Financier | Commitments |
---|---|
FRANCE: French Agency for Development | 18.13 |
IDA Credit | 445.00 |
Borrower/Recipient | 60.00 |
P156433
Active
Fook Eng , Nishtha Mehta, Yohannes Fisseha
Federal Democratic Republic of Ethiopia
January 4, 2017
(as of board presentation)
March 31, 2017
August 4, 2017
US$ 523.13 million
Addis Ababa Water and Sewerage Authority (AAWSA) Water Supply and Sanitation Infrastructural Develop,Ministry of Water and Energy
2017
US$ 463.13 million
B
March 28, 2024
June 30, 2027
Yes
BANK APPROVED
Financier | Commitments |
---|---|
FRANCE: French Agency for Development | 18.13 |
IDA Credit | 445.00 |
Borrower/Recipient | 60.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 445.00 |
IBRD + IDA Commitment | 445.00 |
Lending Instrument | |
---|---|
Grant Amount | 18.13 |
Total Project Cost** | 523.13 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jul 17, 2018 | IDA-60070 | Int Charges | 89,612.42 |
Jan 15, 2019 | IDA-60070 | Int Charges | 1,359.26 |
Jan 15, 2019 | IDA-60070 | Int Charges | 1,359.26 |
Jan 15, 2019 | IDA-60070 | Int Charges | 94,647.97 |
Jan 15, 2019 | IDA-60070 | Int Charges | 94,647.97 |
Jun 13, 2019 | IDA-60070 | Loan Disb | 15,979,727.00 |
Jul 15, 2019 | IDA-60070 | Int Charges | 941.30 |
Jul 15, 2019 | IDA-60070 | Int Charges | 941.30 |
Jul 15, 2019 | IDA-60070 | Int Charges | 96,051.47 |
Jul 15, 2019 | IDA-60070 | Int Charges | 96,051.47 |
Jan 15, 2024 | IDA-60080 | Int Charges | 221,290.27 |
Jan 30, 2024 | IDA-60080 | Loan Disb | 662,816.40 |
Feb 6, 2024 | IDA-60080 | Loan Disb | 35,058,924.00 |
Feb 15, 2024 | IDA-60080 | Loan Disb | 136,254.56 |
Mar 21, 2024 | IDA-60080 | Loan Disb | 1,208,673.60 |
Feb 15, 2024 | IDA-60080 | Loan Disb | 122,142.78 |
Feb 15, 2024 | IDA-60080 | Loan Disb | 110,653.92 |
Feb 15, 2024 | IDA-60080 | Loan Disb | 457,792.38 |
Feb 15, 2024 | IDA-60080 | Loan Disb | 111,530.48 |
Apr 24, 2024 | IDA-60080 | Loan Disb | 477,019.00 |
Aug 2, 2024 | IDA-60080 | Loan Disb | 197,722.48 |
Jun 17, 2024 | IDA-60080 | Loan Disb | 735,659.44 |
Mar 14, 2024 | IDA-60080 | Loan Disb | 182,017.61 |
Apr 15, 2024 | IDA-60080 | Loan Disb | 5,593,569.50 |
Apr 3, 2024 | IDA-60080 | Loan Disb | 1,186,500.00 |
Apr 3, 2024 | IDA-60080 | Loan Disb | 843,665.75 |
Jun 3, 2024 | IDA-60080 | Loan Disb | 197,722.52 |
Aug 8, 2024 | IDA-60080 | Loan Disb | 466,014.60 |
Jan 22, 2024 | IDA-60080 | Loan Disb | 277,449.30 |
Jan 16, 2024 | IDA-60080 | Loan Disb | 367,396.50 |
Oct 23, 2023 | IDA-60080 | Loan Disb | 215,483.64 |
Oct 20, 2023 | IDA-60080 | Loan Disb | 133,507.69 |
Oct 20, 2023 | IDA-60080 | Loan Disb | 205,634.14 |
Jun 25, 2024 | IDA-60080 | Loan Disb | 203,675.40 |
May 10, 2024 | IDA-60080 | Loan Disb | 477,154.00 |
Mar 29, 2024 | IDA-75320 | Loan Commitment | 275,000,000.00 |
Mar 31, 2017 | IDA-60070 | Loan Commitment | 320,000,000.00 |
Mar 31, 2017 | IDA-60080 | Loan Commitment | 125,000,000.00 |
Jul 15, 2019 | IDA-60080 | Int Charges | 154,578.34 |
Jul 15, 2019 | IDA-60080 | Int Charges | 6,640.62 |
Jul 17, 2018 | IDA-60080 | Int Charges | 190,573.62 |
Jul 17, 2018 | IDA-60080 | Int Charges | 5,939.66 |
Jul 17, 2018 | IDA-60080 | Int Charges | 154,578.34 |
Jul 17, 2018 | IDA-60080 | Int Charges | 6,640.62 |
Jan 15, 2019 | IDA-60080 | Int Charges | 6,640.62 |
Jan 15, 2019 | IDA-60080 | Int Charges | 157,140.40 |
Aug 4, 2017 | IDA-60080 | Loan Disb | 312,500.00 |
Aug 4, 2017 | IDA-60080 | Fee Charges | 312,500.00 |
Aug 4, 2023 | IDA-60080 | Loan Disb | 132,425.31 |
Aug 24, 2023 | IDA-60080 | Loan Disb | 162,828.72 |
Jul 20, 2023 | IDA-60080 | Int Charges | 154,507.66 |
Jul 20, 2023 | IDA-60080 | Int Charges | 6,711.31 |
May 3, 2024 | IDA-60080 | Loan Disb | 422,548.75 |
Jun 3, 2024 | IDA-60080 | Loan Disb | 279,207.60 |
May 10, 2024 | IDA-60080 | Loan Disb | 985,646.25 |
Jul 18, 2024 | IDA-60080 | Loan Disb | 1,170,956.80 |
Jul 11, 2024 | IDA-60080 | Loan Disb | 743,293.70 |
Jul 18, 2024 | IDA-60080 | Loan Disb | 1,660,345.00 |
Aug 7, 2024 | IDA-60080 | Loan Disb | 190,029.44 |
Jul 15, 2024 | IDA-60080 | Int Charges | 9,801.91 |
Jul 15, 2024 | IDA-60080 | Int Charges | 53,776.79 |
Jul 15, 2024 | IDA-60080 | Int Charges | 1,725,910.40 |
Aug 7, 2024 | IDA-60080 | Loan Disb | 169,003.20 |
Jul 12, 2024 | IDA-60080 | Loan Disb | 925,483.00 |
Feb 5, 2024 | IDA-60080 | Loan Disb | 25,681,298.00 |
Jun 6, 2024 | IDA-60080 | Loan Disb | 2,552,723.80 |
Jan 15, 2024 | IDA-60080 | Int Charges | 1,147.68 |
Jan 15, 2024 | IDA-60080 | Int Charges | 143,825.55 |
Jan 15, 2021 | IDA-60080 | Int Charges | 156,743.75 |
Jan 15, 2021 | IDA-60080 | Int Charges | 6,640.62 |
Jul 23, 2020 | IDA-60080 | Int Charges | 155,007.70 |
Jul 23, 2020 | IDA-60080 | Int Charges | 6,640.62 |
Jan 15, 2020 | IDA-60080 | Int Charges | 157,107.73 |
Jan 15, 2020 | IDA-60080 | Int Charges | 6,640.62 |
Jul 15, 2022 | IDA-60080 | Int Charges | 6,640.62 |
Jul 15, 2021 | IDA-60080 | Int Charges | 154,578.34 |
Jul 15, 2021 | IDA-60080 | Int Charges | 6,640.62 |
Jul 31, 2023 | IDA-60080 | Loan Disb | 320,104.50 |
Jan 20, 2023 | IDA-60080 | Int Charges | 157,140.40 |
Jan 20, 2023 | IDA-60080 | Int Charges | 6,640.62 |
Jan 15, 2022 | IDA-60080 | Int Charges | 157,140.40 |
Jan 15, 2022 | IDA-60080 | Int Charges | 6,640.62 |
Jul 15, 2022 | IDA-60080 | Int Charges | 154,578.34 |
Dec 4, 2023 | IDA-60080 | Loan Disb | 1,146,584.60 |
Aug 28, 2024 | IDA-60080 | Loan Disb | 1,190,205.60 |
Aug 29, 2024 | IDA-60080 | Loan Disb | 227,760.98 |
Nov 17, 2023 | IDA-60080 | Loan Disb | 711,066.25 |
Oct 8, 2023 | IDA-60080 | Loan Disb | 14,352,582.00 |
Aug 3, 2023 | IDA-60080 | Loan Disb | 439,156.88 |
Aug 10, 2023 | IDA-60080 | Loan Disb | 182,456.95 |
Sep 13, 2023 | IDA-60080 | Loan Disb | 843,395.75 |
Jun 9, 2023 | IDA-60080 | Loan Disb | 160,428.38 |
Jun 9, 2023 | IDA-60080 | Loan Disb | 126,246.63 |
Aug 21, 2023 | IDA-60080 | Loan Disb | 161,603.48 |
May 27, 2024 | IDA-60070 | Loan Cancel | 19,999,330.00 |
Jul 15, 2024 | IDA-60070 | Int Charges | 54,818.74 |
Jul 15, 2024 | IDA-60070 | Int Charges | 54,818.74 |
Jul 15, 2024 | IDA-60070 | Loan Repay | 4,902,566.50 |
Jul 15, 2024 | IDA-60070 | Int Charges | 606,168.25 |
Jul 15, 2024 | IDA-60070 | Int Charges | 606,168.25 |
Feb 8, 2024 | IDA-60070 | Loan Disb | 205,210.72 |
Apr 16, 2024 | IDA-60070 | Loan Disb | 15,907,557.00 |
Nov 28, 2022 | IDA-60070 | Loan Disb | 3,874,825.00 |
Nov 21, 2022 | IDA-60070 | Loan Disb | 13,310,490.00 |
Dec 1, 2022 | IDA-60070 | Loan Disb | 126,139.65 |
Dec 28, 2022 | IDA-60070 | Loan Disb | 151,599.88 |
Dec 28, 2022 | IDA-60070 | Loan Disb | 126,795.75 |
Dec 30, 2022 | IDA-60070 | Loan Disb | 153,076.66 |
Dec 21, 2022 | IDA-60070 | Loan Disb | 268,543.94 |
Dec 21, 2022 | IDA-60070 | Loan Disb | 117,826.95 |
Dec 29, 2022 | IDA-60070 | Loan Disb | 154,087.58 |
Apr 4, 2023 | IDA-60070 | Loan Disb | 140,389.56 |
Jan 20, 2023 | IDA-60070 | Int Charges | 438,010.28 |
Jan 20, 2023 | IDA-60070 | Int Charges | 438,010.28 |
Jan 30, 2023 | IDA-60070 | Loan Disb | 114,026.09 |
Dec 14, 2022 | IDA-60070 | Loan Disb | 211,138.77 |
Jan 10, 2023 | IDA-60070 | Loan Disb | 349,680.00 |
Jan 9, 2023 | IDA-60070 | Loan Disb | 3,240,274.20 |
Feb 22, 2023 | IDA-60070 | Loan Disb | 201,882.69 |
Jan 17, 2023 | IDA-60070 | Loan Disb | 12,456,936.00 |
Apr 11, 2023 | IDA-60070 | Loan Disb | 160,546.69 |
Jul 20, 2023 | IDA-60070 | Int Charges | 31,416.03 |
Jul 20, 2023 | IDA-60070 | Int Charges | 31,416.03 |
Jul 20, 2023 | IDA-60070 | Loan Repay | 4,990,441.00 |
Jul 20, 2023 | IDA-60070 | Int Charges | 561,110.40 |
Jul 20, 2023 | IDA-60070 | Int Charges | 561,110.40 |
Jul 27, 2023 | IDA-60070 | Loan Disb | 7,642,168.50 |
May 31, 2023 | IDA-60070 | Loan Disb | 1,636,712.60 |
Aug 1, 2023 | IDA-60070 | Loan Disb | 126,389.01 |
Jun 9, 2023 | IDA-60070 | Loan Disb | 10,172,374.00 |
Jan 15, 2023 | IDA-60070 | Int Charges | 6,280.84 |
Jan 15, 2023 | IDA-60070 | Int Charges | 6,280.84 |
Nov 20, 2023 | IDA-60070 | Loan Disb | 200,281.94 |
Oct 8, 2023 | IDA-60070 | Loan Disb | -14,352,582.00 |
Dec 26, 2023 | IDA-60070 | Loan Disb | 7,087,904.50 |
Dec 5, 2023 | IDA-60070 | Loan Disb | 12,512,843.00 |
Jun 8, 2023 | IDA-60070 | Loan Disb | 14,352,582.00 |
Nov 27, 2023 | IDA-60070 | Loan Disb | 277,355.28 |
Dec 4, 2023 | IDA-60070 | Loan Disb | 216,442.80 |
Nov 20, 2023 | IDA-60070 | Loan Disb | 119,977.79 |
Jan 15, 2024 | IDA-60070 | Int Charges | 54,808.73 |
Jan 15, 2024 | IDA-60070 | Int Charges | 54,808.73 |
Jan 15, 2024 | IDA-60070 | Loan Repay | 4,935,034.50 |
Jan 15, 2024 | IDA-60070 | Int Charges | 626,902.90 |
Jan 15, 2024 | IDA-60070 | Int Charges | 626,902.90 |
Jan 15, 2024 | IDA-60070 | Int Charges | 514.07 |
Jan 15, 2024 | IDA-60070 | Int Charges | 514.07 |
Feb 6, 2024 | IDA-60070 | Loan Disb | -35,058,924.00 |
Jun 26, 2024 | IDA-60070 | Loan Disb | 5,870,825.50 |
Jan 26, 2024 | IDA-60070 | Loan Disb | 2,989,952.00 |
Dec 23, 2019 | IDA-60070 | Loan Disb | 3,857,763.80 |
Jan 15, 2020 | IDA-60070 | Int Charges | 10,799.94 |
Jan 15, 2020 | IDA-60070 | Int Charges | 10,799.94 |
Jan 15, 2020 | IDA-60070 | Int Charges | 154,955.19 |
Jan 15, 2020 | IDA-60070 | Int Charges | 154,955.19 |
Jun 16, 2020 | IDA-60070 | Loan Disb | 13,576,215.00 |
Apr 24, 2020 | IDA-60070 | Loan Disb | 1,000,000.00 |
Jul 23, 2020 | IDA-60070 | Int Charges | 2,640.17 |
Jul 23, 2020 | IDA-60070 | Int Charges | 2,640.17 |
Jul 23, 2020 | IDA-60070 | Int Charges | 169,208.02 |
Jul 23, 2020 | IDA-60070 | Int Charges | 169,208.02 |
Jan 15, 2021 | IDA-60070 | Int Charges | 13,325.28 |
Jan 15, 2021 | IDA-60070 | Int Charges | 13,325.28 |
Jan 15, 2021 | IDA-60070 | Int Charges | 231,006.62 |
Jan 15, 2021 | IDA-60070 | Int Charges | 231,006.62 |
Sep 22, 2021 | IDA-60070 | Loan Disb | 16,114,122.00 |
Jul 15, 2021 | IDA-60070 | Int Charges | 3,502.64 |
Jul 15, 2021 | IDA-60070 | Int Charges | 3,502.64 |
Jul 15, 2021 | IDA-60070 | Int Charges | 279,833.40 |
Jul 15, 2021 | IDA-60070 | Int Charges | 279,833.40 |
Mar 26, 2021 | IDA-60070 | Loan Disb | 21,010,258.00 |
Sep 17, 2021 | IDA-60070 | Loan Disb | 795,559.00 |
Apr 6, 2022 | IDA-60070 | Loan Disb | 19,417,234.00 |
Jan 15, 2022 | IDA-60070 | Int Charges | 2,808.35 |
Jan 15, 2022 | IDA-60070 | Int Charges | 2,808.35 |
Jan 15, 2022 | IDA-60070 | Int Charges | 343,388.84 |
Jan 15, 2022 | IDA-60070 | Int Charges | 343,388.84 |
Aug 19, 2022 | IDA-60070 | Loan Disb | 9,291,498.00 |
Jul 15, 2022 | IDA-60070 | Int Charges | 382,524.30 |
Jul 15, 2022 | IDA-60070 | Int Charges | 382,524.30 |
Jul 15, 2022 | IDA-60070 | Int Charges | 680.61 |
Jul 15, 2022 | IDA-60070 | Int Charges | 680.61 |
Jan 31, 2018 | IDA-60070 | Loan Disb | 27,000,000.00 |
Jul 17, 2018 | IDA-60070 | Int Charges | 89,612.42 |
Name | Review | Date |
---|---|---|
Project Management | Moderately Satisfactory | 2025-01-27 |
Monitoring and Evaluation | Moderately Satisfactory | 2025-01-27 |
Progress towards achievement of PDO | Moderately Satisfactory | 2025-01-27 |
Procurement | Moderately Satisfactory | 2025-01-27 |
Financial Management | Moderately Satisfactory | 2025-01-27 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2025-01-27 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
People in urban areas whose excreta are safely managed under the project | Value | 0.00 | 685000.00 | 3119000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Operation cost coverage ratio | Value | 1.04 | 1.09 | 1.29 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 685000.00 | 511900.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 1.04 | 0.94 | 1.29 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary cities | Value | 0.00 | 0.00 | 2607100.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary cities | Value | 1.09 | 1.39 | 1.34 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Number of people in urban areas provided with access to Improved Water Sources under the project | Value | 0.00 | 689752.00 | 623000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 489935.00 | 154000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 0.00 | 214754.00 | 469000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Direct project beneficiaries | Value | 0.00 | 1292766.00 | 3720000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Female beneficiaries | Value | 0.00 | 0.00 | 50.00 |
Date | March 30, 2017 | April 30, 2018 | July 7, 2023 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
New Sewer Connections constructed under the project | Value | 0.00 | 37696.00 | 57600.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Proportion of Project utilities producing Project progress report (physical and financial) including progress on GAP as per the reporting format on a quarterly basis | Value | 0.00 | 91.00 | 90.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
New piped household water connections that are resulting from the project intervention | Value | 0.00 | 65468.00 | 61000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 23567.00 | 17000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Residential | Value | 0.00 | 32042.00 | 52340.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 0.00 | 41501.00 | 44000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
commercial | Value | 0.00 | 5654.00 | 5260.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Volume of wastewater/sludge safely collected, transported, treated and disposed under the project (per day) | Value | 0.00 | 73030.00 | 229000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Number of participating utilities in secondary cities that have assigned a unit responsible for sanitation services | Value | 0.00 | 22.00 | 22.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Participating utilities that have established/ are using NRW data management system | Value | 0.00 | 0.00 | 23.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 0.00 | 1.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 73030.00 | 86000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Grievances registered related to delivery of project benefits that are actually addressed (%) | Value | 0.00 | 100.00 | 85.00 |
Date | March 30, 2017 | June 30, 2023 | June 30, 2024 | |
Comment |
of which submitted by women | Value | 0.00 | 33.00 | 85.00 |
Date | April 8, 2020 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 0.00 | 0.00 | 143000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 0.00 | 0.00 | 22.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Collection Efficiency of participating utilities | Value | 81.00 | 86.35 | 95.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Share of newly assigned decision-making positions filled by women in Project participating utilities | Value | 15.00 | 20.60 | 22.50 |
Date | April 8, 2020 | February 1, 2024 | June 30, 2024 | |
Comment |
Participating cities that have prepared and implemented an integrated urban sanitation management plan under the project. | Value | 0.00 | 19.00 | 23.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 0.00 | 1.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 17.00 | 27.00 | 25.00 |
Date | April 8, 2020 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 87.00 | 94.00 | 95.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 81.00 | 78.70 | 95.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 13.00 | 14.42 | 20.00 |
Date | April 8, 2020 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 0.00 | 19.00 | 22.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
People trained to improve hygiene behavior/sanitation practices under the project | Value | 0.00 | 180.00 | 234000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Number of participating utilities with updated business plan | Value | 0.00 | 5.00 | 23.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
People trained to improve hygiene behavior/sanitation practices - female | Value | 0.00 | 162.00 | 117000.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 0.00 | 1.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Number of public and communal latrines constructed under the project and providing service | Value | 0.00 | 407.00 | 1350.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary Cities | Value | 0.00 | 5.00 | 22.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Savings from NRW interventions under the project | Value | 39.00 | 39.00 | 34.00 |
Date | April 8, 2020 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 0.00 | 133.00 | 200.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Secondary cities | Value | 0.00 | 274.00 | 1150.00 |
Date | March 30, 2017 | February 1, 2024 | June 30, 2024 | |
Comment |
Addis Ababa | Value | 39.00 | 39.00 | 0.00 |
Date | ||||
Comment |
Proportion of targeted public facilities provided with water supply and sanitation services under the Project to respond to emergency situations | Value | 0.00 | 0.00 | 0.00 |
Date | ||||
Comment |
Secondary Cities | Value | 38.00 | 38.00 | 0.00 |
Date | ||||
Comment |