Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 75.00 |
P147213
Closed
Miriam Montenegro Lazo
Dominican Republic
June 25, 2014
(as of board presentation)
March 12, 2015
October 28, 2015
US$ 75.00 million
Social Cabinet
2015
US$ 75.00 million
C
Not Applicable
September 20, 2022
TBD
BANK APPROVED
September 12, 2023
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 75.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 75.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 75.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 75.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Mar 21, 2019 | IBRD-84790 | Loan Disb | 1,911,229.20 |
Jun 10, 2019 | IBRD-84790 | Loan Disb | 1,024,089.94 |
Apr 26, 2019 | IBRD-84790 | Loan Disb | 1,021,489.20 |
Mar 8, 2019 | IBRD-84790 | Loan Disb | 949,996.20 |
Mar 15, 2019 | IBRD-84790 | Int Charges | 10,596.03 |
Mar 15, 2019 | IBRD-84790 | Int Charges | 58,292.91 |
Mar 15, 2019 | IBRD-84790 | Int Charges | 434,133.66 |
Mar 15, 2019 | IBRD-84790 | Int Charges | 58,292.91 |
Mar 15, 2019 | IBRD-84790 | Int Charges | 867.03 |
Nov 6, 2019 | IBRD-84790 | Loan Disb | 1,255,177.60 |
Aug 6, 2019 | IBRD-84790 | Loan Disb | 1,062,624.80 |
Aug 29, 2019 | IBRD-84790 | Loan Disb | 1,137,651.90 |
Apr 3, 2019 | IBRD-84790 | Loan Disb | 13,324.59 |
Apr 3, 2019 | IBRD-84790 | Loan Disb | 47,635.28 |
Apr 17, 2019 | IBRD-84790 | Loan Disb | 964,300.44 |
May 23, 2019 | IBRD-84790 | Loan Disb | 1,219,612.60 |
Dec 11, 2019 | IBRD-84790 | Loan Disb | 1,368,430.40 |
Sep 15, 2019 | IBRD-84790 | Int Charges | 483.68 |
Sep 15, 2019 | IBRD-84790 | Int Charges | 45,074.38 |
Sep 15, 2019 | IBRD-84790 | Int Charges | 6,480.03 |
Sep 15, 2019 | IBRD-84790 | Int Charges | 45,074.38 |
Sep 15, 2019 | IBRD-84790 | Int Charges | 686,559.94 |
Oct 25, 2019 | IBRD-84790 | Loan Disb | 611,295.25 |
Jan 2, 2020 | IBRD-84790 | Loan Disb | 1,323,213.50 |
Jan 2, 2020 | IBRD-84790 | Loan Disb | 98,260.83 |
Apr 25, 2022 | IBRD-84790 | Loan Disb | 1,926,919.60 |
Dec 27, 2021 | IBRD-84790 | Loan Disb | 1,100,349.40 |
Mar 8, 2021 | IBRD-84790 | Loan Disb | 321,340.94 |
Jun 21, 2021 | IBRD-84790 | Loan Disb | 857,780.20 |
Nov 18, 2021 | IBRD-84790 | Loan Disb | 2,124,098.00 |
Feb 16, 2022 | IBRD-84790 | Loan Disb | 3,210,188.80 |
Sep 15, 2021 | IBRD-84790 | Int Charges | 64.57 |
Sep 15, 2021 | IBRD-84790 | Int Charges | 18,613.32 |
Sep 15, 2021 | IBRD-84790 | Int Charges | 355,025.25 |
Sep 15, 2021 | IBRD-84790 | Loan Repay | 1,049,293.50 |
Sep 15, 2021 | IBRD-84790 | Int Charges | 15.41 |
Sep 20, 2021 | IBRD-84790 | Loan Disb | 1,520,158.50 |
Mar 15, 2022 | IBRD-84790 | Loan Repay | 13,027.22 |
Mar 15, 2022 | IBRD-84790 | Loan Repay | 1,124,041.50 |
Feb 18, 2020 | IBRD-84790 | Loan Disb | 2,001,482.90 |
Dec 27, 2019 | IBRD-84790 | Loan Disb | 957,110.90 |
Mar 15, 2020 | IBRD-84790 | Int Charges | 5,898.34 |
Mar 15, 2020 | IBRD-84790 | Int Charges | 35,634.11 |
Mar 15, 2020 | IBRD-84790 | Int Charges | 708,504.90 |
Mar 15, 2020 | IBRD-84790 | Loan Repay | 836,608.70 |
Mar 15, 2020 | IBRD-84790 | Int Charges | 423.60 |
Mar 12, 2015 | IBRD-84790 | Loan Commitment | 75,000,000.00 |
Sep 15, 2023 | IBRD-84790 | Int Charges | 24,313.49 |
Sep 15, 2023 | IBRD-84790 | Int Charges | 80.32 |
Sep 15, 2023 | IBRD-84790 | Int Charges | 2,051,582.80 |
Mar 15, 2024 | IBRD-84790 | Int Charges | 34,265.40 |
Mar 15, 2024 | IBRD-84790 | Int Charges | 2,221,560.50 |
Mar 15, 2024 | IBRD-84790 | Loan Repay | 1,305,848.80 |
Sep 15, 2022 | IBRD-84790 | Loan Repay | 4,340.80 |
Sep 15, 2022 | IBRD-84790 | Int Charges | 2,247.35 |
Mar 15, 2022 | IBRD-84790 | Int Charges | 13,027.22 |
Mar 15, 2022 | IBRD-84790 | Int Charges | 356,792.00 |
Oct 28, 2015 | IBRD-84790 | Loan Disb | 187,500.00 |
Oct 28, 2015 | IBRD-84790 | Fee Charges | 187,500.00 |
Sep 15, 2016 | IBRD-84790 | Int Charges | 0.01 |
Sep 15, 2016 | IBRD-84790 | Int Charges | 93,385.62 |
Sep 15, 2016 | IBRD-84790 | Int Charges | 12.59 |
Sep 15, 2016 | IBRD-84790 | Int Charges | 6,242.11 |
Mar 15, 2016 | IBRD-84790 | Int Charges | 152,516.55 |
Mar 15, 2016 | IBRD-84790 | Int Charges | 2,608.66 |
Dec 23, 2015 | IBRD-84790 | Loan Disb | 500,000.00 |
Dec 28, 2016 | IBRD-84790 | Loan Disb | 153,972.56 |
Nov 29, 2017 | IBRD-84790 | Loan Disb | 612,429.00 |
Oct 3, 2017 | IBRD-84790 | Loan Disb | 369,417.78 |
Aug 10, 2017 | IBRD-84790 | Loan Disb | 95,497.61 |
Jun 29, 2018 | IBRD-84790 | Loan Disb | 6,617.79 |
May 22, 2018 | IBRD-84790 | Loan Disb | 1,520,408.40 |
Jun 29, 2018 | IBRD-84790 | Loan Disb | 55,916.27 |
Jul 27, 2018 | IBRD-84790 | Loan Disb | 1,500,000.00 |
Jul 27, 2018 | IBRD-84790 | Loan Disb | 862,930.56 |
May 3, 2018 | IBRD-84790 | Loan Disb | 1,515,337.00 |
Dec 8, 2017 | IBRD-84790 | Loan Disb | 3,250,000.00 |
Dec 28, 2017 | IBRD-84790 | Loan Disb | 804,481.80 |
Jul 10, 2018 | IBRD-84790 | Loan Disb | 1,783,327.60 |
Apr 26, 2017 | IBRD-84790 | Loan Disb | 432,799.47 |
Mar 15, 2017 | IBRD-84790 | Int Charges | 0.01 |
Mar 15, 2017 | IBRD-84790 | Int Charges | 90,787.24 |
Mar 15, 2017 | IBRD-84790 | Int Charges | 16,657.04 |
Mar 15, 2017 | IBRD-84790 | Int Charges | 78.57 |
Sep 9, 2016 | IBRD-84790 | Loan Disb | 307,368.90 |
Mar 16, 2017 | IBRD-84790 | Loan Disb | 43,318.89 |
Dec 9, 2016 | IBRD-84790 | Loan Disb | 109,443.89 |
Dec 9, 2016 | IBRD-84790 | Loan Disb | 134,725.81 |
Dec 22, 2016 | IBRD-84790 | Loan Disb | 750,000.00 |
Sep 7, 2017 | IBRD-84790 | Loan Disb | 286,783.50 |
Aug 10, 2017 | IBRD-84790 | Loan Disb | 16,868.43 |
Mar 16, 2017 | IBRD-84790 | Loan Disb | 38,624.13 |
Mar 16, 2020 | IBRD-84790 | Loan Disb | 1,539,676.90 |
Sep 15, 2022 | IBRD-84790 | Int Charges | 4,340.80 |
Sep 15, 2022 | IBRD-84790 | Int Charges | 731,210.75 |
Sep 15, 2022 | IBRD-84790 | Int Charges | 593.67 |
Sep 15, 2022 | IBRD-84790 | Loan Repay | 1,278,278.50 |
Sep 16, 2022 | IBRD-84790 | Loan Disb | 1,500,000.00 |
Feb 7, 2023 | IBRD-84790 | Loan Cancel | 610,646.06 |
Feb 7, 2023 | IBRD-84790 | Loan Disb | -55,430.15 |
Feb 7, 2023 | IBRD-84790 | Loan Disb | -229,463.58 |
Sep 15, 2023 | IBRD-84790 | Loan Repay | 1,305,848.80 |
Mar 15, 2023 | IBRD-84790 | Int Charges | 77,733.94 |
Mar 15, 2023 | IBRD-84790 | Int Charges | 333.82 |
Mar 15, 2023 | IBRD-84790 | Int Charges | 1,828,218.80 |
Mar 15, 2023 | IBRD-84790 | Loan Repay | 1,311,419.40 |
Jun 7, 2022 | IBRD-84790 | Loan Disb | 2,604,948.20 |
Sep 15, 2017 | IBRD-84790 | Int Charges | 89,666.83 |
Sep 15, 2017 | IBRD-84790 | Int Charges | 45,455.28 |
Aug 8, 2017 | IBRD-84790 | Loan Disb | 311,702.47 |
Oct 23, 2017 | IBRD-84790 | Loan Disb | 589,476.10 |
Jun 29, 2020 | IBRD-84790 | Loan Disb | 843,592.94 |
May 19, 2020 | IBRD-84790 | Loan Disb | 1,175,465.00 |
Apr 20, 2020 | IBRD-84790 | Loan Disb | 1,490,770.40 |
Mar 15, 2021 | IBRD-84790 | Int Charges | 12.19 |
Mar 15, 2021 | IBRD-84790 | Int Charges | 73.09 |
Mar 15, 2021 | IBRD-84790 | Int Charges | 21,198.54 |
Mar 15, 2021 | IBRD-84790 | Int Charges | 360,788.94 |
Mar 15, 2021 | IBRD-84790 | Loan Repay | 1,027,951.40 |
Aug 12, 2020 | IBRD-84790 | Loan Disb | 52,499.30 |
Sep 15, 2020 | IBRD-84790 | Int Charges | 25,765.72 |
Sep 15, 2020 | IBRD-84790 | Int Charges | 471,670.80 |
Sep 15, 2020 | IBRD-84790 | Loan Repay | 960,001.00 |
Sep 15, 2020 | IBRD-84790 | Int Charges | 355.46 |
Sep 15, 2020 | IBRD-84790 | Int Charges | 4,038.91 |
Dec 1, 2020 | IBRD-84790 | Loan Disb | 1,887,118.80 |
Dec 1, 2020 | IBRD-84790 | Loan Disb | 1,085,668.50 |
Dec 21, 2020 | IBRD-84790 | Loan Disb | 398,468.97 |
Dec 3, 2020 | IBRD-84790 | Loan Disb | 58,802.49 |
Dec 3, 2020 | IBRD-84790 | Loan Disb | 334,880.72 |
Jun 26, 2019 | IBRD-84790 | Loan Disb | 914,004.75 |
Jun 20, 2018 | IBRD-84790 | Loan Disb | 1,083,430.00 |
Sep 7, 2018 | IBRD-84790 | Loan Disb | 1,054,928.60 |
Sep 15, 2018 | IBRD-84790 | Int Charges | 1,472.25 |
Sep 15, 2018 | IBRD-84790 | Int Charges | 73,286.11 |
Sep 15, 2018 | IBRD-84790 | Int Charges | 259,060.03 |
Sep 15, 2018 | IBRD-84790 | Int Charges | 773.01 |
Sep 15, 2018 | IBRD-84790 | Int Charges | 167.79 |
Jun 1, 2018 | IBRD-84790 | Loan Disb | 1,163,793.60 |
Dec 10, 2018 | IBRD-84790 | Loan Disb | 1,373,709.00 |
Dec 19, 2018 | IBRD-84790 | Loan Disb | 1,051,018.20 |
Nov 21, 2018 | IBRD-84790 | Loan Disb | 1,098,007.00 |
Nov 28, 2018 | IBRD-84790 | Loan Disb | 1,618,633.20 |
Dec 28, 2018 | IBRD-84790 | Loan Disb | 1,157,965.60 |
Oct 2, 2018 | IBRD-84790 | Loan Disb | 1,155,599.50 |
Oct 5, 2018 | IBRD-84790 | Loan Disb | 1,141,133.00 |
Feb 11, 2019 | IBRD-84790 | Loan Disb | 1,998,993.50 |
Mar 15, 2017 | IBRD-84790 | Int Charges | 12.60 |
Feb 23, 2017 | IBRD-84790 | Loan Disb | 658,810.30 |
Feb 23, 2017 | IBRD-84790 | Loan Disb | 373,542.94 |
Jun 26, 2017 | IBRD-84790 | Loan Disb | 269,566.38 |
Jun 26, 2017 | IBRD-84790 | Loan Disb | 97,590.95 |
Feb 23, 2018 | IBRD-84790 | Loan Disb | 1,224,919.50 |
Mar 15, 2018 | IBRD-84790 | Int Charges | 124.55 |
Mar 15, 2018 | IBRD-84790 | Int Charges | 1,072.57 |
Mar 15, 2018 | IBRD-84790 | Int Charges | 82,882.53 |
Mar 15, 2018 | IBRD-84790 | Int Charges | 97,046.12 |
Sep 15, 2017 | IBRD-84790 | Int Charges | 141.42 |
Sep 15, 2017 | IBRD-84790 | Int Charges | 1,097.40 |
Name | Review | Date |
---|---|---|
Overall Implementation Progress (IP) | Satisfactory | 2022-06-14 |
Progress towards achievement of PDO | Satisfactory | 2022-06-14 |
Financial Management | Satisfactory | 2022-06-14 |
Monitoring and Evaluation | Satisfactory | 2022-06-14 |
Project Management | Satisfactory | 2022-06-14 |
Procurement | Satisfactory | 2022-06-14 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 03-17-2023 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Moderately Satisfactory |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 10-04-2023 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | N/a | |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Substantial | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of extremely and moderate poor households who are incorporated in CCT PROSOLI in selected provinces | Value | 90.00 | 101.50 | 99.90 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of eligible households whose socio-economic situation is updated by SIUBEN based on the SIUBEN III socio economic categorization. | Value | 0.00 | 100.00 | 60.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of eligible extremely poor PROSOLI users in selected provinces with dirt floors replaced by reinforced cement floors. | Value | 0.00 | 84.67 | 70.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Employment rate of PROSOLI users (men and women) 18-29 years in selected provinces who receive vocational training, versus that of the control group. | Value | 0.00 | 0.00 | 10.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Direct project beneficiaries | Value | 1130391.00 | 1969871.00 | 1925518.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Female beneficiaries | Value | 52.00 | 50.90 | 52.00 |
Date | April 30, 2015 | June 8, 2018 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of household members, categorized as ICV I and ICV2 who meet eligibility criteria, identified and incorporated by PROSOLI into the ILAE program in selected provinces. | Value | 88.00 | 99.59 | 98.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of PROSOLI field staff trained on new integrated territorial intervention strategy in selected provinces | Value | 0.00 | 86.29 | 85.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Number of entities associated with the GCPS trained and applying instruments to assess performance of priority social protection programs | Value | 0.00 | 9.00 | 9.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of household members, categorized as ICV I and ICV 2 who meet eligibility criteria, identified and incorporated into Bono Escolar Estudiando Progreso in selected provinces. | Value | 90.00 | 100.42 | 95.00 |
Date | July 14, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Number of “Puntos Solidarios” equipped and functioning in the 14 provinces | Value | 0.00 | 39.00 | 39.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of eligible PROSOLI ICV-I and ICV 2 household members newly incorporated by the National helath Insurance Program SENASA. | Value | 0.00 | 101.00 | 100.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Number of community report card cycles implemented and supervision initiated in the 14 provinces | Value | 0.00 | 4.00 | 4.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of beneficiary households whose dirt floors were replaced reporting an improvement in living conditions. | Value | 0.00 | 80.00 | 80.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Customer Relation Management System (CRM) developed and functioning | Value | NO | YES | YES |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of participants from PROSOLI households categorized as ICVI and ICV2 that finish vocational training | Value | 0.00 | 101.58 | 60.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Technological platform for information exchange between SIUBEN and other public institutions is developed and implemented | Value | NO | YES | YES |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Percentage of vocational training participants who are women | Value | 0.00 | 71.00 | 50.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Number of modules of the Integrated Monitoring and Evaluation System (SIME) developed and functioning | Value | 0.00 | 4.00 | 4.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |
Number of Beneficiaries of vocational training package | Value | 0.00 | 30756.00 | 30000.00 |
Date | July 7, 2014 | June 6, 2022 | August 30, 2018 | |
Comment |