Financier | Commitments |
---|---|
IDA Credit | 40.00 |
P127388
Closed
Anna Olefir
Republic of Moldova
October 12, 2011
(as of board presentation)
January 24, 2013
July 1, 2013
US$ 40.00 million
NATIONAL OFFICE FOR REGIONAL AND LOCAL DEVELOPMENT (NORLD),Ministry of Education and Research
2013
US$ 40.00 million
B
Not Applicable
December 31, 2022
Yes
BANK APPROVED
June 29, 2023
Financier | Commitments |
---|---|
IDA Credit | 40.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 40.00 |
IBRD + IDA Commitment | 40.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 40.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Nov 15, 2023 | IDA-51960 | Int Charges | 167,594.60 |
Nov 15, 2023 | IDA-51960 | Int Charges | -155.61 |
Nov 15, 2023 | IDA-51960 | Int Charges | 155.61 |
Jan 15, 2024 | IDA-61810 | Int Charges | 55,983.88 |
Jan 15, 2024 | IDA-61810 | Int Charges | 2,253.84 |
Jan 15, 2024 | IDA-61810 | Loan Repay | 91,789.11 |
Jan 15, 2024 | IDA-61810 | Int Charges | 34,678.83 |
Jan 15, 2024 | IDA-61810 | Int Charges | 34,678.83 |
Jan 15, 2024 | IDA-61810 | Loan Repay | 63,357.63 |
May 15, 2024 | IDA-51960 | Loan Repay | 271,416.00 |
May 15, 2024 | IDA-51960 | Loan Repay | 283,449.72 |
May 15, 2024 | IDA-51960 | Int Charges | 101,136.87 |
May 15, 2024 | IDA-51960 | Int Charges | 101,136.87 |
May 15, 2024 | IDA-51960 | Int Charges | 168,561.48 |
May 15, 2024 | IDA-51960 | Int Charges | 4,817.68 |
Feb 21, 2023 | IDA-51960 | Loan Disb | -0.25 |
May 15, 2023 | IDA-51960 | Loan Repay | 283,189.40 |
Feb 21, 2023 | IDA-51960 | Loan Disb | -65,658.93 |
Dec 27, 2022 | IDA-51960 | Loan Disb | -141,901.75 |
May 15, 2023 | IDA-51960 | Loan Repay | 295,027.12 |
May 15, 2023 | IDA-51960 | Int Charges | 107,151.85 |
May 15, 2023 | IDA-51960 | Int Charges | 107,151.85 |
May 15, 2023 | IDA-51960 | Int Charges | 171,119.53 |
May 15, 2023 | IDA-51960 | Int Charges | 13,941.23 |
Jan 15, 2023 | IDA-61810 | Int Charges | 403.92 |
Jan 15, 2023 | IDA-61810 | Int Charges | 403.92 |
Jan 15, 2023 | IDA-61810 | Int Charges | 23,361.85 |
Jan 15, 2023 | IDA-61810 | Int Charges | 23,361.85 |
Jan 15, 2023 | IDA-61810 | Int Charges | 32,480.06 |
Jul 15, 2023 | IDA-61810 | Int Charges | 7,161.77 |
Apr 30, 2023 | IDA-61810 | Loan Cancel | 82,421.53 |
Jul 15, 2023 | IDA-61810 | Int Charges | 57,303.41 |
May 15, 2022 | IDA-51960 | Loan Repay | 294,514.30 |
May 15, 2022 | IDA-51960 | Loan Repay | 13,028.13 |
May 15, 2022 | IDA-51960 | Loan Repay | 265,553.66 |
Feb 23, 2022 | IDA-51960 | Loan Disb | -79,134.30 |
Jun 8, 2022 | IDA-61810 | Loan Disb | 226,743.70 |
Jun 8, 2022 | IDA-51960 | Loan Disb | 1,209.11 |
Jul 15, 2022 | IDA-61810 | Int Charges | 104.52 |
Jul 15, 2022 | IDA-61810 | Int Charges | 19,748.51 |
Jul 15, 2022 | IDA-61810 | Int Charges | 19,748.51 |
Jul 15, 2022 | IDA-61810 | Int Charges | 32,914.18 |
Jan 15, 2022 | IDA-61810 | Int Charges | 19,635.40 |
Jan 15, 2022 | IDA-61810 | Int Charges | 19,635.40 |
Jan 15, 2022 | IDA-61810 | Int Charges | 33,188.38 |
Jan 15, 2022 | IDA-61810 | Int Charges | 345.06 |
Nov 17, 2015 | IDA-51960 | Int Charges | 40,897.76 |
Nov 17, 2015 | IDA-51960 | Int Charges | 68,162.93 |
Nov 17, 2015 | IDA-51960 | Int Charges | 2,539.46 |
Nov 15, 2014 | IDA-51960 | Int Charges | 37,027.10 |
Nov 15, 2014 | IDA-51960 | Int Charges | 245.57 |
Nov 15, 2014 | IDA-51960 | Int Charges | 245.57 |
Nov 15, 2014 | IDA-51960 | Int Charges | 21,970.68 |
Nov 15, 2014 | IDA-51960 | Int Charges | 21,970.68 |
Mar 4, 2014 | IDA-51960 | Loan Disb | 1,973,957.00 |
Feb 11, 2014 | IDA-51960 | Loan Disb | 300,000.00 |
Dec 4, 2013 | IDA-51960 | Loan Disb | 3,918,091.00 |
Jul 3, 2014 | IDA-51960 | Loan Disb | 45,175.73 |
May 15, 2014 | IDA-51960 | Int Charges | 16,710.64 |
May 15, 2014 | IDA-51960 | Int Charges | 16,710.64 |
May 15, 2014 | IDA-51960 | Int Charges | 27,851.09 |
Jul 15, 2019 | IDA-61810 | Int Charges | 106.29 |
Jul 15, 2019 | IDA-61810 | Int Charges | 106.29 |
Jul 15, 2019 | IDA-61810 | Int Charges | 177.16 |
Aug 2, 2019 | IDA-51960 | Loan Disb | 306,993.50 |
Nov 15, 2019 | IDA-51960 | Int Charges | 5,448.54 |
Nov 15, 2019 | IDA-51960 | Int Charges | 5,448.54 |
May 22, 2018 | IDA-51960 | Loan Disb | 33,344.36 |
Jul 24, 2018 | IDA-51960 | Loan Disb | 226,986.44 |
May 15, 2018 | IDA-51960 | Loan Repay | 1,667.75 |
May 15, 2018 | IDA-51960 | Loan Repay | 238,811.94 |
May 15, 2018 | IDA-51960 | Int Charges | 147,707.06 |
May 15, 2018 | IDA-51960 | Loan Repay | 374,583.25 |
May 15, 2018 | IDA-51960 | Int Charges | 88,624.22 |
May 15, 2018 | IDA-51960 | Int Charges | 88,624.22 |
Dec 11, 2018 | IDA-61810 | Loan Disb | 150,000.00 |
Nov 15, 2018 | IDA-51960 | Loan Disb | 258,779.47 |
Oct 30, 2018 | IDA-51960 | Loan Disb | 48,732.79 |
Nov 15, 2018 | IDA-51960 | Int Charges | 143,743.48 |
Nov 15, 2018 | IDA-51960 | Loan Repay | 362,255.47 |
Nov 15, 2018 | IDA-51960 | Int Charges | 86,246.09 |
Nov 15, 2018 | IDA-51960 | Int Charges | 86,246.09 |
Jan 17, 2019 | IDA-51960 | Loan Disb | 354,658.10 |
Oct 18, 2018 | IDA-51960 | Loan Disb | 455,724.20 |
Nov 15, 2017 | IDA-51960 | Int Charges | 133,678.05 |
Nov 15, 2017 | IDA-51960 | Int Charges | 2,897.47 |
Nov 15, 2017 | IDA-51960 | Int Charges | 80,206.85 |
Nov 15, 2017 | IDA-51960 | Int Charges | 80,206.85 |
Feb 16, 2018 | IDA-51960 | Loan Disb | 182,274.90 |
Dec 22, 2017 | IDA-51960 | Loan Disb | 1,807,403.00 |
Oct 3, 2016 | IDA-51960 | Loan Disb | 96,053.49 |
Nov 15, 2016 | IDA-51960 | Int Charges | 105,518.92 |
Nov 15, 2016 | IDA-51960 | Int Charges | 1,928.85 |
Nov 15, 2016 | IDA-51960 | Int Charges | 63,311.34 |
Nov 15, 2016 | IDA-51960 | Int Charges | 63,311.34 |
May 15, 2017 | IDA-51960 | Int Charges | 4,378.94 |
May 15, 2017 | IDA-51960 | Int Charges | 4,378.94 |
May 15, 2017 | IDA-51960 | Int Charges | 65,182.58 |
May 15, 2017 | IDA-51960 | Int Charges | 65,182.58 |
May 15, 2017 | IDA-51960 | Int Charges | 113,125.71 |
May 16, 2017 | IDA-51960 | Loan Disb | 1,753,195.80 |
May 23, 2017 | IDA-51960 | Loan Disb | 87,056.10 |
Nov 30, 2017 | IDA-51960 | Loan Disb | 500,000.00 |
Dec 11, 2015 | IDA-51960 | Loan Disb | 1,777,107.80 |
Mar 10, 2016 | IDA-51960 | Loan Disb | 1,774,005.40 |
Feb 18, 2016 | IDA-51960 | Loan Disb | 1,781,231.40 |
Apr 14, 2016 | IDA-51960 | Loan Disb | 94,157.62 |
May 15, 2016 | IDA-51960 | Int Charges | 2,637.05 |
May 15, 2016 | IDA-51960 | Int Charges | 2,637.05 |
May 15, 2016 | IDA-51960 | Int Charges | 53,712.47 |
May 15, 2016 | IDA-51960 | Int Charges | 53,712.47 |
May 15, 2016 | IDA-51960 | Int Charges | 91,919.95 |
Dec 15, 2016 | IDA-51960 | Loan Disb | 129,748.64 |
Dec 21, 2016 | IDA-51960 | Loan Disb | 1,710,133.80 |
Dec 29, 2014 | IDA-51960 | Loan Disb | 1,849,507.50 |
Dec 29, 2014 | IDA-51960 | Loan Disb | 66,324.14 |
Feb 27, 2015 | IDA-51960 | Loan Disb | 2,392,563.00 |
Jun 29, 2015 | IDA-51960 | Loan Disb | 160,296.39 |
May 15, 2015 | IDA-51960 | Int Charges | 1,442.13 |
May 15, 2015 | IDA-51960 | Int Charges | 1,442.13 |
May 15, 2015 | IDA-51960 | Int Charges | 29,302.56 |
May 15, 2015 | IDA-51960 | Int Charges | 29,302.56 |
May 15, 2015 | IDA-51960 | Int Charges | 48,631.58 |
Jul 29, 2015 | IDA-51960 | Loan Disb | 1,786,051.50 |
Nov 17, 2015 | IDA-51960 | Int Charges | 40,897.76 |
Jun 22, 2020 | IDA-51960 | Loan Disb | 473,479.70 |
May 15, 2020 | IDA-51960 | Int Charges | 158,871.94 |
May 15, 2020 | IDA-51960 | Int Charges | 2,098.76 |
May 15, 2020 | IDA-51960 | Loan Repay | 255,923.30 |
May 15, 2020 | IDA-51960 | Loan Repay | 329,498.00 |
May 15, 2020 | IDA-51960 | Int Charges | 95,323.16 |
May 15, 2020 | IDA-51960 | Int Charges | 95,323.16 |
Jul 30, 2020 | IDA-61810 | Loan Disb | 203,432.89 |
Aug 31, 2020 | IDA-51960 | Loan Disb | 540,413.56 |
Jul 14, 2020 | IDA-51960 | Loan Disb | 568,680.50 |
Jun 11, 2020 | IDA-61810 | Loan Disb | 150,000.00 |
Jun 11, 2020 | IDA-61810 | Loan Disb | 79,561.42 |
Jun 11, 2020 | IDA-51960 | Loan Disb | 6,670.59 |
Aug 10, 2020 | IDA-51960 | Loan Disb | 588,799.75 |
Oct 20, 2020 | IDA-51960 | Loan Disb | 414,097.88 |
Sep 22, 2020 | IDA-51960 | Loan Disb | 408,025.60 |
Jul 15, 2020 | IDA-61810 | Int Charges | 18.66 |
Jul 15, 2020 | IDA-61810 | Int Charges | 2,615.69 |
Jul 15, 2020 | IDA-61810 | Int Charges | 2,615.69 |
Jul 15, 2020 | IDA-61810 | Int Charges | 3,778.52 |
Nov 15, 2019 | IDA-51960 | Int Charges | 85,570.37 |
Nov 15, 2019 | IDA-51960 | Int Charges | 85,570.37 |
Nov 15, 2019 | IDA-51960 | Int Charges | 149,576.08 |
Nov 15, 2019 | IDA-51960 | Loan Repay | 6,025.63 |
Nov 15, 2019 | IDA-51960 | Loan Repay | 585,907.06 |
Nov 6, 2019 | IDA-61810 | Loan Disb | 34,221.27 |
Nov 15, 2019 | IDA-51960 | Int Charges | -0.01 |
Nov 15, 2019 | IDA-51960 | Loan Repay | 0.01 |
Oct 11, 2019 | IDA-51960 | Loan Disb | 247,804.80 |
Nov 6, 2019 | IDA-61810 | Loan Disb | 100,000.00 |
Jul 15, 2019 | IDA-61810 | Int Charges | 680.39 |
Jul 15, 2019 | IDA-61810 | Int Charges | 680.39 |
Jul 15, 2019 | IDA-61810 | Int Charges | 1,043.80 |
Aug 8, 2019 | IDA-51960 | Loan Disb | 193,030.56 |
Sep 27, 2019 | IDA-51960 | Loan Disb | 260,206.89 |
Nov 8, 2019 | IDA-61810 | Loan Disb | 230,611.44 |
Nov 8, 2019 | IDA-51960 | Loan Disb | 338,238.62 |
Mar 24, 2020 | IDA-51960 | Loan Disb | 289,677.38 |
Jan 9, 2020 | IDA-51960 | Loan Disb | 500,027.20 |
Jan 15, 2020 | IDA-61810 | Int Charges | 90.00 |
Jan 15, 2020 | IDA-61810 | Int Charges | 1,348.87 |
Jan 15, 2020 | IDA-61810 | Int Charges | 1,348.87 |
Jan 15, 2020 | IDA-61810 | Int Charges | 2,229.55 |
Feb 20, 2020 | IDA-51960 | Loan Disb | 267,033.30 |
May 4, 2020 | IDA-51960 | Loan Disb | 288,377.03 |
May 4, 2020 | IDA-51960 | Loan Disb | 400,000.00 |
Apr 22, 2020 | IDA-51960 | Loan Disb | 411,586.28 |
Nov 15, 2018 | IDA-51960 | Loan Repay | 14,944.79 |
Nov 15, 2018 | IDA-51960 | Loan Repay | 217,815.92 |
May 15, 2019 | IDA-51960 | Loan Repay | 583,472.70 |
May 15, 2019 | IDA-51960 | Loan Repay | 11,827.73 |
May 16, 2019 | IDA-51960 | Loan Disb | 454,248.25 |
Jul 16, 2019 | IDA-51960 | Loan Disb | 215,114.03 |
Mar 8, 2019 | IDA-51960 | Loan Disb | 255,972.06 |
Jun 14, 2019 | IDA-51960 | Loan Disb | 234,479.81 |
May 30, 2019 | IDA-61810 | Loan Disb | 34,489.31 |
May 30, 2019 | IDA-51960 | Loan Disb | 5,373.97 |
Mar 26, 2019 | IDA-61810 | Loan Disb | 37,714.07 |
May 15, 2019 | IDA-51960 | Int Charges | 16,147.13 |
May 15, 2019 | IDA-51960 | Int Charges | 16,147.13 |
May 15, 2019 | IDA-51960 | Int Charges | 72,034.23 |
May 15, 2019 | IDA-51960 | Int Charges | 72,034.23 |
May 15, 2019 | IDA-51960 | Int Charges | 146,968.95 |
Nov 6, 2019 | IDA-51960 | Loan Disb | 19,036.34 |
Jan 15, 2022 | IDA-61810 | Int Charges | 345.06 |
Aug 17, 2022 | IDA-61810 | Loan Disb | 88,467.72 |
Jan 28, 2022 | IDA-61810 | Loan Disb | 20,000.00 |
Dec 21, 2022 | IDA-61810 | Loan Disb | 346,338.40 |
Dec 27, 2022 | IDA-61810 | Loan Disb | 577,861.10 |
Dec 23, 2022 | IDA-61810 | Loan Disb | 1,203,000.00 |
Nov 15, 2022 | IDA-51960 | Loan Repay | 534,646.20 |
Nov 15, 2022 | IDA-51960 | Int Charges | 23,006.81 |
Nov 15, 2022 | IDA-51960 | Int Charges | 23,006.81 |
Nov 15, 2022 | IDA-51960 | Int Charges | 84,656.47 |
Nov 15, 2022 | IDA-51960 | Int Charges | 84,656.47 |
Nov 15, 2022 | IDA-51960 | Int Charges | 165,774.73 |
Nov 15, 2022 | IDA-51960 | Loan Repay | 32,076.30 |
Dec 8, 2022 | IDA-61810 | Loan Disb | 388,800.00 |
Dec 8, 2022 | IDA-61810 | Loan Disb | 1,141,435.80 |
Jul 15, 2021 | IDA-61810 | Int Charges | 299.02 |
Jul 19, 2021 | IDA-51960 | Loan Disb | 432,655.75 |
Apr 12, 2021 | IDA-51960 | Loan Disb | 490,226.12 |
May 6, 2021 | IDA-61810 | Loan Disb | 2,914,200.00 |
Sep 28, 2021 | IDA-51960 | Loan Disb | 336,594.16 |
Sep 10, 2021 | IDA-61810 | Loan Disb | 157,140.00 |
Nov 15, 2021 | IDA-51960 | Int Charges | 116,571.44 |
Nov 15, 2021 | IDA-51960 | Int Charges | 116,571.44 |
Nov 15, 2021 | IDA-51960 | Int Charges | 197,069.12 |
Feb 16, 2022 | IDA-61810 | Loan Disb | 226,989.56 |
Nov 15, 2021 | IDA-51960 | Int Charges | 1,670.03 |
Nov 15, 2021 | IDA-51960 | Int Charges | 1,670.03 |
Nov 15, 2021 | IDA-51960 | Int Charges | 7,403.77 |
Nov 15, 2021 | IDA-51960 | Loan Repay | 605,033.10 |
May 4, 2022 | IDA-61810 | Loan Disb | 75,207.24 |
May 4, 2022 | IDA-51960 | Loan Disb | 8,789.15 |
May 15, 2022 | IDA-51960 | Int Charges | 111,141.96 |
May 15, 2022 | IDA-51960 | Int Charges | 111,141.96 |
May 15, 2022 | IDA-51960 | Int Charges | 185,236.56 |
Sep 22, 2020 | IDA-61810 | Loan Disb | 438,185.10 |
Sep 22, 2020 | IDA-61810 | Loan Disb | 50,000.01 |
Dec 22, 2020 | IDA-51960 | Loan Disb | 318,613.56 |
Jan 29, 2021 | IDA-61810 | Loan Disb | 585,519.90 |
Jan 5, 2021 | IDA-61810 | Loan Disb | 150,000.00 |
Nov 23, 2020 | IDA-51960 | Loan Disb | 452,358.50 |
Jan 15, 2021 | IDA-61810 | Int Charges | 601.89 |
Jan 15, 2021 | IDA-61810 | Int Charges | 5,564.86 |
Jan 15, 2021 | IDA-61810 | Int Charges | 5,564.86 |
Jan 15, 2021 | IDA-61810 | Int Charges | 8,972.42 |
Feb 8, 2021 | IDA-51960 | Loan Disb | 617,130.25 |
Nov 15, 2020 | IDA-51960 | Loan Repay | 278,599.34 |
May 15, 2021 | IDA-51960 | Int Charges | 189,423.08 |
Nov 15, 2020 | IDA-51960 | Loan Repay | 323,034.62 |
Nov 15, 2020 | IDA-51960 | Int Charges | 109,066.17 |
Nov 15, 2020 | IDA-51960 | Int Charges | 109,066.17 |
Nov 15, 2020 | IDA-51960 | Int Charges | 177,975.20 |
May 15, 2021 | IDA-51960 | Int Charges | 118,202.92 |
May 15, 2021 | IDA-51960 | Int Charges | 118,202.92 |
May 15, 2021 | IDA-51960 | Int Charges | 3,852.35 |
May 15, 2021 | IDA-51960 | Loan Repay | 611,322.56 |
May 15, 2021 | IDA-51960 | Loan Repay | 8,253.61 |
Nov 15, 2020 | IDA-51960 | Loan Repay | 9,811.51 |
May 14, 2021 | IDA-51960 | Loan Disb | 242,610.11 |
Jul 15, 2021 | IDA-61810 | Int Charges | 12,943.05 |
Jul 15, 2021 | IDA-61810 | Int Charges | 12,943.05 |
Jul 15, 2021 | IDA-61810 | Int Charges | 21,571.76 |
Apr 9, 2020 | IDA-51960 | Loan Disb | 9,664.04 |
Apr 9, 2020 | IDA-61810 | Loan Disb | 113,651.15 |
Dec 19, 2019 | IDA-51960 | Loan Disb | 365,219.34 |
Jul 15, 2024 | IDA-61810 | Int Charges | 33,872.68 |
Jul 15, 2024 | IDA-61810 | Int Charges | 33,872.68 |
Jul 15, 2024 | IDA-61810 | Int Charges | 55,723.46 |
Jul 15, 2024 | IDA-61810 | Loan Repay | 151,866.27 |
Jul 15, 2024 | IDA-61810 | Loan Repay | 2,259.75 |
Jul 15, 2024 | IDA-61810 | Int Charges | 1,802.22 |
Feb 16, 2018 | IDA-61810 | Loan Commitment | 10,000,000.00 |
Jan 24, 2013 | IDA-51960 | Loan Commitment | 40,000,000.00 |
Jul 15, 2023 | IDA-61810 | Loan Repay | 94,444.69 |
Apr 30, 2023 | IDA-51960 | Loan Cancel | 758,524.75 |
Jul 15, 2023 | IDA-61810 | Loan Repay | 64,236.16 |
Jul 15, 2023 | IDA-61810 | Int Charges | 35,753.05 |
Jul 15, 2023 | IDA-61810 | Int Charges | 35,753.05 |
Nov 15, 2023 | IDA-51960 | Int Charges | 7,376.24 |
Nov 15, 2023 | IDA-51960 | Loan Repay | 274,247.78 |
Nov 15, 2023 | IDA-51960 | Loan Repay | 281,888.40 |
Nov 15, 2023 | IDA-51960 | Int Charges | 103,453.95 |
Nov 15, 2023 | IDA-51960 | Int Charges | 103,453.95 |
Name | Review | Date |
---|---|---|
Financial Management | Moderately Satisfactory | 2022-07-11 |
Procurement | Moderately Satisfactory | 2022-07-11 |
Progress towards achievement of PDO | Satisfactory | 2022-07-11 |
Project Management | Moderately Satisfactory | 2022-07-11 |
Monitoring and Evaluation | Satisfactory | 2022-07-11 |
Overall Implementation Progress (IP) | Satisfactory | 2022-07-11 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 06-29-2023 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 01-05-2024 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | N/a | |
Implementing Agency | N/a | |
Icr Quality | High | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Total receiving schools that meet infrastructure requirements under national quality assurance standards | Value | 0.00 | 17.00 | 17.00 |
Date | December 4, 2012 | May 31, 2022 | January 26, 2018 | |
Comment |
School report cards with comparative data on school performance (2014-2018) publicly disseminated | Value | 0.00 | 8.00 | 0.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Student-teacher ratio for Grades 1-12 of primary and general secondary education | Value | 10.85:1 | 13.9:1 | 11.85:1 |
Date | December 4, 2012 | May 31, 2022 | January 24, 2017 | |
Comment |
Trained teachers demonstrating a defined minimum level of competency for objectives covered in training program | Value | 0.00 | 99.79 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
System in place to closely monitor and mitigate drop outs in primary and general secondary schools (using EMIS) | Value | No system in place to monitor and mitigate dropout | Dropout rates are determined using data disaggrega | Dropout rates are determined using data disaggrega |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Total classes reorganized in primary and general secondary schools | Value | 0.00 | 3486.00 | 980.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
New minimum quality assurance standards formally adopted by MOE | Value | No | Yes | |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Students benefiting from direct interventions to enhance learning | Value | 0.00 | 133404.00 | 0.00 |
Date | September 6, 2017 | May 31, 2022 | ||
Comment |
Primary and general secondary schools that have their budgets approved according to the new per student formula | Value | 38.00 | 100.00 | 80.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Additional receiving schools that meet infrastructure requirements under national quality assurance standards financed by the national budget | Value | 0.00 | 6.00 | 0.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Students benefiting from direct interventions to enhance learning - Female | Value | 0.00 | 0.00 | 0.00 |
Date | September 6, 2017 | |||
Comment |
Updated training program for school directors and teachers officially approved and implementation initiated | Value | Existing program for training of school directors | Work plan to update the existing system for traini | Work plan to update the existing system for traini |
Date | December 4, 2012 | May 31, 2022 | January 24, 2017 | |
Comment |
Beneficiaries of rehabilitated schools who feel their concerns were considered in the planning and implementation process | Value | 0.00 | 84.00 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
School managers trained under the revised training program | Value | 0.00 | 50.66 | 50.00 |
Date | December 4, 2012 | May 31, 2022 | January 16, 2018 | |
Comment |
Schools where parents report that information, community engagement, and school responsiveness has improved | Value | 0.00 | 71.00 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
School managers trained in gender awareness | Value | 0.00 | 0.00 | 0.00 |
Date | December 4, 2012 | |||
Comment |
Number of additional qualified primary teachers resulting from project interventions. | Value | 0.00 | 1376.00 | 0.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Primary and general secondary teachers trained under the revised training program | Value | 0.00 | 21.56 | 20.00 |
Date | December 4, 2012 | May 31, 2022 | January 16, 2018 | |
Comment |
Primary and general secondary teachers trained in gender awareness | Value | 0.00 | 0.00 | 0.00 |
Date | December 4, 2012 | |||
Comment |
Support staff and psycho-pedagogues trained on in-depth skills in special education | Value | 0.00 | 840.00 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
Targeted schools equipped with new science labs and technology equipment | Value | 0.00 | 160.00 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
Targeted schools equipped with teaching/learning materials for students with disabilities and/or special educational needs | Value | 0.00 | 100.00 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
National School Inspectorate Staff Trained | Value | 0.00 | 2791.00 | 0.00 |
Date | September 14, 2017 | May 31, 2022 | ||
Comment |
System for learning assessment at the primary level | Value | Yes | Yes | Yes |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Utility of the learning assessment system | Value | 4.00 | 4.00 | 4.00 |
Date | December 4, 2012 | February 19, 2018 | ||
Comment |
Administration of revised national testing of all 4th grade students completed | Value | Existing national tests and scoring guidelines for | All 4th grade students tested in Romanian language | Existing national tests and scoring guidelines for |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Administration of revised national testing of all 9th grade students completed | Value | Existing national tests and scoring guidelines for | All 9th grade students tested in Romanian language | Existing national tests and scoring guidelines for |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Report analyzing results of national assessments publicly disseminated | Value | 0.00 | 4.00 | 0.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Report analyzing Moldova's performance in PISA 2015 and PISA 2018 publicly disseminated | Value | No report | PISA 2015 and PISA 2018 reports publicly dissemina | PISA 2015 and PISA 2018 reports publicly dissemina |
Date | December 4, 2012 | May 31, 2022 | January 16, 2018 | |
Comment |
Consolidated Education Management Information System (EMIS) covering pre-university education in place | Value | Existing school mapping system | Consolidated EMIS including preschool and VET educ | Consolidated EMIS including preschool and VET educ |
Date | December 4, 2012 | May 31, 2022 | January 16, 2018 | |
Comment |
Large-scale primary/secondary learning assessments completed | Value | 0.00 | 27.00 | 0.00 |
Date | December 4, 2012 | May 31, 2022 | ||
Comment |
Number of laptops provided to primary and secondary education students to access remote learning | Value | 0.00 | 15500.00 | 0.00 |
Date | April 1, 2020 | May 31, 2022 | ||
Comment |