Financier | Commitments |
---|---|
IDA Credit | 100.00 |
P147629
Closed
Valens Mwumvaneza , Anuja Kar
Republic of the Union of Myanmar
Myanmar
March 3, 2014
(as of board presentation)
April 23, 2015
September 29, 2015
US$ 100.00 million
Ministry of Agriculture, Livestock and Irrigation
2015
US$ 100.00 million
B
June 26, 2024
June 30, 2022
Yes
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 100.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 100.00 |
IBRD + IDA Commitment | 100.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 100.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 15, 2018 | IDA-56240 | Int Charges | 692.94 |
Dec 15, 2018 | IDA-56240 | Int Charges | 692.94 |
Dec 4, 2018 | IDA-56240 | Loan Disb | 1,405,634.00 |
Dec 15, 2018 | IDA-56240 | Int Charges | 24,421.35 |
Dec 15, 2020 | IDA-56240 | Int Charges | 4,260.58 |
Dec 15, 2020 | IDA-56240 | Int Charges | 4,260.58 |
Dec 21, 2020 | IDA-56240 | Loan Disb | 26,400.00 |
Jun 16, 2020 | IDA-56240 | Int Charges | 4,027.35 |
Jun 15, 2020 | IDA-56240 | Int Charges | 8,609.25 |
Jun 15, 2020 | IDA-56240 | Int Charges | 8,609.25 |
Jun 15, 2020 | IDA-56240 | Int Charges | 1,354.49 |
Jun 15, 2020 | IDA-56240 | Int Charges | 1,354.49 |
Jun 15, 2020 | IDA-56240 | Int Charges | 14,179.07 |
Jun 15, 2020 | IDA-56240 | Int Charges | 14,179.07 |
Jun 8, 2020 | IDA-56240 | Loan Disb | 7,743,711.00 |
Jun 15, 2020 | IDA-56240 | Int Charges | 3,550.53 |
Jun 15, 2020 | IDA-56240 | Int Charges | 3,550.53 |
Jun 15, 2020 | IDA-56240 | Int Charges | 11,519.38 |
Jun 15, 2020 | IDA-56240 | Int Charges | 11,519.38 |
Sep 23, 2020 | IDA-56240 | Loan Disb | 147,250.34 |
Aug 31, 2020 | IDA-56240 | Loan Disb | 89,124.66 |
Dec 15, 2019 | IDA-56240 | Int Charges | 15,518.42 |
Dec 15, 2019 | IDA-56240 | Int Charges | 88,456.29 |
Dec 15, 2019 | IDA-56240 | Int Charges | 88,456.29 |
Dec 15, 2019 | IDA-56240 | Int Charges | 1,799.51 |
Dec 15, 2019 | IDA-56240 | Int Charges | 1,799.51 |
Dec 15, 2019 | IDA-56240 | Int Charges | 10,545.63 |
Dec 15, 2019 | IDA-56240 | Int Charges | 10,545.63 |
Dec 15, 2019 | IDA-56240 | Int Charges | 4,394.00 |
Dec 15, 2019 | IDA-56240 | Int Charges | 4,394.00 |
Apr 23, 2015 | IDA-56240 | Loan Commitment | 100,000,000.00 |
Dec 28, 2023 | IDA-56240 | Loan Repay | 1,460,863.20 |
Dec 28, 2023 | IDA-56240 | Int Charges | 682.39 |
Dec 28, 2023 | IDA-56240 | Int Charges | 682.39 |
Dec 28, 2023 | IDA-56240 | Int Charges | 202,553.84 |
Dec 28, 2023 | IDA-56240 | Int Charges | 202,553.84 |
Nov 8, 2023 | IDA-56240 | Loan Disb | -2,549,835.20 |
Nov 8, 2023 | IDA-56240 | Loan Disb | -5,297.19 |
Jun 15, 2024 | IDA-56240 | Int Charges | 40,758.89 |
Jun 15, 2024 | IDA-56240 | Int Charges | 40,758.89 |
Jun 15, 2024 | IDA-56240 | Loan Repay | 1,461,734.80 |
Jun 15, 2024 | IDA-56240 | Int Charges | 388.43 |
Jun 15, 2024 | IDA-56240 | Int Charges | 388.43 |
Jun 15, 2024 | IDA-56240 | Int Charges | 220,942.12 |
Jun 15, 2024 | IDA-56240 | Int Charges | 220,942.12 |
Jul 7, 2023 | IDA-56240 | Int Charges | 96,808.49 |
Jul 7, 2023 | IDA-56240 | Int Charges | 96,808.49 |
Jul 7, 2023 | IDA-56240 | Loan Repay | 1,480,072.60 |
Jul 7, 2023 | IDA-56240 | Int Charges | 1,227.08 |
Jul 7, 2023 | IDA-56240 | Int Charges | 1,227.08 |
Jul 7, 2023 | IDA-56240 | Int Charges | 248,177.52 |
Jul 7, 2023 | IDA-56240 | Int Charges | 248,177.52 |
Dec 15, 2023 | IDA-56240 | Loan Repay | 27,979.81 |
Dec 15, 2022 | IDA-56240 | Loan Repay | 23,069.01 |
Dec 15, 2022 | IDA-56240 | Loan Repay | 3,630.06 |
Jan 26, 2023 | IDA-56240 | Int Charges | 159,084.64 |
Jan 26, 2023 | IDA-56240 | Int Charges | 159,084.64 |
Jan 26, 2023 | IDA-56240 | Loan Repay | 1,456,405.00 |
Jan 26, 2023 | IDA-56240 | Int Charges | 164.85 |
Jan 26, 2023 | IDA-56240 | Int Charges | 164.85 |
Dec 15, 2022 | IDA-56240 | Loan Repay | 16,683.15 |
Feb 11, 2022 | IDA-56240 | Loan Disb | 23,392.91 |
Dec 15, 2021 | IDA-56240 | Loan Repay | 18,365.14 |
Dec 15, 2021 | IDA-56240 | Loan Repay | 63,580.72 |
Dec 15, 2021 | IDA-56240 | Loan Repay | 1,429,913.10 |
Dec 15, 2021 | IDA-56240 | Loan Repay | 34,774.32 |
Dec 15, 2021 | IDA-56240 | Int Charges | 213.24 |
Dec 15, 2021 | IDA-56240 | Int Charges | 213.24 |
Dec 15, 2021 | IDA-56240 | Int Charges | 182,467.10 |
Dec 15, 2021 | IDA-56240 | Int Charges | 182,467.10 |
Dec 15, 2021 | IDA-56240 | Int Charges | 19,568.22 |
Dec 15, 2021 | IDA-56240 | Int Charges | 19,568.22 |
Dec 15, 2021 | IDA-56240 | Int Charges | 72,603.04 |
Dec 15, 2021 | IDA-56240 | Int Charges | 72,603.04 |
Dec 15, 2021 | IDA-56240 | Int Charges | 1,430.81 |
Dec 15, 2021 | IDA-56240 | Int Charges | 1,430.81 |
Dec 15, 2021 | IDA-56240 | Loan Repay | 2,653.24 |
Jun 15, 2022 | IDA-56240 | Loan Repay | 22,183.89 |
Jun 15, 2022 | IDA-56240 | Loan Repay | 174,979.19 |
Jun 15, 2022 | IDA-56240 | Loan Repay | 72,804.69 |
Jun 15, 2022 | IDA-56240 | Loan Repay | 74,536.81 |
Jun 22, 2022 | IDA-56240 | Loan Repay | 1,114,410.40 |
Jun 15, 2017 | IDA-56240 | Int Charges | 597.47 |
Jun 15, 2017 | IDA-56240 | Int Charges | 597.47 |
Mar 17, 2017 | IDA-56240 | Loan Disb | 23,600.00 |
Jun 7, 2017 | IDA-56240 | Loan Disb | 19,800.00 |
Jun 15, 2017 | IDA-56240 | Int Charges | 3,375.24 |
Jun 15, 2017 | IDA-56240 | Int Charges | 3,375.24 |
Jun 20, 2016 | IDA-56240 | Loan Disb | 487,016.00 |
Jun 20, 2016 | IDA-56240 | Loan Disb | 4,990,000.00 |
Jun 15, 2016 | IDA-56240 | Loan Disb | 500,000.00 |
Jan 31, 2017 | IDA-56240 | Loan Disb | 19,049.99 |
Dec 20, 2016 | IDA-56240 | Int Charges | 3,565.40 |
Dec 20, 2016 | IDA-56240 | Int Charges | 3,565.40 |
Feb 14, 2017 | IDA-56240 | Loan Disb | 13,800.00 |
Dec 19, 2016 | IDA-56240 | Int Charges | 17,099.12 |
Dec 19, 2016 | IDA-56240 | Int Charges | 17,099.12 |
Dec 15, 2019 | IDA-56240 | Int Charges | 6,203.19 |
Mar 20, 2020 | IDA-56240 | Loan Disb | 8,677,753.00 |
May 11, 2020 | IDA-56240 | Loan Disb | 74,455.20 |
May 11, 2020 | IDA-56240 | Loan Disb | 129,659.62 |
May 11, 2020 | IDA-56240 | Loan Disb | 148,142.56 |
May 11, 2020 | IDA-56240 | Loan Disb | 22,306.15 |
Jun 15, 2020 | IDA-56240 | Int Charges | 132,388.73 |
Jun 15, 2020 | IDA-56240 | Int Charges | 132,388.73 |
Jun 16, 2020 | IDA-56240 | Int Charges | 4,027.35 |
Sep 20, 2019 | IDA-56240 | Loan Disb | 104,609.59 |
Mar 18, 2020 | IDA-56240 | Loan Disb | 131,797.61 |
Mar 18, 2020 | IDA-56240 | Loan Disb | 174,667.56 |
Dec 15, 2019 | IDA-56240 | Int Charges | 6,203.19 |
Dec 15, 2019 | IDA-56240 | Int Charges | 538.60 |
Dec 15, 2019 | IDA-56240 | Int Charges | 538.60 |
Dec 15, 2019 | IDA-56240 | Int Charges | 15,518.42 |
Jul 26, 2019 | IDA-56240 | Loan Disb | -874,716.75 |
Nov 20, 2019 | IDA-56240 | Loan Disb | 4,144,462.20 |
Dec 3, 2019 | IDA-56240 | Loan Disb | 22,320.28 |
Dec 3, 2019 | IDA-56240 | Loan Disb | 39,629.67 |
Aug 8, 2019 | IDA-56240 | Loan Disb | 112,642.30 |
Aug 26, 2019 | IDA-56240 | Loan Disb | 6,379,159.00 |
Sep 9, 2019 | IDA-56240 | Loan Disb | 21,790.20 |
Sep 23, 2019 | IDA-56240 | Loan Disb | 74,195.33 |
Nov 27, 2019 | IDA-56240 | Loan Disb | 350,000.00 |
Sep 5, 2019 | IDA-56240 | Loan Disb | 394,402.40 |
Jul 30, 2019 | IDA-56240 | Loan Disb | 24,454.31 |
Aug 8, 2019 | IDA-56240 | Loan Disb | 1,577,609.60 |
Jan 22, 2020 | IDA-56240 | Loan Disb | 42,138.10 |
Jun 19, 2019 | IDA-56240 | Int Charges | 5,897.81 |
Jun 19, 2019 | IDA-56240 | Int Charges | 735.41 |
Jun 19, 2019 | IDA-56240 | Int Charges | 735.41 |
Jun 15, 2019 | IDA-56240 | Int Charges | 494.21 |
Jun 15, 2019 | IDA-56240 | Int Charges | 494.21 |
Jun 15, 2019 | IDA-56240 | Int Charges | 18,276.24 |
Jun 19, 2019 | IDA-56240 | Int Charges | 10,836.19 |
Jun 19, 2019 | IDA-56240 | Int Charges | 10,836.19 |
Jun 19, 2019 | IDA-56240 | Int Charges | 48,029.07 |
Jun 19, 2019 | IDA-56240 | Int Charges | 48,029.07 |
Jun 19, 2019 | IDA-56240 | Int Charges | 3,162.33 |
Apr 10, 2019 | IDA-56240 | Loan Disb | 4,004,084.20 |
Jun 7, 2019 | IDA-56240 | Loan Disb | 150,000.02 |
Jun 19, 2019 | IDA-56240 | Int Charges | 3,162.33 |
Jun 15, 2019 | IDA-56240 | Int Charges | 18,276.24 |
Aug 28, 2019 | IDA-56240 | Loan Disb | 53,798.83 |
Dec 15, 2018 | IDA-56240 | Int Charges | 135.00 |
Dec 15, 2018 | IDA-56240 | Int Charges | 135.00 |
Dec 15, 2018 | IDA-56240 | Int Charges | 9,646.96 |
Dec 15, 2018 | IDA-56240 | Int Charges | 9,646.96 |
Dec 15, 2018 | IDA-56240 | Int Charges | 1,293.04 |
Dec 15, 2018 | IDA-56240 | Int Charges | 1,293.04 |
Feb 19, 2019 | IDA-56240 | Loan Disb | 187,191.39 |
Apr 8, 2019 | IDA-56240 | Loan Disb | 235,564.86 |
Jul 9, 2019 | IDA-56240 | Loan Disb | 288,349.60 |
Mar 6, 2019 | IDA-56240 | Loan Disb | 6,648,759.50 |
Jun 19, 2019 | IDA-56240 | Int Charges | 5,897.81 |
May 21, 2018 | IDA-56240 | Loan Disb | 27,460.01 |
Aug 14, 2018 | IDA-56240 | Loan Disb | 105,212.30 |
Dec 15, 2018 | IDA-56240 | Int Charges | 7,796.93 |
Dec 15, 2018 | IDA-56240 | Int Charges | 7,796.93 |
Dec 15, 2018 | IDA-56240 | Int Charges | 3,724.73 |
Dec 15, 2018 | IDA-56240 | Int Charges | 3,724.73 |
Dec 15, 2018 | IDA-56240 | Int Charges | 7,784.76 |
Dec 15, 2018 | IDA-56240 | Int Charges | 7,784.76 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 21,479.99 |
Jun 24, 2021 | IDA-56240 | Int Charges | 20,968.30 |
Jun 24, 2021 | IDA-56240 | Int Charges | 20,968.30 |
Jun 23, 2021 | IDA-56240 | Loan Repay | 1,261,379.50 |
Jun 23, 2021 | IDA-56240 | Int Charges | 252,033.56 |
Jun 23, 2021 | IDA-56240 | Int Charges | 252,033.56 |
Jun 18, 2021 | IDA-56240 | Loan Repay | 126,356.80 |
Aug 19, 2021 | IDA-56240 | Loan Disb | 54,048.84 |
Aug 19, 2021 | IDA-56240 | Loan Disb | 123,272.91 |
Nov 30, 2021 | IDA-56240 | Loan Disb | 319,850.03 |
Jan 19, 2021 | IDA-56240 | Loan Disb | 80,670.11 |
Jan 19, 2021 | IDA-56240 | Loan Disb | 150,000.00 |
Jun 15, 2021 | IDA-56240 | Loan Repay | 80,179.00 |
Jun 15, 2021 | IDA-56240 | Loan Repay | 90,638.65 |
Jun 15, 2021 | IDA-56240 | Loan Repay | 3,440.95 |
Jun 15, 2021 | IDA-56240 | Int Charges | 4,402.13 |
Jun 15, 2021 | IDA-56240 | Int Charges | 4,402.13 |
Jun 15, 2021 | IDA-56240 | Loan Repay | 24,292.69 |
Aug 14, 2020 | IDA-56240 | Loan Disb | 114,720.25 |
Aug 26, 2020 | IDA-56240 | Loan Disb | 13,147.57 |
Aug 26, 2020 | IDA-56240 | Loan Disb | 1,137,520.00 |
Aug 12, 2020 | IDA-56240 | Loan Disb | 69,322.12 |
Sep 17, 2020 | IDA-56240 | Loan Disb | 74,732.10 |
Sep 11, 2020 | IDA-56240 | Loan Disb | 111,763.35 |
Aug 7, 2020 | IDA-56240 | Loan Disb | 32,860.00 |
Dec 15, 2020 | IDA-56240 | Int Charges | 15,477.84 |
Dec 15, 2020 | IDA-56240 | Int Charges | 15,477.84 |
Dec 15, 2020 | IDA-56240 | Int Charges | 16,257.82 |
Dec 15, 2020 | IDA-56240 | Int Charges | 16,257.82 |
Dec 15, 2020 | IDA-56240 | Int Charges | 13,370.28 |
Dec 15, 2020 | IDA-56240 | Int Charges | 13,370.28 |
Jan 22, 2021 | IDA-56240 | Loan Disb | 12,396,881.00 |
Dec 15, 2020 | IDA-56240 | Int Charges | 3,177.37 |
Dec 15, 2020 | IDA-56240 | Int Charges | 3,177.37 |
Dec 15, 2020 | IDA-56240 | Int Charges | 2,637.69 |
Dec 15, 2020 | IDA-56240 | Int Charges | 2,637.69 |
Dec 15, 2020 | IDA-56240 | Int Charges | 179,458.80 |
Dec 15, 2020 | IDA-56240 | Int Charges | 179,458.80 |
Jun 22, 2022 | IDA-56240 | Int Charges | 259,119.95 |
Jun 22, 2022 | IDA-56240 | Int Charges | 259,119.95 |
Jun 15, 2022 | IDA-56240 | Loan Repay | 6,197.80 |
Jun 15, 2022 | IDA-56240 | Loan Repay | 13,754.02 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 70,770.00 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 145,727.22 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 143,008.69 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 122,546.73 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 153,929.40 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 47,656.68 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 141,701.88 |
Aug 17, 2021 | IDA-56240 | Loan Disb | 65,940.92 |
Dec 15, 2018 | IDA-56240 | Int Charges | 24,421.35 |
Dec 15, 2018 | IDA-56240 | Int Charges | 6,104.22 |
Dec 15, 2018 | IDA-56240 | Int Charges | 6,104.22 |
Dec 4, 2018 | IDA-56240 | Loan Disb | 102,857.86 |
Feb 11, 2019 | IDA-56240 | Loan Disb | 137,670.00 |
Jun 15, 2018 | IDA-56240 | Int Charges | 343.21 |
Jun 15, 2018 | IDA-56240 | Int Charges | 14,000.99 |
Jun 15, 2018 | IDA-56240 | Int Charges | 14,000.99 |
Jun 15, 2018 | IDA-56240 | Int Charges | 4,364.31 |
Jun 15, 2018 | IDA-56240 | Int Charges | 4,364.31 |
Jun 15, 2018 | IDA-56240 | Int Charges | 2,415.80 |
Jun 15, 2018 | IDA-56240 | Int Charges | 2,415.80 |
Jun 15, 2018 | IDA-56240 | Int Charges | 5,986.34 |
Jun 15, 2018 | IDA-56240 | Int Charges | 5,986.34 |
Jun 15, 2018 | IDA-56240 | Int Charges | 19,217.01 |
Jun 15, 2018 | IDA-56240 | Int Charges | 19,217.01 |
Jun 15, 2018 | IDA-56240 | Int Charges | 103.91 |
Jun 15, 2018 | IDA-56240 | Int Charges | 103.91 |
Jun 15, 2018 | IDA-56240 | Int Charges | 343.21 |
Jun 27, 2018 | IDA-56240 | Loan Disb | 235,752.70 |
Jun 27, 2018 | IDA-56240 | Loan Disb | 19,888.00 |
Dec 5, 2017 | IDA-56240 | Loan Disb | 306,172.90 |
Dec 15, 2017 | IDA-56240 | Int Charges | 18,976.85 |
Dec 15, 2017 | IDA-56240 | Int Charges | 18,976.85 |
Feb 23, 2018 | IDA-56240 | Loan Disb | 22,050.00 |
Mar 8, 2018 | IDA-56240 | Loan Disb | 6,243,794.00 |
Dec 15, 2017 | IDA-56240 | Int Charges | 481.01 |
Dec 15, 2017 | IDA-56240 | Int Charges | 481.01 |
Jan 19, 2018 | IDA-56240 | Loan Disb | 1,494,466.80 |
Dec 15, 2017 | IDA-56240 | Int Charges | 8,963.75 |
Dec 15, 2017 | IDA-56240 | Int Charges | 8,963.75 |
Jun 18, 2018 | IDA-56240 | Loan Disb | 962,100.60 |
Sep 20, 2017 | IDA-56240 | Loan Disb | 15,815.00 |
Oct 30, 2017 | IDA-56240 | Loan Disb | 15,600.00 |
Jul 14, 2017 | IDA-56240 | Loan Disb | 21,880.00 |
Sep 6, 2017 | IDA-56240 | Loan Disb | 245,020.00 |
Jun 13, 2017 | IDA-56240 | Loan Disb | 1,223,835.90 |
Jun 15, 2017 | IDA-56240 | Int Charges | 17,618.75 |
Jun 15, 2017 | IDA-56240 | Int Charges | 17,618.75 |
Name | Review | Date |
---|---|---|
Project Management | Satisfactory | 2020-10-29 |
Procurement | Satisfactory | 2020-10-29 |
Progress towards achievement of PDO | Satisfactory | 2020-10-29 |
Financial Management | Moderately Satisfactory | 2020-10-29 |
Monitoring and Evaluation | Moderately Satisfactory | 2020-10-29 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2020-10-29 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-15-2023 |
---|---|
Outcomes | Substantial |
Risk to Development Outcome | |
Bank Performance | Substantial |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | ICR REVIEW: 05-16-2024 | PROJECT PERFORMANCE ASSESSMENT REPORT: |
---|---|---|
Outcome Rating | Moderately Satisfactory | N/a |
Risk To Development Outcome | N/a | |
Bank Performance | Moderately Satisfactory | N/a |
Borrower Performance | N/a | |
Government Performance | N/a | |
Implementing Agency | N/a | |
Icr Quality | Substantial | N/a |
M&e Quality | Modest | N/a |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 0.00 | 43552.00 | 0.00 |
Date | October 30, 2014 | June 30, 2020 | ||
Comment |
Average yields of selected crops in project areas increased | Value | 0.00 | 29.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Female beneficiaries | Value | 0.00 | 21.00 | 0.00 |
Date | October 30, 2014 | May 31, 2018 | ||
Comment |
Paddy rice (wet season) | Value | 0.00 | 25.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Farmers reached with agricultural assets or services | Value | 0.00 | 120000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Paddy rice (dry season) | Value | 0.00 | 30.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Blackgram | Value | 0.00 | 30.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Farmers reached with agricultural assets or services - Female | Value | 0.00 | 7863.00 | 0.00 |
Date | ||||
Comment |
Green gram | Value | 0.00 | 30.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Cropping intensity in project areas increased | Value | 120.00 | 162.00 | 0.00 |
Date | October 30, 2014 | June 30, 2020 | ||
Comment |
Farmers adopting improved agricultural technology | Value | 0.00 | 8088.00 | 0.00 |
Date | October 30, 2014 | June 30, 2020 | ||
Comment |
Farmers adopting improved agricultural technology -Female | Value | 0.00 | 2158.00 | 0.00 |
Date | June 30, 2014 | August 31, 2020 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Goods procured and distributed as outlines in the CERIP | Value | No | Yes | |
Date | June 14, 2016 | June 30, 2022 | ||
Comment |
Project progress reports submitted on time | Value | 0.00 | 7.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Technologies demonstrated in the project areas (number) | Value | 0.00 | 56.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Area provided with irrigation and drainage services (ha) | Value | 0.00 | 35000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Annual audit report submitted on time | Value | No | Yes | |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Clients who have adopted an improved agr. technology promoted by the project | Value | 0.00 | 11000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Share of irrigable area where rehabilitation works have been completed under the project | Value | 0.00 | 35000.00 | 0.00 |
Date | October 30, 2015 | June 30, 2022 | ||
Comment |
Clients who adopted an improved agr. technology promoted by project – female | Value | 0.00 | 1100.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Pre-feasibility land assessment of command area completed | Value | 0.00 | 35000.00 | 0.00 |
Date | October 30, 2015 | June 30, 2022 | ||
Comment |
Water users provided with new/improved irrigation and drainage services (number) | Value | 0.00 | 22000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Targeted clients satisfied with agricultural services (percentage) | Value | 0.00 | 396000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Water users provided with irrigation and drainage services - female (number) | Value | 0.00 | 2200.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Targeted clients satisfied with agricultural services - male (number) | Value | 0.00 | 0.00 | 0.00 |
Date | October 30, 2014 | May 31, 2018 | ||
Comment |
Operational water user associations created and/or strengthened (number) | Value | 0.00 | 56.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Targeted clients satisfied with agricultural services - female (number) | Value | 0.00 | 0.00 | 0.00 |
Date | October 30, 2014 | May 31, 2018 | ||
Comment |
Targeted clients- male (number) | Value | 0.00 | 0.00 | 0.00 |
Date | October 30, 2014 | May 31, 2018 | ||
Comment |
Targeted clients – female (number) | Value | 0.00 | 0.00 | 0.00 |
Date | October 30, 2014 | May 31, 2018 | ||
Comment |
Land area where sustainable land mgt. practices were adopted as a result of proj | Value | 0.00 | 10500.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Land users adopting sustainable land mgt. practices as a result of the project | Value | 0.00 | 6500.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Land users adopting SLM practices as a result of the project - female | Value | 0.00 | 0.00 | 0.00 |
Date | October 30, 2014 | March 30, 2018 | ||
Comment |
Client days of training provided (number) | Value | 0.00 | 30000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |
Client days of training provided - Female (number) | Value | 0.00 | 3000.00 | 0.00 |
Date | October 30, 2014 | June 30, 2022 | ||
Comment |