Disaster Risk Management and Reconstruction

Development Objective

The Project Development Objective is to support the Recipient in improving disaster response capacity and enhancing the resiliency of critical transport infrastructure.

Key Details

Project Details

  • P126346

  • Closed

  • Claudia Soto Orozco , Malaika Becoulet

  • Ministry of Economy and Finance

  • Haiti

  • September 15, 2011

  • (as of board presentation)

    December 1, 2011

  • April 3, 2012

  • US$ 60.00 million

  • Unite de Coordination et Execution - Ministry of Public Works,Unite de Coordination de Projet - Ministry of Interior and Local Authorities

  • Latin America and Caribbean

  • 2012

  • US$ 60.00 million

  • B

  • Not Applicable

  • June 30, 2020

  • BANK APPROVED

  • April 2, 2024

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Grant 60.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 60.00
IBRD + IDA Commitment 60.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 60.00

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 5, 2020 IDA-D2090 Loan Disb 7,217.88
May 5, 2020 IDA-D2090 Loan Disb 14,797.10
May 5, 2020 IDA-D2090 Loan Disb 51,528.39
May 6, 2020 IDA-D2090 Loan Disb 1,104,863.90
May 1, 2020 IDA-D2090 Loan Disb 174,987.81
May 5, 2020 IDA-D2090 Loan Disb 1,241,012.80
Apr 13, 2020 IDA-D2090 Loan Disb 51,661.49
Apr 13, 2020 IDA-D2090 Loan Disb 93,615.25
Apr 13, 2020 IDA-D2090 Loan Disb 107,631.20
Apr 23, 2020 IDA-D2090 Loan Disb 50,198.50
Feb 14, 2020 IDA-D2090 Loan Disb 96,290.34
Feb 14, 2020 IDA-D2090 Loan Disb 72,400.70
Apr 2, 2020 IDA-D2090 Loan Disb 66,636.53
Apr 2, 2020 IDA-D2090 Loan Disb 56,222.25
Apr 20, 2020 IDA-D2090 Loan Disb 69,596.19
Apr 20, 2020 IDA-D2090 Loan Disb 21,927.30
Apr 27, 2021 IDA-H7460 Loan Disb -876.08
Aug 4, 2021 IDA-D2090 Loan Disb -28,236.83
Aug 4, 2021 IDA-H7460 Loan Disb -19,270.54
Aug 4, 2021 IDA-H7460 Loan Disb -4,192.23
Mar 2, 2021 IDA-H7460 Loan Disb -51,471.00
Jul 16, 2021 IDA-D2090 Loan Disb -1,911.70
Mar 2, 2021 IDA-H7460 Loan Disb -888.01
Mar 2, 2021 IDA-H7460 Loan Disb -2,511.17
Aug 26, 2020 IDA-D2090 Loan Disb 501,208.10
Jul 15, 2020 IDA-D2090 Loan Disb 46,903.26
Jul 15, 2020 IDA-D2090 Loan Disb 81,411.63
Jul 15, 2020 IDA-D2090 Loan Disb 55,355.32
Jul 15, 2020 IDA-D2090 Loan Disb 68,369.32
Oct 22, 2020 IDA-H7460 Loan Disb 28,259.00
Aug 5, 2020 IDA-H7460 Loan Disb 2,640,671.50
Sep 9, 2020 IDA-D2090 Loan Disb 86,775.95
Dec 17, 2020 IDA-D2090 Loan Disb 87,875.00
Dec 23, 2020 IDA-D2090 Loan Disb 68,983.99
Dec 28, 2020 IDA-H7460 Loan Disb -219,415.23
Jun 24, 2020 IDA-D2090 Loan Disb 51,475.59
Jun 24, 2020 IDA-D2090 Loan Disb 77,296.67
May 27, 2020 IDA-D2090 Loan Disb 47,994.95
Jun 1, 2020 IDA-D2090 Loan Disb 118,102.90
Jun 1, 2020 IDA-D2090 Loan Disb 202,253.62
Jun 1, 2020 IDA-D2090 Loan Disb 347,790.50
Jun 1, 2020 IDA-D2090 Loan Disb 164,206.30
Jun 24, 2020 IDA-D2090 Loan Disb 129,933.24
Aug 19, 2020 IDA-D2090 Loan Disb 14,545.46
Aug 19, 2020 IDA-D2090 Loan Disb 32,811.08
Aug 31, 2020 IDA-D2090 Loan Disb 53,352.05
Aug 31, 2020 IDA-D2090 Loan Disb 60,342.55
Aug 31, 2020 IDA-D2090 Loan Disb 86,355.56
May 31, 2022 IDA-D2090 Loan Cancel 606,336.50
Jun 13, 2022 IDA-H7460 Loan Disb -30,118.63
Jun 13, 2022 IDA-H7460 Loan Cancel 2,460,920.80
Apr 27, 2021 IDA-D2090 Loan Disb -3,119.71
Oct 29, 2018 IDA-H7460 Loan Disb 122,667.23
Oct 23, 2018 IDA-H7460 Loan Disb 943,159.00
May 9, 2019 IDA-D2090 Loan Disb 44,267.15
Jul 15, 2019 IDA-D2090 Loan Disb 1,828,256.00
May 7, 2018 IDA-H7460 Loan Disb 246,729.45
Dec 19, 2018 IDA-H7460 Loan Disb 192,477.72
Oct 19, 2018 IDA-H7460 Loan Disb 258,226.22
Nov 15, 2018 IDA-H7460 Loan Disb 870,859.20
Aug 1, 2018 IDA-H7460 Loan Disb 400,000.00
Jun 19, 2018 IDA-H7460 Loan Disb 350,000.00
Jul 25, 2018 IDA-H7460 Loan Disb 1,019,709.00
Sep 13, 2018 IDA-H7460 Loan Disb 400,000.00
Jun 20, 2018 IDA-H7460 Loan Disb 118,589.11
Jul 10, 2018 IDA-D2090 Loan Disb 2,000,000.00
Apr 16, 2020 IDA-D2090 Loan Disb 72,303.72
Apr 16, 2020 IDA-D2090 Loan Disb 142,829.40
Apr 16, 2020 IDA-D2090 Loan Disb 86,349.66
Apr 16, 2020 IDA-D2090 Loan Disb 90,770.40
Jan 28, 2020 IDA-D2090 Loan Disb 161,006.52
Jan 28, 2020 IDA-D2090 Loan Disb 1,332,225.20
Mar 13, 2020 IDA-D2090 Loan Disb 50,133.00
Feb 7, 2020 IDA-D2090 Loan Disb -60,657.93
Mar 13, 2020 IDA-D2090 Loan Disb 44,403.14
Mar 25, 2020 IDA-D2090 Loan Disb 60,657.94
Jun 8, 2017 IDA-D2090 Loan Commitment 20,000,000.00
Dec 1, 2011 IDA-H7460 Loan Commitment 60,000,000.00
May 26, 2020 IDA-D2090 Loan Cancel 265,000.28
Jun 26, 2020 IDA-D2090 Loan Disb 1,675,004.50
May 27, 2020 IDA-H7460 Loan Disb 239,285.23
Jul 7, 2020 IDA-D2090 Loan Disb 46,326.90
Jul 23, 2020 IDA-D2090 Loan Disb 153,999.98
Sep 3, 2020 IDA-D2090 Loan Disb 60,291.67
Jul 10, 2020 IDA-D2090 Loan Disb 134,839.20
Feb 7, 2020 IDA-D2090 Loan Disb 94,667.80
Feb 7, 2020 IDA-D2090 Loan Disb 69,717.84
Feb 7, 2020 IDA-D2090 Loan Disb 60,657.93
Apr 1, 2020 IDA-D2090 Loan Disb 143,283.86
Apr 1, 2020 IDA-D2090 Loan Disb 33,752.54
Feb 19, 2015 IDA-H7460 Loan Disb 117,266.23
Apr 11, 2018 IDA-H7460 Loan Disb 591,017.30
Dec 11, 2017 IDA-H7460 Loan Disb 1,280,000.00
Dec 18, 2017 IDA-H7460 Loan Disb 700,000.00
Feb 21, 2018 IDA-H7460 Loan Disb 222,876.94
Jul 24, 2017 IDA-H7460 Loan Disb 170,578.69
Aug 21, 2017 IDA-H7460 Loan Disb 1,000,000.00
Feb 17, 2017 IDA-H7460 Loan Disb 1,920,000.00
Jul 12, 2017 IDA-H7460 Loan Disb 237,492.00
Mar 2, 2017 IDA-H7460 Loan Disb 240,000.00
Jul 24, 2017 IDA-H7460 Loan Disb 178,603.25
Dec 1, 2016 IDA-H7460 Loan Disb 136,792.00
Aug 11, 2016 IDA-H7460 Loan Disb -755,340.90
Aug 11, 2016 IDA-H7460 Loan Disb 755,340.90
Mar 24, 2017 IDA-H7460 Loan Disb 703,321.60
May 20, 2019 IDA-D2090 Loan Disb 90,802.79
Oct 4, 2018 IDA-D2090 Loan Disb 1,417,567.90
Mar 11, 2020 IDA-H7460 Loan Disb 450,000.00
Feb 13, 2020 IDA-D2090 Loan Disb 35,743.35
Mar 13, 2020 IDA-D2090 Loan Disb 86,833.51
Mar 13, 2020 IDA-D2090 Loan Disb 28,796.79
Mar 19, 2020 IDA-D2090 Loan Disb 78,486.10
Feb 13, 2020 IDA-D2090 Loan Disb 115,199.09
Feb 13, 2020 IDA-D2090 Loan Disb 72,883.15
Apr 2, 2020 IDA-D2090 Loan Disb 92,335.71
Mar 19, 2020 IDA-D2090 Loan Disb 24,794.11
Mar 19, 2020 IDA-D2090 Loan Disb 48,212.73
Mar 19, 2020 IDA-D2090 Loan Disb 339,111.60
Mar 16, 2020 IDA-D2090 Loan Disb 33,003.99
Mar 11, 2020 IDA-D2090 Loan Disb 258,992.95
Mar 13, 2020 IDA-D2090 Loan Disb 52,371.90
Feb 19, 2020 IDA-D2090 Loan Disb 137,263.95
Apr 3, 2020 IDA-D2090 Loan Disb 72,245.09
Mar 20, 2020 IDA-D2090 Loan Disb 83,840.50
Mar 20, 2020 IDA-D2090 Loan Disb 78,774.30
Feb 7, 2020 IDA-D2090 Loan Disb 57,568.09
Feb 7, 2020 IDA-D2090 Loan Disb 75,922.00
Feb 7, 2020 IDA-D2090 Loan Disb 125,326.39
Feb 7, 2020 IDA-D2090 Loan Disb 51,346.19
Apr 1, 2020 IDA-D2090 Loan Disb 57,672.59
Apr 1, 2020 IDA-D2090 Loan Disb 66,247.50
Apr 1, 2020 IDA-D2090 Loan Disb 52,875.15
Feb 7, 2020 IDA-D2090 Loan Disb 46,698.52
Sep 16, 2019 IDA-D2090 Loan Disb 52,725.00
Jan 31, 2020 IDA-D2090 Loan Disb 112,865.30
Apr 2, 2020 IDA-D2090 Loan Disb 62,360.25
Apr 2, 2020 IDA-D2090 Loan Disb 69,981.63
Apr 2, 2020 IDA-D2090 Loan Disb 117,675.48
Mar 18, 2019 IDA-H7460 Loan Disb 400,000.00
Mar 18, 2019 IDA-D2090 Loan Disb 400,000.00
Mar 18, 2019 IDA-H7460 Loan Disb 875,000.00
Apr 11, 2019 IDA-H7460 Loan Disb 373,734.00
Aug 31, 2020 IDA-D2090 Loan Disb 216,620.58
May 26, 2020 IDA-H7460 Loan Cancel 3,735,000.50
Jun 18, 2020 IDA-D2090 Loan Disb 396,612.62
Jun 29, 2015 IDA-H7460 Loan Disb 232,988.10
Apr 24, 2015 IDA-H7460 Loan Disb 332,694.30
Apr 30, 2015 IDA-H7460 Loan Disb 243,851.25
Apr 30, 2015 IDA-H7460 Loan Disb 341,695.56
Jun 22, 2015 IDA-H7460 Loan Disb 396,138.70
Jul 29, 2015 IDA-H7460 Loan Disb 323,272.75
Jan 13, 2016 IDA-H7460 Loan Disb 331,810.94
Dec 11, 2015 IDA-H7460 Loan Disb 117,846.64
Dec 11, 2015 IDA-H7460 Loan Disb 138,955.14
Sep 24, 2014 IDA-H7460 Loan Disb 626,641.25
Sep 17, 2014 IDA-H7460 Loan Disb 394,925.84
Jun 30, 2020 IDA-D2090 Loan Disb 74,722.80
Jun 11, 2020 IDA-D2090 Loan Disb 131,505.86
Sep 23, 2014 IDA-H7460 Loan Disb 2,150,000.00
Sep 2, 2014 IDA-H7460 Loan Disb 490,000.00
Sep 2, 2014 IDA-H7460 Loan Disb 459,027.00
Aug 18, 2015 IDA-H7460 Loan Disb 298,695.38
May 4, 2015 IDA-H7460 Loan Disb 306,232.34
Feb 3, 2014 IDA-H7460 Loan Disb 341,157.40
Mar 18, 2014 IDA-H7460 Loan Disb 344,270.00
Apr 21, 2014 IDA-H7460 Loan Disb 1,195,843.00
Mar 28, 2014 IDA-H7460 Loan Disb 481,088.00
Oct 2, 2014 IDA-H7460 Loan Disb 282,676.78
Dec 10, 2014 IDA-H7460 Loan Disb 104,994.01
Dec 10, 2014 IDA-H7460 Loan Disb 170,906.69
Dec 10, 2014 IDA-H7460 Loan Disb 505,441.30
Oct 3, 2014 IDA-H7460 Loan Disb 70,687.00
Dec 4, 2014 IDA-H7460 Loan Disb 257,256.00
Dec 8, 2014 IDA-H7460 Loan Disb 220,405.48
Sep 16, 2013 IDA-H7460 Loan Disb 342,503.16
Jul 18, 2013 IDA-H7460 Loan Disb 261,264.58
Jul 25, 2013 IDA-H7460 Loan Disb 253,121.70
Aug 2, 2013 IDA-H7460 Loan Disb 831,292.80
Sep 25, 2013 IDA-H7460 Loan Disb 2,203,707.00
Feb 3, 2014 IDA-H7460 Loan Disb 357,206.50
Dec 16, 2013 IDA-H7460 Loan Disb 2,203,708.00
Feb 16, 2016 IDA-H7460 Loan Disb 103,825.81
Dec 6, 2016 IDA-H7460 Loan Disb 2,800,000.00
Dec 8, 2015 IDA-H7460 Loan Disb 220,183.33
Feb 12, 2016 IDA-H7460 Loan Disb 755,340.90
Feb 11, 2016 IDA-H7460 Loan Disb 747,327.60
Feb 5, 2016 IDA-H7460 Loan Disb 68,172.16
Sep 15, 2015 IDA-H7460 Loan Disb 139,410.40
Sep 17, 2015 IDA-H7460 Loan Disb 483,000.00
Mar 10, 2016 IDA-H7460 Loan Disb 755,340.90
Nov 5, 2015 IDA-H7460 Loan Disb 267,973.28
Mar 24, 2016 IDA-H7460 Loan Disb 330,000.00
Apr 28, 2016 IDA-H7460 Loan Disb 246,000.02
Jul 14, 2015 IDA-H7460 Loan Disb 1,376,000.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2020-06-30
Project Management Moderately Satisfactory 2020-06-30
Financial Management Moderately Unsatisfactory 2020-06-30
Monitoring and Evaluation Moderately Satisfactory 2020-06-30
Overall Implementation Progress (IP) Moderately Satisfactory 2020-06-30
Progress towards achievement of PDO Satisfactory 2020-06-30

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 01-29-2021
OutcomesModerately Satisfactory
Risk to Development Outcome
Bank PerformanceModerately Satisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-29-2021PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Line ministries developing an action plan for vulnerability reductionValue0.002.002.00
    DateDecember 1, 2011June 24, 2020July 25, 2016
    Comment
  • Share of population living in a municipality with a CCPC (Comite Communal de Protection Civile - Municipal Civil Protection Staff) of category 2 or higherValue45.0077.3075.00
    DateDecember 1, 2011June 27, 2020July 25, 2016
    Comment
  • Number of beneficiaries from an improved and resilient investments on the road networkValue0.00150000.00150000.00
    DateDecember 1, 2011June 30, 2020July 25, 2016
    Comment
  • Percentate of Female Beneficiaries from an improved and resilient investments on the primary and secondary road networkValue0.0050.000.00
    DateDecember 1, 2011June 21, 2018
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Roads rehabilitated, Non-ruralValue0.00120.00100.00
    DateDecember 1, 2011June 30, 2020July 25, 2016
    Comment
  • Number of beneficiaries from a training in disaster risk management, disaggregated by sexValue0.001520.00799.00
    DateDecember 1, 2011June 26, 2020June 27, 2019
    Comment
  • Number of CCPC Staff trained and level 2-certified (Office Management and Emergency Operation Center Management), disaggregated bysexValue0.003313.002800.00
    DateDecember 1, 2011June 26, 2020June 27, 2019
    Comment
  • Number of bridges built or rehabilitated with satisfactory technical standardsValue0.006.006.00
    DateDecember 1, 2011June 30, 2020June 29, 2017
    Comment
  • Dissaggregation by sex in percentValue0.0014.000.00
    DateDecember 2, 2019June 26, 2020
    Comment
  • Number of level 2-certified operational Municipal Civil Protection Committees (CCPCs)Value0.00119.00140.00
    DateDecember 1, 2011June 25, 2020July 25, 2016
    Comment
  • Number of spot interventions to protect the local access executed with satisfactory technical standardsValue0.00112.0040.00
    DateDecember 1, 2012June 30, 2020June 29, 2017
    Comment
  • Number of ministry officials benefitting from a training program in risk management, disaggregated by sexValue0.00127.0070.00
    DateDecember 1, 2011June 26, 2020June 27, 2019
    Comment
  • A national radio communication system has been initiated and at least four pilot departments have been connected to the national levelValue0.004.004.00
    DateDecember 1, 2011June 26, 2020July 25, 2016
    Comment
  • Dissaggregation by sex in percentValue0.0023.000.00
    DateDecember 2, 2019June 26, 2020
    Comment
  • A draft road map with a score card for a disaster risk management system is developedValueNoYesYes
    DateDecember 1, 2011June 25, 2020July 25, 2016
    Comment
  • Number of departments with investment plan to improve all weather rural accessibility based on the Rural Index Access methodologyValue0.005.005.00
    DateDecember 1, 2011June 30, 2020June 29, 2017
    Comment
  • Pilot evacuation shelters have been rehabilitated or reconstructed with multi-hazard resilient measuresValue0.005.0012.00
    DateJanuary 13, 2017June 26, 2020June 27, 2019
    Comment
  • Percentage of the national territory covered by a high resolution Digital Elevation Model and high resolution aero-photographyValue0.00100.00100.00
    DateDecember 1, 2011June 26, 2020July 25, 2016
    Comment
  • Number of bridges and road sections damaged by hurricane Matthew that have been repaired or consolidatedwith satisfactory technical standardsValue0.0027.0015.00
    DateMarch 15, 2017June 30, 2020June 29, 2017
    Comment
  • Pilot evacuation shelters tool to evaluate and prioritize shelters needs is developed and used in the affected area by MatthewValueNoYesYes
    DateMarch 15, 2017June 25, 2020June 29, 2017
    Comment
  • Number of bridges damaged by hurricane Matthew that have been rebuiltwith satisfactory technical standardsValue0.001.001.00
    DateMarch 15, 2017June 30, 2020June 27, 2019
    Comment
  • Number of risk maps are produced, disseminated and available in an open-data online platformValue0.000.0035.00
    DateMay 4, 2017June 25, 2020June 29, 2017
    Comment
  • Number of man/days of LIW generated by project activitiesValue0.00370000.00350000.00
    DateMarch 15, 2017June 30, 2020June 27, 2019
    Comment
  • A first pilot detailed hydrological risk modelling is developed using the Digital Elevation ModelValueNoYesYes
    DateMarch 15, 2017June 25, 2020June 29, 2017
    Comment
  • Female BeneficiariesValue0.0040.000.00
    DateMarch 15, 2017May 30, 2018
    Comment
  • Actions are taken in a timely manner in response to feedback received during consultation sessions with beneficiaries/project affected people(Feedback, Responses and Action are monitored and reported)ValueNoYesYes
    DateMay 21, 2017June 30, 2020June 29, 2017
    Comment