Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 50.00 |
Borrower/Recipient | 0.65 |
P148181
Closed
Tigran Shmis
Republic of Belarus
July 28, 2014
(as of board presentation)
September 17, 2015
January 20, 2016
US$ 50.65 million
Ministry of Education
2016
US$ 50.00 million
B
February 1, 2024
February 28, 2025
Yes
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 50.00 |
Borrower/Recipient | 0.65 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 50.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 50.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 50.65 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 17, 2020 | IBRD-89430 | Loan Disb | 1,223,750.00 |
Feb 18, 2021 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Apr 15, 2020 | IBRD-89430 | Int Charges | 75,288.18 |
Apr 15, 2020 | IBRD-89430 | Int Charges | 46.09 |
Apr 15, 2020 | IBRD-89430 | Int Charges | 122,350.24 |
Apr 15, 2020 | IBRD-89430 | Int Charges | 728.00 |
Jun 17, 2020 | IBRD-85290 | Loan Disb | 2,000,000.00 |
Oct 15, 2020 | IBRD-85290 | Int Charges | 932.37 |
Oct 15, 2020 | IBRD-85290 | Int Charges | 8,812.21 |
Oct 15, 2020 | IBRD-85290 | Int Charges | 20,286.83 |
Oct 15, 2020 | IBRD-85290 | Int Charges | 306,822.06 |
Oct 15, 2020 | IBRD-85290 | Loan Repay | 758.19 |
Sep 28, 2020 | IBRD-85290 | Loan Disb | 2,000,000.00 |
Nov 12, 2020 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Oct 15, 2020 | IBRD-85290 | Loan Repay | 1,691,866.80 |
Oct 15, 2020 | IBRD-89430 | Int Charges | 39.22 |
Oct 15, 2020 | IBRD-89430 | Int Charges | 21.37 |
Mar 31, 2020 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Feb 18, 2020 | IBRD-85290 | Loan Disb | 2,000,000.00 |
Feb 26, 2020 | IBRD-89430 | Loan Disb | 108,845.00 |
Jan 15, 2020 | IBRD-85290 | Loan Disb | 1,000,000.00 |
May 6, 2020 | IBRD-89430 | Loan Disb | 118,827.50 |
Apr 15, 2020 | IBRD-85290 | Int Charges | 690.40 |
Apr 15, 2020 | IBRD-85290 | Int Charges | 8,353.60 |
Apr 15, 2020 | IBRD-85290 | Int Charges | 27,209.72 |
Feb 11, 2022 | IBRD-85290 | Loan Disb | 500,000.00 |
Jan 18, 2022 | IBRD-89430 | Loan Disb | 3,415,800.00 |
Dec 28, 2021 | IBRD-89430 | Loan Disb | -2,266,700.00 |
Dec 20, 2021 | IBRD-85290 | Loan Disb | 500,000.00 |
May 26, 2022 | IBRD-89430 | Loan Disb | 237,691.48 |
Apr 15, 2022 | IBRD-89430 | Int Charges | 621.87 |
Apr 15, 2022 | IBRD-85290 | Int Charges | 78.77 |
Dec 16, 2021 | IBRD-89430 | Loan Disb | 2,259,200.00 |
May 17, 2022 | IBRD-89430 | Loan Disb | 119,518.37 |
May 17, 2022 | IBRD-89430 | Loan Disb | 224,223.52 |
Sep 24, 2021 | IBRD-89430 | Loan Disb | 1,760,250.00 |
Oct 15, 2021 | IBRD-85290 | Loan Repay | 2,181,303.20 |
Apr 15, 2020 | IBRD-85290 | Int Charges | 359,443.60 |
Oct 15, 2019 | IBRD-85290 | Int Charges | 297.94 |
Oct 15, 2019 | IBRD-85290 | Int Charges | 3,604.98 |
Oct 15, 2019 | IBRD-85290 | Int Charges | 36,574.60 |
Oct 15, 2019 | IBRD-85290 | Int Charges | 332,807.30 |
Oct 2, 2019 | IBRD-89430 | Fee Charges | 245,711.25 |
Oct 2, 2019 | IBRD-89430 | Loan Disb | 245,711.25 |
Oct 3, 2019 | IBRD-85290 | Loan Disb | 1,900,000.00 |
Mar 14, 2019 | IBRD-85290 | Loan Disb | 1,200,000.00 |
Jun 14, 2019 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Apr 12, 2019 | IBRD-85290 | Loan Disb | 1,700,000.00 |
Sep 6, 2019 | IBRD-85290 | Loan Disb | 2,000,000.00 |
Apr 15, 2019 | IBRD-85290 | Int Charges | 3,737.90 |
Apr 15, 2019 | IBRD-85290 | Int Charges | 43,811.40 |
Apr 15, 2019 | IBRD-85290 | Int Charges | 238,664.25 |
Apr 15, 2019 | IBRD-85290 | Int Charges | 328.77 |
Nov 25, 2019 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Nov 20, 2019 | IBRD-89430 | Loan Disb | 165,847.50 |
Aug 2, 2019 | IBRD-85290 | Loan Disb | 2,000,000.00 |
Oct 15, 2018 | IBRD-85290 | Int Charges | 180,493.70 |
Oct 15, 2018 | IBRD-85290 | Int Charges | 177.89 |
Jan 7, 2019 | IBRD-85290 | Loan Disb | 2,030,000.00 |
Oct 15, 2018 | IBRD-85290 | Int Charges | 1,329.81 |
Oct 15, 2018 | IBRD-85290 | Int Charges | 47,750.56 |
Aug 12, 2021 | IBRD-89430 | Loan Disb | 1,760,325.00 |
Aug 10, 2021 | IBRD-85290 | Loan Disb | 1,000,000.00 |
Sep 10, 2021 | IBRD-89430 | Loan Disb | 1,774,650.00 |
Oct 15, 2021 | IBRD-85290 | Loan Disb | 500,000.00 |
May 20, 2021 | IBRD-89430 | Loan Disb | 2,438,800.00 |
Apr 15, 2021 | IBRD-85290 | Int Charges | 4,853.47 |
Apr 15, 2021 | IBRD-85290 | Int Charges | 13,524.19 |
Apr 15, 2021 | IBRD-85290 | Int Charges | 158,262.86 |
Apr 15, 2021 | IBRD-85290 | Loan Repay | 1,773,724.50 |
Apr 15, 2021 | IBRD-85290 | Loan Repay | 176,640.52 |
Apr 15, 2021 | IBRD-85290 | Int Charges | 758.19 |
Oct 15, 2021 | IBRD-85290 | Int Charges | 767.14 |
Jul 21, 2021 | IBRD-85290 | Loan Disb | 1,000,000.00 |
Sep 22, 2021 | IBRD-85290 | Loan Disb | 500,000.00 |
Oct 15, 2021 | IBRD-85290 | Int Charges | 1,877.31 |
Oct 15, 2021 | IBRD-85290 | Int Charges | 6,474.59 |
Oct 15, 2021 | IBRD-85290 | Int Charges | 177,709.97 |
Oct 15, 2021 | IBRD-89430 | Int Charges | 1,002.07 |
Oct 15, 2021 | IBRD-89430 | Int Charges | 95.23 |
Oct 15, 2021 | IBRD-89430 | Int Charges | 16,453.95 |
Oct 15, 2021 | IBRD-89430 | Int Charges | 114,714.83 |
Oct 15, 2021 | IBRD-85290 | Loan Repay | 186,061.88 |
Oct 19, 2021 | IBRD-89430 | Loan Disb | 1,749,000.00 |
Nov 24, 2021 | IBRD-89430 | Loan Disb | 2,243,500.00 |
May 18, 2021 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Jul 23, 2021 | IBRD-89430 | Loan Disb | 1,176,350.00 |
Apr 23, 2021 | IBRD-89430 | Loan Disb | 1,205,700.00 |
Apr 20, 2021 | IBRD-85290 | Loan Disb | 1,500,000.00 |
Jul 1, 2021 | IBRD-89430 | Loan Disb | 1,186,700.00 |
Apr 15, 2021 | IBRD-89430 | Int Charges | 127,483.77 |
Apr 15, 2021 | IBRD-89430 | Int Charges | 6,092.67 |
Feb 17, 2021 | IBRD-89430 | Loan Disb | 2,412,400.00 |
Mar 18, 2021 | IBRD-85290 | Loan Disb | 1,000,000.00 |
Mar 22, 2021 | IBRD-89430 | Loan Disb | 595,525.00 |
Oct 15, 2020 | IBRD-89430 | Int Charges | 130,476.85 |
Oct 15, 2020 | IBRD-89430 | Int Charges | 3,075.88 |
Oct 16, 2020 | IBRD-89430 | Loan Disb | 1,757,700.00 |
Aug 12, 2020 | IBRD-89430 | Loan Disb | 1,177,800.00 |
Apr 18, 2019 | IBRD-89430 | Loan Commitment | 102,300,000.00 |
Nov 4, 2016 | IBRD-85290 | Loan Disb | 1,621,500.00 |
Oct 15, 2016 | IBRD-85290 | Int Charges | 405.52 |
Oct 15, 2016 | IBRD-85290 | Int Charges | 62,024.02 |
Oct 15, 2016 | IBRD-85290 | Int Charges | 1,566.96 |
Aug 17, 2016 | IBRD-85290 | Loan Disb | 300,000.00 |
May 30, 2018 | IBRD-85290 | Loan Disb | 700,000.00 |
Apr 16, 2018 | IBRD-85290 | Loan Disb | 450,000.00 |
Apr 15, 2018 | IBRD-85290 | Int Charges | 1,145.00 |
Apr 15, 2018 | IBRD-85290 | Int Charges | 49,955.59 |
Apr 15, 2018 | IBRD-85290 | Int Charges | 103,368.80 |
Apr 15, 2018 | IBRD-85290 | Int Charges | 105.61 |
Aug 2, 2018 | IBRD-85290 | Loan Disb | 850,000.00 |
Sep 5, 2018 | IBRD-85290 | Loan Disb | 1,200,000.00 |
Oct 15, 2017 | IBRD-85290 | Int Charges | 571.92 |
Aug 9, 2017 | IBRD-85290 | Loan Disb | 230,000.00 |
Nov 2, 2017 | IBRD-85290 | Loan Disb | 500,000.00 |
Sep 19, 2017 | IBRD-85290 | Loan Disb | 593,000.00 |
Feb 21, 2018 | IBRD-85290 | Loan Disb | 490,000.00 |
Jun 16, 2017 | IBRD-85290 | Loan Disb | 400,000.00 |
May 23, 2017 | IBRD-85290 | Loan Disb | 860,000.00 |
Apr 15, 2017 | IBRD-85290 | Int Charges | 890.24 |
Apr 15, 2017 | IBRD-85290 | Int Charges | 56,655.88 |
Apr 15, 2017 | IBRD-85290 | Int Charges | 36,121.93 |
Apr 15, 2017 | IBRD-85290 | Int Charges | 194.73 |
Oct 15, 2017 | IBRD-85290 | Int Charges | 80,180.12 |
Jul 14, 2017 | IBRD-85290 | Loan Disb | 388,000.00 |
Oct 15, 2017 | IBRD-85290 | Int Charges | 3,533.49 |
Oct 15, 2017 | IBRD-85290 | Int Charges | 52,426.94 |
Oct 15, 2016 | IBRD-85290 | Int Charges | 49,456.48 |
Jan 17, 2017 | IBRD-85290 | Loan Disb | 970,000.00 |
Sep 13, 2016 | IBRD-85290 | Loan Disb | 130,000.00 |
Oct 5, 2016 | IBRD-85290 | Loan Disb | 665,000.00 |
Mar 8, 2017 | IBRD-85290 | Loan Disb | 900,000.00 |
Feb 16, 2017 | IBRD-85290 | Loan Disb | 850,000.00 |
Jan 20, 2016 | IBRD-85290 | Loan Disb | 125,000.00 |
Jan 20, 2016 | IBRD-85290 | Fee Charges | 125,000.00 |
Mar 3, 2016 | IBRD-85290 | Loan Disb | 100,000.00 |
Dec 14, 2016 | IBRD-85290 | Loan Disb | 1,200,000.00 |
Aug 21, 2020 | IBRD-85290 | Loan Disb | 1,400,000.00 |
Sep 17, 2015 | IBRD-85290 | Loan Commitment | 50,000,000.00 |
Jul 6, 2022 | IBRD-89430 | Loan Cancel | 65,175,508.00 |
Jul 6, 2022 | IBRD-85290 | Loan Cancel | 1,501,224.00 |
May 17, 2022 | IBRD-89430 | Loan Disb | 124,335.33 |
May 11, 2022 | IBRD-85290 | Loan Disb | 246,275.98 |
May 11, 2022 | IBRD-89430 | Loan Disb | 92,342.73 |
May 11, 2022 | IBRD-89430 | Loan Disb | 369,819.03 |
May 11, 2022 | IBRD-89430 | Loan Disb | 771,832.56 |
May 11, 2022 | IBRD-89430 | Loan Disb | 61,413.87 |
May 11, 2022 | IBRD-89430 | Loan Disb | 164,902.94 |
May 11, 2022 | IBRD-89430 | Loan Disb | 152,371.38 |
May 11, 2022 | IBRD-89430 | Loan Disb | 104,749.44 |
May 11, 2022 | IBRD-89430 | Loan Disb | 127,613.46 |
May 11, 2022 | IBRD-89430 | Loan Disb | 107,319.78 |
May 11, 2022 | IBRD-89430 | Loan Disb | 74,914.05 |
May 11, 2022 | IBRD-89430 | Loan Disb | 115,500.75 |
May 11, 2022 | IBRD-89430 | Loan Disb | 184,193.81 |
May 11, 2022 | IBRD-89430 | Loan Disb | 107,309.79 |
May 11, 2022 | IBRD-89430 | Loan Disb | 89,271.13 |
May 11, 2022 | IBRD-89430 | Loan Disb | 69,905.79 |
May 11, 2022 | IBRD-89430 | Loan Disb | 77,866.80 |
May 11, 2022 | IBRD-89430 | Loan Disb | 141,276.70 |
May 11, 2022 | IBRD-89430 | Loan Disb | 39,518.94 |
May 11, 2022 | IBRD-89430 | Loan Disb | 124,446.04 |
Name | Review | Date |
---|---|---|
Financial Management | Satisfactory | 2023-01-19 |
Progress towards achievement of PDO | Moderately Unsatisfactory | 2023-01-19 |
Project Management | Satisfactory | 2023-01-19 |
Procurement | Moderately Satisfactory | 2023-01-19 |
Overall Implementation Progress (IP) | Moderately Unsatisfactory | 2023-01-19 |
Counterpart Funding | Satisfactory | 2023-01-19 |
Monitoring and Evaluation | Satisfactory | 2023-01-19 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: |
---|---|
Outcomes | |
Risk to Development Outcome | |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Students benefitting from an improved learning environment in general secondary schools targeted by the project | Value | 0.00 | 54682.00 | 65000.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Republic of Belarus’s participation in PISA is supported | Value | No participation in international assessments | Belarus participated in PISA 2018 and published it | Belarus participate in PISA 2018, 2021, and (subje |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Annual education statistics reports produced using data generated by the integrated EMIS | Value | No integrated EMIS in place | The development of EMIS has been suspended. Only t | Annual report produced with100% of its data genera |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Female students benefiting from improved learning environment | Value | 0.00 | 26773.00 | 32500.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Students from closed/reorganized schools accomodated in schools with improved learning environment | Value | 0.00 | 7814.00 | 13000.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Female students from closed/reorganized schools benefitting from improved learning environment | Value | 0.00 | 4086.00 | 6500.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Impact evaluation study on the progress of project schools in the improvement of quality of learning environment and its use as perthe international study on learning environments is conducted | Value | No study is completed | A baseline study of the assessment of the quality | According to international methodology, project sc |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of schools rehabilitated under the project to meet minimum conditions for a quality learning environment | Value | 0.00 | 175.00 | 300.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Improved national system of education quality assessment | Value | Existing sample-based national assessment system i | A toolkit for psychological examination of textboo | Assessment of the quality of education with new to |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Percent of beneficiaries reporting that community center activities represented the views of the community, students, and teachers | Value | 0.00 | 90.20 | 80.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of schools that received innovative teaching and learning clusters on science subjects (Physics, Chemistry, Computer Science, Biology) | Value | 0.00 | 1.00 | 21.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Analytical work on PISA research results in the Republic of Belarus completed | Value | No analytical work | Multicomponent analysis of the official results of | Developed recommendations for the development of e |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Percent of school users who consider that the project implementation responded to their views | Value | 0.00 | 93.90 | 80.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of education managers trained in the use of the integrated EMIS | Value | 0.00 | 0.00 | 7210.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of participants of the STEM related activities and classes | Value | 0.00 | 64.00 | 5000.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of female participants of the STEM related activities and classes | Value | 0.00 | 38.00 | 2500.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of female education managers trained in the use of the integrated EMIS | Value | 0.00 | 0.00 | 6380.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of rehabilitated schools targeted by the project, providing social and cultural services to the population | Value | 0.00 | 18.00 | 21.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of education managers that received training and capacity building in modernization of the education system | Value | 0.00 | 100.00 | 1770.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of social and cultural activities organized at the centers | Value | 0.00 | 6.00 | 120.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of female education managers that received training and capacity building in modernization of the education system | Value | 0.00 | 75.00 | 1000.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Beneficiaries reporting improved satisfaction with the quality of learning environment, relative to an appropriate control group | Value | 0.00 | According to the annual survey by the Ministry of | Satisfaction is statistically higher in the treatm |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Large-scale primary/secondary learning assessments completed | Value | 0.00 | 1.00 | 2.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Number of schools supplied with laboratory equipment under the project (either one or a combination of Physics, Chemistry, ComputerScience, Biology) | Value | 0.00 | 122.00 | 279.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Students benefiting from direct interventions to enhance learning | Value | 0.00 | 54682.00 | 65000.00 |
Date | September 17, 2015 | December 15, 2022 | September 16, 2024 | |
Comment |
Students benefiting from direct interventions to enhance learning - Female | Value | 0.00 | 19576.00 | 0.00 |
Date | ||||
Comment |