Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 55.00 |
Borrower/Recipient | 5.00 |
P147854
Active
Lamia Mansour , Dahlia Lotayef
Lebanese Republic
December 11, 2013
(as of board presentation)
July 14, 2016
December 13, 2016
US$ 60.00 million
Council for Development and Reconstruction
2017
US$ 55.00 million
B
February 1, 2024
December 31, 2025
TBD
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 55.00 |
Borrower/Recipient | 5.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 55.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 55.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 60.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Nov 15, 2017 | IBRD-86370 | Loan Disb | 31,353.62 |
Oct 15, 2017 | IBRD-86370 | Int Charges | 42.49 |
Oct 15, 2017 | IBRD-86370 | Int Charges | 65,956.95 |
Oct 15, 2017 | IBRD-86370 | Int Charges | 30,189.29 |
Oct 15, 2017 | IBRD-86370 | Int Charges | 4.96 |
Apr 4, 2017 | IBRD-86370 | Loan Disb | 65,797.80 |
Dec 19, 2017 | IBRD-86370 | Loan Disb | 8,778.00 |
Aug 8, 2017 | IBRD-86370 | Loan Disb | 405,338.00 |
Jul 27, 2017 | IBRD-86370 | Loan Disb | 14,226.25 |
Oct 23, 2017 | IBRD-86370 | Loan Disb | 8,889.00 |
Aug 18, 2017 | IBRD-86370 | Loan Disb | 5,735.10 |
Sep 22, 2017 | IBRD-86370 | Loan Disb | 9,814.18 |
Feb 21, 2018 | IBRD-86370 | Loan Disb | 24,409.12 |
Mar 20, 2018 | IBRD-86370 | Loan Disb | 20,483.01 |
Jul 24, 2018 | IBRD-86370 | Loan Disb | 255,754.00 |
May 22, 2018 | IBRD-86370 | Loan Disb | 62,008.46 |
Aug 27, 2020 | IBRD-86370 | Loan Disb | 10,800.00 |
Nov 4, 2020 | IBRD-86370 | Loan Disb | 5,124.37 |
Sep 16, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Oct 15, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Jul 29, 2020 | IBRD-86370 | Loan Disb | 4,500.00 |
Dec 15, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Dec 18, 2020 | IBRD-86370 | Loan Disb | 4,560.00 |
Dec 18, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Dec 18, 2020 | IBRD-86370 | Loan Disb | 3,617.67 |
Feb 20, 2020 | IBRD-86370 | Loan Disb | 23,096.08 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
May 29, 2020 | IBRD-86370 | Loan Disb | 5,700.00 |
Jun 3, 2020 | IBRD-86370 | Loan Disb | 3,638.00 |
Apr 15, 2020 | IBRD-86370 | Int Charges | 20.69 |
Apr 15, 2020 | IBRD-86370 | Int Charges | 292.31 |
Apr 15, 2020 | IBRD-86370 | Int Charges | 59,775.08 |
Apr 15, 2020 | IBRD-86370 | Int Charges | 113,087.85 |
Apr 14, 2020 | IBRD-86370 | Loan Disb | 16,660.08 |
Apr 24, 2020 | IBRD-86370 | Loan Disb | 4,666.67 |
Apr 24, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
May 6, 2020 | IBRD-86370 | Loan Disb | 3,638.00 |
Apr 1, 2020 | IBRD-86370 | Loan Disb | 4,522.08 |
Apr 1, 2020 | IBRD-86370 | Loan Disb | 3,638.00 |
Apr 1, 2020 | IBRD-86370 | Loan Disb | 9,000.00 |
Sep 30, 2020 | IBRD-86370 | Loan Disb | 44,100.00 |
Sep 30, 2020 | IBRD-86370 | Loan Disb | 2,971.03 |
Sep 15, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Sep 15, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Jul 27, 2020 | IBRD-86370 | Loan Disb | 3,536.95 |
Jul 8, 2020 | IBRD-86370 | Loan Disb | 29,120.02 |
Jul 20, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
May 18, 2020 | IBRD-86370 | Loan Disb | 11,368.33 |
Jun 19, 2020 | IBRD-86370 | Loan Disb | 5,700.00 |
Jun 26, 2020 | IBRD-86370 | Loan Disb | 4,522.08 |
Jun 15, 2020 | IBRD-86370 | Loan Disb | 5,124.38 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 4,500.00 |
Jul 29, 2019 | IBRD-86370 | Loan Disb | 387,035.00 |
Sep 20, 2019 | IBRD-86370 | Loan Disb | 120,839.31 |
Mar 16, 2020 | IBRD-86370 | Loan Disb | 29,765.91 |
Apr 21, 2020 | IBRD-86370 | Loan Disb | 4,500.00 |
Apr 27, 2020 | IBRD-86370 | Loan Disb | 4,500.00 |
Apr 27, 2020 | IBRD-86370 | Loan Disb | 8,000.00 |
Dec 16, 2019 | IBRD-86370 | Loan Disb | 56,064.32 |
Jul 17, 2019 | IBRD-86370 | Loan Disb | 38,137.39 |
Aug 7, 2019 | IBRD-86370 | Loan Disb | 32,274.54 |
Apr 15, 2019 | IBRD-86370 | Int Charges | 74.98 |
Apr 15, 2019 | IBRD-86370 | Int Charges | 62,087.97 |
Apr 15, 2019 | IBRD-86370 | Int Charges | 97,712.10 |
Apr 15, 2019 | IBRD-86370 | Int Charges | 5.55 |
Oct 15, 2019 | IBRD-86370 | Int Charges | 31.59 |
Oct 15, 2019 | IBRD-86370 | Int Charges | 447.41 |
Oct 15, 2019 | IBRD-86370 | Int Charges | 61,235.66 |
Oct 15, 2019 | IBRD-86370 | Int Charges | 116,207.36 |
Oct 17, 2019 | IBRD-86370 | Loan Disb | 29,631.58 |
Nov 20, 2019 | IBRD-86370 | Loan Disb | 26,148.00 |
Jan 10, 2020 | IBRD-86370 | Loan Disb | 686,219.75 |
Feb 15, 2019 | IBRD-86370 | Loan Disb | 38,975.25 |
Feb 13, 2019 | IBRD-86370 | Loan Disb | 431,768.53 |
Oct 15, 2018 | IBRD-86370 | Int Charges | 120.89 |
May 17, 2019 | IBRD-86370 | Loan Disb | 60,604.07 |
Mar 8, 2019 | IBRD-86370 | Loan Disb | 51,044.62 |
Apr 5, 2019 | IBRD-86370 | Loan Disb | 37,162.54 |
Jul 17, 2019 | IBRD-86370 | Loan Disb | 499,443.34 |
Apr 26, 2021 | IBRD-86370 | Loan Disb | 9,180.00 |
Apr 26, 2021 | IBRD-86370 | Loan Disb | 3,600.00 |
Oct 1, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Jun 24, 2021 | IBRD-86370 | Loan Disb | 2,910.40 |
May 6, 2021 | IBRD-86370 | Loan Disb | 2,910.40 |
May 6, 2021 | IBRD-86370 | Loan Disb | 3,617.67 |
Jun 22, 2021 | IBRD-86370 | Loan Disb | 4,560.00 |
Jun 22, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Jun 22, 2021 | IBRD-86370 | Loan Disb | 3,617.67 |
Jun 22, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Dec 18, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Dec 18, 2020 | IBRD-86370 | Loan Disb | 2,910.40 |
Mar 17, 2021 | IBRD-86370 | Loan Disb | 870.00 |
Mar 15, 2021 | IBRD-86370 | Loan Disb | 4,377.78 |
Mar 15, 2021 | IBRD-86370 | Loan Disb | 437,116.38 |
Dec 18, 2020 | IBRD-86370 | Loan Disb | 14,470.68 |
Mar 2, 2021 | IBRD-86370 | Loan Disb | 4,129.34 |
Mar 2, 2021 | IBRD-86370 | Loan Disb | 5,124.38 |
Mar 2, 2021 | IBRD-86370 | Loan Disb | 3,600.00 |
Mar 2, 2021 | IBRD-86370 | Loan Disb | 16,000.00 |
Feb 23, 2021 | IBRD-86370 | Loan Disb | 2,797.21 |
Feb 23, 2021 | IBRD-86370 | Loan Disb | 17,716.05 |
Feb 23, 2021 | IBRD-86370 | Loan Disb | 3,164.45 |
Nov 30, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Nov 30, 2020 | IBRD-86370 | Loan Disb | 6,400.00 |
Nov 30, 2020 | IBRD-86370 | Loan Disb | 2,910.40 |
Dec 9, 2020 | IBRD-86370 | Loan Disb | 3,200.00 |
Feb 4, 2021 | IBRD-86370 | Loan Disb | 38,958.35 |
Mar 5, 2021 | IBRD-86370 | Loan Disb | 3,617.67 |
Mar 5, 2021 | IBRD-86370 | Loan Disb | 4,000.00 |
Mar 23, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Mar 23, 2021 | IBRD-86370 | Loan Disb | 4,560.00 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 4,500.00 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 5,000.00 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 4,522.08 |
Jun 2, 2020 | IBRD-86370 | Loan Disb | 30,000.00 |
Jun 12, 2020 | IBRD-86370 | Loan Disb | 4,522.08 |
Jun 13, 2018 | IBRD-86370 | Loan Disb | 18,120.04 |
Jan 16, 2018 | IBRD-86370 | Loan Disb | 18,508.54 |
Apr 15, 2018 | IBRD-86370 | Int Charges | 65,172.14 |
Apr 15, 2018 | IBRD-86370 | Int Charges | 36,019.20 |
Apr 19, 2018 | IBRD-86370 | Loan Disb | 36,977.09 |
Apr 15, 2018 | IBRD-86370 | Int Charges | 3.83 |
Apr 15, 2018 | IBRD-86370 | Int Charges | 155.86 |
Aug 10, 2018 | IBRD-86370 | Loan Disb | 16,661.41 |
Jul 25, 2018 | IBRD-86370 | Loan Disb | 118,800.22 |
Jun 7, 2018 | IBRD-86370 | Loan Disb | 1,470,860.10 |
Sep 14, 2018 | IBRD-86370 | Loan Disb | 26,125.96 |
Dec 12, 2018 | IBRD-86370 | Loan Disb | 69,579.29 |
Nov 14, 2018 | IBRD-86370 | Loan Disb | 198,297.90 |
Oct 15, 2018 | IBRD-86370 | Int Charges | 63,805.99 |
Oct 15, 2018 | IBRD-86370 | Int Charges | 74,435.74 |
Oct 15, 2018 | IBRD-86370 | Int Charges | 12.52 |
Oct 17, 2018 | IBRD-86370 | Loan Disb | 32,930.08 |
Dec 13, 2016 | IBRD-86370 | Loan Disb | 137,500.00 |
Dec 13, 2016 | IBRD-86370 | Fee Charges | 137,500.00 |
Feb 14, 2017 | IBRD-86370 | Loan Disb | 2,000,000.00 |
Apr 15, 2017 | IBRD-86370 | Int Charges | 61,152.09 |
Apr 15, 2017 | IBRD-86370 | Int Charges | 8,975.38 |
Jun 21, 2017 | IBRD-86370 | Loan Disb | 12,187.95 |
May 15, 2017 | IBRD-86370 | Loan Disb | 9,198.47 |
Apr 30, 2024 | IBRD-86370 | Int Charges | 748,037.60 |
Apr 30, 2024 | IBRD-86370 | Loan Repay | 1,945,258.60 |
Feb 20, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
May 6, 2024 | IBRD-86370 | Loan Disb | 46,671.00 |
Feb 6, 2024 | IBRD-86370 | Loan Disb | 7,500.00 |
Feb 6, 2024 | IBRD-86370 | Loan Disb | 5,508.00 |
Feb 6, 2024 | IBRD-86370 | Loan Disb | 7,616.00 |
Jan 2, 2024 | IBRD-86370 | Loan Disb | 19,121.96 |
Jan 16, 2024 | IBRD-86370 | Loan Disb | 5,032.50 |
Dec 21, 2023 | IBRD-86370 | Loan Disb | 2,152.50 |
Dec 21, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Dec 21, 2023 | IBRD-86370 | Loan Disb | 18,154.05 |
Dec 21, 2023 | IBRD-86370 | Loan Disb | 19,200.00 |
Nov 16, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Nov 16, 2023 | IBRD-86370 | Loan Disb | 24,480.00 |
Jul 23, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
Mar 15, 2024 | IBRD-86370 | Loan Disb | 12,134.46 |
Sep 3, 2024 | IBRD-86370 | Loan Disb | 1,541,247.00 |
Jul 23, 2024 | IBRD-86370 | Loan Disb | 871,846.44 |
Jul 1, 2024 | IBRD-86370 | Loan Disb | -2,002.38 |
Mar 20, 2024 | IBRD-86370 | Loan Disb | 5,508.00 |
Mar 20, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
Apr 18, 2024 | IBRD-86370 | Loan Disb | 594,536.00 |
Apr 15, 2024 | IBRD-86370 | Int Charges | 385.94 |
Apr 18, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
Jul 24, 2024 | IBRD-86370 | Loan Disb | 35,003.25 |
Jul 24, 2024 | IBRD-86370 | Loan Disb | 5,508.00 |
Apr 3, 2024 | IBRD-86370 | Loan Disb | 3,060.00 |
May 23, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
May 23, 2024 | IBRD-86370 | Loan Disb | 6,048.00 |
Sep 28, 2023 | IBRD-86370 | Loan Disb | 632,596.25 |
Jul 16, 2024 | IBRD-86370 | Loan Disb | 8,160.00 |
Jul 16, 2024 | IBRD-86370 | Loan Disb | 7,500.00 |
Jul 2, 2024 | IBRD-86370 | Loan Disb | 736,931.50 |
Jul 16, 2024 | IBRD-86370 | Loan Disb | 5,440.00 |
Jul 16, 2024 | IBRD-86370 | Loan Disb | 5,000.00 |
May 17, 2023 | IBRD-86370 | Loan Disb | 502,930.70 |
May 17, 2023 | IBRD-86370 | Loan Disb | 2,404.08 |
May 17, 2023 | IBRD-86370 | Loan Disb | 514,205.00 |
Jul 11, 2023 | IBRD-86370 | Loan Disb | 500,142.88 |
Jun 2, 2023 | IBRD-86370 | Loan Disb | 35,655.80 |
Jun 2, 2023 | IBRD-86370 | Loan Disb | 15,075.43 |
Sep 25, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Sep 27, 2023 | IBRD-86370 | Loan Disb | 3,083.33 |
May 30, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Feb 6, 2024 | IBRD-86370 | Loan Disb | 18,360.00 |
Feb 6, 2024 | IBRD-86370 | Loan Disb | 18,305.50 |
Mar 28, 2024 | IBRD-86370 | Loan Disb | 414,116.03 |
Aug 26, 2024 | IBRD-86370 | Loan Disb | 2,500.00 |
Aug 26, 2024 | IBRD-86370 | Loan Disb | 2,400.00 |
Aug 26, 2024 | IBRD-86370 | Loan Disb | 2,720.00 |
Aug 26, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
Aug 26, 2024 | IBRD-86370 | Loan Disb | 635,473.20 |
Mar 5, 2024 | IBRD-86370 | Loan Disb | 638,932.75 |
Jul 14, 2016 | IBRD-86370 | Loan Commitment | 55,000,000.00 |
Aug 14, 2023 | IBRD-86370 | Loan Disb | 535,097.20 |
Aug 3, 2023 | IBRD-86370 | Loan Disb | 502,230.78 |
Aug 1, 2023 | IBRD-86370 | Loan Disb | -617,015.60 |
Aug 3, 2023 | IBRD-86370 | Loan Disb | -502,205.78 |
Sep 1, 2023 | IBRD-86370 | Loan Disb | 51,400.00 |
Jul 13, 2023 | IBRD-86370 | Loan Disb | 616,567.60 |
Jun 21, 2023 | IBRD-86370 | Loan Disb | 34,425.00 |
Aug 11, 2023 | IBRD-86370 | Loan Disb | 9,286.20 |
Sep 18, 2023 | IBRD-86370 | Loan Disb | 34,177.31 |
Jun 20, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Nov 10, 2023 | IBRD-86370 | Loan Disb | 646,330.20 |
Nov 8, 2023 | IBRD-86370 | Loan Disb | 10,880.00 |
Nov 10, 2023 | IBRD-86370 | Loan Disb | 501,488.56 |
May 25, 2023 | IBRD-86370 | Loan Disb | 34,400.00 |
May 15, 2023 | IBRD-86370 | Int Charges | 65.85 |
May 15, 2023 | IBRD-86370 | Int Charges | 54,050.69 |
May 15, 2023 | IBRD-86370 | Int Charges | 3,712.77 |
May 15, 2023 | IBRD-86370 | Int Charges | 296,649.62 |
May 15, 2023 | IBRD-86370 | Loan Repay | 745,488.50 |
Mar 22, 2023 | IBRD-86370 | Loan Disb | 18,920.00 |
May 2, 2023 | IBRD-86370 | Loan Disb | 2,154,158.20 |
Mar 30, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Mar 30, 2023 | IBRD-86370 | Loan Disb | 49,621.95 |
Nov 16, 2022 | IBRD-86370 | Int Charges | 55,860.71 |
Jan 23, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
May 7, 2024 | IBRD-86370 | Loan Disb | 7,500.00 |
Jun 5, 2024 | IBRD-86370 | Loan Disb | 502,830.56 |
Feb 7, 2024 | IBRD-86370 | Loan Disb | 532,509.75 |
Jun 5, 2024 | IBRD-86370 | Loan Disb | 5,508.00 |
Feb 7, 2024 | IBRD-86370 | Loan Disb | 633,861.70 |
Sep 3, 2024 | IBRD-86370 | Loan Disb | 2,400.00 |
Mar 5, 2024 | IBRD-86370 | Loan Disb | 18,300.00 |
Jun 25, 2024 | IBRD-86370 | Loan Disb | 5,680.00 |
Jun 17, 2024 | IBRD-86370 | Loan Disb | 2,226.45 |
Jun 27, 2024 | IBRD-86370 | Loan Disb | 616,567.60 |
Feb 26, 2024 | IBRD-86370 | Loan Disb | 519,342.60 |
Apr 30, 2024 | IBRD-86370 | Int Charges | 38,239.47 |
Apr 30, 2024 | IBRD-86370 | Int Charges | 9,647.20 |
Apr 30, 2024 | IBRD-86370 | Int Charges | 4,027.14 |
May 12, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Jul 28, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Jul 28, 2021 | IBRD-86370 | Loan Disb | 4,560.00 |
Jul 28, 2021 | IBRD-86370 | Loan Disb | 6,400.00 |
Jul 28, 2021 | IBRD-86370 | Loan Disb | 3,617.67 |
Jul 28, 2021 | IBRD-86370 | Loan Disb | 8,000.00 |
Jul 28, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Jun 11, 2021 | IBRD-86370 | Loan Disb | 207,882.00 |
Apr 19, 2021 | IBRD-86370 | Loan Disb | 3,007.41 |
Apr 26, 2021 | IBRD-86370 | Loan Disb | 7,235.34 |
Apr 26, 2021 | IBRD-86370 | Loan Disb | 4,635.99 |
Apr 26, 2021 | IBRD-86370 | Loan Disb | 19.46 |
Apr 26, 2021 | IBRD-86370 | Loan Disb | 3,075.55 |
Nov 16, 2022 | IBRD-86370 | Int Charges | 140,475.83 |
Nov 16, 2022 | IBRD-86370 | Loan Repay | 736,499.94 |
Oct 24, 2022 | IBRD-86370 | Loan Disb | 6,800.00 |
Oct 24, 2022 | IBRD-86370 | Loan Disb | 2,754.00 |
Jan 18, 2023 | IBRD-86370 | Loan Disb | 2,754.00 |
Mar 22, 2023 | IBRD-86370 | Loan Disb | 2,754.00 |
Mar 22, 2023 | IBRD-86370 | Loan Disb | 34,400.00 |
Apr 15, 2023 | IBRD-86370 | Int Charges | 6.75 |
Nov 29, 2022 | IBRD-86370 | Loan Disb | 2,754.00 |
Dec 30, 2022 | IBRD-86370 | Loan Disb | 2,754.00 |
Dec 30, 2022 | IBRD-86370 | Loan Disb | 2,226.45 |
Dec 30, 2022 | IBRD-86370 | Loan Disb | 2,500.00 |
Dec 30, 2022 | IBRD-86370 | Loan Disb | 13,600.00 |
Sep 9, 2022 | IBRD-86370 | Loan Disb | 8,776.18 |
Oct 12, 2022 | IBRD-86370 | Loan Disb | 2,226.45 |
Dec 30, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Dec 30, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Sep 21, 2022 | IBRD-86370 | Loan Disb | 2,226.45 |
Sep 21, 2022 | IBRD-86370 | Loan Disb | 2,754.00 |
Sep 21, 2022 | IBRD-86370 | Loan Disb | 6,051.36 |
Sep 16, 2022 | IBRD-86370 | Loan Disb | 6,638.32 |
Oct 15, 2022 | IBRD-86370 | Int Charges | 34.23 |
Sep 26, 2022 | IBRD-86370 | Loan Disb | 2,600.00 |
Sep 26, 2022 | IBRD-86370 | Loan Disb | 2,754.00 |
Dec 14, 2022 | IBRD-86370 | Loan Disb | 24,205.41 |
Dec 6, 2022 | IBRD-86370 | Loan Disb | 15,480.00 |
Dec 6, 2022 | IBRD-86370 | Loan Disb | 2,226.45 |
Nov 16, 2022 | IBRD-86370 | Int Charges | 140.78 |
Dec 6, 2022 | IBRD-86370 | Loan Disb | 9,180.00 |
Nov 4, 2022 | IBRD-86370 | Loan Disb | 2,226.45 |
Apr 15, 2022 | IBRD-86370 | Int Charges | 6.28 |
May 20, 2022 | IBRD-86370 | Int Charges | 27.45 |
May 20, 2022 | IBRD-86370 | Int Charges | 56,431.22 |
May 20, 2022 | IBRD-86370 | Int Charges | 61,811.46 |
Jun 8, 2022 | IBRD-86370 | Loan Disb | 17,000.00 |
Apr 11, 2022 | IBRD-86370 | Loan Disb | 13,600.00 |
Apr 11, 2022 | IBRD-86370 | Loan Disb | 5,440.00 |
May 10, 2022 | IBRD-86370 | Loan Disb | 2,473.84 |
Apr 11, 2022 | IBRD-86370 | Loan Disb | 3,060.00 |
Feb 8, 2022 | IBRD-86370 | Loan Disb | 5,124.37 |
Aug 9, 2022 | IBRD-86370 | Loan Disb | 2,600.00 |
Aug 9, 2022 | IBRD-86370 | Loan Disb | 2,720.00 |
Aug 9, 2022 | IBRD-86370 | Loan Disb | 20,985.00 |
Aug 9, 2022 | IBRD-86370 | Loan Disb | 874,842.70 |
Aug 11, 2022 | IBRD-86370 | Loan Disb | 16,316.14 |
Mar 25, 2022 | IBRD-86370 | Loan Disb | 2,473.84 |
Jul 20, 2022 | IBRD-86370 | Loan Disb | 2,336.40 |
Aug 29, 2022 | IBRD-86370 | Loan Disb | 2,226.45 |
Aug 5, 2022 | IBRD-86370 | Loan Disb | 2,754.00 |
Dec 29, 2021 | IBRD-86370 | Loan Disb | 2,473.84 |
Dec 29, 2021 | IBRD-86370 | Loan Disb | 2,600.00 |
Dec 29, 2021 | IBRD-86370 | Loan Disb | 6,630.00 |
Dec 29, 2021 | IBRD-86370 | Loan Disb | 2,600.00 |
Dec 29, 2021 | IBRD-86370 | Loan Disb | 18,469.35 |
Dec 29, 2021 | IBRD-86370 | Loan Disb | 2,720.00 |
Feb 22, 2022 | IBRD-86370 | Loan Disb | 3,060.00 |
Feb 22, 2022 | IBRD-86370 | Loan Disb | 2,473.84 |
Feb 22, 2022 | IBRD-86370 | Loan Disb | 6,400.00 |
Jun 14, 2022 | IBRD-86370 | Loan Disb | 5,200.00 |
Jun 14, 2022 | IBRD-86370 | Loan Disb | 5,124.38 |
Jun 14, 2022 | IBRD-86370 | Loan Disb | 2,600.00 |
Jun 14, 2022 | IBRD-86370 | Loan Disb | 2,322.66 |
Apr 14, 2022 | IBRD-86370 | Loan Disb | 2,473.84 |
Apr 14, 2022 | IBRD-86370 | Loan Disb | 3,060.00 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 34,400.00 |
May 20, 2021 | IBRD-86370 | Loan Disb | 4,377.78 |
May 20, 2021 | IBRD-86370 | Loan Disb | 12,800.00 |
May 20, 2021 | IBRD-86370 | Loan Disb | 8,000.00 |
May 20, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
May 20, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Jun 2, 2021 | IBRD-86370 | Loan Disb | 2,910.40 |
Apr 15, 2021 | IBRD-86370 | Int Charges | 146.69 |
Apr 15, 2021 | IBRD-86370 | Int Charges | 57,620.36 |
Apr 15, 2021 | IBRD-86370 | Int Charges | 58,898.87 |
Apr 15, 2021 | IBRD-86370 | Int Charges | 17.29 |
May 24, 2021 | IBRD-86370 | Loan Disb | 4,560.00 |
Oct 19, 2021 | IBRD-86370 | Int Charges | 517.44 |
Oct 19, 2021 | IBRD-86370 | Int Charges | 57,043.54 |
Oct 19, 2021 | IBRD-86370 | Int Charges | 63,643.12 |
Sep 8, 2021 | IBRD-86370 | Loan Disb | 3,324.44 |
Sep 8, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Sep 8, 2021 | IBRD-86370 | Loan Disb | 2,473.84 |
Oct 15, 2021 | IBRD-86370 | Int Charges | 115.62 |
Oct 1, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Sep 28, 2021 | IBRD-86370 | Loan Disb | 8,755.56 |
Oct 5, 2021 | IBRD-86370 | Loan Disb | 5,850.00 |
Aug 25, 2021 | IBRD-86370 | Loan Disb | 2,473.84 |
Nov 15, 2021 | IBRD-86370 | Loan Disb | 2,473.84 |
Oct 26, 2021 | IBRD-86370 | Loan Disb | 19,861.00 |
Oct 4, 2021 | IBRD-86370 | Loan Disb | 2,473.84 |
May 19, 2022 | IBRD-86370 | Loan Disb | 5,440.00 |
Nov 23, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Nov 10, 2021 | IBRD-86370 | Loan Disb | 3,060.00 |
Nov 29, 2021 | IBRD-86370 | Loan Disb | 2,600.00 |
Nov 29, 2021 | IBRD-86370 | Loan Disb | 12,425.44 |
Nov 23, 2021 | IBRD-86370 | Loan Disb | 8,000.00 |
Nov 23, 2021 | IBRD-86370 | Loan Disb | 3,900.00 |
Aug 31, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Mar 23, 2021 | IBRD-86370 | Loan Disb | 3,600.00 |
Mar 5, 2021 | IBRD-86370 | Loan Disb | 2,910.40 |
Jan 11, 2021 | IBRD-86370 | Loan Disb | 4,560.00 |
Jan 11, 2021 | IBRD-86370 | Loan Disb | 3,200.00 |
Jan 11, 2021 | IBRD-86370 | Loan Disb | 3,600.00 |
Jan 11, 2021 | IBRD-86370 | Loan Disb | 3,600.00 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 5,508.00 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 9,591.96 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 9,004.10 |
Sep 29, 2023 | IBRD-86370 | Loan Disb | 736,684.06 |
Dec 22, 2023 | IBRD-86370 | Loan Disb | 551,333.50 |
Dec 22, 2023 | IBRD-86370 | Loan Disb | 506,720.75 |
Nov 1, 2023 | IBRD-86370 | Int Charges | 47,655.52 |
Nov 1, 2023 | IBRD-86370 | Int Charges | 13,640.67 |
Dec 18, 2023 | IBRD-86370 | Loan Disb | 914,891.75 |
Dec 18, 2023 | IBRD-86370 | Loan Disb | 5,124.37 |
Dec 18, 2023 | IBRD-86370 | Loan Disb | 544,884.50 |
Nov 8, 2023 | IBRD-86370 | Loan Disb | 25,700.00 |
Nov 8, 2023 | IBRD-86370 | Loan Disb | 7,500.00 |
Oct 15, 2023 | IBRD-86370 | Int Charges | 623.62 |
Oct 17, 2023 | IBRD-86370 | Loan Disb | 685,411.75 |
Oct 19, 2023 | IBRD-86370 | Loan Disb | 25,700.00 |
Nov 1, 2023 | IBRD-86370 | Int Charges | 3,982.15 |
Nov 1, 2023 | IBRD-86370 | Int Charges | 494,948.70 |
Nov 1, 2023 | IBRD-86370 | Loan Repay | 1,246,464.40 |
Dec 1, 2023 | IBRD-86370 | Loan Disb | 5,508.00 |
Oct 31, 2023 | IBRD-86370 | Loan Disb | 505,802.90 |
Oct 31, 2023 | IBRD-86370 | Loan Disb | 5,508.00 |
Oct 31, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Dec 6, 2023 | IBRD-86370 | Loan Disb | 25,700.00 |
Mar 22, 2023 | IBRD-86370 | Loan Disb | 5,440.00 |
Jun 20, 2023 | IBRD-86370 | Loan Disb | 5,508.00 |
Sep 8, 2023 | IBRD-86370 | Loan Disb | 12,500.00 |
Jul 31, 2023 | IBRD-86370 | Loan Disb | 2,662.20 |
Aug 7, 2023 | IBRD-86370 | Loan Disb | 2,500.00 |
Aug 7, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Aug 23, 2023 | IBRD-86370 | Loan Disb | 502,230.78 |
Feb 24, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Feb 28, 2023 | IBRD-86370 | Loan Disb | 1,926,769.50 |
Jun 22, 2023 | IBRD-86370 | Loan Disb | 8,160.00 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 2,720.00 |
Jun 28, 2023 | IBRD-86370 | Loan Disb | 11,543.88 |
Aug 3, 2023 | IBRD-86370 | Loan Disb | 25,700.00 |
Sep 15, 2023 | IBRD-86370 | Loan Disb | 112,510.71 |
Sep 15, 2023 | IBRD-86370 | Loan Disb | 2,226.45 |
Jun 12, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Jun 12, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Jun 22, 2020 | IBRD-86370 | Loan Disb | 4,500.00 |
Jun 29, 2020 | IBRD-86370 | Loan Disb | 3,638.00 |
Oct 30, 2020 | IBRD-86370 | Loan Disb | 2,910.40 |
Nov 18, 2020 | IBRD-86370 | Loan Disb | 252,402.05 |
Nov 18, 2020 | IBRD-86370 | Loan Disb | 13,680.00 |
Nov 18, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Nov 18, 2020 | IBRD-86370 | Loan Disb | 10,000.00 |
Nov 18, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Nov 12, 2020 | IBRD-86370 | Loan Disb | 5,400.00 |
Aug 10, 2020 | IBRD-86370 | Loan Disb | 362,892.20 |
Oct 8, 2020 | IBRD-86370 | Loan Disb | 3,600.00 |
Oct 8, 2020 | IBRD-86370 | Loan Disb | 933.00 |
Oct 23, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Sep 28, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Oct 15, 2020 | IBRD-86370 | Int Charges | 16.51 |
Oct 15, 2020 | IBRD-86370 | Int Charges | 190.55 |
Oct 15, 2020 | IBRD-86370 | Int Charges | 58,822.98 |
Oct 15, 2020 | IBRD-86370 | Int Charges | 93,897.78 |
Aug 31, 2020 | IBRD-86370 | Loan Disb | 4,522.08 |
Sep 1, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Sep 2, 2020 | IBRD-86370 | Loan Disb | 2,910.40 |
Aug 4, 2020 | IBRD-86370 | Loan Disb | 5,415.00 |
Aug 4, 2020 | IBRD-86370 | Loan Disb | 4,000.00 |
Jul 16, 2020 | IBRD-86370 | Loan Disb | 5,700.00 |
Sep 10, 2020 | IBRD-86370 | Loan Disb | 10,000.00 |
Apr 14, 2022 | IBRD-86370 | Loan Disb | 2,600.00 |
Jun 16, 2022 | IBRD-86370 | Loan Disb | 8,961.70 |
Jun 7, 2022 | IBRD-86370 | Loan Disb | 2,720.00 |
Jun 7, 2022 | IBRD-86370 | Loan Disb | 24,993.25 |
Jul 15, 2022 | IBRD-86370 | Loan Disb | 2,600.00 |
Jul 15, 2022 | IBRD-86370 | Loan Disb | 2,720.00 |
Jul 15, 2022 | IBRD-86370 | Loan Disb | 8,262.00 |
Mar 29, 2022 | IBRD-86370 | Loan Disb | 243,991.00 |
Dec 14, 2021 | IBRD-86370 | Loan Disb | 8,160.00 |
Dec 14, 2021 | IBRD-86370 | Loan Disb | 3,900.00 |
Dec 14, 2021 | IBRD-86370 | Loan Disb | 2,473.84 |
Mar 14, 2022 | IBRD-86370 | Loan Disb | 2,600.00 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2024-08-05 |
Monitoring and Evaluation | Satisfactory | 2024-08-05 |
Procurement | Moderately Satisfactory | 2024-08-05 |
Financial Management | Moderately Satisfactory | 2024-08-05 |
Overall Safeguards Rating | Moderately Satisfactory | 2024-08-05 |
Project Management | Satisfactory | 2024-08-05 |
Overall Implementation Progress (IP) | Satisfactory | 2024-08-05 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Reduction in the excess fertilizers used | Value | 0.00 | 65.75 | 50.00 |
Date | March 31, 2020 | May 25, 2023 | June 30, 2023 | |
Comment |
Reduction in pesticides sprays | Value | 0.00 | 63.00 | 30.00 |
Date | March 31, 2020 | May 25, 2023 | June 30, 2023 | |
Comment |
Number of locations monitored monthly for water quality | Value | 10.00 | 10.00 | 20.00 |
Date | June 1, 2016 | January 31, 2024 | December 31, 2024 | |
Comment |
Nutrient load reduction (Nitrogen(N)) achieved under the project | Value | 496.00 | 470.00 | 248.00 |
Date | June 1, 2016 | May 25, 2023 | June 30, 2023 | |
Comment |
Quantity of municipal wastewater collected and treated under the project (daily flow in m3) | Value | 0.00 | 11873.00 | 30000.00 |
Date | June 1, 2016 | January 31, 2024 | December 31, 2024 | |
Comment |
Direct project beneficiaries | Value | 0.00 | 57624.00 | 344000.00 |
Date | June 1, 2016 | January 31, 2024 | January 31, 2024 | |
Comment |
Female beneficiaries | Value | 0.00 | 0.00 | 49.00 |
Date | June 1, 2016 | May 2, 2018 | June 30, 2023 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
New household sewer connections constructed under the project | Value | 0.00 | 1200.00 | 7300.00 |
Date | June 1, 2016 | January 31, 2024 | December 31, 2024 | |
Comment |
Quantity of trash removed from Litani river banks (throug clean up campaigns) | Value | 0.00 | 0.00 | 1250.00 |
Date | June 1, 2016 | January 31, 2024 | December 31, 2024 | |
Comment |
Participants in consultation activities during project implementation | Value | 50.00 | 184.00 | 100.00 |
Date | June 8, 2016 | May 25, 2023 | June 14, 2023 | |
Comment |
Sewer network constructed in the project area (km) | Value | 0.00 | 157.00 | 200.00 |
Date | June 14, 2016 | January 31, 2024 | December 31, 2024 | |
Comment |
o SESA of National Solid Waste Strategy and SESA of National Water Strategy prepared following a consultative approach and approvedby the MoE | Value | No | No | Yes |
Date | March 31, 2020 | January 31, 2024 | December 31, 2024 | |
Comment |
Farmers trained on Integrated Pest Management (IPM) practices | Value | 249.00 | 203.00 | 280.00 |
Date | December 13, 2016 | May 25, 2023 | June 30, 2023 | |
Comment |