Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 1068.00 |
Borrower/Recipient | 188.00 |
P128050
Active
Irina Li , Nijat Valiyev
Republic of Kazakhstan
March 2, 2012
(as of board presentation)
May 1, 2012
June 14, 2013
US$ 1256.00 million
Ministry of Transport
2012
US$ 1068.00 million
A
November 26, 2023
December 31, 2025
No
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 1068.00 |
Borrower/Recipient | 188.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 1068.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 1068.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 1256.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Aug 15, 2021 | IBRD-81560 | Int Charges | 2,124,316.50 |
Aug 15, 2021 | IBRD-81560 | Loan Repay | 25,618,442.00 |
Oct 25, 2021 | IBRD-81560 | Loan Disb | 1,490,000.00 |
Sep 22, 2021 | IBRD-81560 | Loan Disb | 1,330,000.00 |
Aug 6, 2021 | IBRD-81560 | Loan Disb | 4,500,000.00 |
Apr 22, 2020 | IBRD-81560 | Loan Disb | 2,200,000.00 |
Jun 22, 2020 | IBRD-81560 | Loan Disb | 3,350,000.00 |
May 20, 2020 | IBRD-81560 | Loan Disb | 2,680,000.00 |
Sep 23, 2020 | IBRD-81560 | Loan Disb | 5,535,000.00 |
Sep 10, 2020 | IBRD-81560 | Loan Disb | -942,306.56 |
Jul 23, 2020 | IBRD-81560 | Loan Disb | 1,350,000.00 |
Sep 10, 2020 | IBRD-81560 | Loan Disb | -3,502,460.50 |
Aug 15, 2020 | IBRD-81560 | Int Charges | 3,634.52 |
Aug 15, 2020 | IBRD-81560 | Int Charges | 5,930,975.00 |
Sep 13, 2013 | IBRD-81560 | Loan Disb | 1,797,097.00 |
Sep 13, 2013 | IBRD-81560 | Loan Disb | 3,548,733.50 |
Nov 26, 2013 | IBRD-81560 | Loan Disb | 384,475.40 |
Sep 13, 2013 | IBRD-81560 | Loan Disb | 1,763,018.10 |
Sep 13, 2013 | IBRD-81560 | Loan Disb | 1,652,039.60 |
Sep 13, 2013 | IBRD-81560 | Loan Disb | 3,265,124.20 |
Nov 8, 2013 | IBRD-81560 | Loan Disb | 2,237.71 |
Nov 26, 2013 | IBRD-81560 | Loan Disb | 470,712.16 |
Nov 26, 2013 | IBRD-81560 | Loan Disb | 164,385.75 |
Dec 6, 2013 | IBRD-81560 | Loan Disb | 1,034,266.00 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 10,583,164.00 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 1,863,721.80 |
Oct 25, 2019 | IBRD-81560 | Loan Disb | 3,870,000.00 |
Oct 28, 2019 | IBRD-81560 | Loan Disb | 700,000.00 |
Sep 19, 2019 | IBRD-81560 | Loan Disb | 1,500,000.00 |
Aug 15, 2019 | IBRD-81560 | Int Charges | 8,668,677.00 |
Aug 15, 2019 | IBRD-81560 | Loan Repay | 21,943,064.00 |
Nov 22, 2019 | IBRD-81560 | Loan Disb | 2,480,000.00 |
Jan 24, 2020 | IBRD-81560 | Loan Disb | 2,000,000.00 |
Jan 24, 2020 | IBRD-81560 | Loan Disb | 270,000.00 |
Dec 11, 2019 | IBRD-81560 | Loan Disb | 2,500,000.00 |
Feb 19, 2020 | IBRD-81560 | Loan Disb | 1,280,000.00 |
Feb 15, 2020 | IBRD-81560 | Int Charges | 17,363.36 |
Feb 15, 2020 | IBRD-81560 | Int Charges | 7,002,123.00 |
Feb 15, 2023 | IBRD-81560 | Int Charges | 866,132.75 |
Feb 15, 2023 | IBRD-81560 | Int Charges | 11,754,030.00 |
Feb 15, 2023 | IBRD-81560 | Loan Repay | 31,226,466.00 |
Feb 8, 2023 | IBRD-81560 | Loan Disb | 42,000.00 |
Nov 8, 2021 | IBRD-81560 | Loan Disb | 2,000,000.00 |
Nov 29, 2021 | IBRD-81560 | Loan Disb | 5,150,000.00 |
Nov 10, 2021 | IBRD-81560 | Loan Disb | 2,400,000.00 |
May 20, 2022 | IBRD-81560 | Loan Disb | 1,880,000.00 |
Jul 8, 2022 | IBRD-81560 | Loan Disb | 2,200,000.00 |
Apr 22, 2022 | IBRD-81560 | Loan Disb | 1,000,000.00 |
Dec 16, 2021 | IBRD-81560 | Loan Disb | 18,700,000.00 |
Mar 17, 2022 | IBRD-81560 | Loan Disb | 1,180,000.00 |
Jun 9, 2022 | IBRD-81560 | Loan Disb | 1,300,000.00 |
Feb 18, 2022 | IBRD-81560 | Loan Disb | 2,515,000.00 |
Feb 15, 2022 | IBRD-81560 | Int Charges | 9,540.15 |
Feb 15, 2022 | IBRD-81560 | Int Charges | 2,066,740.90 |
Feb 15, 2022 | IBRD-81560 | Loan Repay | 27,262,982.00 |
Jul 20, 2022 | IBRD-81560 | Loan Disb | 2,850,000.00 |
May 17, 2022 | IBRD-81560 | Loan Disb | 3,200,000.00 |
Aug 15, 2022 | IBRD-81560 | Int Charges | 33,915.00 |
Aug 15, 2022 | IBRD-81560 | Int Charges | 3,365,173.50 |
Aug 15, 2022 | IBRD-81560 | Loan Repay | 29,368,842.00 |
Feb 15, 2021 | IBRD-81560 | Int Charges | 13,482.37 |
Feb 15, 2021 | IBRD-81560 | Int Charges | 2,413,746.20 |
Feb 15, 2021 | IBRD-81560 | Loan Repay | 24,113,840.00 |
Nov 24, 2020 | IBRD-81560 | Loan Disb | 4,130,000.00 |
Feb 23, 2021 | IBRD-81560 | Loan Disb | 18,210,000.00 |
Dec 29, 2020 | IBRD-81560 | Loan Disb | -32,770.00 |
Apr 16, 2021 | IBRD-81560 | Loan Disb | 176,000.00 |
May 5, 2021 | IBRD-81560 | Loan Disb | 400,000.00 |
Apr 6, 2021 | IBRD-81560 | Loan Disb | 280,000.00 |
May 24, 2021 | IBRD-81560 | Loan Disb | 2,850,000.00 |
Jun 3, 2021 | IBRD-81560 | Loan Disb | 1,520,000.00 |
Jul 8, 2021 | IBRD-81560 | Loan Disb | 2,065,000.00 |
Jun 22, 2021 | IBRD-81560 | Loan Disb | 1,430,000.00 |
Jul 12, 2021 | IBRD-81560 | Loan Disb | 6,400,000.00 |
Sep 8, 2021 | IBRD-81560 | Loan Disb | 4,500,000.00 |
Aug 15, 2021 | IBRD-81560 | Int Charges | 10,083.46 |
Aug 15, 2020 | IBRD-81560 | Loan Repay | 23,384,080.00 |
Nov 9, 2020 | IBRD-81560 | Loan Disb | 2,590,000.00 |
Aug 21, 2020 | IBRD-81560 | Loan Disb | 2,510,000.00 |
Jan 25, 2021 | IBRD-81560 | Loan Disb | 11,800.00 |
Dec 15, 2020 | IBRD-81560 | Loan Disb | 6,250,000.00 |
Mar 17, 2021 | IBRD-81560 | Loan Disb | 107,000.00 |
Mar 3, 2021 | IBRD-81560 | Loan Disb | 320,000.00 |
Dec 3, 2020 | IBRD-81560 | Loan Disb | 310,000.00 |
Jun 19, 2019 | IBRD-81560 | Loan Disb | 3,400,000.00 |
May 28, 2019 | IBRD-81560 | Loan Disb | 6,150,000.00 |
Jul 24, 2019 | IBRD-81560 | Loan Disb | 8,020,000.00 |
Aug 26, 2019 | IBRD-81560 | Loan Disb | 4,280,000.00 |
May 1, 2012 | IBRD-81560 | Loan Commitment | 1,068,000,000.00 |
Aug 15, 2024 | IBRD-81560 | Int Charges | 119,052.00 |
Aug 15, 2024 | IBRD-81560 | Int Charges | 16,888,382.00 |
Aug 15, 2024 | IBRD-81560 | Loan Repay | 38,649,460.00 |
Apr 15, 2024 | IBRD-81560 | Loan Disb | 1,500,000.00 |
Jan 26, 2024 | IBRD-81560 | Loan Disb | 100,000.00 |
Aug 5, 2024 | IBRD-81560 | Loan Disb | 4,650,000.00 |
Aug 30, 2024 | IBRD-81560 | Loan Disb | 22,605,000.00 |
Mar 20, 2024 | IBRD-81560 | Loan Disb | 4,555,000.00 |
Aug 22, 2024 | IBRD-81560 | Loan Disb | 2,750,000.00 |
Apr 24, 2024 | IBRD-81560 | Loan Disb | 4,870,000.00 |
Feb 22, 2024 | IBRD-81560 | Loan Disb | 1,600,000.00 |
Jan 24, 2024 | IBRD-81560 | Loan Disb | 5,500,000.00 |
May 22, 2024 | IBRD-81560 | Loan Disb | 22,000,000.00 |
Feb 15, 2024 | IBRD-81560 | Int Charges | 232,982.34 |
Feb 15, 2024 | IBRD-81560 | Int Charges | 16,713,400.00 |
Feb 15, 2024 | IBRD-81560 | Loan Repay | 34,947,012.00 |
Feb 8, 2024 | IBRD-81560 | Loan Disb | 2,200,000.00 |
May 28, 2024 | IBRD-81560 | Loan Disb | 1,470,000.00 |
Mar 6, 2024 | IBRD-81560 | Loan Disb | 2,560,000.00 |
May 6, 2024 | IBRD-81560 | Loan Disb | 3,500,000.00 |
Jun 6, 2024 | IBRD-81560 | Loan Disb | 2,000,000.00 |
Jun 26, 2024 | IBRD-81560 | Loan Disb | -400,000.00 |
Mar 17, 2023 | IBRD-81560 | Loan Disb | 38,000.00 |
Feb 22, 2023 | IBRD-81560 | Loan Disb | 7,330,000.00 |
Aug 15, 2023 | IBRD-81560 | Int Charges | 604,545.30 |
Feb 15, 2020 | IBRD-81560 | Loan Repay | 22,950,692.00 |
Mar 20, 2020 | IBRD-81560 | Loan Disb | 1,116,000.00 |
May 14, 2018 | IBRD-81560 | Loan Disb | 4,620,000.00 |
Aug 14, 2018 | IBRD-81560 | Loan Disb | 270,000.00 |
Aug 15, 2018 | IBRD-81560 | Int Charges | 7,068,160.00 |
Aug 15, 2018 | IBRD-81560 | Loan Repay | 20,748,704.00 |
Nov 13, 2018 | IBRD-81560 | Loan Disb | 545,000.00 |
Feb 15, 2019 | IBRD-81560 | Int Charges | 19.64 |
Feb 15, 2019 | IBRD-81560 | Loan Repay | 20,909,304.00 |
Feb 15, 2019 | IBRD-81560 | Int Charges | 8,232,446.00 |
Oct 9, 2018 | IBRD-81560 | Loan Disb | 1,700,000.00 |
Dec 10, 2018 | IBRD-81560 | Loan Disb | 1,500,000.00 |
May 7, 2019 | IBRD-81560 | Loan Disb | 5,200,000.00 |
Apr 22, 2019 | IBRD-81560 | Loan Disb | 13,500,000.00 |
Jun 25, 2019 | IBRD-81560 | Loan Disb | -3,590,000.00 |
Aug 4, 2017 | IBRD-81560 | Loan Disb | 2,870,000.00 |
Jul 24, 2017 | IBRD-81560 | Loan Disb | 6,800,000.00 |
Nov 17, 2017 | IBRD-81560 | Loan Disb | 6,380,000.00 |
Aug 15, 2017 | IBRD-81560 | Int Charges | 13,537.50 |
Aug 15, 2017 | IBRD-81560 | Int Charges | 5,090,253.00 |
Aug 15, 2017 | IBRD-81560 | Loan Repay | 19,428,870.00 |
Sep 22, 2017 | IBRD-81560 | Loan Disb | 1,289,000.00 |
Oct 23, 2017 | IBRD-81560 | Loan Disb | 787,000.00 |
Feb 15, 2018 | IBRD-81560 | Int Charges | 25,219.26 |
Feb 15, 2018 | IBRD-81560 | Int Charges | 5,619,213.00 |
Feb 15, 2018 | IBRD-81560 | Loan Repay | 20,517,152.00 |
Dec 8, 2017 | IBRD-81560 | Loan Disb | 5,470,000.00 |
Jun 11, 2018 | IBRD-81560 | Loan Disb | 1,410,000.00 |
May 20, 2016 | IBRD-81560 | Loan Disb | 2,107,087.80 |
May 6, 2016 | IBRD-81560 | Loan Disb | 10,000,000.00 |
Nov 28, 2016 | IBRD-81560 | Loan Disb | 7,400,000.00 |
Nov 28, 2016 | IBRD-81560 | Loan Disb | 3,376,286.50 |
Sep 6, 2016 | IBRD-81560 | Loan Disb | 9,200,000.00 |
Jul 27, 2016 | IBRD-81560 | Loan Disb | 984,578.75 |
Jul 27, 2016 | IBRD-81560 | Loan Disb | 1,837,790.00 |
Feb 15, 2017 | IBRD-81560 | Int Charges | 20,067.37 |
Feb 15, 2017 | IBRD-81560 | Int Charges | 4,275,397.50 |
Dec 8, 2016 | IBRD-81560 | Loan Disb | 18,000,000.00 |
Dec 11, 2013 | IBRD-81560 | Loan Disb | 3,061,265.20 |
Nov 15, 2013 | IBRD-81560 | Loan Disb | 2,249.12 |
Nov 18, 2013 | IBRD-81560 | Loan Disb | 20,000,000.00 |
Aug 27, 2014 | IBRD-81560 | Loan Disb | 11,804,735.00 |
Jul 11, 2014 | IBRD-81560 | Loan Disb | 10,265,779.00 |
Aug 15, 2014 | IBRD-81560 | Int Charges | 7,465.76 |
Aug 15, 2014 | IBRD-81560 | Int Charges | 405,540.44 |
Dec 18, 2014 | IBRD-81560 | Loan Disb | 24,445,210.00 |
Feb 15, 2015 | IBRD-81560 | Int Charges | 8,396.19 |
Feb 15, 2015 | IBRD-81560 | Int Charges | 811,384.40 |
Aug 11, 2014 | IBRD-81560 | Loan Disb | 18,125,550.00 |
Jun 24, 2015 | IBRD-81560 | Loan Disb | 5,793,440.00 |
Aug 15, 2015 | IBRD-81560 | Int Charges | 36,853.24 |
Aug 15, 2015 | IBRD-81560 | Int Charges | 1,048,046.30 |
Aug 14, 2015 | IBRD-81560 | Loan Disb | 16,641,581.00 |
Apr 28, 2015 | IBRD-81560 | Loan Disb | 4,088,320.80 |
Apr 23, 2015 | IBRD-81560 | Loan Disb | 11,000,000.00 |
May 14, 2015 | IBRD-81560 | Loan Disb | 18,916,154.00 |
Jul 15, 2015 | IBRD-81560 | Loan Disb | 15,229,314.00 |
Jul 27, 2015 | IBRD-81560 | Loan Disb | 11,888,133.00 |
Oct 2, 2014 | IBRD-81560 | Loan Disb | 12,622,926.00 |
Jan 13, 2015 | IBRD-81560 | Loan Disb | -98,778,392.00 |
Oct 29, 2014 | IBRD-81560 | Loan Disb | 19,636,478.00 |
Nov 26, 2014 | IBRD-81560 | Loan Disb | 30,000,000.00 |
Dec 9, 2014 | IBRD-81560 | Loan Disb | 100,000,000.00 |
Jul 15, 2013 | IBRD-81560 | Fee Charges | 2,670,000.00 |
Dec 4, 2014 | IBRD-81560 | Loan Disb | 3,936,069.00 |
Sep 13, 2013 | IBRD-81560 | Loan Disb | 1,397,729.20 |
Aug 15, 2023 | IBRD-81560 | Int Charges | 14,384,153.00 |
Aug 15, 2023 | IBRD-81560 | Loan Repay | 32,685,610.00 |
Aug 7, 2023 | IBRD-81560 | Loan Disb | 2,350,000.00 |
Jul 25, 2023 | IBRD-81560 | Loan Disb | 2,650,000.00 |
May 26, 2023 | IBRD-81560 | Loan Disb | 8,000,000.00 |
May 26, 2023 | IBRD-81560 | Loan Disb | 185,000.00 |
Sep 22, 2023 | IBRD-81560 | Loan Disb | 12,050,000.00 |
Sep 7, 2023 | IBRD-81560 | Loan Disb | 2,120,000.00 |
Jun 2, 2023 | IBRD-81560 | Loan Disb | 750,000.00 |
Jul 6, 2023 | IBRD-81560 | Loan Disb | 4,400,000.00 |
Nov 10, 2023 | IBRD-81560 | Loan Disb | 2,300,000.00 |
Jun 23, 2023 | IBRD-81560 | Loan Disb | 4,900,000.00 |
Dec 8, 2023 | IBRD-81560 | Loan Disb | 2,085,000.00 |
Nov 27, 2023 | IBRD-81560 | Loan Disb | 1,100,000.00 |
Jul 24, 2024 | IBRD-81560 | Loan Disb | 1,550,000.00 |
Aug 22, 2022 | IBRD-81560 | Loan Disb | 2,600,000.00 |
Aug 22, 2022 | IBRD-81560 | Loan Disb | 2,650,000.00 |
Dec 27, 2021 | IBRD-81560 | Loan Disb | 4,567,302.00 |
Dec 27, 2021 | IBRD-81560 | Loan Disb | 3,571,167.20 |
Jan 21, 2022 | IBRD-81560 | Loan Disb | 150,000.00 |
Dec 28, 2021 | IBRD-81560 | Loan Disb | -120,000.00 |
Nov 8, 2022 | IBRD-81560 | Loan Disb | 1,200,000.00 |
Sep 7, 2022 | IBRD-81560 | Loan Disb | 2,200,000.00 |
Oct 31, 2022 | IBRD-81560 | Loan Disb | -6,960,000.00 |
Dec 8, 2022 | IBRD-81560 | Loan Disb | 16,500,000.00 |
Dec 15, 2022 | IBRD-81560 | Loan Disb | 5,180,000.00 |
Jul 12, 2016 | IBRD-81560 | Loan Disb | 11,000,000.00 |
Dec 2, 2016 | IBRD-81560 | Loan Disb | 4,589,117.50 |
Sep 22, 2016 | IBRD-81560 | Loan Disb | 13,200,000.00 |
Jun 8, 2016 | IBRD-81560 | Loan Disb | 19,600,000.00 |
Aug 26, 2016 | IBRD-81560 | Loan Disb | 704,028.50 |
Aug 15, 2016 | IBRD-81560 | Int Charges | 4,785.49 |
Aug 15, 2016 | IBRD-81560 | Int Charges | 2,637,588.20 |
Jun 22, 2016 | IBRD-81560 | Loan Disb | 2,139,843.80 |
Feb 16, 2017 | IBRD-81560 | Loan Disb | 185,000.00 |
Mar 14, 2017 | IBRD-81560 | Loan Disb | 228,000.00 |
May 5, 2017 | IBRD-81560 | Loan Disb | 3,000,000.00 |
May 24, 2017 | IBRD-81560 | Loan Disb | 5,700,000.00 |
Sep 30, 2022 | IBRD-81560 | Loan Disb | -550,000.00 |
Nov 30, 2022 | IBRD-81560 | Loan Disb | -100,000.00 |
Apr 6, 2023 | IBRD-81560 | Loan Disb | 200,000.00 |
Oct 7, 2022 | IBRD-81560 | Loan Disb | 9,000,000.00 |
May 3, 2023 | IBRD-81560 | Loan Disb | 400,000.00 |
Jan 31, 2023 | IBRD-81560 | Loan Disb | -18,720.40 |
Apr 25, 2023 | IBRD-81560 | Loan Disb | 1,240,000.00 |
Oct 18, 2016 | IBRD-81560 | Loan Disb | 16,700,000.00 |
Nov 29, 2016 | IBRD-81560 | Loan Disb | 10,400,000.00 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 1,449,548.00 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 1,713,286.60 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 4,168,359.80 |
Sep 23, 2013 | IBRD-81560 | Loan Disb | 1,913,496.20 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 5,257,737.50 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 5,359,369.00 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 4,926,773.50 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 1,828,379.50 |
Sep 18, 2013 | IBRD-81560 | Loan Disb | 9,737,374.00 |
Sep 25, 2013 | IBRD-81560 | Loan Disb | 3,575,621.80 |
Sep 30, 2013 | IBRD-81560 | Loan Disb | 1,899,666.80 |
Jan 21, 2014 | IBRD-81560 | Loan Disb | 13,961,955.00 |
Apr 11, 2017 | IBRD-81560 | Loan Disb | 2,350,000.00 |
Jul 6, 2017 | IBRD-81560 | Loan Disb | 1,500,000.00 |
Jun 20, 2017 | IBRD-81560 | Loan Disb | 4,317,000.00 |
Jun 7, 2017 | IBRD-81560 | Loan Disb | 900,000.00 |
Jan 13, 2016 | IBRD-81560 | Loan Disb | 5,382,000.00 |
Sep 14, 2015 | IBRD-81560 | Loan Disb | 7,531,661.00 |
Nov 25, 2015 | IBRD-81560 | Loan Disb | 1,365,000.00 |
Nov 18, 2015 | IBRD-81560 | Loan Disb | 10,000,000.00 |
Dec 11, 2015 | IBRD-81560 | Loan Disb | 2,810,000.00 |
Feb 15, 2016 | IBRD-81560 | Int Charges | 22,857.38 |
Feb 15, 2016 | IBRD-81560 | Int Charges | 1,703,496.00 |
Feb 19, 2016 | IBRD-81560 | Loan Disb | 5,050,000.00 |
Mar 16, 2016 | IBRD-81560 | Loan Disb | 9,300,000.00 |
Feb 29, 2016 | IBRD-81560 | Loan Disb | 236,476.25 |
Apr 22, 2016 | IBRD-81560 | Loan Disb | 5,020,000.00 |
Feb 24, 2016 | IBRD-81560 | Loan Disb | 181,543.64 |
Nov 14, 2016 | IBRD-81560 | Loan Disb | 3,300,000.00 |
Sep 2, 2016 | IBRD-81560 | Loan Disb | 703,821.06 |
Aug 23, 2016 | IBRD-81560 | Loan Disb | 4,600,000.00 |
May 25, 2016 | IBRD-81560 | Loan Disb | 9,300,000.00 |
Dec 20, 2016 | IBRD-81560 | Loan Disb | 5,000,000.00 |
Dec 6, 2013 | IBRD-81560 | Loan Disb | 2,133,103.00 |
Feb 15, 2014 | IBRD-81560 | Int Charges | 275,305.03 |
Dec 11, 2013 | IBRD-81560 | Loan Disb | 6,313,650.50 |
Name | Review | Date |
---|---|---|
Procurement | Moderately Satisfactory | 2024-12-03 |
Monitoring and Evaluation | Moderately Satisfactory | 2024-12-03 |
Progress towards achievement of PDO | Satisfactory | 2024-12-03 |
Financial Management | Satisfactory | 2024-12-03 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2024-12-03 |
Project Management | Moderately Satisfactory | 2024-12-03 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Transport Efficiency:Reduce by the end of the Project, Road User Costs from US$0.26/veh-km to US$0.23/veh-km on Project road sections | Value | 0.26 | 0.233 | 0.23 |
Date | March 1, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
Transport Efficiency: Reduce Travel time on the Almaty -Khorgos section of the WE WCh corridor | Value | 5.00 | 3.00 | 3.00 |
Date | March 1, 2012 | November 20, 2023 | December 31, 2018 | |
Comment |
Travel Efficiency: Reduce travel time on the selected section of the Center South Corridor | Value | 4.00 | 3.38 | 3.00 |
Date | May 12, 2017 | November 20, 2023 | December 29, 2023 | |
Comment |
Modernization of highway management: Introduction of sound operation and maintenance practices along the WE-WC Corridor and Center South Corridor. | Value | 0.00 | 1853.00 | 600.00 |
Date | March 1, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
Modernization of highway management: Financing gap for operations and maintenance activities along the WE-WC and Center South Corridor | Value | 50.00 | 20.00 | 20.00 |
Date | March 1, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
Roads in good and fair condition as a share of total classified roads | Value | 70.00 | 93.00 | 95.00 |
Date | March 1, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Roads constructed, non-rural | Value | 0.00 | 518.00 | 605.00 |
Date | January 12, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
CR and KAZ Staff familiar with new operation and maintenance methods | Value | 0.00 | 898.00 | 300.00 |
Date | March 1, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
User survey --the number of users interviewed | Value | 0.00 | 8362.00 | 500.00 |
Date | March 1, 2012 | November 20, 2023 | December 29, 2023 | |
Comment |
Length of the road network for which new user-pay principles (e.g., tolling) are agreed upon. | Value | 0.00 | 3221.00 | 1000.00 |
Date | March 1, 2012 | November 20, 2023 | December 31, 2021 | |
Comment |
Changes to Project activities as a result of citizen feedback | Value | No | Yes | Yes |
Date | January 31, 2013 | November 20, 2023 | December 29, 2023 | |
Comment |
Feedback on Project activities received - Number of questions from citizens answered at the Project website | Value | 1.00 | 991.00 | 700.00 |
Date | June 18, 2010 | November 20, 2023 | December 29, 2023 | |
Comment |
Complete road safety audit of the design for Balkhash-Burylbaital Road; improvements integrated. | Value | No | Yes | Yes |
Date | May 17, 2017 | November 20, 2023 | January 31, 2018 | |
Comment |
Develop and operationalize the road accident database | Value | No | Yes | Yes |
Date | May 17, 2017 | November 20, 2023 | December 31, 2020 | |
Comment |