Financier | Commitments |
---|---|
IDA Credit | 150.00 |
P150523
Closed
Makiko Watanabe , Mirko Serkovic, Nicholas Soikan
Ministry of Finance, United Republic of Tanzania
July 11, 2017
(as of board presentation)
September 28, 2017
June 6, 2018
US$ 150.00 million
Ministry of Natural Resources and Tourism
2018
US$ 150.00 million
B
January 31, 2024
November 6, 2024
Yes
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 150.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 150.00 |
IBRD + IDA Commitment | 150.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 150.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 15, 2021 | IDA-61430 | Int Charges | 43,070.48 |
Dec 15, 2021 | IDA-61430 | Int Charges | 43,070.48 |
Jan 18, 2022 | IDA-61430 | Loan Disb | 171,877.95 |
Jun 15, 2020 | IDA-61430 | Int Charges | 30,114.05 |
Jun 15, 2020 | IDA-61430 | Int Charges | 30,114.05 |
Feb 27, 2024 | IDA-61430 | Loan Disb | 22,521,718.00 |
Feb 26, 2024 | IDA-61430 | Loan Disb | 2,786,311.50 |
Jan 24, 2024 | IDA-61430 | Loan Disb | 11,215.81 |
Jun 15, 2024 | IDA-61430 | Int Charges | 59,420.33 |
Sep 28, 2017 | IDA-61430 | Loan Commitment | 150,000,000.00 |
Sep 21, 2020 | IDA-61430 | Loan Disb | 38,474.50 |
Sep 21, 2020 | IDA-61430 | Loan Disb | 79,625.45 |
Sep 21, 2020 | IDA-61430 | Loan Disb | 62,624.55 |
Oct 13, 2020 | IDA-61430 | Loan Disb | 339,714.00 |
Dec 15, 2020 | IDA-61430 | Int Charges | 296.21 |
Dec 15, 2020 | IDA-61430 | Int Charges | 296.21 |
Dec 15, 2020 | IDA-61430 | Int Charges | 33,856.42 |
Dec 15, 2020 | IDA-61430 | Int Charges | 33,856.42 |
Jan 7, 2021 | IDA-61430 | Loan Disb | 436,001.47 |
Jun 15, 2021 | IDA-61430 | Int Charges | 640.75 |
Jun 15, 2021 | IDA-61430 | Int Charges | 640.75 |
Jun 15, 2021 | IDA-61430 | Int Charges | 36,894.27 |
Jun 15, 2021 | IDA-61430 | Int Charges | 36,894.27 |
Aug 30, 2021 | IDA-61430 | Loan Disb | 2,350,000.00 |
Mar 31, 2020 | IDA-61430 | Loan Disb | 869,436.00 |
Dec 15, 2019 | IDA-61430 | Int Charges | 149.37 |
Dec 15, 2019 | IDA-61430 | Int Charges | 149.37 |
Dec 15, 2019 | IDA-61430 | Int Charges | 28,373.15 |
Dec 15, 2019 | IDA-61430 | Int Charges | 28,373.15 |
Feb 21, 2020 | IDA-61430 | Loan Disb | 23,892.09 |
Jun 15, 2020 | IDA-61430 | Int Charges | 365.29 |
Jun 15, 2020 | IDA-61430 | Int Charges | 365.29 |
Dec 15, 2018 | IDA-61430 | Int Charges | 6,263.95 |
Dec 15, 2018 | IDA-61430 | Int Charges | 6,263.95 |
Dec 15, 2018 | IDA-61430 | Int Charges | 16,600.28 |
Dec 15, 2018 | IDA-61430 | Int Charges | 16,600.28 |
Jun 15, 2019 | IDA-61430 | Int Charges | 28,465.17 |
Jun 15, 2019 | IDA-61430 | Int Charges | 28,465.17 |
Jun 15, 2019 | IDA-61430 | Int Charges | 312.72 |
Jun 15, 2019 | IDA-61430 | Int Charges | 312.72 |
Oct 24, 2019 | IDA-61430 | Loan Disb | 59,268.15 |
Aug 20, 2019 | IDA-61430 | Loan Disb | 13,268.27 |
Jun 28, 2018 | IDA-61430 | Loan Disb | 3,000,000.00 |
Jun 19, 2018 | IDA-61430 | Loan Disb | 1,775,897.40 |
Sep 4, 2018 | IDA-61430 | Loan Disb | 3,000,000.00 |
Jun 15, 2024 | IDA-61430 | Int Charges | 59,420.33 |
Jun 15, 2024 | IDA-61430 | Loan Repay | 2,194,660.80 |
Jun 15, 2024 | IDA-61430 | Int Charges | 273.89 |
Jun 15, 2024 | IDA-61430 | Int Charges | 273.89 |
Jun 15, 2024 | IDA-61430 | Int Charges | 411,578.25 |
Jun 15, 2024 | IDA-61430 | Int Charges | 411,578.25 |
Jun 15, 2023 | IDA-61430 | Int Charges | 232,063.10 |
Jun 15, 2023 | IDA-61430 | Int Charges | 232,063.10 |
Jun 15, 2023 | IDA-61430 | Int Charges | 9,706.60 |
Jun 15, 2023 | IDA-61430 | Int Charges | 9,706.60 |
May 11, 2021 | IDA-61430 | Loan Disb | 3,392.00 |
May 11, 2021 | IDA-61430 | Loan Disb | -3,392.00 |
Jun 15, 2023 | IDA-61430 | Loan Disb | 6,832,110.00 |
Aug 2, 2023 | IDA-61430 | Loan Disb | 210,236.10 |
Dec 21, 2023 | IDA-61430 | Loan Repay | 2,226,428.00 |
Dec 21, 2023 | IDA-61430 | Int Charges | 281,621.22 |
Dec 21, 2023 | IDA-61430 | Int Charges | 281,621.22 |
Dec 15, 2023 | IDA-61430 | Loan Repay | 3,615.78 |
Nov 10, 2023 | IDA-61430 | Loan Disb | 882,234.90 |
Jun 16, 2023 | IDA-61430 | Loan Disb | 20,352,948.00 |
Jan 4, 2024 | IDA-61430 | Loan Disb | 11,343.70 |
Nov 20, 2023 | IDA-61430 | Loan Disb | 7,661,211.00 |
Nov 1, 2023 | IDA-61430 | Loan Disb | 229,478.33 |
Oct 6, 2023 | IDA-61430 | Loan Disb | 15,889.50 |
Jan 29, 2024 | IDA-61430 | Loan Disb | 247,640.50 |
Dec 15, 2022 | IDA-61430 | Int Charges | 11,227.52 |
Dec 15, 2022 | IDA-61430 | Int Charges | 11,227.52 |
Dec 15, 2022 | IDA-61430 | Int Charges | 185,863.83 |
Dec 15, 2022 | IDA-61430 | Int Charges | 185,863.83 |
Dec 13, 2022 | IDA-61430 | Loan Disb | 3,058,833.80 |
Mar 24, 2023 | IDA-61430 | Loan Disb | 125,414.01 |
Apr 5, 2023 | IDA-61430 | Loan Disb | 661,514.30 |
Jan 23, 2023 | IDA-61430 | Loan Disb | 588,550.30 |
Oct 15, 2021 | IDA-61430 | Loan Disb | 3,617,244.80 |
Aug 20, 2021 | IDA-61430 | Loan Disb | 545,664.70 |
Apr 21, 2022 | IDA-61430 | Loan Disb | 3,754,820.20 |
May 24, 2022 | IDA-61430 | Loan Disb | 342,107.50 |
Jun 23, 2022 | IDA-61430 | Loan Disb | 8,527,490.00 |
Apr 22, 2022 | IDA-61430 | Loan Disb | 7,280,007.50 |
May 26, 2022 | IDA-61430 | Loan Disb | 111,249.90 |
May 26, 2022 | IDA-61430 | Loan Disb | 189,141.67 |
May 26, 2022 | IDA-61430 | Loan Disb | 122,750.19 |
May 26, 2022 | IDA-61430 | Loan Disb | 479,620.80 |
Jun 15, 2022 | IDA-61430 | Int Charges | 61,585.39 |
Jun 15, 2022 | IDA-61430 | Int Charges | 61,585.39 |
Jun 15, 2022 | IDA-61430 | Int Charges | 3,816.09 |
Jun 15, 2022 | IDA-61430 | Int Charges | 3,816.09 |
Jun 15, 2022 | IDA-61430 | Loan Disb | 250,046.39 |
Jun 14, 2022 | IDA-61430 | Loan Disb | 6,191,256.00 |
May 5, 2022 | IDA-61430 | Loan Disb | 131,069.87 |
Jun 17, 2022 | IDA-61430 | Loan Disb | 8,527,489.00 |
Jun 17, 2022 | IDA-61430 | Loan Disb | 317,701.66 |
May 24, 2022 | IDA-61430 | Loan Disb | 250,046.39 |
May 10, 2022 | IDA-61430 | Loan Disb | 79,088.57 |
Dec 5, 2022 | IDA-61430 | Loan Disb | 5,591,593.00 |
Dec 30, 2021 | IDA-61430 | Loan Disb | 452,155.60 |
Dec 21, 2021 | IDA-61430 | Loan Disb | 115,275.00 |
Dec 15, 2021 | IDA-61430 | Int Charges | 269.49 |
Dec 15, 2021 | IDA-61430 | Int Charges | 269.49 |
Name | Review | Date |
---|---|---|
Financial Management | Satisfactory | 2024-06-06 |
Procurement | Moderately Satisfactory | 2024-06-06 |
Project Management | Moderately Unsatisfactory | 2024-06-06 |
Overall Implementation Progress (IP) | Moderately Unsatisfactory | 2024-06-06 |
Progress towards achievement of PDO | Moderately Satisfactory | 2024-06-06 |
Monitoring and Evaluation | Moderately Satisfactory | 2024-06-06 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Area of the priority Protected Area (PA) with improved access for basic management supported by the project | Value | 0.00 | 4439.00 | 6850.00 |
Date | December 21, 2017 | December 5, 2023 | February 26, 2025 | |
Comment |
Total tourist visits to the priority PAs | Value | 64000.00 | 98921.00 | 135000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Households with access to alternative livelihood activities supported by the project | Value | 0.00 | 3701.00 | 20000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Land area under sustainable landscape management practices | Value | 0.00 | 4202.00 | 10000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Share of beneficiaries with rating â??Satisfiedâ?? or above on project interventions | Value | 0.00 | 0.00 | 65.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Nyerere National Park | Value | 0.00 | 1515.00 | 1500.00 |
Date | December 21, 2017 | December 6, 2022 | September 28, 2023 | |
Comment |
Mikumi National Park | Value | 42000.00 | 52474.00 | 71000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
NRM-based | Value | 0.00 | 649.00 | 15000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
of which female | Value | 0.00 | 0.00 | 65.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Udzungwa National Park | Value | 0.00 | 0.00 | 350.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Ruaha National Park | Value | 18961.00 | 11947.00 | 26000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Tourism-based | Value | 0.00 | 2584.00 | 5000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
of which youth | Value | 0.00 | 0.00 | 65.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Mikumi National Park | Value | 0.00 | 60.00 | 500.00 |
Date | December 21, 2017 | December 6, 2023 | September 28, 2023 | |
Comment |
Nyerere National Park | Value | 18197.00 | 28586200.00 | 26000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Ruaha National Park | Value | 0.00 | 2864.00 | 4500.00 |
Date | December 21, 2017 | December 6, 2023 | September 28, 2023 | |
Comment |
Udzungwa National Park | Value | 4618.00 | 5887.00 | 12000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Access roads rehabilitated inside priority Protected Areas | Value | 0.00 | 1606.00 | 982.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Dry season water supply sources constructed by the project in Ruaha National Park | Value | 0.00 | 46.00 | 4.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Scholarships for vocational training in nature conservation and/or tourism hospitality awarded (disaggregated by sex, age (16-29)) | Value | 0.00 | 1051.00 | 160.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
of which women | Value | 0.00 | 417.00 | 80.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Nyerere National Park | Value | 0.00 | 420.00 | 600.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Smallholder farmers trained on the irrigation water use efficient technologies for improving farming and exploitation of water resources | Value | 0.00 | 6000.00 | 20000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
of which youth | Value | 0.00 | 634.00 | 120.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Ruaha National Park | Value | 0.00 | 1156.00 | 189.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Smallholder agriculture area benefiting from improved irrigation infrastructure | Value | 0.00 | 1365.00 | 2200.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Households trained by the project in alternative livelihood activities (disaggregated by sex, age (16-29)) | Value | 0.00 | 3107.00 | 20000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Operational water user associations and irrigators organizations strengthened under the project | Value | 0.00 | 13.00 | 16.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Mikumi National Park | Value | 0.00 | 30.00 | 193.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
of which youth | Value | 0.00 | 844.00 | 10000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Airstrips rehabilitated in selected project sites | Value | 0.00 | 7.00 | 15.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Nyerere National Park | Value | 0.00 | 3.00 | 6.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
of which women | Value | 0.00 | 2263.00 | 10000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Households trained by the project in reduction of human-wildlife conflicts | Value | 0.00 | 161.00 | 6000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Ruaha National Park | Value | 0.00 | 3.00 | 8.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Mikumi National Park | Value | 0.00 | 1.00 | 1.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Communities using project-promoted techniques to reduce human-wildlife conflict disaggregated by crop-protection and livestock-protection technique | Value | 0.00 | 240.00 | 5000.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Ranger posts constructed or/and upgraded in priority Protected Areas | Value | 0.00 | 0.00 | 15.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Crop-protection technique | Value | 0.00 | 201.00 | 2500.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Livestock-protection technique | Value | 0.00 | 39.00 | 2500.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Udzungwa National Park | Value | 0.00 | 0.00 | 1.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Nyerere National Park | Value | 0.00 | 0.00 | 5.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Ruaha National Park | Value | 0.00 | 0.00 | 7.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Mikumi National Park | Value | 0.00 | 0.00 | 2.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Visitor information centers constructed and operational in priority Protected Areas | Value | 0.00 | 0.00 | 5.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Nyerere National Park | Value | 0.00 | 0.00 | 3.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Ruaha National Park | Value | 0.00 | 0.00 | 2.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Wildlife census conducted in priority Protected Areas | Value | 0.00 | 6.00 | 12.00 |
Date | December 21, 2017 | December 6, 2023 | February 26, 2025 | |
Comment |
Udzungwa | Value | 0.00 | 0.00 | 3.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Nyerere National Park | Value | 0.00 | 0.00 | 3.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Ruaha National Park | Value | 0.00 | 0.00 | 3.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Mikumi National Park | Value | 0.00 | 0.00 | 3.00 |
Date | December 21, 2017 | June 20, 2022 | September 28, 2023 | |
Comment |
Product and Market Development Strategy for Southern Tanzania is developed | Value | No | No | Yes |
Date | December 21, 2017 | June 20, 2022 | February 26, 2025 | |
Comment |
Destination management partnership for Southern Tanzania operational | Value | No | Yes | Yes |
Date | December 21, 2017 | September 20, 2023 | February 26, 2025 | |
Comment |