Financier | Commitments |
---|---|
IDA recommitted as a Credit | 19.00 |
Borrower/Recipient | 12.00 |
P126516
Closed
Vincent Vesin , Shruti Vijayakumar
Ministry of Finance
November 7, 2012
(as of board presentation)
June 24, 2013
September 17, 2013
US$ 31.00 million
Project Coordination Unit,Ministry of Infrastructure and Maritime Economy
2013
US$ 19.00 million
B
Not Applicable
September 30, 2022
Yes
BANK APPROVED
March 12, 2024
Financier | Commitments |
---|---|
IDA recommitted as a Credit | 19.00 |
Borrower/Recipient | 12.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 19.00 |
IBRD + IDA Commitment | 19.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 31.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 16, 2014 | IDA-52660 | Int Charges | 952.06 |
Dec 16, 2014 | IDA-52660 | Int Charges | 952.06 |
May 28, 2014 | IDA-52660 | Loan Disb | 2,529,111.50 |
Mar 26, 2015 | IDA-52660 | Loan Disb | 1,140,216.90 |
Jun 15, 2015 | IDA-52660 | Int Charges | 40.40 |
Jun 15, 2015 | IDA-52660 | Int Charges | 40.40 |
Jun 15, 2015 | IDA-52660 | Int Charges | 35,016.54 |
Jun 15, 2015 | IDA-52660 | Int Charges | 35,016.54 |
Apr 15, 2021 | IDA-61000 | Int Charges | 85,544.75 |
Oct 19, 2021 | IDA-61000 | Loan Disb | 125,036.84 |
Oct 19, 2021 | IDA-61000 | Int Charges | 508.96 |
Oct 19, 2021 | IDA-61000 | Int Charges | 508.96 |
Oct 19, 2021 | IDA-61000 | Int Charges | 100,846.26 |
Oct 19, 2021 | IDA-61000 | Int Charges | 100,846.26 |
Jun 16, 2022 | IDA-52660 | Int Charges | 1,100.72 |
Jun 16, 2022 | IDA-52660 | Int Charges | 1,100.72 |
Jun 16, 2022 | IDA-52660 | Int Charges | 62,637.07 |
Jun 16, 2022 | IDA-52660 | Int Charges | 62,637.07 |
Apr 15, 2022 | IDA-61000 | Int Charges | 99,872.46 |
Apr 15, 2022 | IDA-61000 | Int Charges | 99,872.46 |
Apr 15, 2022 | IDA-61000 | Int Charges | 319.26 |
Apr 15, 2022 | IDA-61000 | Int Charges | 319.26 |
Oct 15, 2018 | IDA-61000 | Int Charges | 5,449.64 |
Oct 15, 2018 | IDA-61000 | Int Charges | 5,449.64 |
Dec 6, 2018 | IDA-61000 | Loan Disb | 2,861,297.20 |
Mar 7, 2019 | IDA-61000 | Loan Disb | 2,620,953.80 |
Jun 17, 2019 | IDA-61000 | Loan Disb | 2,146,621.00 |
Jun 15, 2019 | IDA-52660 | Int Charges | 682.94 |
Jun 15, 2019 | IDA-52660 | Int Charges | 682.94 |
Jun 15, 2019 | IDA-52660 | Int Charges | 65,881.09 |
Jun 15, 2019 | IDA-52660 | Int Charges | 65,881.09 |
Apr 15, 2019 | IDA-61000 | Int Charges | 103.05 |
Apr 15, 2019 | IDA-61000 | Int Charges | 103.05 |
Apr 15, 2019 | IDA-61000 | Int Charges | 15,716.55 |
Apr 15, 2019 | IDA-61000 | Int Charges | 15,716.55 |
Oct 15, 2019 | IDA-61000 | Int Charges | 2,089.28 |
Oct 15, 2019 | IDA-61000 | Int Charges | 2,089.28 |
Oct 15, 2019 | IDA-61000 | Int Charges | 33,474.35 |
Oct 15, 2019 | IDA-61000 | Int Charges | 33,474.35 |
Oct 15, 2020 | IDA-61000 | Int Charges | 1,645.13 |
Oct 15, 2020 | IDA-61000 | Int Charges | 1,645.13 |
Oct 15, 2020 | IDA-61000 | Int Charges | 64,936.12 |
Oct 15, 2020 | IDA-61000 | Int Charges | 64,936.12 |
Oct 7, 2020 | IDA-61000 | Loan Disb | 3,238,714.50 |
Mar 17, 2021 | IDA-61000 | Loan Disb | 2,124,064.00 |
Dec 15, 2020 | IDA-52660 | Int Charges | 1,741.83 |
Dec 15, 2020 | IDA-52660 | Int Charges | 1,741.83 |
Dec 15, 2020 | IDA-52660 | Int Charges | 66,741.97 |
Dec 15, 2020 | IDA-52660 | Int Charges | 66,741.97 |
Jan 19, 2021 | IDA-61000 | Loan Disb | 3,409,613.00 |
Jun 15, 2021 | IDA-52660 | Int Charges | 67,272.25 |
Jun 15, 2021 | IDA-52660 | Int Charges | 67,272.25 |
Jun 15, 2021 | IDA-52660 | Int Charges | 1,268.23 |
Jun 15, 2021 | IDA-52660 | Int Charges | 1,268.23 |
Jun 15, 2021 | IDA-61000 | Loan Disb | 941,119.25 |
Apr 15, 2021 | IDA-61000 | Int Charges | 634.40 |
Apr 15, 2021 | IDA-61000 | Int Charges | 634.40 |
Apr 15, 2021 | IDA-61000 | Int Charges | 85,544.75 |
Oct 15, 2019 | IDA-61000 | Loan Disb | 2,744,136.20 |
Jan 10, 2020 | IDA-61000 | Loan Disb | 1,150,854.40 |
Mar 19, 2020 | IDA-61000 | Loan Disb | 2,958,351.50 |
Dec 15, 2019 | IDA-52660 | Int Charges | 66.93 |
Dec 15, 2019 | IDA-52660 | Int Charges | 66.93 |
Dec 15, 2019 | IDA-52660 | Int Charges | 65,850.35 |
Dec 15, 2019 | IDA-52660 | Int Charges | 65,850.35 |
Apr 15, 2020 | IDA-61000 | Int Charges | 94.97 |
Apr 15, 2020 | IDA-61000 | Int Charges | 94.97 |
Apr 15, 2020 | IDA-61000 | Int Charges | 48,571.15 |
Apr 15, 2020 | IDA-61000 | Int Charges | 48,571.15 |
Jun 22, 2020 | IDA-61000 | Loan Disb | 450,671.97 |
Jun 15, 2020 | IDA-52660 | Int Charges | 307.91 |
Dec 15, 2017 | IDA-52660 | Int Charges | 59,217.04 |
Dec 15, 2017 | IDA-52660 | Int Charges | 59,217.04 |
Dec 15, 2017 | IDA-52660 | Int Charges | 2,143.96 |
Dec 15, 2017 | IDA-52660 | Int Charges | 2,143.96 |
Dec 22, 2017 | IDA-52660 | Loan Disb | 297,263.10 |
Mar 27, 2018 | IDA-52660 | Loan Disb | 839,318.50 |
Jan 26, 2018 | IDA-52660 | Loan Disb | 434,795.97 |
Jun 18, 2018 | IDA-52660 | Int Charges | 63,232.01 |
Jun 18, 2018 | IDA-52660 | Int Charges | 63,232.01 |
Jun 18, 2018 | IDA-52660 | Int Charges | 109.33 |
Jun 18, 2018 | IDA-52660 | Int Charges | 109.33 |
Jun 7, 2018 | IDA-61000 | Loan Disb | 1,021,137.50 |
May 24, 2018 | IDA-61000 | Loan Disb | 978,669.00 |
Oct 3, 2018 | IDA-61000 | Loan Disb | 185,787.25 |
Dec 27, 2018 | IDA-52660 | Int Charges | 1,815.04 |
Dec 27, 2018 | IDA-52660 | Int Charges | 1,815.04 |
Dec 27, 2018 | IDA-52660 | Int Charges | 65,354.63 |
Dec 27, 2018 | IDA-52660 | Int Charges | 65,354.63 |
Jul 14, 2016 | IDA-52660 | Loan Disb | 28,764.11 |
Sep 21, 2016 | IDA-52660 | Loan Disb | 30,752.88 |
Apr 15, 2024 | IDA-61000 | Int Charges | 1,675.15 |
Apr 15, 2024 | IDA-61000 | Int Charges | 1,675.15 |
Apr 15, 2024 | IDA-61000 | Int Charges | 95,432.99 |
Apr 15, 2024 | IDA-61000 | Int Charges | 95,432.99 |
Jun 15, 2024 | IDA-52660 | Loan Repay | 4,314.27 |
Jun 15, 2024 | IDA-52660 | Loan Repay | 163,023.47 |
Dec 19, 2016 | IDA-52660 | Int Charges | 292.13 |
Dec 19, 2016 | IDA-52660 | Int Charges | 292.13 |
Dec 19, 2016 | IDA-52660 | Int Charges | 55,857.86 |
Dec 19, 2016 | IDA-52660 | Int Charges | 55,857.86 |
Jan 6, 2017 | IDA-52660 | Loan Disb | 29,378.27 |
Jun 29, 2017 | IDA-52660 | Loan Disb | 31,928.67 |
Mar 30, 2017 | IDA-52660 | Loan Disb | 150,828.70 |
Jun 15, 2017 | IDA-52660 | Int Charges | 1,539.29 |
Jun 15, 2017 | IDA-52660 | Int Charges | 1,539.29 |
Jun 15, 2017 | IDA-52660 | Int Charges | 59,555.58 |
Jun 15, 2017 | IDA-52660 | Int Charges | 59,555.58 |
Oct 5, 2017 | IDA-52660 | Loan Disb | 50,116.46 |
Jul 7, 2015 | IDA-52660 | Loan Disb | 707,845.60 |
Sep 11, 2015 | IDA-52660 | Loan Disb | 1,768,997.60 |
Dec 16, 2015 | IDA-52660 | Int Charges | 40,552.87 |
Dec 16, 2015 | IDA-52660 | Int Charges | 40,552.87 |
Dec 15, 2015 | IDA-52660 | Loan Disb | 2,281,410.00 |
Dec 15, 2015 | IDA-52660 | Int Charges | 1,238.79 |
Dec 15, 2015 | IDA-52660 | Int Charges | 1,238.79 |
Apr 11, 2016 | IDA-52660 | Loan Disb | 1,211,802.20 |
Jun 15, 2016 | IDA-52660 | Int Charges | 56,796.09 |
Jun 15, 2016 | IDA-52660 | Int Charges | 56,796.09 |
Jun 15, 2016 | IDA-52660 | Int Charges | 1,040.00 |
Jun 15, 2016 | IDA-52660 | Int Charges | 1,040.00 |
Dec 16, 2014 | IDA-52660 | Loan Disb | 1,844,128.50 |
Sep 26, 2014 | IDA-52660 | Loan Disb | 2,596,839.50 |
Oct 23, 2013 | IDA-52660 | Loan Disb | 1,000,000.00 |
Mar 10, 2014 | IDA-52660 | Loan Disb | 1,581,736.80 |
Dec 16, 2014 | IDA-52660 | Int Charges | 22,446.19 |
Dec 16, 2014 | IDA-52660 | Int Charges | 22,446.19 |
Jun 15, 2014 | IDA-52660 | Int Charges | 1,079.67 |
Jun 15, 2014 | IDA-52660 | Int Charges | 1,079.67 |
Jun 15, 2014 | IDA-52660 | Int Charges | 6,740.85 |
Jun 15, 2014 | IDA-52660 | Int Charges | 6,740.85 |
Jun 15, 2024 | IDA-52660 | Int Charges | 62,124.10 |
Jun 15, 2024 | IDA-52660 | Int Charges | 62,124.10 |
Jun 24, 2013 | IDA-52660 | Loan Commitment | 19,000,000.00 |
Jun 15, 2017 | IDA-61000 | Loan Commitment | 27,000,000.00 |
Dec 20, 2021 | IDA-61000 | Loan Disb | 558,987.10 |
Dec 15, 2021 | IDA-52660 | Int Charges | 341.02 |
Dec 15, 2021 | IDA-52660 | Int Charges | 341.02 |
Dec 16, 2021 | IDA-52660 | Int Charges | 65,071.97 |
Dec 16, 2021 | IDA-52660 | Int Charges | 65,071.97 |
Oct 15, 2022 | IDA-61000 | Int Charges | 2,525.33 |
Oct 15, 2022 | IDA-61000 | Int Charges | 2,525.33 |
Oct 15, 2022 | IDA-61000 | Int Charges | 91,776.11 |
Oct 15, 2022 | IDA-61000 | Int Charges | 91,776.11 |
Dec 16, 2022 | IDA-52660 | Int Charges | 673.52 |
Dec 16, 2022 | IDA-52660 | Int Charges | 673.52 |
Dec 16, 2022 | IDA-52660 | Int Charges | 63,337.92 |
Dec 16, 2022 | IDA-52660 | Int Charges | 63,337.92 |
Mar 2, 2023 | IDA-61000 | Loan Disb | -37,369.57 |
Apr 15, 2023 | IDA-61000 | Int Charges | 3,242.37 |
Apr 15, 2023 | IDA-61000 | Int Charges | 3,242.37 |
Apr 15, 2023 | IDA-61000 | Int Charges | 95,556.56 |
Apr 15, 2023 | IDA-61000 | Int Charges | 95,556.56 |
Mar 2, 2023 | IDA-61000 | Loan Cancel | 37,369.57 |
Jun 15, 2023 | IDA-52660 | Int Charges | 60,077.33 |
Jun 15, 2023 | IDA-52660 | Int Charges | 3,172.02 |
Jun 15, 2023 | IDA-52660 | Int Charges | 3,172.02 |
Jun 15, 2023 | IDA-52660 | Int Charges | 60,077.33 |
Dec 15, 2023 | IDA-52660 | Int Charges | 313.85 |
Dec 15, 2023 | IDA-52660 | Int Charges | 313.85 |
Dec 15, 2023 | IDA-52660 | Loan Repay | 170,280.33 |
Dec 15, 2023 | IDA-52660 | Int Charges | 63,855.12 |
Dec 15, 2023 | IDA-52660 | Int Charges | 63,855.12 |
Oct 15, 2023 | IDA-61000 | Int Charges | 1,196.51 |
Oct 15, 2023 | IDA-61000 | Int Charges | 1,196.51 |
Oct 15, 2023 | IDA-61000 | Int Charges | 96,632.33 |
Oct 15, 2023 | IDA-61000 | Int Charges | 96,632.33 |
Jun 15, 2020 | IDA-52660 | Int Charges | 307.91 |
Jun 16, 2020 | IDA-52660 | Int Charges | 65,588.41 |
Jun 16, 2020 | IDA-52660 | Int Charges | 65,588.41 |
Name | Review | Date |
---|---|---|
Financial Management | Satisfactory | 2021-12-10 |
Monitoring and Evaluation | Satisfactory | 2021-12-10 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2021-12-10 |
Counterpart Funding | Satisfactory | 2021-12-10 |
Project Management | Satisfactory | 2021-12-10 |
Progress towards achievement of PDO | Moderately Satisfactory | 2021-12-10 |
Procurement | Satisfactory | 2021-12-10 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-29-2023 |
---|---|
Outcomes | Moderately Satisfactory |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 12-01-2023 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | N/a | |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Roads in good and fair condition as a share of total classified roads | Value | 50.00 | 90.00 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Realistic plans or strategies defined, adopted, and implemented to reform the transport sector including SOEs | Value | 0.00 | 1.00 | 0.00 |
Date | April 29, 2017 | September 30, 2021 | ||
Comment |
Share of the national road network maintained through performance based contracts | Value | 44.00 | 89.20 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Direct project beneficiaries | Value | 0.00 | 141625.00 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Roads rehablitated | Value | 0.00 | 21.90 | 0.00 |
Date | March 21, 2017 | September 30, 2021 | ||
Comment |
Number of students benefiting from the training equipment to be acquired under the credit | Value | 0.00 | 1523.00 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Annual reports on accidents issued every year from the improved database and monitoring system | Value | No | No | |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Timely publication of annual Financial Audits (ENAPOR, ASA, TACV) | Value | 2.00 | 2.00 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
The highway code is revised | Value | No | No | |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Comprehensive Aggregate Annual Fiscal Risk Report on SOEs | Value | No | No | |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Roads rehabilitated - rural | Value | 0.00 | 0.00 | 0.00 |
Date | March 21, 2017 | October 18, 2018 | ||
Comment |
ENAPOR : Port tariffs are adjusted | Value | No | Yes | |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Roads rehabilitated - non-rural | Value | 0.00 | 0.00 | 0.00 |
Date | March 21, 2017 | October 18, 2018 | ||
Comment |
Roads Rehabilitated and/or Maintained under project financed PBMCs | Value | 0.00 | 485.10 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
A realistic loss reduction strategy has been defined, adopted, and implemented for TACV | Value | No | No | |
Date | April 29, 2017 | September 30, 2021 | ||
Comment |
Amount of labor and material costs paid for the cobblestone road rehabilitation | Value | 0.00 | 974413.13 | 0.00 |
Date | April 1, 2017 | September 30, 2021 | ||
Comment |
IMP : Regulatory Agency model, training and business plan is defined. | Value | No | Yes | |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Number of jobs created through the cobblestone road rehabilitation (person-days) | Value | 0.00 | 276051.00 | 0.00 |
Date | April 1, 2017 | September 30, 2021 | ||
Comment |
Number of female jobs created through the cobblestone road rehabilitation (person-days) | Value | 0.00 | 17304.00 | 0.00 |
Date | April 29, 2017 | September 30, 2021 | ||
Comment |
Grievances responded and/or resolved within one month under the performance-based road contracts | Value | 90.00 | 100.00 | 0.00 |
Date | April 11, 2017 | September 30, 2021 | ||
Comment |
Annual reports on the condition of the national network and on priorities in terms of rehabilitation and maintenance | Value | No | Yes | |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |
Percentage of national road network where axle load control is enforced | Value | 0.00 | 0.00 | 0.00 |
Date | April 8, 2013 | September 30, 2021 | ||
Comment |