Peru Lima Metro Line 2 Project

Abstract*

The objective of the Lima Metro Line Two Project for Peru is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of the Lima Metro Line Two and the Gambetta Branch of Line Four. The project consists of a single Component: ‘support for the construction of the lima metro line two’. The...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The PDO is to provide a major east-west axis (Ate-Lima-Callao) of the Lima-Callao Metropolitan Region with a modern and integrated mass transit system that will improve accessibility to jobs and services in the area of influence of Lima Metro Line 2 and the Gambetta branch of Line 4.

Key Details

Project Details

  • P145610

  • Closed

  • Sofia Guerrero Gamez , Georges Darido

  • Republic of Peru

  • Peru

  • December 4, 2014

  • (as of board presentation)

    September 15, 2015

  • November 3, 2016

  • US$ 5836.00 million

  • Autoridad de Transporte Urbano,Ministry of Transport and Communications,AATE

  • Latin America and Caribbean

  • 2016

  • US$ 1900.00 million

  • A

  • November 1, 2023

  • June 5, 2020

  • TBD

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Andean Development Corporation 150.00
Inter-American Development Bank 300.00
Foreign Multilateral Institutions (unidentified) 1150.00
Private Commercial Sources (identified) 1651.00
International Bank for Reconstruction and Development 300.00
Borrower/Recipient 2285.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 300.00
IDA Commitment N/A
IBRD + IDA Commitment 300.00
Lending Instrument
Grant Amount 1600.00
Total Project Cost** 5836.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Nov 15, 2023 IBRD-85170 Int Charges 1,680,032.20
Sep 15, 2015 IBRD-85170 Loan Commitment 300,000,000.00
May 15, 2017 IBRD-85170 Int Charges 297,122.22
Nov 15, 2023 IBRD-85170 Loan Repay 3,185,000.00
Nov 15, 2023 IBRD-85170 Loan Repay 0.01
Nov 15, 2023 IBRD-85170 Int Charges 34,303.86
May 15, 2024 IBRD-85170 Loan Repay 0.01
May 15, 2024 IBRD-85170 Int Charges 10,662.49
May 15, 2024 IBRD-85170 Int Charges 1,670,040.00
May 15, 2024 IBRD-85170 Loan Repay 3,185,000.00
May 15, 2023 IBRD-85170 Int Charges 84,776.01
May 15, 2023 IBRD-85170 Int Charges 1,480,317.20
May 15, 2023 IBRD-85170 Loan Repay 3,185,000.00
May 15, 2022 IBRD-85170 Int Charges 307,120.80
May 15, 2022 IBRD-85170 Loan Repay 3,185,000.00
Nov 15, 2022 IBRD-85170 Int Charges 962,823.75
Nov 15, 2022 IBRD-85170 Loan Repay 3,185,000.00
Nov 15, 2020 IBRD-85170 Int Charges -25,136.62
Nov 15, 2020 IBRD-85170 Int Charges 25,136.62
Nov 15, 2020 IBRD-85170 Int Charges 465,018.94
May 15, 2021 IBRD-85170 Int Charges 334,347.22
May 15, 2021 IBRD-85170 Loan Repay 3,185,000.00
Nov 15, 2021 IBRD-85170 Int Charges 314,178.97
Nov 15, 2021 IBRD-85170 Loan Repay 3,185,000.00
Nov 15, 2019 IBRD-85170 Int Charges 289,863.00
Nov 15, 2019 IBRD-85170 Int Charges 1,177,088.90
May 15, 2020 IBRD-85170 Int Charges 286,131.28
May 15, 2020 IBRD-85170 Int Charges 923,650.00
Apr 29, 2020 IBRD-85170 Loan Cancel 230,000,000.00
May 15, 2018 IBRD-85170 Int Charges 285,136.97
May 15, 2018 IBRD-85170 Int Charges 802,433.30
Nov 15, 2018 IBRD-85170 Int Charges 289,863.00
Nov 15, 2018 IBRD-85170 Int Charges 1,141,311.10
May 15, 2019 IBRD-85170 Int Charges 285,136.97
May 15, 2019 IBRD-85170 Int Charges 1,249,402.80
Aug 22, 2017 IBRD-85170 Loan Disb 30,000,000.00
Nov 15, 2017 IBRD-85170 Int Charges 310,205.47
Nov 15, 2017 IBRD-85170 Int Charges 575,330.56
Dec 23, 2016 IBRD-85170 Loan Disb 40,000,000.00
Dec 9, 2016 IBRD-85170 Fee Charges 750,000.00
May 15, 2017 IBRD-85170 Int Charges 654,203.94

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2020-06-05
Financial Management Moderately Satisfactory 2020-06-05
Overall Implementation Progress (IP) Unsatisfactory 2020-06-05
Counterpart Funding Satisfactory 2020-06-05
Project Management Unsatisfactory 2020-06-05
Monitoring and Evaluation Satisfactory 2020-06-05
Progress towards achievement of PDO Unsatisfactory 2020-06-05

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 02-26-2021
OutcomesUnsatisfactory
Risk to Development Outcome
Bank PerformanceModerately Unsatisfactory
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 06-21-2021PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingUnsatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceModerately UnsatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceNot RatedN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualityModestN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Engagement: (i) Number of citizens engaged in station accessibility design activities;Value0.00200.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Acceptability: (ii) Percentage of Metro Line 2 users satisfied with services, differentiated by income level and other user characteristics (such as gender, mobility impairment, previous modes used).Value0.000.000.00
    DateJune 1, 2015
    Comment
  • Ridership. Passengers traveling per day on Metro Line 2, differentiated by income level, gender and other user characteristics.Value0.00360000.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Integration. Number of major Metro Line 2 stations with physical integration and fare system interoperability to facilitate transfer s.Value0.002.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Mobility: Change in travel time for public transport users for the following origin-destination pairsValue120.0045.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Accessibility. Increase in number of jobs reachable by public transportation within a 60 minute one-way commute in the area of influ ence of Metro Line 2.Value0.00100000.000.00
    DateJune 1, 2015June 30, 2021
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Stations. Number of stations completed, including all equipment and urban integration elements according to the Concession Contract.Value0.0035.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Rail Infrastructure. Progress in the construction of the tunnel, including track superstructure, signaling and telecom equipment, and catenary.Value0.0035.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Depots. Progress in the construction of the depots for Line 2, including track, electrification, signaling and telecom, and all maintenance and personnel facilities.Value0.002.000.00
    DateJune 1, 2015June 30, 2021
    Comment
  • Rolling Stock. Train vehicles tested and approved for operations with signaling and control system.Value0.00252.000.00
    DateJune 1, 2015June 30, 2021
    Comment