Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 40.50 |
Borrower/Recipient | 20.60 |
P132443
Closed
Sandu Ghidirim
Ministry of Finance
February 1, 2013
(as of board presentation)
November 21, 2014
August 14, 2015
US$ 61.10 million
Moldova Energy Projects Implementation Unit (MEPIU),Ministry of Economy,Termoelectrica
2015
US$ 40.50 million
B
Not Applicable
June 30, 2020
Yes
BANK APPROVED
October 2, 2023
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 40.50 |
Borrower/Recipient | 20.60 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 40.50 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 40.50 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 61.10 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Sep 9, 2015 | IBRD-84510 | Loan Disb | 63,000.00 |
Sep 9, 2015 | IBRD-84510 | Loan Disb | 2,000,000.00 |
Apr 15, 2016 | IBRD-84510 | Int Charges | 17,198.63 |
Apr 15, 2016 | IBRD-84510 | Int Charges | 16,324.89 |
Apr 15, 2016 | IBRD-84510 | Int Charges | 2,998.97 |
Apr 15, 2016 | IBRD-84510 | Int Charges | 47,622.13 |
Apr 15, 2016 | IBRD-84510 | Int Charges | 16,407.98 |
Apr 26, 2016 | IBRD-84510 | Loan Disb | 104,820.30 |
Mar 23, 2016 | IBRD-84510 | Loan Disb | 444,805.38 |
Mar 4, 2016 | IBRD-84510 | Loan Disb | 152,000.00 |
Oct 15, 2016 | IBRD-84510 | Int Charges | 113.48 |
Oct 15, 2016 | IBRD-84510 | Int Charges | 518.80 |
Oct 15, 2016 | IBRD-84510 | Int Charges | 43,256.57 |
Oct 15, 2016 | IBRD-84510 | Int Charges | 41,135.50 |
Aug 12, 2016 | IBRD-84510 | Loan Disb | 360,992.62 |
Jul 15, 2016 | IBRD-84510 | Loan Disb | 52,281.90 |
Jul 21, 2016 | IBRD-84510 | Loan Disb | 98,720.42 |
Jul 21, 2016 | IBRD-84510 | Loan Disb | 34,232.78 |
Jul 21, 2016 | IBRD-84510 | Loan Disb | 666,849.56 |
Jul 28, 2016 | IBRD-84510 | Loan Disb | 292,837.12 |
May 25, 2016 | IBRD-84510 | Loan Disb | 110,798.53 |
Oct 3, 2016 | IBRD-84510 | Loan Disb | 1,179,506.50 |
Jul 8, 2016 | IBRD-84510 | Loan Disb | 97,067.44 |
Jun 15, 2016 | IBRD-84510 | Loan Disb | 7,500.00 |
Aug 23, 2016 | IBRD-84510 | Loan Disb | 1,000,000.00 |
Oct 18, 2016 | IBRD-84510 | Loan Disb | 1,572,480.90 |
Nov 29, 2016 | IBRD-84510 | Loan Disb | 281,833.84 |
Oct 25, 2016 | IBRD-84510 | Loan Disb | 236,894.48 |
Nov 2, 2018 | IBRD-84510 | Loan Disb | 150,000.00 |
Dec 18, 2018 | IBRD-84510 | Loan Disb | 33,000.00 |
Oct 1, 2018 | IBRD-84510 | Loan Disb | 73,024.20 |
Dec 6, 2018 | IBRD-84510 | Loan Disb | 91,590.26 |
Oct 15, 2018 | IBRD-84510 | Int Charges | 66.90 |
Oct 25, 2018 | IBRD-84510 | Loan Disb | 383,119.84 |
Oct 25, 2018 | IBRD-84510 | Loan Disb | 30,696.76 |
Oct 25, 2018 | IBRD-84510 | Loan Disb | 98,359.48 |
Oct 25, 2018 | IBRD-84510 | Loan Disb | 72,205.49 |
Oct 15, 2018 | IBRD-84510 | Int Charges | 608.73 |
Oct 15, 2018 | IBRD-84510 | Int Charges | 10,283.33 |
Oct 15, 2018 | IBRD-84510 | Int Charges | 566,068.60 |
Mar 4, 2019 | IBRD-84510 | Loan Disb | -33,648,384.00 |
Mar 4, 2019 | IBRD-84510 | Loan Disb | 33,648,384.00 |
Mar 4, 2019 | IBRD-84510 | Loan Disb | -33,648,384.00 |
Mar 4, 2019 | IBRD-84510 | Loan Disb | 33,648,384.00 |
Mar 11, 2019 | IBRD-84510 | Loan Disb | 100,000.00 |
Apr 24, 2019 | IBRD-84510 | Loan Disb | 112,095.00 |
Apr 9, 2019 | IBRD-84510 | Loan Disb | 61,541.53 |
Apr 30, 2019 | IBRD-84510 | Loan Disb | 38,811.36 |
Apr 5, 2019 | IBRD-84510 | Loan Disb | 211,619.44 |
Apr 5, 2019 | IBRD-84510 | Loan Disb | 179,553.89 |
Jul 11, 2019 | IBRD-84510 | Loan Disb | 1,263,844.00 |
Mar 12, 2019 | IBRD-84510 | Loan Disb | 252,651.52 |
Apr 15, 2019 | IBRD-84510 | Int Charges | 22.79 |
Apr 15, 2019 | IBRD-84510 | Int Charges | 296.06 |
Sep 19, 2016 | IBRD-84510 | Loan Disb | 461,225.38 |
Sep 19, 2016 | IBRD-84510 | Loan Disb | 557,802.20 |
Jan 3, 2017 | IBRD-84510 | Loan Disb | 181,741.34 |
Jan 23, 2017 | IBRD-84510 | Loan Disb | 2,700.00 |
May 13, 2016 | IBRD-84510 | Loan Disb | 134,800.00 |
Sep 22, 2016 | IBRD-84510 | Loan Disb | 1,139,146.60 |
Aug 22, 2016 | IBRD-84510 | Loan Disb | 103,242.43 |
Aug 15, 2016 | IBRD-84510 | Loan Disb | 236,104.02 |
Sep 29, 2016 | IBRD-84510 | Loan Disb | 282,698.88 |
Nov 16, 2016 | IBRD-84510 | Loan Disb | 159,063.81 |
Jun 8, 2016 | IBRD-84510 | Loan Disb | 373,110.50 |
Sep 12, 2016 | IBRD-84510 | Loan Disb | 500,000.00 |
Jul 14, 2016 | IBRD-84510 | Loan Disb | 235,089.70 |
Nov 21, 2016 | IBRD-84510 | Loan Disb | 539,015.25 |
Nov 18, 2016 | IBRD-84510 | Loan Disb | 1,121,538.60 |
Sep 29, 2016 | IBRD-84510 | Loan Disb | 109,510.44 |
Jun 27, 2017 | IBRD-84510 | Loan Disb | 526,714.56 |
Jan 3, 2017 | IBRD-84510 | Loan Disb | 924,398.25 |
Aug 5, 2016 | IBRD-84510 | Loan Disb | 498,391.97 |
Aug 5, 2016 | IBRD-84510 | Loan Disb | 81,368.68 |
Aug 22, 2016 | IBRD-84510 | Loan Disb | 285,480.20 |
Sep 2, 2016 | IBRD-84510 | Loan Disb | 1,119,127.40 |
Aug 22, 2016 | IBRD-84510 | Loan Disb | 295,293.44 |
Apr 11, 2017 | IBRD-84510 | Loan Disb | 1,340,177.00 |
Apr 20, 2017 | IBRD-84510 | Loan Disb | 183,378.95 |
Feb 24, 2017 | IBRD-84510 | Loan Disb | 139,997.60 |
Jun 2, 2017 | IBRD-84510 | Loan Disb | 317,314.56 |
May 4, 2017 | IBRD-84510 | Loan Disb | 478,669.70 |
Jun 1, 2017 | IBRD-84510 | Loan Disb | 511,681.66 |
Apr 15, 2017 | IBRD-84510 | Int Charges | 28,617.01 |
Apr 15, 2017 | IBRD-84510 | Int Charges | 191,404.88 |
Jul 7, 2017 | IBRD-84510 | Loan Disb | 691,709.44 |
Apr 15, 2017 | IBRD-84510 | Int Charges | 1,653.58 |
Apr 15, 2017 | IBRD-84510 | Int Charges | 10,249.00 |
Aug 4, 2017 | IBRD-84510 | Loan Disb | 179,601.23 |
Nov 8, 2017 | IBRD-84510 | Loan Disb | 157,012.17 |
Sep 12, 2017 | IBRD-84510 | Loan Disb | 203,185.02 |
Oct 15, 2017 | IBRD-84510 | Int Charges | 660.40 |
Oct 15, 2022 | IBRD-84510 | Int Charges | 16,138.77 |
Oct 15, 2022 | IBRD-84510 | Int Charges | 92,809.44 |
Apr 15, 2019 | IBRD-84510 | Int Charges | 6,694.27 |
Apr 15, 2019 | IBRD-84510 | Int Charges | 473,529.53 |
Jun 4, 2019 | IBRD-84510 | Loan Disb | 112,585.00 |
Mar 14, 2019 | IBRD-84510 | Loan Disb | -352,651.53 |
Mar 14, 2019 | IBRD-84510 | Loan Disb | 352,651.53 |
Mar 14, 2019 | IBRD-84510 | Loan Disb | -352,651.53 |
Mar 14, 2019 | IBRD-84510 | Loan Disb | 352,651.53 |
Nov 25, 2019 | IBRD-84510 | Loan Disb | 275,375.00 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 83.94 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 29,762.24 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 238.23 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 6,229.33 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 2,033.01 |
Aug 26, 2019 | IBRD-84510 | Loan Disb | 131,112.69 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 3,100.70 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 137,991.00 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 1,449.72 |
Oct 15, 2019 | IBRD-84510 | Int Charges | 1,788.44 |
Nov 22, 2019 | IBRD-84510 | Loan Disb | 474,899.94 |
Nov 22, 2019 | IBRD-84510 | Loan Disb | 134,057.80 |
Oct 15, 2017 | IBRD-84510 | Int Charges | 22,532.33 |
Oct 15, 2017 | IBRD-84510 | Int Charges | 264,455.84 |
Oct 15, 2017 | IBRD-84510 | Int Charges | 84.67 |
Nov 9, 2017 | IBRD-84510 | Loan Disb | 104,563.80 |
Jul 24, 2017 | IBRD-84510 | Loan Disb | 128,086.05 |
Oct 6, 2017 | IBRD-84510 | Loan Disb | 1,990,335.90 |
Nov 9, 2017 | IBRD-84510 | Loan Disb | 1,024,355.90 |
Jun 15, 2017 | IBRD-84510 | Loan Disb | 235,268.55 |
Oct 31, 2017 | IBRD-84510 | Loan Disb | 1,623,564.40 |
Nov 21, 2017 | IBRD-84510 | Loan Disb | 130,704.75 |
Aug 14, 2015 | IBRD-84510 | Loan Disb | 101,250.00 |
Aug 14, 2015 | IBRD-84510 | Fee Charges | 101,250.00 |
Sep 11, 2015 | IBRD-84510 | Loan Disb | 183,417.50 |
Sep 11, 2015 | IBRD-84510 | Loan Disb | 8,390.96 |
Nov 22, 2019 | IBRD-84510 | Loan Disb | 652,045.75 |
Oct 31, 2019 | IBRD-84510 | Loan Disb | 221,929.17 |
Dec 23, 2019 | IBRD-84510 | Loan Disb | 1,019,305.20 |
Mar 10, 2020 | IBRD-84510 | Loan Disb | 56,765.00 |
May 5, 2020 | IBRD-84510 | Loan Disb | 84,525.56 |
Feb 6, 2020 | IBRD-84510 | Loan Disb | 104,792.41 |
Apr 15, 2020 | IBRD-84510 | Int Charges | 113,590.75 |
Apr 15, 2020 | IBRD-84510 | Int Charges | 1,193.39 |
Apr 15, 2020 | IBRD-84510 | Loan Repay | 13.41 |
Apr 15, 2020 | IBRD-84510 | Loan Repay | 5,750.01 |
Apr 15, 2020 | IBRD-84510 | Int Charges | 93.49 |
Apr 15, 2020 | IBRD-84510 | Int Charges | 2,677.52 |
Apr 15, 2020 | IBRD-84510 | Int Charges | 13,149.21 |
Apr 15, 2020 | IBRD-84510 | Int Charges | 44.05 |
Apr 15, 2020 | IBRD-84510 | Loan Repay | 82,580.02 |
Apr 15, 2020 | IBRD-84510 | Loan Repay | 547,308.30 |
May 8, 2020 | IBRD-84510 | Loan Disb | 15,651.69 |
May 7, 2020 | IBRD-84510 | Loan Disb | 205,048.00 |
Jun 23, 2020 | IBRD-84510 | Loan Disb | 202,720.94 |
Jun 29, 2020 | IBRD-84510 | Loan Disb | 556,982.44 |
May 21, 2020 | IBRD-84510 | Loan Disb | 135,209.31 |
Oct 15, 2020 | IBRD-84510 | Int Charges | 22.51 |
Sep 27, 2017 | IBRD-84510 | Loan Disb | 816,637.25 |
Sep 18, 2017 | IBRD-84510 | Loan Disb | 368,927.20 |
Aug 15, 2017 | IBRD-84510 | Loan Disb | 250,929.60 |
Sep 15, 2017 | IBRD-84510 | Loan Disb | 187,683.19 |
Oct 12, 2017 | IBRD-84510 | Loan Disb | 108,544.34 |
Aug 11, 2017 | IBRD-84510 | Loan Disb | 183,926.72 |
Mar 20, 2018 | IBRD-84510 | Loan Disb | 375,698.28 |
Dec 4, 2017 | IBRD-84510 | Loan Disb | 1,003,998.75 |
Apr 15, 2018 | IBRD-84510 | Int Charges | 5,266.55 |
Apr 15, 2018 | IBRD-84510 | Int Charges | 12,113.05 |
Apr 15, 2018 | IBRD-84510 | Int Charges | 386,830.30 |
Apr 15, 2018 | IBRD-84510 | Int Charges | 483.18 |
Dec 27, 2017 | IBRD-84510 | Loan Disb | 121,350.96 |
Jul 18, 2018 | IBRD-84510 | Loan Disb | 172,493.88 |
Jun 20, 2018 | IBRD-84510 | Loan Disb | 143,364.34 |
Jun 20, 2018 | IBRD-84510 | Loan Disb | 137,363.56 |
Jun 20, 2018 | IBRD-84510 | Loan Disb | 156,107.95 |
Jul 11, 2018 | IBRD-84510 | Loan Disb | 14,134.06 |
Jul 11, 2018 | IBRD-84510 | Loan Disb | 252,525.98 |
Sep 10, 2018 | IBRD-84510 | Loan Disb | 65,852.17 |
Nov 21, 2014 | IBRD-84510 | Loan Commitment | 40,500,000.00 |
Oct 15, 2022 | IBRD-84510 | Int Charges | 975.05 |
Oct 15, 2022 | IBRD-84510 | Loan Repay | 93,038.63 |
Oct 15, 2022 | IBRD-84510 | Loan Repay | 383,661.56 |
Oct 15, 2022 | IBRD-84510 | Int Charges | 121.57 |
Oct 15, 2022 | IBRD-84510 | Loan Repay | 104,791.58 |
Oct 15, 2022 | IBRD-84510 | Loan Repay | 5,131.68 |
Apr 15, 2023 | IBRD-84510 | Int Charges | 137.35 |
Apr 15, 2023 | IBRD-84510 | Int Charges | 84,935.40 |
Apr 15, 2023 | IBRD-84510 | Int Charges | 4,779.33 |
Apr 15, 2023 | IBRD-84510 | Loan Repay | 105,687.49 |
Apr 15, 2023 | IBRD-84510 | Loan Repay | 554,859.70 |
Apr 15, 2023 | IBRD-84510 | Loan Repay | 5,829.34 |
Apr 15, 2023 | IBRD-84510 | Int Charges | 454,916.30 |
Oct 15, 2023 | IBRD-84510 | Loan Repay | 5,544.43 |
Oct 15, 2023 | IBRD-84510 | Int Charges | 131.35 |
Oct 15, 2023 | IBRD-84510 | Int Charges | 118,084.06 |
Oct 15, 2023 | IBRD-84510 | Int Charges | 515,591.00 |
Oct 15, 2023 | IBRD-84510 | Int Charges | 112,827.71 |
Oct 15, 2023 | IBRD-84510 | Int Charges | 6,602.17 |
Oct 15, 2023 | IBRD-84510 | Loan Repay | 100,521.86 |
Oct 15, 2023 | IBRD-84510 | Loan Repay | 509,742.53 |
Oct 15, 2023 | IBRD-84510 | Loan Repay | 17,997.59 |
Apr 15, 2024 | IBRD-84510 | Int Charges | 710,755.56 |
Apr 15, 2024 | IBRD-84510 | Int Charges | 133,012.80 |
Apr 15, 2024 | IBRD-84510 | Int Charges | 7,467.18 |
Apr 15, 2024 | IBRD-84510 | Loan Repay | 762.09 |
Apr 15, 2024 | IBRD-84510 | Int Charges | -762.09 |
Apr 15, 2024 | IBRD-84510 | Int Charges | 762.09 |
Apr 15, 2024 | IBRD-84510 | Loan Repay | 101,088.21 |
Apr 15, 2024 | IBRD-84510 | Loan Repay | 534,714.44 |
Apr 15, 2024 | IBRD-84510 | Loan Repay | 5,617.70 |
Dec 1, 2020 | IBRD-84510 | Loan Cancel | 119,273.35 |
Oct 15, 2020 | IBRD-84510 | Int Charges | 642.98 |
Oct 15, 2020 | IBRD-84510 | Int Charges | 25,183.96 |
Oct 15, 2020 | IBRD-84510 | Int Charges | 151,258.30 |
Oct 15, 2020 | IBRD-84510 | Int Charges | 1,589.14 |
Oct 15, 2020 | IBRD-84510 | Loan Repay | 112,035.83 |
Oct 15, 2020 | IBRD-84510 | Loan Repay | 587,950.06 |
Oct 15, 2020 | IBRD-84510 | Loan Repay | 6,176.99 |
Oct 15, 2020 | IBRD-84510 | Int Charges | 14.40 |
Jul 17, 2020 | IBRD-84510 | Loan Disb | 32,001.20 |
Dec 1, 2020 | IBRD-84510 | Loan Disb | -2,652.38 |
Apr 15, 2021 | IBRD-84510 | Int Charges | 1,057.30 |
Apr 15, 2021 | IBRD-84510 | Loan Repay | 600,318.20 |
Apr 15, 2021 | IBRD-84510 | Loan Repay | 114,346.25 |
Apr 15, 2021 | IBRD-84510 | Loan Repay | 6,306.93 |
Apr 15, 2021 | IBRD-84510 | Int Charges | 147.57 |
Apr 15, 2021 | IBRD-84510 | Int Charges | 17,185.78 |
Apr 15, 2021 | IBRD-84510 | Int Charges | 100,637.24 |
Oct 15, 2021 | IBRD-84510 | Loan Repay | 6,120.85 |
Oct 15, 2021 | IBRD-84510 | Int Charges | 145.00 |
Oct 15, 2021 | IBRD-84510 | Int Charges | 16,158.42 |
Oct 15, 2021 | IBRD-84510 | Int Charges | 94,823.38 |
Oct 15, 2021 | IBRD-84510 | Int Charges | 996.23 |
Oct 15, 2021 | IBRD-84510 | Loan Repay | 110,972.58 |
Oct 15, 2021 | IBRD-84510 | Loan Repay | 582,606.44 |
Apr 15, 2022 | IBRD-84510 | Int Charges | 14,693.17 |
Apr 15, 2022 | IBRD-84510 | Int Charges | 134.25 |
Apr 15, 2022 | IBRD-84510 | Int Charges | 86,224.70 |
Apr 15, 2022 | IBRD-84510 | Int Charges | 905.88 |
Apr 15, 2022 | IBRD-84510 | Loan Repay | 542,341.00 |
Apr 15, 2022 | IBRD-84510 | Loan Repay | 103,302.99 |
Apr 15, 2022 | IBRD-84510 | Loan Repay | 5,697.82 |
Name | Review | Date |
---|---|---|
Procurement | Satisfactory | 2020-06-29 |
Project Management | Satisfactory | 2020-06-29 |
Progress towards achievement of PDO | Satisfactory | 2020-06-29 |
Financial Management | Satisfactory | 2020-06-29 |
Monitoring and Evaluation | Satisfactory | 2020-06-29 |
Overall Implementation Progress (IP) | Satisfactory | 2020-06-29 |
Counterpart Funding | Satisfactory | 2020-06-29 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 04-08-2021 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Reduction in network heat losses (GCal) | Value | 360000.00 | 330000.00 | 355000.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Debt Service Coverage Ratio | Value | 2.45 | 1.20 | 2.40 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Projected lifetime fuel savings | Value | 0.00 | 9603288368.00 | 0.00 |
Date | February 16, 2015 | December 31, 2019 | December 31, 2020 | |
Comment |
Projected lifetime energy savings | Value | 0.00 | 2849208.00 | 32750.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Percentage of households that reported improved quality of service in buildings where IHSs were installed (Percentage) | Value | 0.00 | 63.00 | 0.00 |
Date | February 16, 2015 | June 25, 2020 | ||
Comment |
Projected lifetime reduction in CO2 emissions due to investments financed under the project (tCO2) | Value | 0.00 | 685299.00 | 32750.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
District Heating system breakdown rate (Number/km) | Value | 1.36 | 0.90 | 1.36 |
Date | October 23, 2014 | December 31, 2019 | ||
Comment |
Lifetime fuel savings - reported | Value | 0.00 | 9603288368.00 | 0.00 |
Date | August 14, 2015 | December 31, 2019 | December 31, 2019 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Staff who received re-training | Value | 0.00 | 648.00 | 324.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
People that gained access to more energy-efficient heat-generating facilities | Value | 0.00 | 76040.00 | 0.00 |
Date | February 16, 2016 | December 31, 2019 | ||
Comment |
People that gained access to more energy-efficient cooking and/or heating facilities | Value | 27000.00 | 109000.00 | 45000.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Termination of CHP-1 operations | Value | 20150216 | 20160329 | |
Date | February 16, 2015 | March 29, 2016 | ||
Comment |
Actual fuel savings (GCal) | Value | 0 | 79,138 | 26379 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Self-financing ratio | Value | 55.00 | 25.00 | 51.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Reduction in Heat Consumption due to transition from Group Heating Substations to Individual Heating Substations (GCal) | Value | 0.00 | 709.00 | 0.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Staff who received severance payment | Value | 0.00 | 898.00 | 488.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |
Government buildings reconnected to DH system | Value | 0.00 | 44.00 | 20.00 |
Date | February 16, 2015 | December 31, 2019 | ||
Comment |