Abstract*

The objective of the Disaster Risk Management Policy Loan with a Catastrophe Deferred Drawdown Option Program Project for Philippines is to enhance the capacity of the government of the Philippines to manage the impacts of natural disasters. This objective will be achieved by supporting the following aspects of the government's Disaster Risk Reduction and Management (DRRM) framework: (a) strengthen the institutional capacity for disaster risk management...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To enhance the capacity of the Government of the Philippines to manage the impacts of natural disasters.

Key Details

Project Details

  • P125943

  • Closed

  • Jolanta Kryspin-Watson

  • N/A

  • Philippines

  • April 18, 2011

  • (as of board presentation)

    September 13, 2011

  • December 15, 2011

  • US$ 500.00 million

  • Department of Finance

  • East Asia and Pacific

  • 2012

  • US$ 500.00 million

  • N/A

  • January 15, 2013

  • October 31, 2014

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 500.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 500.00
IDA Commitment N/A
IBRD + IDA Commitment 500.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 500.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Oct 15, 2018 IBRD-80850 Int Charges 7,966,219.00
Apr 15, 2019 IBRD-80850 Int Charges 42,087.50
Apr 15, 2019 IBRD-80850 Int Charges 8,375,412.50
Oct 15, 2019 IBRD-80850 Int Charges 42,318.75
Oct 15, 2019 IBRD-80850 Int Charges 8,421,431.00
Apr 15, 2018 IBRD-80850 Int Charges 127.08
Apr 15, 2018 IBRD-80850 Int Charges 25,289.58
Apr 15, 2018 IBRD-80850 Int Charges 27,679.17
Apr 15, 2018 IBRD-80850 Int Charges 5,508,154.00
Apr 15, 2017 IBRD-80850 Int Charges 4,703,309.50
Apr 15, 2017 IBRD-80850 Int Charges 23,634.72
Oct 15, 2017 IBRD-80850 Int Charges 26,052.08
Oct 15, 2017 IBRD-80850 Int Charges 5,184,364.50
Apr 15, 2015 IBRD-80850 Int Charges 10,363.89
Apr 15, 2015 IBRD-80850 Int Charges 2,062,413.90
Oct 15, 2015 IBRD-80850 Int Charges 2,377,220.80
Oct 15, 2015 IBRD-80850 Int Charges 11,945.82
Apr 15, 2016 IBRD-80850 Int Charges 13,597.91
Apr 15, 2016 IBRD-80850 Int Charges 2,705,985.50
Oct 15, 2016 IBRD-80850 Int Charges 18,681.25
Oct 15, 2016 IBRD-80850 Int Charges 3,717,568.80
Apr 15, 2014 IBRD-80850 Int Charges 10,490.28
Apr 15, 2014 IBRD-80850 Int Charges 2,087,565.20
Oct 15, 2014 IBRD-80850 Int Charges 10,039.58
Oct 15, 2014 IBRD-80850 Int Charges 1,997,877.10
Oct 15, 2013 IBRD-80850 Int Charges 11,437.50
Sep 13, 2011 IBRD-80850 Loan Commitment 500,000,000.00
Apr 15, 2024 IBRD-80850 Int Charges 780.50
Oct 15, 2013 IBRD-80850 Int Charges 2,276,062.50
Apr 15, 2023 IBRD-80850 Int Charges 2,471.74
Oct 15, 2023 IBRD-80850 Int Charges 1,231.62
Oct 15, 2023 IBRD-80850 Int Charges 245,092.62
Oct 15, 2023 IBRD-80850 Int Charges 68,378.62
Oct 15, 2023 IBRD-80850 Int Charges 13,607,349.00
Oct 15, 2023 IBRD-80850 Loan Repay 83,250.00
Oct 15, 2023 IBRD-80850 Loan Repay 16,566,750.00
Apr 15, 2024 IBRD-80850 Int Charges 12,156,955.00
Apr 15, 2024 IBRD-80850 Loan Repay 83,250.00
Apr 15, 2024 IBRD-80850 Loan Repay 16,566,750.00
Apr 15, 2024 IBRD-80850 Int Charges 155,320.39
Apr 15, 2024 IBRD-80850 Int Charges 71,545.64
Apr 15, 2022 IBRD-80850 Int Charges 2,238,473.50
Apr 15, 2022 IBRD-80850 Int Charges 11,248.61
Apr 15, 2022 IBRD-80850 Loan Repay 83,250.00
Apr 15, 2022 IBRD-80850 Loan Repay 16,566,750.00
Oct 15, 2022 IBRD-80850 Int Charges 33,250.76
Oct 15, 2022 IBRD-80850 Int Charges 6,616,897.50
Oct 15, 2022 IBRD-80850 Loan Repay 83,250.00
Oct 15, 2022 IBRD-80850 Loan Repay 16,566,750.00
Apr 15, 2023 IBRD-80850 Int Charges 491,876.88
Apr 15, 2023 IBRD-80850 Int Charges 57,645.58
Apr 15, 2023 IBRD-80850 Int Charges 11,471,470.00
Apr 15, 2023 IBRD-80850 Loan Repay 83,250.00
Apr 15, 2023 IBRD-80850 Loan Repay 16,566,750.00
Apr 15, 2021 IBRD-80850 Int Charges 12,006.95
Apr 15, 2021 IBRD-80850 Int Charges 2,389,382.00
Oct 15, 2021 IBRD-80850 Int Charges 12,072.93
Oct 15, 2021 IBRD-80850 Int Charges 2,402,510.50
Apr 15, 2020 IBRD-80850 Int Charges 33,931.25
Apr 15, 2020 IBRD-80850 Int Charges 6,752,319.00
Oct 15, 2020 IBRD-80850 Int Charges 24,400.00
Oct 15, 2020 IBRD-80850 Int Charges 4,855,600.00
Oct 15, 2018 IBRD-80850 Int Charges 40,031.25

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2014-11-24
Overall Implementation Progress (IP) Moderately Satisfactory 2014-11-24
Program Management Satisfactory 2014-11-24
Monitoring and Evaluation Satisfactory 2014-11-24

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 04-19-2015
OutcomesSubstantial
Risk to Development OutcomeModest
Bank PerformanceSubstantial
Borrower PerformanceSubstantial
Government PerformanceNot Applicable
Implementing AgencyNot Applicable

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 08-19-2015PROJECT PERFORMANCE ASSESSMENT REPORT: 07-17-2017
Outcome RatingSatisfactory Satisfactory
Risk To Development OutcomeModerateModest
Bank PerformanceSatisfactorySatisfactory
Borrower PerformanceSatisfactorySatisfactory
Government PerformanceSatisfactoryNot Rated
Implementing AgencySatisfactorySatisfactory
Icr QualitySatisfactoryNot Rated
M&e QualitySubstantialModest

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • NDRRMC develops a monitoring system to track disaster-related financing; updated guidelines on the use of LGU Local Disaster Risk Reduction and Management Funds (LDRRMF) are issued.ValueNoYesYes
    DateOctober 17, 2014October 31, 2014
    CommentGuidelines on the use of Local Disaster Risk Reduction and Management Fund (LDRRMF) were issued. The DILG issued MemorandumCircular No. 2012-73 on April 17, 2012 to provide guidance on the eligible expenditures to be supported by the LDRRMF. This wasfollowed by the Commission on Audit (COA) Circular No. 2012-002 dated September 12, 2012 , which stipulates the reporting andaccounting procedures for the LDRRMF. Joint Memorandum Circular No. 2013-1 was issued by the NDRRMC, DBM, and DILG on March 25,2013 to clarify the allocation and utilization of the LDRRMF for ex-ante (70%) and ex-post (30%) measures (Quick Response Fund).It further clarified provisions in the DRRM Act regarding the establishment of a trust fund for unspent LDRRMF proceeds that mayaccumulate over 5 years. These guidelines enable LGUs to provide budgets for their DRRM plans, and account for these budgets inaccordance with government rules and regulations. The Project Monitoring and Evaluation System for DRM (PMESD) was developed andthe training workshop for the Office of Civil Defense (OCD), its user and beneficiary, was held in February 2014. In view of theongoing development within OPARR (with assistance of the UNDP) of a similar system to monitor post-Yolanda reconstruction, andcontracted with the same consultant that developed the PMESD, the Bank has recommended to both OCD and OPARR that it would beoptimal for the two systems to be linked, inter-operable and to share data as part of an overall DRM information system.
  • The Department of Public Works and Highways (DPWH) retrofits and/or reconstructs bridges in Metro Manila, based on the results of structural audits.Value0.0010.0010.00
    DateMay 13, 2011October 17, 2014October 31, 2014
    CommentThe Department of Public Works and Highways has completed retrofitting/reconstruction of ten (10) bridges in Metro Manila , meetingthe target specified in the Policy Matrix. In 2011, DPWH conducted an assessment of all bridges along national roads in MetroManila and identified 56 bridges for retrofitting, major repair and/or reconstruction, of which 18 have been funded, and theaforementioned 10 have been completed. In 2013, DPWH completed an assessment of the structural condition of all the bridges alongnational roads throughout the country to further inform prioritization and budgeting.
  • Department of Finance has prepared its catastrophe risk financing strategyValueNoYesYes
    DateMay 13, 2011October 17, 2014October 31, 2014
    CommentThe Department of Finance has prepared its Disaster Risk Financing and Insurance (DRFI) strategy. The DRFI Strategy and theassociated Action Plan were prepared by DOF, in consultation with representatives of government agencies and other relevantstakeholders. The DRFI Strategy, together with the Action Plan, and an investment plan for donor consideration were presented bythe Secretary of Finance at the Political Champions Group Insurance Initiative in July 2014 (London, United Kingdom).
  • Provinces have mainstreamed climate change adaptation and disaster risk reduction measures into their Provincial Development and Physical Framework Plans (PDPFP).Value1.0072.0030.00
    DateMay 13, 2011October 17, 2014October 31, 2014
    CommentSeventy-two (72) provinces have mainstreamed climate change adaptation and disaster risk reduction measures into their ProvincialDevelopment and Physical Framework Plans (PDPFP), exceeding the CAT-DDO Policy Matrix target of 30 provinces. Sixty-nine of the 72provinces have already had their plans approved by their respective Governors and Provincial Planning and Development Councils(PPDC), while the remaining 3 have received PPDC approval and are awaiting Governors’ approval. A monitoring and evaluation tool inthe form of a results matrix for mainstreaming DRR and CCA was issued by NEDA to further inform planning at the provincial level.
  • DOH expands coverage of its Safe Hospitals Program in accordance with WHO guidelines by conducting audits of public and private health facilities in Metro Manila.Value25.00199.00100.00
    DateMay 13, 2011October 17, 2014October 31, 2014
    CommenthospitalsThe Department of Health (DOH) has expanded coverage of its Safe Hospitals Program in accordance with WHO guidelines. The DOH hasassessed 199 hospitals in Luzon, exceeding the Cat-DDO target of 100 health facilities. These hospitals, both in the public andprivate sectors, were evaluated based on agreed indicators of structural, non-structural, and functional capacities in order toinform investment decisions for meeting the identified gaps. The assessment followed the indicators developed by DOH inpartnership with the World Health Organization and the European Union. The DOH is also planning to undertake a similar assessmentfor the Visayas and Mindanao regions.
  • Government community development and social protection programs are enhanced to better address disaster risks.Value0.0024026.001000.00
    DateMay 13, 2011October 17, 2014October 31, 2014
    CommentCommunity development and social protection programs continue to be enhanced to better address disaster risks through theDepartment of Social Welfare and Development’s (DSWD) flagship poverty reduction programs, Pantawid Pamilya (4Ps) andKALAHI-CIDSS/National Community Driven Development Program (KC-NCDDP). The target of 1,000 communities identified in the PolicyMatrix for DRRM training was substantially exceeded, with 24,026 communities covered through the DRRM module in the DSWD’s FamilyDevelopment Sessions (FDS). DSWD has now prepared a new Disaster Response Operations Manual that provides more comprehensivetraining to communities under KC-NCDDP.
  • NDRRMC has rolled out training programs for government authorities to conduct post-disaster needs assessments and emergency preparedness drills.ValueNoYes
    DateMay 13, 2011October 17, 2014
    CommentNDRRMC has rolled out training programs for government authorities to conduct post-disaster needs assessments and emergencypreparedness drills. Fifteen sector-specific Guidance Notes were developed under the Bank’s technical assistance and have beenlocally adopted to become the framework for the Philippine post-disaster assessment methodology. These Guidance Notes were used ina formal training program, followed by training roll-out and application of the methods by the various government agencies duringthe PDNAs conducted after Typhoons Pablo and Yolanda. The PDNAs constituted the real-life application of the newly learned skills,and the NDRRMC/OCD will continue the capacity building as part of the OCD’s regular training and emergency preparedness drillprogram. Multisectoral disaster preparedness drills and training are conducted periodically by the member agencies of the NDRRMC.
  • 4 Field Offices are covered by a community-based post-disaster response window.Value1.004.004.00
    DateMay 13, 2011October 17, 2014October 31, 2014
    Comment
  • DILG supports the establishment of functional DRRM units or offices.Value4.0080.0014.00
    DateMay 13, 2011October 17, 2014October 31, 2014
    CommentprovincesEighty (80) provinces have established fully functional DRRM offices, substantially exceeding the target of 14 provinces.Similarly, over 1,487 cities and municipalities have established Local DRRM Offices. The National DRRM Council (NDRRMC), DILG, theDepartment of Budget and Management (DBM) and the Civil Service Commission issued Joint Memorandum Circular No. 2014-1 in April ,setting forth the implementing guidelines for the establishment of Local DRRM offices and Barangay DRRM Committees in LGUs. DILG ismonitoring progress in the functionality of the Local DRRM Offices, through the annual Seal of Good Local Governance.