Financier | Commitments |
---|---|
IDA Credit | 236.00 |
Borrower/Recipient | 101.20 |
P143382
Closed
Anup Karanth , Deepak Singh
Department of Economic Affairs, Ministry of Finance, Republic of India
December 26, 2012
(as of board presentation)
June 20, 2013
January 29, 2014
US$ 337.20 million
Tamil Nadu Medical Services Corporation Limited,Project Implementation Agency, Department of Revenue and DM, Government of Puducherry,Tamil Nadu State Disaster Management Agency, Government of Tamil Nadu
2013
US$ 236.00 million
B
November 29, 2021
June 30, 2020
Yes
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 236.00 |
Borrower/Recipient | 101.20 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 236.00 |
IBRD + IDA Commitment | 236.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 337.20 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Feb 5, 2016 | IDA-52790 | Loan Disb | 204,964.16 |
Sep 16, 2016 | IDA-52790 | Loan Disb | 671,128.00 |
Feb 26, 2016 | IDA-52790 | Loan Disb | 3,013,385.50 |
Feb 22, 2016 | IDA-52790 | Loan Disb | 289,853.00 |
Jun 15, 2016 | IDA-52790 | Int Charges | 302,822.06 |
Jun 15, 2016 | IDA-52790 | Int Charges | 302,822.06 |
Jun 15, 2016 | IDA-52790 | Int Charges | 524,906.40 |
Dec 15, 2016 | IDA-52790 | Int Charges | 353.06 |
Jun 15, 2016 | IDA-52790 | Int Charges | 12,344.13 |
Jun 15, 2016 | IDA-52790 | Int Charges | 12,344.13 |
Dec 13, 2016 | IDA-52790 | Loan Disb | 497,987.25 |
Jan 31, 2017 | IDA-52790 | Loan Disb | 46,553.00 |
Dec 15, 2016 | IDA-52790 | Int Charges | 324,011.47 |
Dec 15, 2016 | IDA-52790 | Int Charges | 324,011.47 |
Dec 15, 2016 | IDA-52790 | Int Charges | 540,019.20 |
Aug 24, 2016 | IDA-52790 | Loan Disb | 35,092.00 |
Jul 13, 2016 | IDA-52790 | Loan Disb | 5,497,550.50 |
Nov 29, 2016 | IDA-52790 | Loan Disb | 2,326,852.50 |
Jun 23, 2017 | IDA-52790 | Loan Disb | 4,564,136.50 |
Apr 12, 2017 | IDA-52790 | Loan Disb | 2,491,691.80 |
Jun 21, 2017 | IDA-52790 | Loan Disb | 522,524.25 |
Jun 21, 2017 | IDA-52790 | Loan Disb | 1,008,227.56 |
Jun 21, 2017 | IDA-52790 | Loan Disb | 1,459,054.40 |
Jun 15, 2017 | IDA-52790 | Int Charges | 571,026.40 |
Jun 15, 2017 | IDA-52790 | Int Charges | 22,905.90 |
Jun 15, 2017 | IDA-52790 | Int Charges | 22,905.90 |
Jun 15, 2017 | IDA-52790 | Int Charges | 329,336.84 |
Jun 15, 2017 | IDA-52790 | Int Charges | 329,336.84 |
Oct 4, 2017 | IDA-52790 | Loan Disb | 1,901,561.50 |
Aug 17, 2017 | IDA-52790 | Loan Disb | 244,652.00 |
Jun 15, 2021 | IDA-52790 | Int Charges | 90,997.27 |
Jun 15, 2021 | IDA-52790 | Loan Repay | 2,492,404.50 |
Jun 15, 2021 | IDA-52790 | Int Charges | 480,074.06 |
Jun 15, 2021 | IDA-52790 | Int Charges | 480,074.06 |
Jun 15, 2022 | IDA-52790 | Int Charges | 715,099.90 |
Jun 15, 2022 | IDA-52790 | Loan Repay | 40,312.97 |
Dec 30, 2014 | IDA-52790 | Loan Disb | 3,142,573.20 |
Oct 20, 2014 | IDA-52790 | Loan Disb | 1,125,764.10 |
Mar 10, 2014 | IDA-52790 | Loan Disb | 44,086,804.00 |
Mar 11, 2014 | IDA-52790 | Loan Disb | 346,477.25 |
Apr 4, 2014 | IDA-52790 | Loan Disb | 4,242,951.00 |
Apr 4, 2014 | IDA-52790 | Loan Disb | 1,245,044.50 |
Jun 15, 2014 | IDA-52790 | Int Charges | 172,696.33 |
Jun 25, 2014 | IDA-52790 | Loan Disb | 14,624.00 |
Mar 11, 2014 | IDA-52790 | Loan Disb | 4,240,171.00 |
Mar 3, 2015 | IDA-52790 | Loan Disb | 798,397.44 |
Jun 15, 2014 | IDA-52790 | Int Charges | 103,617.79 |
Jun 15, 2014 | IDA-52790 | Int Charges | 103,617.79 |
Dec 15, 2014 | IDA-52790 | Int Charges | 1,529.18 |
Dec 15, 2014 | IDA-52790 | Int Charges | 1,529.18 |
Dec 15, 2014 | IDA-52790 | Int Charges | 218,723.22 |
Dec 15, 2014 | IDA-52790 | Int Charges | 218,723.22 |
Dec 15, 2014 | IDA-52790 | Int Charges | 367,087.30 |
Jun 15, 2015 | IDA-52790 | Int Charges | 5,802.18 |
Jun 15, 2015 | IDA-52790 | Int Charges | 5,802.18 |
Jun 15, 2015 | IDA-52790 | Int Charges | 248,284.62 |
Jun 15, 2015 | IDA-52790 | Int Charges | 248,284.62 |
Jun 15, 2015 | IDA-52790 | Int Charges | 400,830.97 |
Aug 4, 2014 | IDA-52790 | Loan Disb | 1,724,758.50 |
Aug 20, 2014 | IDA-52790 | Loan Disb | 10,000,000.00 |
Mar 4, 2015 | IDA-52790 | Loan Disb | 5,023,923.50 |
Jul 23, 2015 | IDA-52790 | Loan Disb | 3,723,726.00 |
Aug 17, 2015 | IDA-52790 | Loan Disb | 1,925,846.00 |
Apr 30, 2015 | IDA-52790 | Loan Disb | 2,995,874.80 |
Dec 15, 2015 | IDA-52790 | Int Charges | 22,476.54 |
Dec 15, 2015 | IDA-52790 | Int Charges | 287,149.72 |
Dec 15, 2015 | IDA-52790 | Int Charges | 287,149.72 |
Dec 15, 2015 | IDA-52790 | Int Charges | 478,582.80 |
Dec 8, 2015 | IDA-52790 | Loan Disb | 3,209,733.50 |
Feb 2, 2016 | IDA-52790 | Loan Disb | 25,754.12 |
Dec 15, 2021 | IDA-52790 | Loan Repay | 2,418,576.20 |
Dec 15, 2022 | IDA-52790 | Int Charges | 466,324.16 |
Dec 15, 2022 | IDA-52790 | Loan Repay | 89,594.33 |
Dec 15, 2022 | IDA-52790 | Int Charges | 420,091.78 |
Dec 15, 2022 | IDA-52790 | Int Charges | 420,091.78 |
Dec 15, 2022 | IDA-52790 | Loan Repay | 4,519,891.00 |
Jun 15, 2023 | IDA-52790 | Int Charges | 234,499.95 |
Jun 15, 2023 | IDA-52790 | Loan Repay | 4,622,717.00 |
Jun 15, 2023 | IDA-52790 | Int Charges | 403,962.38 |
Jun 15, 2023 | IDA-52790 | Int Charges | 403,962.38 |
Jun 15, 2023 | IDA-52790 | Int Charges | 673,270.70 |
Dec 15, 2023 | IDA-52790 | Int Charges | 516,582.20 |
Dec 15, 2023 | IDA-52790 | Int Charges | 388,411.72 |
Dec 15, 2023 | IDA-52790 | Int Charges | 388,411.72 |
Dec 15, 2023 | IDA-52790 | Loan Repay | 88,752.40 |
Dec 15, 2023 | IDA-52790 | Loan Repay | 4,555,300.50 |
Jun 15, 2024 | IDA-52790 | Int Charges | 364,585.40 |
Jun 15, 2024 | IDA-52790 | Int Charges | 364,585.40 |
Jun 15, 2024 | IDA-52790 | Int Charges | 602,268.44 |
Jun 15, 2024 | IDA-52790 | Int Charges | 128,510.81 |
Jun 15, 2024 | IDA-52790 | Loan Repay | 4,563,800.00 |
Jun 20, 2013 | IDA-52790 | Loan Commitment | 236,000,000.00 |
Feb 9, 2018 | IDA-52790 | Loan Disb | 2,220,930.50 |
Dec 15, 2017 | IDA-52790 | Int Charges | 398,044.84 |
Dec 15, 2017 | IDA-52790 | Int Charges | 398,044.84 |
Dec 15, 2017 | IDA-52790 | Int Charges | 663,408.00 |
Dec 15, 2017 | IDA-52790 | Int Charges | 16,414.69 |
Mar 28, 2018 | IDA-52790 | Loan Disb | 489,844.00 |
Mar 28, 2018 | IDA-52790 | Loan Disb | 2,562,530.20 |
Jan 31, 2018 | IDA-52790 | Loan Disb | 75,309.99 |
Jun 15, 2018 | IDA-52790 | Int Charges | 541.19 |
Jun 15, 2018 | IDA-52790 | Int Charges | 541.19 |
Jun 15, 2018 | IDA-52790 | Int Charges | 414,165.53 |
Jun 15, 2018 | IDA-52790 | Int Charges | 414,165.53 |
Jun 15, 2018 | IDA-52790 | Int Charges | 691,177.90 |
Jun 1, 2018 | IDA-52790 | Loan Disb | 3,698,380.80 |
Jul 20, 2018 | IDA-52790 | Loan Disb | 4,440,724.50 |
Aug 7, 2018 | IDA-52790 | Loan Disb | 135,848.00 |
Dec 20, 2018 | IDA-52790 | Loan Disb | 1,652,989.60 |
Jan 31, 2019 | IDA-52790 | Loan Disb | 2,056,996.00 |
Dec 15, 2018 | IDA-52790 | Int Charges | 733,238.70 |
Dec 15, 2018 | IDA-52790 | Loan Repay | 31,039.22 |
Dec 15, 2018 | IDA-52790 | Loan Repay | 7,086,204.00 |
Dec 15, 2018 | IDA-52790 | Int Charges | 439,943.22 |
Dec 15, 2018 | IDA-52790 | Int Charges | 439,943.22 |
Jun 15, 2019 | IDA-52790 | Loan Repay | 113,385.46 |
Jun 26, 2019 | IDA-52790 | Loan Disb | 1,559,625.10 |
Jun 15, 2019 | IDA-52790 | Loan Repay | 7,026,257.50 |
Jun 7, 2019 | IDA-52790 | Loan Disb | 3,740,380.20 |
Mar 27, 2019 | IDA-52790 | Loan Disb | 2,997,851.00 |
Jun 14, 2019 | IDA-52790 | Loan Disb | 703,805.00 |
Jun 15, 2019 | IDA-52790 | Int Charges | 435,094.94 |
Jun 15, 2019 | IDA-52790 | Int Charges | 435,094.94 |
Jun 15, 2019 | IDA-52790 | Int Charges | 725,158.25 |
Dec 2, 2019 | IDA-52790 | Loan Disb | 2,384,067.00 |
Aug 27, 2019 | IDA-52790 | Loan Disb | 714,679.70 |
Mar 31, 2020 | IDA-52790 | Loan Disb | 8,505,280.00 |
Nov 22, 2019 | IDA-52790 | Loan Disb | 727,554.80 |
Dec 15, 2019 | IDA-52790 | Int Charges | 652,195.40 |
Dec 15, 2019 | IDA-52790 | Loan Repay | 41,369.32 |
Dec 15, 2019 | IDA-52790 | Loan Repay | 7,102,196.00 |
Dec 15, 2019 | IDA-52790 | Int Charges | 441,089.53 |
Dec 15, 2019 | IDA-52790 | Int Charges | 441,089.53 |
Jun 26, 2020 | IDA-52790 | Loan Cancel | 13,121,797.00 |
Jun 15, 2020 | IDA-52790 | Int Charges | 82,669.73 |
Jun 15, 2020 | IDA-52790 | Loan Repay | 7,119,101.00 |
Jun 15, 2020 | IDA-52790 | Int Charges | 438,470.12 |
Jun 15, 2020 | IDA-52790 | Int Charges | 438,470.12 |
Jun 15, 2020 | IDA-52790 | Int Charges | 653,466.80 |
Jun 29, 2020 | IDA-52790 | Loan Disb | 2,749,358.50 |
Nov 2, 2020 | IDA-52790 | Loan Disb | 1,408,576.00 |
Dec 30, 2020 | IDA-52790 | Loan Disb | 8,553,380.00 |
Dec 15, 2020 | IDA-52790 | Loan Repay | 3,450,623.20 |
Dec 15, 2020 | IDA-52790 | Int Charges | 675,870.56 |
Dec 15, 2020 | IDA-52790 | Int Charges | 80,603.14 |
Jan 19, 2021 | IDA-52790 | Loan Disb | -576,353.00 |
Dec 15, 2020 | IDA-52790 | Int Charges | 460,075.56 |
Dec 15, 2020 | IDA-52790 | Int Charges | 460,075.56 |
Jan 19, 2021 | IDA-52790 | Loan Cancel | 49,622,420.00 |
Jun 15, 2021 | IDA-52790 | Int Charges | 771,747.20 |
Jun 15, 2022 | IDA-52790 | Int Charges | 429,059.94 |
Jun 15, 2022 | IDA-52790 | Int Charges | 429,059.94 |
Jun 15, 2022 | IDA-52790 | Loan Repay | 2,266,179.00 |
Dec 15, 2021 | IDA-52790 | Int Charges | 764,966.40 |
Dec 15, 2021 | IDA-52790 | Int Charges | 458,979.84 |
Dec 15, 2021 | IDA-52790 | Int Charges | 458,979.84 |
Dec 15, 2021 | IDA-52790 | Int Charges | 27,535.72 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Moderately Satisfactory | 2020-06-30 |
Financial Management | Moderately Satisfactory | 2020-06-30 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2020-06-30 |
Procurement | Moderately Satisfactory | 2020-06-30 |
Project Management | Moderately Satisfactory | 2020-06-30 |
Counterpart Funding | Satisfactory | 2020-06-30 |
Monitoring and Evaluation | Satisfactory | 2020-06-30 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 11-29-2021 |
---|---|
Outcomes | Moderately Satisfactory |
Risk to Development Outcome | |
Bank Performance | Moderately Satisfactory |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | Not Rated | N/a |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Improved multi-hazard resilient coastal infrastructure | Value | 0.00 | 109.00 | 100.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Increased community resilience and preparedness in coastal areas | Value | 0.00 | 100.00 | 100.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Percentage of coastal area with electrical cabling transferred underground | Value | 0.00 | 10.00 | 0.00 |
Date | July 2, 2012 | June 15, 2018 | ||
Comment |
Percentage of habitations with access to community managed emergency shelter | Value | 0.00 | 80.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |
Increased institutional capacity for risk mitigation and response at State level | Value | 0.00 | 60.00 | 100.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Percentage of households with Quality certified multi-hazard resilient houses | Value | 0.00 | 100.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |
Percentage of coastal population covered by the early warning systems | Value | 0.00 | 65.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |
Percentage of coastal villages better prepared through CBDRM training | Value | 0.00 | 100.00 | 0.00 |
Date | June 20, 2012 | |||
Comment |
Enhanced performance of livelihood opportunities from fisheries with increased safety at sea | Value | 0.00 | 100.00 | 100.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Percentage of fishers with wireless communication facilities | Value | 0.00 | 0.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |
Percentage of local fisheries co-management platforms formed and involved in FMPs | Value | 0.00 | 70.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |
Percentage of villages having access to fishing related restored linkages/ infrastructure | Value | 0.00 | 90.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of resilient houses reconstructed | Value | 0.00 | 15534.00 | 14649.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of habitations covered in CBDRM program | Value | 0.00 | 561.00 | 560.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of fishing related infrastructure works completed | Value | 0.00 | 39.00 | 19.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Multi-hazard resistant electrical network created | Value | 0.00 | 2022.00 | 1850.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of districts where HTL pillars are installed | Value | 0.00 | 11.00 | 11.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of local fisheries co-management platforms formed and involved in FMPs | Value | 0.00 | 4.00 | 4.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of evacuation shelters created | Value | 0.00 | 121.00 | 121.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Establishment of a Centre for Disaster Management (TAMIL NADU) | Value | 0.00 | 0.00 | 1.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of fishermen provided with communication network/equipment | Value | 0.00 | 18555.00 | 5000.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Evacuation Routes laid | Value | 0.00 | 41.00 | 41.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Integration of multiple Emergency Operation Centre | Value | 0.00 | 0.00 | 1.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
No. of early warning systems installed | Value | 0.00 | 450.00 | 450.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of Public buildings restored | Value | 0.00 | 2.00 | 3.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Roads rehabilitated, Rural | Value | 0.00 | 41.00 | 41.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of old bridges rehabilitated and reconstructed | Value | 0.00 | 0.00 | 3.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Number of culverts reconstructed | Value | 0.00 | 2.00 | 2.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Sub-projects with post-project community engagement or O&M arrangements (%) | Value | 0.00 | 100.00 | 100.00 |
Date | January 29, 2014 | June 30, 2021 | June 30, 2020 | |
Comment |
Sub-projects that are expected to have a mechanism for post-completion operation | Value | 0.00 | 70.00 | 0.00 |
Date | June 20, 2012 | June 15, 2018 | ||
Comment |