Second Lao Environment & Social Project (formerly Protected Area and Wildlife Project)

Abstract*

The objective of the Protected Area and Wildlife Project for Lao People's Democratic Republic is to strengthen the management systems for national protected areas conservation and for enforcement of wildlife laws. There are three components to the project, the first component being national institution development and capacity building. This component seeks this intermediary result: improved capacity of DFRM, DOFI and other institutions' partnership...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The objective of the Project is to help strengthen selected environmental protection management systems, specifically for protectedareas conservation, enforcement of wildlife laws and environmental assessment management.

Key Details

Project Details

  • P128393

  • Closed

  • Viengkeo Phetnavongxay

  • Lao People's Democratic Republic

  • US$ 33.40 million

  • Environment Protection Fund

  • East Asia And Pacific

  • 2014

  • US$ 32.00 million

  • B

  • July 16, 2024

  • June 30, 2023

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
GLOBAL ENVIRONMENT - Associated IDA Fund 51.00
Borrower/Recipient 1.40
IDA Credit 27.50
IDA Grant 4.50

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 32.00
IBRD + IDA Commitment 32.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 33.40

Summary Status of World Bank Financing (US$ Millions) as of January 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of January 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Dec 16, 2016 IDA-H9150 Loan Disb 392,399.06
Jul 12, 2016 IDA-H9150 Loan Disb 334,588.38
Sep 23, 2016 IDA-H9150 Loan Disb 613,593.40
Nov 2, 2016 IDA-56200 Int Charges 2.92
Nov 2, 2016 IDA-56200 Int Charges 2.92
Nov 2, 2016 IDA-56200 Int Charges 1,630.41
Nov 2, 2016 IDA-56200 Int Charges 1,630.41
May 8, 2017 IDA-53830 Loan Disb 188,717.52
Jun 7, 2017 IDA-53830 Loan Disb 441,388.20
Jun 28, 2017 IDA-53830 Loan Disb 254,604.19
Apr 15, 2017 IDA-56200 Int Charges 1,576.56
Apr 15, 2017 IDA-56200 Int Charges 1,576.56
Apr 15, 2017 IDA-56200 Int Charges 14.66
Apr 15, 2017 IDA-56200 Int Charges 14.66
Mar 28, 2017 IDA-53830 Loan Disb 468,450.44
Oct 15, 2017 IDA-56200 Int Charges 10.65
Oct 15, 2017 IDA-56200 Int Charges 10.65
Oct 15, 2017 IDA-56200 Int Charges 1,658.89
Oct 15, 2017 IDA-56200 Int Charges 1,658.89
Feb 22, 2017 IDA-53830 Loan Disb 324,760.00
Sep 26, 2014 IDA-H9150 Loan Disb -21,741.76
Oct 8, 2014 IDA-H9150 Loan Disb 710,000.00
Aug 13, 2014 IDA-H9150 Loan Disb 331,803.70
Jun 30, 2015 IDA-H9150 Loan Disb 37,813.37
Aug 20, 2015 IDA-H9150 Loan Disb 34,513.75
May 13, 2015 IDA-H9150 Loan Disb 64,333.52
Dec 15, 2015 IDA-56200 Loan Disb 438,141.12
Feb 11, 2016 IDA-H9150 Loan Disb 28,622.61
Apr 19, 2016 IDA-56200 Int Charges 1,104.75
Mar 1, 2016 IDA-H9150 Loan Disb 283,231.03
Nov 10, 2015 IDA-H9150 Loan Disb 49,612.95
Apr 4, 2016 IDA-H9150 Loan Disb 500,000.00
Apr 6, 2016 IDA-H9150 Loan Disb 338,544.06
Apr 19, 2016 IDA-56200 Int Charges 1,104.75
Aug 23, 2019 IDA-56200 Loan Disb 476,609.06
Feb 15, 2020 IDA-53830 Int Charges 283.25
Feb 15, 2020 IDA-53830 Int Charges 283.25
Oct 18, 2022 IDA-56200 Int Charges 49,706.83
Oct 18, 2022 IDA-56200 Int Charges 49,706.83
Nov 18, 2022 IDA-53830 Loan Disb 316.59
Apr 15, 2023 IDA-56200 Int Charges 48,269.49
Apr 15, 2023 IDA-56200 Int Charges 48,269.49
Apr 15, 2023 IDA-56200 Loan Repay 8,670.92
Apr 15, 2023 IDA-56200 Loan Repay 42,486.62
Apr 15, 2023 IDA-56200 Loan Repay 175,312.97
Apr 15, 2023 IDA-56200 Int Charges 10.76
Apr 15, 2023 IDA-56200 Int Charges 10.76
Feb 15, 2023 IDA-53830 Int Charges 492.41
Feb 15, 2023 IDA-53830 Int Charges 492.41
Feb 15, 2023 IDA-53830 Int Charges 40,429.37
Feb 15, 2023 IDA-53830 Int Charges 40,429.37
Aug 15, 2023 IDA-53830 Int Charges 201.26
Aug 15, 2023 IDA-53830 Int Charges 201.26
Aug 15, 2023 IDA-53830 Int Charges 40,969.76
Aug 15, 2023 IDA-53830 Int Charges 40,969.76
Oct 15, 2023 IDA-56200 Int Charges 330.99
Oct 15, 2023 IDA-56200 Int Charges 330.99
Nov 29, 2021 IDA-56200 Loan Disb 44,473.61
Nov 29, 2021 IDA-56200 Loan Disb 123,095.81
Mar 4, 2022 IDA-56200 Loan Disb 133,424.84
Apr 15, 2022 IDA-56200 Loan Repay 1,069.19
Apr 27, 2022 IDA-56200 Loan Repay 224,425.44
Apr 27, 2022 IDA-56200 Int Charges 46.93
Apr 27, 2022 IDA-56200 Int Charges 46.93
Apr 27, 2022 IDA-56200 Int Charges 9,730.57
Apr 27, 2022 IDA-56200 Int Charges 9,730.57
Apr 27, 2022 IDA-56200 Int Charges 42,866.71
Apr 27, 2022 IDA-56200 Int Charges 42,866.71
Feb 15, 2022 IDA-53830 Int Charges 405.66
Feb 15, 2022 IDA-53830 Int Charges 405.66
Aug 16, 2022 IDA-53830 Int Charges 40,406.26
Aug 11, 2017 IDA-53830 Loan Disb 323,249.78
Sep 14, 2017 IDA-53830 Loan Disb 314,730.56
Apr 15, 2018 IDA-56200 Int Charges 1,714.41
Apr 15, 2018 IDA-56200 Int Charges 1,714.41
Mar 15, 2018 IDA-53830 Loan Disb 714,216.00
Apr 15, 2018 IDA-56200 Int Charges 9.03
Apr 15, 2018 IDA-56200 Int Charges 9.03
Feb 15, 2018 IDA-53830 Int Charges 13,591.13
Feb 15, 2018 IDA-53830 Int Charges 13,591.13
Feb 15, 2018 IDA-53830 Int Charges 504.29
Feb 15, 2018 IDA-53830 Int Charges 504.29
Aug 31, 2018 IDA-53830 Loan Disb 258,619.62
Jul 19, 2018 IDA-53830 Loan Disb 1,164,854.50
May 17, 2018 IDA-53830 Loan Disb 1,500,000.00
May 17, 2018 IDA-53830 Loan Disb 177,513.90
Jun 22, 2018 IDA-53830 Loan Disb 390,602.12
Aug 15, 2018 IDA-53830 Int Charges 420.98
Aug 15, 2018 IDA-53830 Int Charges 420.98
Aug 15, 2018 IDA-53830 Int Charges 21,536.58
Aug 15, 2018 IDA-53830 Int Charges 21,536.58
Feb 10, 2017 IDA-H9150 Loan Disb 187.10
Dec 15, 2016 IDA-H9150 Loan Disb 379,446.16
Feb 1, 2017 IDA-H9150 Loan Disb 61,518.65
Jun 7, 2016 IDA-H9150 Loan Disb 91,914.21
Aug 16, 2022 IDA-53830 Int Charges 40,406.26
Aug 15, 2022 IDA-53830 Int Charges 53.57
Aug 15, 2022 IDA-53830 Int Charges 53.57
Mar 1, 2022 IDA-53830 Int Charges 42,483.08
Mar 1, 2022 IDA-53830 Int Charges 42,483.08
Jan 21, 2022 IDA-56200 Loan Disb 77,021.29
Oct 15, 2022 IDA-56200 Loan Repay 40,750.51
Jan 19, 2021 IDA-56200 Loan Disb 1,033,201.06
Jun 8, 2021 IDA-56200 Loan Disb 442,038.12
Jun 8, 2021 IDA-56200 Loan Disb 94,226.60
Apr 2, 2021 IDA-56200 Loan Disb 247,014.70
Jul 8, 2021 IDA-56200 Loan Disb 76,410.41
Apr 21, 2021 IDA-56200 Loan Disb 155,114.48
Apr 21, 2021 IDA-56200 Int Charges 941.51
Apr 21, 2021 IDA-56200 Int Charges 941.51
Oct 22, 2019 IDA-56200 Loan Disb 636,609.44
Oct 22, 2019 IDA-56200 Loan Disb 659,524.25
Aug 15, 2019 IDA-53830 Int Charges 2,350.63
Aug 15, 2019 IDA-53830 Int Charges 2,350.63
Aug 15, 2019 IDA-53830 Int Charges 41,195.53
Aug 15, 2019 IDA-53830 Int Charges 41,195.53
Oct 18, 2019 IDA-56200 Int Charges 4.65
Oct 18, 2019 IDA-56200 Int Charges 4.65
Oct 18, 2019 IDA-56200 Int Charges 6,969.52
Oct 18, 2019 IDA-56200 Int Charges 6,969.52
Feb 15, 2024 IDA-53830 Int Charges 40,606.25
Feb 15, 2024 IDA-53830 Int Charges 40,606.25
Apr 29, 2015 IDA-56200 Loan Commitment 15,000,000.00
Apr 2, 2014 IDA-53830 Loan Commitment 12,500,000.00
Apr 2, 2014 IDA-H9150 Loan Commitment 4,500,000.00
Dec 27, 2023 IDA-56200 Loan Disb -33,523.27
Oct 15, 2023 IDA-56200 Int Charges 48,944.51
Oct 15, 2023 IDA-56200 Int Charges 48,944.51
Oct 15, 2023 IDA-56200 Int Charges 3,419.02
Oct 15, 2023 IDA-56200 Int Charges 3,419.02
Oct 15, 2023 IDA-56200 Loan Repay 219,002.25
Aug 15, 2024 IDA-53830 Loan Repay 39,964.24
Apr 15, 2024 IDA-56200 Loan Repay 4,652.31
Apr 15, 2024 IDA-56200 Loan Repay 215,428.30
Apr 15, 2024 IDA-56200 Int Charges 5,730.69
Apr 15, 2024 IDA-56200 Int Charges 5,730.69
Aug 15, 2024 IDA-53830 Loan Repay 552.58
Aug 15, 2024 IDA-53830 Int Charges 38,798.91
Aug 15, 2024 IDA-53830 Int Charges 38,798.91
Aug 15, 2024 IDA-53830 Loan Repay 69,245.86
Apr 15, 2024 IDA-56200 Int Charges 42,888.16
Apr 15, 2024 IDA-56200 Int Charges 42,888.16
Feb 15, 2024 IDA-53830 Int Charges 70.47
Feb 15, 2024 IDA-53830 Int Charges 70.47
Dec 27, 2023 IDA-56200 Loan Cancel 33,523.27
Oct 30, 2023 IDA-53830 Loan Cancel 7.17
Oct 15, 2022 IDA-56200 Loan Repay 10,629.45
Oct 18, 2022 IDA-56200 Loan Repay 162,321.75
Oct 18, 2022 IDA-56200 Int Charges 53.20
Oct 18, 2022 IDA-56200 Int Charges 53.20
Feb 15, 2020 IDA-53830 Int Charges 41,766.42
Feb 15, 2020 IDA-53830 Int Charges 41,766.42
Mar 5, 2020 IDA-56200 Loan Disb 290,495.80
Dec 16, 2019 IDA-56200 Loan Disb 531,956.06
Feb 14, 2020 IDA-56200 Loan Disb 959,657.10
Dec 16, 2019 IDA-56200 Loan Disb 388,709.84
Apr 30, 2020 IDA-56200 Loan Disb 468,951.60
Jun 3, 2020 IDA-56200 Loan Disb 442,543.28
Dec 21, 2018 IDA-53830 Loan Disb 418,299.80
Dec 21, 2018 IDA-53830 Loan Disb 492,733.62
Dec 21, 2018 IDA-53830 Loan Disb 1,042,622.30
Oct 15, 2018 IDA-56200 Int Charges 4.95
Oct 15, 2018 IDA-56200 Int Charges 4.95
Oct 15, 2018 IDA-56200 Int Charges 1,625.71
Oct 15, 2018 IDA-56200 Int Charges 1,625.71
Feb 15, 2019 IDA-53830 Int Charges 618.16
Feb 15, 2019 IDA-53830 Int Charges 618.16
Feb 15, 2019 IDA-53830 Int Charges 31,193.26
Feb 15, 2019 IDA-53830 Int Charges 31,193.26
Apr 8, 2019 IDA-53830 Loan Disb 863,320.44
Mar 20, 2019 IDA-53830 Loan Disb 169,089.45
Jun 26, 2019 IDA-56200 Loan Disb 5,881.34
Jun 26, 2019 IDA-56200 Loan Disb 1,083,857.90
Jun 26, 2019 IDA-56200 Loan Disb 983,651.40
Apr 15, 2019 IDA-56200 Int Charges 16.98
Apr 15, 2019 IDA-56200 Int Charges 16.98
Apr 15, 2019 IDA-56200 Int Charges 1,634.38
Apr 15, 2019 IDA-56200 Int Charges 1,634.38
Dec 2, 2019 IDA-56200 Loan Disb 402,918.44
Aug 30, 2019 IDA-56200 Loan Disb 673,346.00
Aug 2, 2019 IDA-56200 Loan Disb 455,094.20
Aug 15, 2017 IDA-53830 Int Charges 3,560.73
Aug 15, 2017 IDA-53830 Int Charges 3,560.73
Nov 15, 2017 IDA-53830 Loan Disb 346,482.40
Nov 30, 2017 IDA-53830 Loan Disb 580,026.00
Jul 24, 2017 IDA-53830 Loan Disb 323,715.84
Sep 26, 2017 IDA-53830 Loan Disb 738,306.00
Apr 21, 2021 IDA-56200 Int Charges 47,343.19
Apr 21, 2021 IDA-56200 Int Charges 47,343.19
Oct 15, 2021 IDA-56200 Loan Repay 179.99
Nov 4, 2021 IDA-56200 Int Charges 51,143.37
Nov 4, 2021 IDA-56200 Int Charges 51,143.37
Oct 25, 2021 IDA-56200 Loan Repay 236,299.72
Oct 25, 2021 IDA-56200 Int Charges 1,165.05
Oct 25, 2021 IDA-56200 Int Charges 1,165.05
Sep 7, 2021 IDA-53830 Int Charges 8.76
Sep 7, 2021 IDA-53830 Int Charges 8.76
Sep 7, 2021 IDA-53830 Int Charges 43,847.57
Sep 7, 2021 IDA-53830 Int Charges 43,847.57
Sep 24, 2021 IDA-56200 Loan Disb 234,095.23
Sep 24, 2021 IDA-56200 Loan Disb 221,598.14
Aug 26, 2021 IDA-56200 Loan Disb 110,585.76
Oct 14, 2021 IDA-56200 Loan Disb 78,511.50
Apr 15, 2020 IDA-56200 Int Charges 1,158.60
Apr 15, 2020 IDA-56200 Int Charges 1,158.60
Apr 15, 2020 IDA-56200 Int Charges 24,496.76
Apr 15, 2020 IDA-56200 Int Charges 24,496.76
Jun 30, 2020 IDA-56200 Loan Disb 391,270.12
Jun 30, 2020 IDA-56200 Loan Disb 501,815.62
Oct 13, 2020 IDA-56200 Loan Disb 457,159.40
Sep 8, 2020 IDA-56200 Loan Disb 258,973.98
Sep 8, 2020 IDA-56200 Loan Disb 625,041.10
Sep 15, 2020 IDA-53830 Int Charges 41,903.91
Sep 15, 2020 IDA-53830 Int Charges 41,903.91
Oct 22, 2020 IDA-56200 Int Charges 230.63
Oct 22, 2020 IDA-56200 Int Charges 230.63
Aug 15, 2020 IDA-53830 Int Charges 509.82
Aug 15, 2020 IDA-53830 Int Charges 509.82
Nov 13, 2020 IDA-56200 Loan Disb 619,697.50
Oct 22, 2020 IDA-56200 Int Charges 35,515.18
Oct 22, 2020 IDA-56200 Int Charges 35,515.18
Feb 17, 2021 IDA-53830 Int Charges 44,216.34
Feb 17, 2021 IDA-53830 Int Charges 44,216.34
Feb 17, 2021 IDA-53830 Int Charges 1,161.58
Feb 17, 2021 IDA-53830 Int Charges 1,161.58
Jan 12, 2021 IDA-56200 Loan Disb 86,168.51

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Counterpart Funding Satisfactory 2023-02-27
Overall Safeguards Rating Satisfactory 2023-02-27
Financial Management Satisfactory 2023-02-27
Monitoring and Evaluation Satisfactory 2023-02-27
Overall Implementation Progress (IP) Moderately Satisfactory 2023-02-27
Procurement Moderately Satisfactory 2023-02-27
Progress towards achievement of PDO Moderately Satisfactory 2023-02-27
Project Management Moderately Satisfactory 2023-02-27
Overall Safeguards Rating Satisfactory 2023-02-27

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 02-11-2024
OutcomesModerately Satisfactory
Risk to Development Outcome
Bank PerformanceModerately Satisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-07-2024PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingModerately Satisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceModerately SatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceN/a
Implementing AgencyN/a
Icr QualityModestN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Plans supported by MONRE departments on environmental monitoring arrangements (cumulative)Value0.0032.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Score of functional capacity of Environment Protection FundValue22.0072.000.00
    DateDecember 31, 2015June 30, 2023
    Comment
  • Plans supported by MONRE departments on ISP and/or SEA (cumulative)Value0.006.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Score of functional capacity of Department of Public Relation of the Prime Minister OfficeValue11.0033.000.00
    DateDecember 31, 2015June 30, 2023
    Comment
  • Plans supported by MPI or NIER on GG M&E (cumulative)Value0.008.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Average of score of functional capacity of Faculties (NUOL FFS, FSS, FNS, FES and FEB) (number) (annual)Value11.0031.000.00
    DateDecember 31, 2016June 30, 2023
    Comment
  • Up-to-date reports published on relevant government websites including (i) compliance monitoring for Category 2 projects, (ii) state of air and noise quality, (iii) national pollution inventory (cum.)Value0.00146.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Average of score of functional capacity of Protected Area Management Units (NEPL, WMPA and 7 PAFOs) (number) (annual)Value11.0033.000.00
    DateDecember 31, 2016June 30, 2023
    Comment
  • Score of functional capacity of MAF DOF Protected Area Management Division (number) (annual)Value10.0069.000.00
    DateDecember 31, 2014June 30, 2023
    Comment
  • Compliance monitoring reports for hydropower projects registered in environment impact Category 2 published on the MONRE website (cumulative)Value0.0045.007.00
    DateDecember 30, 2017May 25, 2022
    Comment
  • Score of functional capacity of National Academy of Public Administration (NAPA) (annual) (Number)Value1.0040.000.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Compliance monitoring reports for mining projects registered in environment impact Category 2 published on the MONRE website (cumulative)Value0.0066.001.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Compliance monitoring reports for road projects registered in environment impact Category 2 published on the MONRE website (cumulative)Value0.006.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • State of air and noise quality report published on the MONRE website (cumulative)Value0.0018.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • National pollution inventory report published on the MONRE website (cumulative)Value0.0011.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Increased score on Protected Area Management Effectiveness Tracking Tool (METT) (cumulative)Value0.0024.0010.00
    DateDecember 30, 2016June 30, 2023June 30, 2021
    Comment
  • Wildlife trafficking cases involving CITES 1 listed species that are referred to the national and/or provincial public prosecutor office (cumulative)Value0.0041.000.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • 5-year provincial or sectoral development plans that include environmental planning, monitoring, assessment, or management components supported by MONRE or MPI (cumulative)Value0.0046.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Score of functional capacity of EPF and key institutions implementing subprojectsValue11.0046.000.00
    DateDecember 31, 2016June 30, 2023
    Comment
  • Number of wildlife trafficking cases involving CITES1 and non-CITES listed species opened for investigation (cumulative)Value0.009.000.00
    DateDecember 30, 2016May 9, 2014
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Score tracking the development and management of a NPA system (point) (cumulative)Value0.00100.000.00
    DateDecember 30, 2014June 30, 2023
    Comment
  • Category 1 and Category 2 projects that are under design, construction or operation that have a valid Environmental Compliance Certificate (ECC) (cum.)Value19.0082.0050.00
    DateDecember 30, 2016June 30, 2023June 30, 2021
    Comment
  • Staff of SDA and SDA partner institutions that received formal short courses or participate in study tours under the project (cumulative)Value0.0016246.001300.00
    DateDecember 30, 2015June 30, 2023
    Comment
  • Village organizations that meet the terms of Conservation Agreements, and as a result, receive grants for implementing their actionplans (cumulative)Value0.00191.00190.00
    DateDecember 30, 2014June 30, 2023June 30, 2023
    Comment
  • Category 1 hydropower projects with ECC (cumulative)Value35.0079.0035.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Female staff (cumulative)Value0.004405.000.00
    DateDecember 30, 2015June 30, 2023
    Comment
  • Financing mobilized by EPF each year from (a) public sources and (b) private sources (annual)Value800000.00948592.00850000.00
    DateDecember 30, 2014June 30, 2022
    Comment
  • Category 1 mining projects with ECC (cumulative)Value11.0090.0011.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Village organizations with at least 40% female participation (cumulative)Value0.00184.0010.00
    DateDecember 30, 2014June 30, 2023
    Comment
  • Area within selected PAs where the status of selected wildlife population and threats are measured (annual)Value242000.00643678.00634000.00
    DateDecember 30, 2016June 30, 2023June 30, 2021
    Comment
  • Category 1 road projects with ECC (cumulative)Value0.0065.000.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Funds from public sources (annual)Value350000.00396781.00350000.00
    DateDecember 30, 2014June 30, 2023
    Comment
  • Area within selected PAs where the gross forest loss rate is measuredValue305000.001250385.00305000.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Category 2 hydropower projects with ECC (cumulative)Value65.0087.0065.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Funds from private sources (annual)Value450000.001882194.00500000.00
    DateDecember 30, 2014June 30, 2023
    Comment
  • Wildlife crime cases detected by law enforcement officers of SDAs supported by the project (cumulative)Value188.005593.00188.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Category 2 mining projects with ECC (cumulative)Value10.0084.0010.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Category 2 road and railway projects with ECC (cumulative)Value0.0095.000.00
    DateDecember 30, 2016June 30, 2023
    Comment
  • Score tracking the development of national, provincial or sectoral guiding documents and planning tools that integrate environment into development planning (point) (cumulative)Value0.0080.000.00
    DateDecember 30, 2017June 30, 2023
    Comment
  • Score tracking the design and adoption of pollution management instruments (point) (cumulative)Value0.0080.000.00
    DateDecember 30, 2017June 30, 2023
    Comment