Financier | Commitments |
---|---|
IDA Credit | 500.00 |
Borrower/Recipient | 500.00 |
P132173
Closed
Xavier Chauvot De Beauchene , Mariappa Kullappa
India
October 25, 2012
(as of board presentation)
December 30, 2013
April 8, 2014
US$ 1000.00 million
Ministry of Jal Shakti, Department of Drinking Water and Sanitation
2014
US$ 500.00 million
B
July 11, 2024
March 31, 2020
Yes
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 500.00 |
Borrower/Recipient | 500.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 500.00 |
IBRD + IDA Commitment | 500.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 1000.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Mar 21, 2019 | IDA-53450 | Loan Disb | 10,399,582.00 |
Jun 3, 2019 | IDA-53450 | Loan Cancel | 116,585,624.00 |
Jul 29, 2019 | IDA-53450 | Loan Cancel | 132,507,792.00 |
Aug 15, 2019 | IDA-53450 | Int Charges | 85,967.27 |
Aug 15, 2019 | IDA-53450 | Loan Repay | 10,783,886.00 |
Aug 15, 2019 | IDA-53450 | Int Charges | 368,376.47 |
Aug 15, 2019 | IDA-53450 | Int Charges | 368,376.47 |
Aug 15, 2019 | IDA-53450 | Int Charges | 613,960.80 |
Mar 27, 2019 | IDA-53450 | Loan Disb | 9,880,496.00 |
Oct 16, 2019 | IDA-53450 | Loan Disb | 14,079,222.00 |
Nov 4, 2019 | IDA-53450 | Loan Disb | 10,340,978.00 |
Feb 15, 2020 | IDA-53450 | Loan Repay | 77,095.00 |
Feb 15, 2020 | IDA-53450 | Loan Repay | 5,998,826.00 |
Feb 15, 2020 | IDA-53450 | Int Charges | 398,811.66 |
Feb 15, 2020 | IDA-53450 | Int Charges | 398,811.66 |
Feb 15, 2020 | IDA-53450 | Int Charges | 664,686.06 |
Apr 29, 2020 | IDA-53450 | Loan Disb | 12,143,739.00 |
Aug 15, 2020 | IDA-53450 | Loan Repay | 3,045,082.20 |
Aug 15, 2020 | IDA-53450 | Int Charges | 451,876.84 |
Aug 15, 2020 | IDA-53450 | Int Charges | 657,853.56 |
Aug 15, 2020 | IDA-53450 | Int Charges | 0.01 |
Aug 15, 2020 | IDA-53450 | Int Charges | 0.01 |
Sep 30, 2020 | IDA-53450 | Loan Cancel | 11,322,599.00 |
Aug 15, 2020 | IDA-53450 | Loan Repay | 86,559.93 |
Aug 15, 2020 | IDA-53450 | Int Charges | 451,876.84 |
Sep 30, 2020 | IDA-53450 | Loan Disb | 16,070,966.00 |
Aug 13, 2020 | IDA-53450 | Loan Disb | 18,131,146.00 |
Feb 15, 2021 | IDA-53450 | Int Charges | 97,374.36 |
Feb 15, 2021 | IDA-53450 | Loan Repay | 2,984,467.50 |
Feb 15, 2021 | IDA-53450 | Int Charges | 584,524.10 |
Feb 15, 2021 | IDA-53450 | Int Charges | 584,524.10 |
Feb 15, 2021 | IDA-53450 | Int Charges | 965,284.80 |
Aug 15, 2021 | IDA-53450 | Int Charges | 8,795.69 |
Aug 15, 2021 | IDA-53450 | Loan Repay | 2,942,209.50 |
Aug 15, 2021 | IDA-53450 | Int Charges | 580,417.70 |
Aug 15, 2021 | IDA-53450 | Int Charges | 580,417.70 |
Sep 12, 2016 | IDA-53450 | Loan Disb | 2,806,277.50 |
Jan 27, 2017 | IDA-53450 | Loan Disb | 3,500,591.50 |
Dec 21, 2016 | IDA-53450 | Loan Disb | 3,063,589.20 |
May 23, 2016 | IDA-53450 | Loan Disb | 1,341,554.90 |
Aug 15, 2021 | IDA-53450 | Int Charges | 967,362.80 |
Aug 15, 2022 | IDA-53450 | Int Charges | 519,056.06 |
Aug 15, 2022 | IDA-53450 | Int Charges | 519,056.06 |
Aug 15, 2022 | IDA-53450 | Int Charges | 865,093.40 |
Feb 15, 2022 | IDA-53450 | Loan Repay | 59,610.07 |
Feb 15, 2022 | IDA-53450 | Loan Repay | 2,842,185.20 |
Feb 15, 2022 | IDA-53450 | Int Charges | 561,563.30 |
Feb 15, 2022 | IDA-53450 | Int Charges | 561,563.30 |
Feb 15, 2022 | IDA-53450 | Int Charges | 922,434.90 |
Aug 15, 2022 | IDA-53450 | Int Charges | 12,728.48 |
Aug 15, 2022 | IDA-53450 | Loan Repay | 5,470,291.50 |
Aug 15, 2023 | IDA-53450 | Int Charges | 33,706.91 |
Aug 15, 2023 | IDA-53450 | Loan Repay | 5,519,841.00 |
Aug 15, 2023 | IDA-53450 | Int Charges | 482,358.80 |
Aug 15, 2023 | IDA-53450 | Int Charges | 482,358.80 |
Aug 15, 2023 | IDA-53450 | Int Charges | 803,931.40 |
Feb 15, 2023 | IDA-53450 | Int Charges | 807,761.50 |
Feb 15, 2023 | IDA-53450 | Loan Repay | 59,445.89 |
Feb 15, 2023 | IDA-53450 | Loan Repay | 5,481,234.00 |
Feb 15, 2023 | IDA-53450 | Int Charges | 504,957.44 |
Feb 15, 2023 | IDA-53450 | Int Charges | 504,957.44 |
Feb 15, 2024 | IDA-53450 | Int Charges | 763,928.80 |
Feb 15, 2024 | IDA-53450 | Loan Repay | 1,251,427.40 |
Aug 15, 2024 | IDA-53450 | Int Charges | 633,080.00 |
Aug 15, 2024 | IDA-53450 | Loan Repay | 91,052.84 |
Aug 15, 2024 | IDA-53450 | Loan Repay | 5,454,557.00 |
Aug 15, 2024 | IDA-53450 | Int Charges | 443,018.60 |
Aug 15, 2024 | IDA-53450 | Int Charges | 443,018.60 |
Dec 30, 2013 | IDA-53450 | Loan Commitment | 500,000,000.00 |
Feb 15, 2024 | IDA-53450 | Loan Repay | 1,640,034.60 |
Feb 15, 2024 | IDA-53450 | Loan Repay | 11,704.76 |
Feb 15, 2024 | IDA-53450 | Loan Repay | 364,050.00 |
Feb 15, 2024 | IDA-53450 | Loan Repay | 2,213,142.00 |
Feb 15, 2024 | IDA-53450 | Int Charges | 458,357.28 |
Feb 15, 2024 | IDA-53450 | Int Charges | 458,357.28 |
Feb 15, 2019 | IDA-53450 | Int Charges | 526,800.56 |
Feb 15, 2019 | IDA-53450 | Int Charges | 7,722.79 |
Feb 15, 2019 | IDA-53450 | Loan Repay | 14,875,539.00 |
Feb 15, 2017 | IDA-53450 | Int Charges | 113,158.11 |
Feb 15, 2017 | IDA-53450 | Int Charges | 113,158.11 |
Feb 15, 2017 | IDA-53450 | Int Charges | 173,672.48 |
Mar 24, 2017 | IDA-53450 | Loan Disb | 4,184,674.00 |
Mar 24, 2017 | IDA-53450 | Loan Disb | 1,856,978.20 |
Feb 15, 2017 | IDA-53450 | Int Charges | 1,000.78 |
Sep 9, 2016 | IDA-53450 | Loan Disb | 1,282,867.60 |
Dec 9, 2016 | IDA-53450 | Loan Disb | 1,607,389.60 |
Mar 31, 2017 | IDA-53450 | Loan Disb | 6,704,674.50 |
Jun 7, 2017 | IDA-53450 | Loan Disb | 7,496,034.00 |
Aug 15, 2017 | IDA-53450 | Int Charges | 15,559.55 |
Aug 15, 2017 | IDA-53450 | Int Charges | 194,060.34 |
Aug 15, 2017 | IDA-53450 | Int Charges | 194,060.34 |
Aug 15, 2017 | IDA-53450 | Int Charges | 313,904.28 |
Oct 11, 2017 | IDA-53450 | Loan Disb | 10,531,893.00 |
Mar 14, 2018 | IDA-53450 | Loan Disb | 10,350,212.00 |
Dec 5, 2017 | IDA-53450 | Loan Disb | 9,501,110.00 |
Feb 15, 2018 | IDA-53450 | Int Charges | 9,876.54 |
Feb 15, 2018 | IDA-53450 | Int Charges | 273,891.00 |
Feb 15, 2018 | IDA-53450 | Int Charges | 273,891.00 |
Feb 15, 2018 | IDA-53450 | Int Charges | 433,885.50 |
Aug 15, 2018 | IDA-53450 | Int Charges | 21,434.21 |
Aug 15, 2018 | IDA-53450 | Int Charges | 333,558.90 |
Aug 15, 2018 | IDA-53450 | Int Charges | 333,558.90 |
Aug 15, 2018 | IDA-53450 | Int Charges | 548,226.50 |
Jun 29, 2018 | IDA-53450 | Loan Disb | 10,112,390.00 |
Feb 15, 2019 | IDA-53450 | Int Charges | 368,117.78 |
Feb 15, 2019 | IDA-53450 | Int Charges | 368,117.78 |
Dec 1, 2014 | IDA-53450 | Loan Disb | 71,496.50 |
Dec 1, 2014 | IDA-53450 | Loan Disb | 91,224.11 |
Dec 11, 2014 | IDA-53450 | Loan Disb | 882,197.25 |
Jun 17, 2014 | IDA-53450 | Loan Disb | 373,970.90 |
Aug 15, 2015 | IDA-53450 | Int Charges | 266.58 |
Aug 15, 2015 | IDA-53450 | Int Charges | 266.58 |
Aug 15, 2015 | IDA-53450 | Int Charges | 13,283.36 |
Aug 15, 2015 | IDA-53450 | Int Charges | 13,283.36 |
Mar 31, 2015 | IDA-53450 | Loan Disb | 1,712,664.80 |
Mar 3, 2015 | IDA-53450 | Loan Disb | 797,333.06 |
Feb 15, 2015 | IDA-53450 | Int Charges | 415.08 |
Feb 15, 2015 | IDA-53450 | Int Charges | 415.08 |
Feb 15, 2015 | IDA-53450 | Int Charges | 691.80 |
Feb 15, 2015 | IDA-53450 | Int Charges | 2,668.46 |
Feb 15, 2015 | IDA-53450 | Int Charges | 2,668.46 |
Feb 15, 2015 | IDA-53450 | Int Charges | 4,447.43 |
May 26, 2015 | IDA-53450 | Loan Disb | 555,234.40 |
Aug 15, 2015 | IDA-53450 | Int Charges | 22,583.22 |
Jan 21, 2016 | IDA-53450 | Loan Disb | 3,255,019.50 |
Oct 13, 2015 | IDA-53450 | Loan Disb | 3,222,725.20 |
Dec 18, 2015 | IDA-53450 | Loan Disb | 2,155,869.20 |
Feb 15, 2016 | IDA-53450 | Int Charges | 19.55 |
Feb 15, 2016 | IDA-53450 | Int Charges | 19.55 |
Feb 24, 2016 | IDA-53450 | Loan Disb | 1,450,268.50 |
Mar 31, 2016 | IDA-53450 | Loan Disb | 2,678,168.20 |
Feb 15, 2016 | IDA-53450 | Int Charges | 29,082.47 |
Feb 15, 2016 | IDA-53450 | Int Charges | 29,082.47 |
Feb 15, 2016 | IDA-53450 | Int Charges | 36,585.73 |
Mar 15, 2016 | IDA-53450 | Loan Disb | 2,531,843.50 |
Aug 23, 2016 | IDA-53450 | Loan Disb | 2,952,096.80 |
Aug 15, 2016 | IDA-53450 | Int Charges | 11,830.76 |
Aug 15, 2016 | IDA-53450 | Int Charges | 72,829.84 |
Aug 15, 2016 | IDA-53450 | Int Charges | 72,829.84 |
Jul 21, 2016 | IDA-53450 | Loan Disb | 1,926,276.50 |
Aug 15, 2016 | IDA-53450 | Int Charges | 120,348.42 |
Name | Review | Date |
---|---|---|
Project Management | Unsatisfactory | 2019-12-10 |
Monitoring and Evaluation | Moderately Satisfactory | 2019-12-10 |
Progress towards achievement of PDO | Moderately Unsatisfactory | 2019-12-10 |
Procurement | Moderately Unsatisfactory | 2019-12-10 |
Counterpart Funding | Unsatisfactory | 2019-12-10 |
Financial Management | Moderately Unsatisfactory | 2019-12-10 |
Overall Implementation Progress (IP) | Moderately Unsatisfactory | 2019-12-10 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 02-24-2021 |
---|---|
Outcomes | Unsatisfactory |
Risk to Development Outcome | |
Bank Performance | Unsatisfactory |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 08-24-2021 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Unsatisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Unsatisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | N/a | |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
New piped household water connections that are resulting from the project intervention | Value | 0.00 | 1150000.00 | 356000.00 |
Date | December 30, 2013 | March 31, 2020 | March 31, 2020 | |
Comment |
Number of Participating States having increase their capacity to handle an eligible crisis | Value | 0.00 | 0.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
People provided with access to improved sanitation services | Value | 0.00 | 3900000.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
People provided with access to improved sanitation services - rural | Value | 0.00 | 3267369.00 | 0.00 |
Date | December 31, 2013 | December 31, 2017 | ||
Comment |
People provided with access to improved sanitation services - Female (RMS requirement) | Value | 0.00 | 1568337.00 | 0.00 |
Date | December 31, 2013 | December 31, 2017 | ||
Comment |
Number of people using improved latrines in the project area | Value | 0.00 | 2700000.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
O&M Cost Recovery: (i) Percentage habitations with 50% or more O&M Cost Recovery; (ii) Percentage Habitations with 100% O&M Cost Recovery. | Value | 0.00 | 50.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Population benefiting from improved grey water management under the project | Value | 0.00 | 135561.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Number of piped water supply schemes which recover 50% or more of O&M cost by way of water tariff and GP level contributions | Value | 0.00 | 106.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Households provided with 24/7 piped water supply services by a decentralized (not State-level) water and sanitation service provider | Value | 0.00 | 41809.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Web-based monitoring system developed to track functionality of piped water supply schemes and performance and sustainability of water supply service providers | Value | No | Yes | |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
People trained to improve hygiene behavior/sanitation practices - female | Value | 0.00 | 3744000.00 | 960000.00 |
Date | December 30, 2013 | March 31, 2020 | July 31, 2019 | |
Comment |
Schemes which have carried out community monitoring /social audits | Value | 0.00 | 548.00 | 1000.00 |
Date | July 31, 2019 | March 31, 2020 | March 31, 2020 | |
Comment |
Water utilities that the project is supporting | Value | 4.00 | 4.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Schemes which have carried out beneficiary assessments at least once a year | Value | 0.00 | 341.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | March 31, 2020 | |
Comment |
People provided with access to "improved water sources" under the project -rural | Value | 0.00 | 7800000.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Number of GP/Village or Multi-village Water and Sanitation Committees trained to become professional customer-focused water serviceproviders under the Project | Value | 0.00 | 1453.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
External Audits of environmental performance completed. | Value | 0.00 | 200.00 | 4.00 |
Date | December 30, 2013 | March 31, 2020 | March 31, 2020 | |
Comment |
Improved community water points constructed or rehabilitated under the project | Value | 0.00 | 15000.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Schemes with over 80% of satisfaction with service provided (yearly beneficiary assessments) | Value | 0.00 | 341.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Number of piped water schemes funded under the project | Value | 0.00 | 1112.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Piped household water connections that are benefiting from rehabilitation works undertaken by the project | Value | 0.00 | 64000.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Number of people trained on improved hygiene behavior, sanitation, SLWM under the Project | Value | 0.00 | 1659794.00 | 2000000.00 |
Date | December 30, 2013 | March 31, 2020 | July 31, 2019 | |
Comment |
Schemes operationalized using the decentralized service delivery system. (i) SVS (ii) MVS | Value | 0.00 | 2000.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
National, State, and District Level institutions are set up, staffed and fully functional: NPMU, SPMU, and DPMU. | Value | No | Yes | |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
GPs that are declared open-defecation free. | Value | 0.00 | 30.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Schemes with a collection ratio of water charges of at least 50% | Value | 0.00 | 77.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
National, State, and District level institutions are set up, staffed and fully functional: NPMU, SPMU, and DPMU. | Value | 0.00 | 33.00 | 0.00 |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
GPs action plans for solid, liquid waste and fecal sludge management (SLWM) implemented in Project GPs | Value | 0.00 | 167.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Capacity building activities undertaken as per agreed strategy and plan in response to the requirements of the scheme cycle. | Value | No | Yes | |
Date | December 30, 2013 | March 31, 2020 | ||
Comment |
Project GPs that have been verified as open-defecation free | Value | 50.00 | 100.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
GP-WSCs with at least 33% woman members | Value | 0.00 | 1200.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
Number of piped water schemes completed under the Project | Value | 0.00 | 637.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
States having adopted an O & M policy empowering GPs to operate and maintain water supply schemes, either directly or through a performance based third party agreement. | Value | 0.00 | 1.00 | 0.00 |
Date | July 31, 2019 | March 31, 2020 | ||
Comment |
People trained to improve hygiene behavior/sanitation practices under the proj | Value | 0.00 | 7800000.00 | 2000000.00 |
Date | December 30, 2013 | March 31, 2020 | March 31, 2020 | |
Comment |
Schemes which have carried out independent supervision quality checks | Value | 0.00 | 2000.00 | 1000.00 |
Date | July 31, 2019 | March 31, 2020 | March 31, 2020 | |
Comment |
Direct project beneficiaries | Value | 0.00 | 7800000.00 | 1780000.00 |
Date | December 30, 2013 | March 31, 2020 | March 31, 2020 | |
Comment |
Direct project beneficiaries- female | Value | 0.00 | 313395.00 | 0.00 |
Date | December 31, 2013 | December 31, 2017 | ||
Comment |