Abstract*

The objective of the Rural Water Supply and Sanitation Project for low income states for India is to improve piped water supply and sanitation services for selected rural communities in the target states through decentralized delivery systems and to increase the capacity of the participating states to respond promptly and effectively to an eligible crisis or emergency. The project consists of the following components: 1) capacity building and sector...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The project development objective is to improve piped water supply and sanitation services for selected rural communities in the target states through decentralized delivery systems and to increase the capacity of the Participating States to respond promptly and effectively to an Eligible Crisis or Emergency.

Key Details

Project Details

  • P132173

  • Closed

  • Xavier Chauvot De Beauchene , Mariappa Kullappa

  • India

  • India

  • October 25, 2012

  • (as of board presentation)

    December 30, 2013

  • April 8, 2014

  • US$ 1000.00 million

  • Ministry of Jal Shakti, Department of Drinking Water and Sanitation

  • South Asia

  • 2014

  • US$ 500.00 million

  • B

  • July 11, 2024

  • March 31, 2020

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 500.00
Borrower/Recipient 500.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 500.00
IBRD + IDA Commitment 500.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 1000.00

Summary Status of World Bank Financing (US$ Millions) as of January 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of January 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Mar 21, 2019 IDA-53450 Loan Disb 10,399,582.00
Jun 3, 2019 IDA-53450 Loan Cancel 116,585,624.00
Jul 29, 2019 IDA-53450 Loan Cancel 132,507,792.00
Aug 15, 2019 IDA-53450 Int Charges 85,967.27
Aug 15, 2019 IDA-53450 Loan Repay 10,783,886.00
Aug 15, 2019 IDA-53450 Int Charges 368,376.47
Aug 15, 2019 IDA-53450 Int Charges 368,376.47
Aug 15, 2019 IDA-53450 Int Charges 613,960.80
Mar 27, 2019 IDA-53450 Loan Disb 9,880,496.00
Oct 16, 2019 IDA-53450 Loan Disb 14,079,222.00
Nov 4, 2019 IDA-53450 Loan Disb 10,340,978.00
Feb 15, 2020 IDA-53450 Loan Repay 77,095.00
Feb 15, 2020 IDA-53450 Loan Repay 5,998,826.00
Feb 15, 2020 IDA-53450 Int Charges 398,811.66
Feb 15, 2020 IDA-53450 Int Charges 398,811.66
Feb 15, 2020 IDA-53450 Int Charges 664,686.06
Apr 29, 2020 IDA-53450 Loan Disb 12,143,739.00
Aug 15, 2020 IDA-53450 Loan Repay 3,045,082.20
Aug 15, 2020 IDA-53450 Int Charges 451,876.84
Aug 15, 2020 IDA-53450 Int Charges 657,853.56
Aug 15, 2020 IDA-53450 Int Charges 0.01
Aug 15, 2020 IDA-53450 Int Charges 0.01
Sep 30, 2020 IDA-53450 Loan Cancel 11,322,599.00
Aug 15, 2020 IDA-53450 Loan Repay 86,559.93
Aug 15, 2020 IDA-53450 Int Charges 451,876.84
Sep 30, 2020 IDA-53450 Loan Disb 16,070,966.00
Aug 13, 2020 IDA-53450 Loan Disb 18,131,146.00
Feb 15, 2021 IDA-53450 Int Charges 97,374.36
Feb 15, 2021 IDA-53450 Loan Repay 2,984,467.50
Feb 15, 2021 IDA-53450 Int Charges 584,524.10
Feb 15, 2021 IDA-53450 Int Charges 584,524.10
Feb 15, 2021 IDA-53450 Int Charges 965,284.80
Aug 15, 2021 IDA-53450 Int Charges 8,795.69
Aug 15, 2021 IDA-53450 Loan Repay 2,942,209.50
Aug 15, 2021 IDA-53450 Int Charges 580,417.70
Aug 15, 2021 IDA-53450 Int Charges 580,417.70
Sep 12, 2016 IDA-53450 Loan Disb 2,806,277.50
Jan 27, 2017 IDA-53450 Loan Disb 3,500,591.50
Dec 21, 2016 IDA-53450 Loan Disb 3,063,589.20
May 23, 2016 IDA-53450 Loan Disb 1,341,554.90
Aug 15, 2021 IDA-53450 Int Charges 967,362.80
Aug 15, 2022 IDA-53450 Int Charges 519,056.06
Aug 15, 2022 IDA-53450 Int Charges 519,056.06
Aug 15, 2022 IDA-53450 Int Charges 865,093.40
Feb 15, 2022 IDA-53450 Loan Repay 59,610.07
Feb 15, 2022 IDA-53450 Loan Repay 2,842,185.20
Feb 15, 2022 IDA-53450 Int Charges 561,563.30
Feb 15, 2022 IDA-53450 Int Charges 561,563.30
Feb 15, 2022 IDA-53450 Int Charges 922,434.90
Aug 15, 2022 IDA-53450 Int Charges 12,728.48
Aug 15, 2022 IDA-53450 Loan Repay 5,470,291.50
Aug 15, 2023 IDA-53450 Int Charges 33,706.91
Aug 15, 2023 IDA-53450 Loan Repay 5,519,841.00
Aug 15, 2023 IDA-53450 Int Charges 482,358.80
Aug 15, 2023 IDA-53450 Int Charges 482,358.80
Aug 15, 2023 IDA-53450 Int Charges 803,931.40
Feb 15, 2023 IDA-53450 Int Charges 807,761.50
Feb 15, 2023 IDA-53450 Loan Repay 59,445.89
Feb 15, 2023 IDA-53450 Loan Repay 5,481,234.00
Feb 15, 2023 IDA-53450 Int Charges 504,957.44
Feb 15, 2023 IDA-53450 Int Charges 504,957.44
Feb 15, 2024 IDA-53450 Int Charges 763,928.80
Feb 15, 2024 IDA-53450 Loan Repay 1,251,427.40
Aug 15, 2024 IDA-53450 Int Charges 633,080.00
Aug 15, 2024 IDA-53450 Loan Repay 91,052.84
Aug 15, 2024 IDA-53450 Loan Repay 5,454,557.00
Aug 15, 2024 IDA-53450 Int Charges 443,018.60
Aug 15, 2024 IDA-53450 Int Charges 443,018.60
Dec 30, 2013 IDA-53450 Loan Commitment 500,000,000.00
Feb 15, 2024 IDA-53450 Loan Repay 1,640,034.60
Feb 15, 2024 IDA-53450 Loan Repay 11,704.76
Feb 15, 2024 IDA-53450 Loan Repay 364,050.00
Feb 15, 2024 IDA-53450 Loan Repay 2,213,142.00
Feb 15, 2024 IDA-53450 Int Charges 458,357.28
Feb 15, 2024 IDA-53450 Int Charges 458,357.28
Feb 15, 2019 IDA-53450 Int Charges 526,800.56
Feb 15, 2019 IDA-53450 Int Charges 7,722.79
Feb 15, 2019 IDA-53450 Loan Repay 14,875,539.00
Feb 15, 2017 IDA-53450 Int Charges 113,158.11
Feb 15, 2017 IDA-53450 Int Charges 113,158.11
Feb 15, 2017 IDA-53450 Int Charges 173,672.48
Mar 24, 2017 IDA-53450 Loan Disb 4,184,674.00
Mar 24, 2017 IDA-53450 Loan Disb 1,856,978.20
Feb 15, 2017 IDA-53450 Int Charges 1,000.78
Sep 9, 2016 IDA-53450 Loan Disb 1,282,867.60
Dec 9, 2016 IDA-53450 Loan Disb 1,607,389.60
Mar 31, 2017 IDA-53450 Loan Disb 6,704,674.50
Jun 7, 2017 IDA-53450 Loan Disb 7,496,034.00
Aug 15, 2017 IDA-53450 Int Charges 15,559.55
Aug 15, 2017 IDA-53450 Int Charges 194,060.34
Aug 15, 2017 IDA-53450 Int Charges 194,060.34
Aug 15, 2017 IDA-53450 Int Charges 313,904.28
Oct 11, 2017 IDA-53450 Loan Disb 10,531,893.00
Mar 14, 2018 IDA-53450 Loan Disb 10,350,212.00
Dec 5, 2017 IDA-53450 Loan Disb 9,501,110.00
Feb 15, 2018 IDA-53450 Int Charges 9,876.54
Feb 15, 2018 IDA-53450 Int Charges 273,891.00
Feb 15, 2018 IDA-53450 Int Charges 273,891.00
Feb 15, 2018 IDA-53450 Int Charges 433,885.50
Aug 15, 2018 IDA-53450 Int Charges 21,434.21
Aug 15, 2018 IDA-53450 Int Charges 333,558.90
Aug 15, 2018 IDA-53450 Int Charges 333,558.90
Aug 15, 2018 IDA-53450 Int Charges 548,226.50
Jun 29, 2018 IDA-53450 Loan Disb 10,112,390.00
Feb 15, 2019 IDA-53450 Int Charges 368,117.78
Feb 15, 2019 IDA-53450 Int Charges 368,117.78
Dec 1, 2014 IDA-53450 Loan Disb 71,496.50
Dec 1, 2014 IDA-53450 Loan Disb 91,224.11
Dec 11, 2014 IDA-53450 Loan Disb 882,197.25
Jun 17, 2014 IDA-53450 Loan Disb 373,970.90
Aug 15, 2015 IDA-53450 Int Charges 266.58
Aug 15, 2015 IDA-53450 Int Charges 266.58
Aug 15, 2015 IDA-53450 Int Charges 13,283.36
Aug 15, 2015 IDA-53450 Int Charges 13,283.36
Mar 31, 2015 IDA-53450 Loan Disb 1,712,664.80
Mar 3, 2015 IDA-53450 Loan Disb 797,333.06
Feb 15, 2015 IDA-53450 Int Charges 415.08
Feb 15, 2015 IDA-53450 Int Charges 415.08
Feb 15, 2015 IDA-53450 Int Charges 691.80
Feb 15, 2015 IDA-53450 Int Charges 2,668.46
Feb 15, 2015 IDA-53450 Int Charges 2,668.46
Feb 15, 2015 IDA-53450 Int Charges 4,447.43
May 26, 2015 IDA-53450 Loan Disb 555,234.40
Aug 15, 2015 IDA-53450 Int Charges 22,583.22
Jan 21, 2016 IDA-53450 Loan Disb 3,255,019.50
Oct 13, 2015 IDA-53450 Loan Disb 3,222,725.20
Dec 18, 2015 IDA-53450 Loan Disb 2,155,869.20
Feb 15, 2016 IDA-53450 Int Charges 19.55
Feb 15, 2016 IDA-53450 Int Charges 19.55
Feb 24, 2016 IDA-53450 Loan Disb 1,450,268.50
Mar 31, 2016 IDA-53450 Loan Disb 2,678,168.20
Feb 15, 2016 IDA-53450 Int Charges 29,082.47
Feb 15, 2016 IDA-53450 Int Charges 29,082.47
Feb 15, 2016 IDA-53450 Int Charges 36,585.73
Mar 15, 2016 IDA-53450 Loan Disb 2,531,843.50
Aug 23, 2016 IDA-53450 Loan Disb 2,952,096.80
Aug 15, 2016 IDA-53450 Int Charges 11,830.76
Aug 15, 2016 IDA-53450 Int Charges 72,829.84
Aug 15, 2016 IDA-53450 Int Charges 72,829.84
Jul 21, 2016 IDA-53450 Loan Disb 1,926,276.50
Aug 15, 2016 IDA-53450 Int Charges 120,348.42

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Project Management Unsatisfactory 2019-12-10
Monitoring and Evaluation Moderately Satisfactory 2019-12-10
Progress towards achievement of PDO Moderately Unsatisfactory 2019-12-10
Procurement Moderately Unsatisfactory 2019-12-10
Counterpart Funding Unsatisfactory 2019-12-10
Financial Management Moderately Unsatisfactory 2019-12-10
Overall Implementation Progress (IP) Moderately Unsatisfactory 2019-12-10

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 02-24-2021
OutcomesUnsatisfactory
Risk to Development Outcome
Bank PerformanceUnsatisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 08-24-2021PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingUnsatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceUnsatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • New piped household water connections that are resulting from the project interventionValue0.001150000.00356000.00
    DateDecember 30, 2013March 31, 2020March 31, 2020
    Comment
  • Number of Participating States having increase their capacity to handle an eligible crisisValue0.000.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • People provided with access to improved sanitation servicesValue0.003900000.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • People provided with access to improved sanitation services - ruralValue0.003267369.000.00
    DateDecember 31, 2013December 31, 2017
    Comment
  • People provided with access to improved sanitation services - Female (RMS requirement)Value0.001568337.000.00
    DateDecember 31, 2013December 31, 2017
    Comment
  • Number of people using improved latrines in the project areaValue0.002700000.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • O&M Cost Recovery: (i) Percentage habitations with 50% or more O&M Cost Recovery; (ii) Percentage Habitations with 100% O&M Cost Recovery.Value0.0050.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • Population benefiting from improved grey water management under the projectValue0.00135561.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Number of piped water supply schemes which recover 50% or more of O&M cost by way of water tariff and GP level contributionsValue0.00106.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Households provided with 24/7 piped water supply services by a decentralized (not State-level) water and sanitation service providerValue0.0041809.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Web-based monitoring system developed to track functionality of piped water supply schemes and performance and sustainability of water supply service providersValueNoYes
    DateJuly 31, 2019March 31, 2020
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • People trained to improve hygiene behavior/sanitation practices - femaleValue0.003744000.00960000.00
    DateDecember 30, 2013March 31, 2020July 31, 2019
    Comment
  • Schemes which have carried out community monitoring /social auditsValue0.00548.001000.00
    DateJuly 31, 2019March 31, 2020March 31, 2020
    Comment
  • Water utilities that the project is supportingValue4.004.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • Schemes which have carried out beneficiary assessments at least once a yearValue0.00341.000.00
    DateJuly 31, 2019March 31, 2020March 31, 2020
    Comment
  • People provided with access to "improved water sources" under the project -ruralValue0.007800000.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • Number of GP/Village or Multi-village Water and Sanitation Committees trained to become professional customer-focused water serviceproviders under the ProjectValue0.001453.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • External Audits of environmental performance completed.Value0.00200.004.00
    DateDecember 30, 2013March 31, 2020March 31, 2020
    Comment
  • Improved community water points constructed or rehabilitated under the projectValue0.0015000.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • Schemes with over 80% of satisfaction with service provided (yearly beneficiary assessments)Value0.00341.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Number of piped water schemes funded under the projectValue0.001112.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Piped household water connections that are benefiting from rehabilitation works undertaken by the projectValue0.0064000.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • Number of people trained on improved hygiene behavior, sanitation, SLWM under the ProjectValue0.001659794.002000000.00
    DateDecember 30, 2013March 31, 2020July 31, 2019
    Comment
  • Schemes operationalized using the decentralized service delivery system. (i) SVS (ii) MVSValue0.002000.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • National, State, and District Level institutions are set up, staffed and fully functional: NPMU, SPMU, and DPMU.ValueNoYes
    DateDecember 30, 2013March 31, 2020
    Comment
  • GPs that are declared open-defecation free.Value0.0030.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • Schemes with a collection ratio of water charges of at least 50%Value0.0077.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • National, State, and District level institutions are set up, staffed and fully functional: NPMU, SPMU, and DPMU.Value0.0033.000.00
    DateDecember 30, 2013March 31, 2020
    Comment
  • GPs action plans for solid, liquid waste and fecal sludge management (SLWM) implemented in Project GPsValue0.00167.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Capacity building activities undertaken as per agreed strategy and plan in response to the requirements of the scheme cycle.ValueNoYes
    DateDecember 30, 2013March 31, 2020
    Comment
  • Project GPs that have been verified as open-defecation freeValue50.00100.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • GP-WSCs with at least 33% woman membersValue0.001200.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • Number of piped water schemes completed under the ProjectValue0.00637.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • States having adopted an O & M policy empowering GPs to operate and maintain water supply schemes, either directly or through a performance based third party agreement.Value0.001.000.00
    DateJuly 31, 2019March 31, 2020
    Comment
  • People trained to improve hygiene behavior/sanitation practices under the projValue0.007800000.002000000.00
    DateDecember 30, 2013March 31, 2020March 31, 2020
    Comment
  • Schemes which have carried out independent supervision quality checksValue0.002000.001000.00
    DateJuly 31, 2019March 31, 2020March 31, 2020
    Comment
  • Direct project beneficiariesValue0.007800000.001780000.00
    DateDecember 30, 2013March 31, 2020March 31, 2020
    Comment
  • Direct project beneficiaries- femaleValue0.00313395.000.00
    DateDecember 31, 2013December 31, 2017
    Comment