Skip to Main Navigation

IN Swachh Bharat Mission Support Operation

Abstract*

India has been one of the fastest growing economies during the last decade. Between 2004 and 2011, Gross Domestic Product (GDP) expanded at a rate of 8.3 percent per year while poverty declined by an average of 2.5 percentage points per year, a pace significantly faster than earlier periods. Poverty reduction was supported by higher economic growth and greater responsiveness of poverty to growth, including through the expansion of social programs...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

This Operation provides support to the Swachh Bharat Mission – Gramin (SBM-G) national program, the new rural sanitation flagshipprogram launched by the Prime Minister in September, 2014. The Program Development Objective of the Swachh Bharat Mission Support Operation ( SBMSO) is to: to reduce open defecation in rural areas, and strengthen MDWS capacity to manage the national SBM-G program.

Key Details

Project Details

  • P153251

  • Closed

  • Raghava Neti , Xavier Chauvot De Beauchene

  • INDIA

  • India

  • October 15, 2015

  • (as of board presentation)

    December 15, 2015

  • April 27, 2016

  • US$ 22000.00 million

  • Ministry of Jal Shakti, Department of Drinking Water and Sanitation

  • South Asia

  • 2016

  • US$ 1500.00 million

  • B

  • July 11, 2024

  • September 30, 2021

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 1500.00
Borrower/Recipient 20500.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 1500.00
IDA Commitment N/A
IBRD + IDA Commitment 1500.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 22000.00

Summary Status of World Bank Financing (US$ Millions) as of January 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of January 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 5, 2020 IBRD-85590 Loan Disb 406,400,000.00
May 19, 2020 IBRD-85590 Loan Cancel 232,520,000.00
Jun 15, 2020 IBRD-85590 Int Charges 11,681,988.00
Jun 15, 2020 IBRD-85590 Int Charges 688,976.40
Oct 29, 2020 IBRD-85590 Loan Disb 665,127.56
Jun 4, 2020 IBRD-85590 Loan Cancel 1,250,000.00
Jun 15, 2017 IBRD-85590 Int Charges 76,861.44
Jun 15, 2017 IBRD-85590 Int Charges 3,908,769.80
Jun 15, 2021 IBRD-85590 Int Charges 132.68
Jun 15, 2021 IBRD-85590 Int Charges 6,700,385.00
Jun 15, 2021 IBRD-85590 Loan Repay 33,755,712.00
Jun 15, 2021 IBRD-85590 Loan Repay 1,245,901.20
Mar 6, 2021 IBRD-85590 Loan Cancel 7,000,000.00
Jun 15, 2022 IBRD-85590 Int Charges 130.07
Jun 15, 2022 IBRD-85590 Int Charges 6,792,765.00
Jun 15, 2022 IBRD-85590 Loan Repay 35,001,612.00
Mar 31, 2022 IBRD-85590 Loan Cancel 179,166.39
Dec 15, 2021 IBRD-85590 Int Charges 224.57
Dec 15, 2021 IBRD-85590 Int Charges 6,097,805.00
Dec 15, 2021 IBRD-85590 Loan Repay 35,001,612.00
Dec 15, 2022 IBRD-85590 Int Charges 93.26
Dec 15, 2018 IBRD-85590 Int Charges 2,533,304.50
Dec 15, 2018 IBRD-85590 Int Charges 993.21
Dec 15, 2018 IBRD-85590 Int Charges 1,689,014.20
Nov 21, 2018 IBRD-85590 Loan Disb 597,005.10
Dec 15, 2018 IBRD-85590 Int Charges 107.72
Jun 15, 2019 IBRD-85590 Int Charges 98.13
Jun 19, 2019 IBRD-85590 Loan Disb 432,460,000.00
Jun 15, 2019 IBRD-85590 Int Charges 1,552,889.80
Jun 15, 2019 IBRD-85590 Int Charges 4,743,504.00
Jun 15, 2019 IBRD-85590 Int Charges 1,203.34
Apr 8, 2019 IBRD-85590 Loan Disb 269,940,000.00
Apr 9, 2019 IBRD-85590 Loan Disb 1,018,207.94
Aug 21, 2019 IBRD-85590 Loan Disb 645,851.60
Dec 30, 2019 IBRD-85590 Loan Disb 425,714.00
Apr 27, 2020 IBRD-85590 Loan Disb 1,615,638.60
Dec 15, 2019 IBRD-85590 Int Charges 13,440,059.00
Dec 15, 2019 IBRD-85590 Int Charges 817,961.60
Jun 15, 2023 IBRD-85590 Int Charges 1,476,500.60
Jun 15, 2023 IBRD-85590 Int Charges 30,951,698.00
Dec 15, 2023 IBRD-85590 Int Charges 595,108.90
Dec 15, 2023 IBRD-85590 Int Charges 34,297,916.00
Dec 15, 2023 IBRD-85590 Loan Repay 35,001,612.00
Jun 15, 2024 IBRD-85590 Int Charges 35,163,624.00
Jun 15, 2024 IBRD-85590 Loan Repay 35,001,612.00
Jun 15, 2024 IBRD-85590 Int Charges 215,544.17
Dec 15, 2015 IBRD-85590 Loan Commitment 1,500,000,000.00
Dec 15, 2020 IBRD-85590 Int Charges -42,339.08
Dec 15, 2020 IBRD-85590 Int Charges 42,339.08
Dec 15, 2020 IBRD-85590 Int Charges 114,354.96
Dec 15, 2020 IBRD-85590 Int Charges 1,131,961.60
Dec 15, 2020 IBRD-85590 Int Charges 7,742,056.00
Mar 6, 2021 IBRD-85590 Loan Disb -7,163,372.00
Jun 15, 2021 IBRD-85590 Int Charges 837.19
Dec 15, 2022 IBRD-85590 Int Charges 21,992,904.00
Dec 15, 2022 IBRD-85590 Loan Repay 35,001,612.00
Jun 15, 2023 IBRD-85590 Loan Repay 35,001,612.00
Apr 27, 2016 IBRD-85590 Loan Disb 3,750,000.00
Apr 27, 2016 IBRD-85590 Fee Charges 3,750,000.00
Dec 15, 2017 IBRD-85590 Int Charges 28,965.06
Dec 15, 2017 IBRD-85590 Int Charges 1,192,190.80
May 31, 2018 IBRD-85590 Loan Disb 1,048,503.25
Dec 15, 2017 IBRD-85590 Int Charges 654,280.75
Dec 15, 2017 IBRD-85590 Int Charges 41,365.62
Mar 27, 2018 IBRD-85590 Loan Disb 147,500,000.00
Jun 15, 2018 IBRD-85590 Int Charges 1,784,258.80
Jun 15, 2018 IBRD-85590 Int Charges 873,775.00
Aug 9, 2018 IBRD-85590 Loan Disb 148,157.31

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Monitoring and Evaluation Satisfactory 2021-02-04
Overall Implementation Progress (IP) Moderately Satisfactory 2021-02-04
Progress towards achievement of PDO Satisfactory 2021-02-04

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT: 04-13-2023
OutcomesSubstantial
Risk to Development Outcome
Bank PerformanceSubstantial
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

INDICATORICR REVIEW: 09-15-2023PROJECT PERFORMANCE ASSESSMENT REPORT:
Outcome RatingSatisfactory N/a
Risk To Development OutcomeN/a
Bank PerformanceSatisfactoryN/a
Borrower PerformanceN/a
Government PerformanceN/a
Implementing AgencyN/a
Icr QualitySubstantialN/a
M&e QualitySubstantialN/a

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • PDO Indicator 1: Reduction in the prevalence of open defecationValue0.00206000000.000.00
    DateMarch 31, 2018March 31, 2020
    Comment
  • PDO Indicator 2: National annual sanitation survey conducted and results publishedValueNoYes
    DateDecember 31, 2015March 31, 2020
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Intermediate Result Indicator 5: Rural population with SLWMValue255782.61371782.610.00
    DateMarch 31, 2018December 31, 2020
    Comment
  • Intermediate Result Indicator 7: Program management unit strengthened and functionalValueNoYes
    DateDecember 31, 2015December 31, 2020
    Comment
  • Intermediate Results Indicator 2: Percent of female beneficiariesValue47.8047.800.00
    DateMarch 31, 2018December 31, 2020
    Comment
  • Intermediate Result Indicator 6: Number of villages with SLWMValue227754.00311754.000.00
    DateMarch 31, 2018December 31, 2020
    Comment
  • Intermediate Result Indicator 8: Monitoring and Evaluation Unit strengthenedValueNoYes
    DateDecember 31, 2015December 31, 2020
    Comment
  • Intermediate Result Indicatior 3: Increase in the percentage of poor and vulnerable (PAV) rural population having access to safte and functional sanitationValue66.1088.100.00
    DateMarch 31, 2018December 31, 2020
    Comment
  • Intermediate Result Indicator 9: IMIS improved and functionalValueYesYes
    DateDecember 31, 2015December 31, 2020
    Comment
  • Intermediate Result Indictor 10: BCC campaign implemented at national levelValueYesYes
    DateDecember 31, 2015December 31, 2020
    Comment
  • Intermediate Result Indicator 11: Report on grievances received and addressedValueYesYes
    DateDecember 31, 2015December 31, 2020
    Comment
  • Intermediate Result Indicator 12: Report on annual program performanceValueNoYes
    DateDecember 31, 2015December 31, 2020
    Comment
  • Intermediate Results Indicator 1: Increase in the rural population having access to safe and functional sanitation facilities (beneficaries)Value57.6087.100.00
    DateMarch 31, 2018December 31, 2020
    Comment
  • Intermediate Results Indicator 4: Sustaining ODF status in villagesValue89790.00137790.000.00
    DateMarch 31, 2018December 31, 2020
    Comment