Charges | 118,357.53 |
Dec 26, 2019 | IDA-53050 | Loan Disb | -61,247.40 |
Jan 2, 2020 | IDA-53050 | Loan Disb | 1,006,370.80 |
Feb 15, 2020 | IDA-53050 | Int Charges | 942.10 |
Feb 15, 2020 | IDA-53050 | Int Charges | 942.10 |
Feb 15, 2019 | IDA-53050 | Int Charges | 106,265.49 |
Feb 15, 2019 | IDA-53050 | Int Charges | 106,265.49 |
Sep 25, 2018 | IDA-53050 | Loan Disb | 396,195.25 |
Aug 15, 2021 | IDA-53050 | Int Charges | 575.98 |
Aug 15, 2021 | IDA-53050 | Int Charges | 575.98 |
Aug 15, 2021 | IDA-53050 | Int Charges | 137,613.56 |
Aug 15, 2021 | IDA-53050 | Int Charges | 137,613.56 |
Feb 15, 2022 | IDA-53050 | Int Charges | 2,436.51 |
Feb 15, 2022 | IDA-53050 | Int Charges | 2,436.51 |
Feb 15, 2022 | IDA-53050 | Int Charges | 137,689.95 |
Feb 15, 2022 | IDA-53050 | Int Charges | 137,689.95 |
Feb 15, 2021 | IDA-53050 | Int Charges | 2,880.74 |
Feb 15, 2021 | IDA-53050 | Int Charges | 2,880.74 |
Feb 15, 2021 | IDA-53050 | Int Charges | 139,114.34 |
Feb 15, 2021 | IDA-53050 | Int Charges | 139,114.34 |
Apr 15, 2021 | IDA-53050 | Loan Disb | -383,316.62 |
May 18, 2021 | IDA-53050 | Loan Cancel | 417,451.34 |
Apr 9, 2020 | IDA-53050 | Loan Disb | 134,706.84 |
May 13, 2020 | IDA-53050 | Loan Disb | 216,269.86 |
Mar 20, 2020 | IDA-53050 | Loan Disb | 131,545.77 |
Jun 19, 2020 | IDA-53050 | Loan Disb | 215,141.84 |
Jun 30, 2020 | IDA-53050 | Loan Disb | 441,451.16 |
Sep 29, 2020 | IDA-53050 | Loan Disb | 210,833.83 |
Jun 15, 2020 | IDA-53050 | Loan Disb | 206,356.69 |
Aug 15, 2020 | IDA-53050 | Int Charges | 3,358.49 |
Aug 15, 2020 | IDA-53050 | Int Charges | 3,358.49 |
Aug 15, 2020 | IDA-53050 | Int Charges | 134,056.72 |
Aug 15, 2020 | IDA-53050 | Int Charges | 134,056.72 |
Sep 9, 2020 | IDA-53050 | Loan Disb | 557,874.80 |
Nov 14, 2019 | IDA-53050 | Loan Disb | 247,404.30 |
Nov 14, 2019 | IDA-53050 | Loan Disb | 117,127.19 |
Sep 26, 2019 | IDA-53050 | Loan Disb | 109,160.41 |
Aug 15, 2019 | IDA-53050 | Int Charges | 1,460.61 |
Aug 15, 2019 | IDA-53050 | Int Charges | 1,460.61 |
Oct 21, 2019 | IDA-53050 | Loan Disb | 344,636.03 |
Oct 3, 2019 | IDA-53050 | Loan Disb | 169,400.47 |
Jul 18, 2019 | IDA-53050 | Loan Disb | 371,208.53 |
Aug 15, 2019 | IDA-53050 | Int Charges | 114,134.51 |
Aug 15, 2019 | IDA-53050 | Int Charges | 114,134.51 |
Dec 11, 2019 | IDA-53050 | Loan Disb | 248,898.27 |
Feb 13, 2020 | IDA-53050 | Loan Disb | 307,758.80 |
Dec 30, 2019 | IDA-53050 | Loan Disb | 188,615.08 |
Nov 27, 2018 | IDA-53050 | Loan Disb | 880,537.75 |
May 6, 2019 | IDA-53050 | Loan Disb | 513,524.75 |
Mar 11, 2019 | IDA-53050 | Loan Disb | 262,083.69 |
Jun 26, 2019 | IDA-53050 | Loan Disb | 350,158.66 |
May 17, 2019 | IDA-53050 | Loan Disb | 96,392.94 |
Mar 27, 2019 | IDA-53050 | Loan Disb | 221,990.40 |
Jul 12, 2018 | IDA-53050 | Loan Disb | 702,893.70 |
Jun 19, 2018 | IDA-53050 | Loan Disb | 205,562.52 |
Aug 15, 2018 | IDA-53050 | Int Charges | 1,534.46 |
Aug 15, 2018 | IDA-53050 | Int Charges | 1,534.46 |
Aug 15, 2018 | IDA-53050 | Int Charges | 93,190.58 |
Name | Review | Date |
---|---|---|
Project Management | Satisfactory | 2020-06-25 |
Financial Management | Satisfactory | 2020-06-25 |
Procurement | Moderately Satisfactory | 2020-06-25 |
Counterpart Funding | Unsatisfactory | 2020-06-25 |
Progress towards achievement of PDO | Moderately Satisfactory | 2020-06-25 |
Monitoring and Evaluation | Moderately Satisfactory | 2020-06-25 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2020-06-25 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 05-07-2021 |
---|---|
Outcomes | Moderately Satisfactory |
Risk to Development Outcome | |
Bank Performance | Moderately Satisfactory |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 0.00 | 120842.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Share of rural population with access to an all-season road | Value | 0.00 | 71.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Female beneficiaries | Value | 0.00 | 55.49 | 0.00 |
Date | July 31, 2013 | March 30, 2018 | ||
Comment |
Number of rural people with access to an all-season road | Value | 614000.00 | 631516.00 | 0.00 |
Date | July 31, 2013 | March 30, 2018 | ||
Comment |
Youth beneficiaries (Percentate, Custom Supplement) | Value | 0.00 | 24.09 | 0.00 |
Date | July 31, 2013 | |||
Comment |
Tons of local products passing through the platform of Bignona per Year | Value | 0.00 | 338.98 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Average revenue per hectare of horticulture | Value | 250.00 | 1650.00 | 1350.00 |
Date | July 31, 2013 | September 30, 2020 | September 19, 2017 | |
Comment |
Average increase in rainfed rice output | Value | 0.00 | 1.35 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Rural Roads rehabilitated and/or improved to all weather conditions | Value | 0.00 | 460.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
The platform of Bignona is constructed and functional | Value | No | Yes | |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Percentage of grievance responses within the required timeframe | Value | 0.00 | 94.30 | 100.00 |
Date | July 31, 2013 | September 30, 2020 | September 19, 2017 | |
Comment |
Agricultural storage facilities | Value | 0.00 | 15.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Number of citizen engagement pilots implemented | Value | 0.00 | 3.00 | 9.00 |
Date | July 31, 2013 | September 30, 2020 | September 19, 2017 | |
Comment |
Area provided with irrigation and drainage services (ha) | Value | 0.00 | 126620.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
People in the project area aware of the project's beneficiary targeting criteria | Value | 0.00 | 98.30 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Area provided with irrigation and drainage services - Improved (ha) | Value | 0.00 | 5300.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Area provided with improved irrigation or drainage services | Value | 0.00 | 23461.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Women and youth groups provided with equipment and input packages Horticulture | Value | 0.00 | 94.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Women and youth groups provided with equipment and input packages Oyster farms | Value | 0.00 | 21.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Women and youth groups provided with equipment and input packages Rice | Value | 0.00 | 509.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Rice valleys rehabilitated | Value | 0.00 | 126620.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Small enterprises created around the platform of Bignona | Value | 0.00 | 9.00 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Targeted clients satisfied with agricultural services (percentage) | Value | 0.00 | 98.70 | 0.00 |
Date | July 31, 2013 | September 30, 2020 | ||
Comment |
Horticultural perimeters rehabilitated managed and /or developped (hectares) | Value | 0.00 | 197.39 | 300.00 |
Date | August 30, 2017 | September 30, 2020 | September 19, 2017 | |
Comment |