Financier | Commitments |
---|---|
IDA Credit | 30.00 |
Borrower/Recipient | 6.00 |
P157963
Closed
Benjamin Burckhart
Ministry of Finance
February 11, 2016
(as of board presentation)
May 24, 2016
September 13, 2016
US$ 36.00 million
Poverty Reduction Fund
2016
US$ 30.00 million
B
Not Applicable
June 30, 2024
No
BANK APPROVED
June 26, 2024
Financier | Commitments |
---|---|
IDA Credit | 30.00 |
Borrower/Recipient | 6.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 30.00 |
IBRD + IDA Commitment | 30.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 36.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Jan 31, 2024 | IDA-65060 | Loan Disb | 373,952.20 |
Jun 7, 2024 | IDA-65060 | Loan Disb | 666,632.00 |
Mar 25, 2024 | IDA-65060 | Loan Disb | 206,450.56 |
Mar 25, 2024 | IDA-65060 | Loan Disb | 1,064,474.40 |
May 24, 2016 | IDA-58270 | Loan Commitment | 30,000,000.00 |
Dec 2, 2019 | IDA-65060 | Loan Commitment | 22,500,000.00 |
Jan 27, 2023 | IDA-65060 | Loan Disb | 414,592.22 |
Mar 10, 2023 | IDA-65060 | Loan Disb | 386,439.66 |
May 4, 2023 | IDA-65060 | Loan Disb | 517,351.16 |
Jan 17, 2023 | IDA-65060 | Loan Disb | 579,165.06 |
Aug 7, 2023 | IDA-65060 | Loan Disb | 818,731.10 |
Aug 25, 2023 | IDA-65060 | Loan Disb | 645,449.94 |
Sep 26, 2023 | IDA-65060 | Loan Disb | 591,047.40 |
Jun 22, 2023 | IDA-65060 | Loan Disb | 1,067,391.80 |
Dec 26, 2023 | IDA-65060 | Loan Disb | 310,796.56 |
Nov 20, 2023 | IDA-65060 | Loan Disb | 498,478.22 |
Dec 22, 2023 | IDA-65060 | Loan Disb | 482,685.97 |
Oct 3, 2023 | IDA-58270 | Loan Repay | 192,876.72 |
Oct 4, 2023 | IDA-65060 | Int Charges | 519.11 |
Apr 1, 2024 | IDA-58270 | Loan Repay | 17,927.35 |
Oct 3, 2023 | IDA-58270 | Int Charges | 97,513.87 |
Oct 3, 2023 | IDA-58270 | Int Charges | 97,513.87 |
Oct 3, 2023 | IDA-58270 | Loan Repay | 263,028.78 |
Oct 4, 2023 | IDA-65060 | Int Charges | 53,427.20 |
Sep 2, 2022 | IDA-65060 | Loan Disb | 608,569.56 |
Nov 2, 2022 | IDA-65060 | Loan Disb | 668,420.25 |
Oct 6, 2022 | IDA-58270 | Loan Repay | 257,992.31 |
Oct 6, 2022 | IDA-58270 | Loan Repay | 179,202.64 |
Oct 6, 2022 | IDA-58270 | Int Charges | 92.63 |
Oct 6, 2022 | IDA-58270 | Int Charges | 92.63 |
Oct 6, 2022 | IDA-65060 | Int Charges | 659.75 |
Oct 6, 2022 | IDA-65060 | Int Charges | 29,070.07 |
Oct 6, 2022 | IDA-65060 | Int Charges | 29,070.07 |
Oct 6, 2022 | IDA-65060 | Int Charges | 48,450.08 |
Oct 1, 2022 | IDA-58270 | Loan Repay | 15,121.99 |
Oct 6, 2022 | IDA-58270 | Int Charges | 154.39 |
Oct 6, 2022 | IDA-58270 | Int Charges | 99,426.08 |
Oct 6, 2022 | IDA-58270 | Int Charges | 99,426.08 |
Oct 6, 2022 | IDA-58270 | Int Charges | 165,710.10 |
Apr 1, 2023 | IDA-58270 | Loan Repay | 20,997.55 |
Apr 1, 2023 | IDA-58270 | Loan Repay | 451,783.53 |
Apr 1, 2023 | IDA-58270 | Int Charges | 47.59 |
Apr 1, 2023 | IDA-58270 | Int Charges | 47.59 |
Dec 14, 2022 | IDA-65060 | Loan Disb | 652,107.10 |
Apr 1, 2023 | IDA-65060 | Int Charges | 1,278.53 |
Apr 1, 2023 | IDA-65060 | Int Charges | 1,278.53 |
Apr 1, 2023 | IDA-65060 | Int Charges | 39,209.23 |
Apr 1, 2023 | IDA-65060 | Int Charges | 39,209.23 |
Apr 1, 2023 | IDA-65060 | Int Charges | 66,946.25 |
Apr 1, 2023 | IDA-58270 | Int Charges | 79.33 |
Apr 1, 2023 | IDA-58270 | Int Charges | 23,088.28 |
Apr 1, 2023 | IDA-58270 | Int Charges | 23,088.28 |
Apr 1, 2023 | IDA-58270 | Int Charges | 79,043.17 |
Apr 1, 2023 | IDA-58270 | Int Charges | 79,043.17 |
Apr 1, 2023 | IDA-58270 | Int Charges | 170,219.11 |
Mar 22, 2023 | IDA-65060 | Loan Disb | 1,153,058.00 |
Apr 6, 2021 | IDA-58270 | Int Charges | 336.56 |
Apr 6, 2021 | IDA-65060 | Int Charges | 11.82 |
Oct 25, 2021 | IDA-58270 | Loan Repay | 192,527.77 |
Oct 25, 2021 | IDA-58270 | Int Charges | 112,979.99 |
Oct 25, 2021 | IDA-58270 | Int Charges | 112,979.99 |
Oct 25, 2021 | IDA-58270 | Int Charges | 188,299.98 |
Oct 1, 2021 | IDA-58270 | Loan Repay | 3,731.63 |
Oct 4, 2021 | IDA-65060 | Int Charges | 20,411.61 |
Oct 4, 2021 | IDA-58270 | Loan Repay | 300,596.38 |
Oct 1, 2021 | IDA-65060 | Int Charges | 293.56 |
Oct 1, 2021 | IDA-65060 | Int Charges | 293.56 |
Oct 4, 2021 | IDA-65060 | Int Charges | 12,286.66 |
Oct 4, 2021 | IDA-65060 | Int Charges | 12,286.66 |
Apr 1, 2022 | IDA-65060 | Loan Disb | 245,034.64 |
Aug 9, 2021 | IDA-65060 | Loan Disb | 318,120.22 |
Oct 12, 2021 | IDA-65060 | Loan Disb | 628,634.00 |
May 23, 2022 | IDA-65060 | Loan Disb | 429,853.75 |
May 23, 2022 | IDA-65060 | Loan Disb | 842,879.10 |
Feb 22, 2022 | IDA-65060 | Loan Disb | 829,990.40 |
Jun 23, 2022 | IDA-65060 | Loan Disb | 744,598.25 |
Dec 6, 2021 | IDA-65060 | Loan Disb | 1,207,829.00 |
Apr 11, 2022 | IDA-65060 | Int Charges | 33,498.67 |
Apr 11, 2022 | IDA-65060 | Int Charges | 539.27 |
Apr 11, 2022 | IDA-65060 | Int Charges | 20,520.77 |
Apr 11, 2022 | IDA-65060 | Int Charges | 20,520.77 |
Apr 1, 2022 | IDA-58270 | Loan Repay | 8,333.46 |
Apr 11, 2022 | IDA-58270 | Loan Repay | 473,530.03 |
Apr 11, 2022 | IDA-58270 | Int Charges | 111.52 |
Apr 11, 2022 | IDA-58270 | Int Charges | 111.52 |
Apr 11, 2022 | IDA-58270 | Int Charges | 185.87 |
Apr 11, 2022 | IDA-58270 | Int Charges | 17,485.61 |
Apr 11, 2022 | IDA-58270 | Int Charges | 17,485.61 |
Apr 11, 2022 | IDA-58270 | Int Charges | 90,209.02 |
Apr 11, 2022 | IDA-58270 | Int Charges | 90,209.02 |
Apr 11, 2022 | IDA-58270 | Int Charges | 179,491.14 |
Oct 13, 2020 | IDA-58270 | Int Charges | 111,063.53 |
Oct 13, 2020 | IDA-58270 | Int Charges | 111,063.53 |
Oct 13, 2020 | IDA-65060 | Int Charges | 3,899.09 |
Oct 13, 2020 | IDA-65060 | Int Charges | 3,899.09 |
Oct 13, 2020 | IDA-65060 | Int Charges | 6,486.69 |
Oct 1, 2020 | IDA-58270 | Int Charges | 1,927.56 |
Oct 1, 2020 | IDA-58270 | Int Charges | 1,927.56 |
Oct 13, 2020 | IDA-58270 | Int Charges | 187,992.84 |
Dec 7, 2020 | IDA-65060 | Loan Disb | 504,799.78 |
Jun 16, 2021 | IDA-65060 | Loan Disb | 650,820.50 |
Apr 6, 2021 | IDA-65060 | Int Charges | 8,933.14 |
Apr 6, 2021 | IDA-65060 | Int Charges | 8,933.14 |
Apr 6, 2021 | IDA-65060 | Int Charges | 14,888.53 |
Apr 6, 2021 | IDA-58270 | Int Charges | 113,486.40 |
Apr 6, 2021 | IDA-58270 | Int Charges | 113,486.40 |
Apr 6, 2021 | IDA-58270 | Int Charges | 189,144.00 |
Jun 16, 2021 | IDA-65060 | Loan Disb | 591,751.70 |
Jul 12, 2019 | IDA-58270 | Loan Disb | 1,639,016.90 |
Apr 3, 2019 | IDA-58270 | Int Charges | 79,986.14 |
Apr 3, 2019 | IDA-58270 | Int Charges | 133,229.23 |
May 31, 2019 | IDA-58270 | Loan Disb | 988,622.56 |
Jun 7, 2019 | IDA-58270 | Loan Disb | 688,041.20 |
Mar 5, 2019 | IDA-58270 | Loan Disb | 1,099,824.20 |
Apr 3, 2019 | IDA-58270 | Int Charges | 5,629.70 |
Apr 3, 2019 | IDA-58270 | Int Charges | 79,986.14 |
Nov 14, 2019 | IDA-58270 | Loan Disb | 618,309.40 |
Oct 18, 2019 | IDA-58270 | Int Charges | 80.31 |
Oct 18, 2019 | IDA-58270 | Int Charges | 91,887.95 |
Oct 18, 2019 | IDA-58270 | Int Charges | 91,887.95 |
Oct 18, 2019 | IDA-58270 | Int Charges | 150,949.95 |
Oct 22, 2019 | IDA-58270 | Loan Disb | 1,900,509.60 |
Sep 9, 2019 | IDA-58270 | Loan Disb | 725,173.60 |
Feb 14, 2020 | IDA-58270 | Loan Disb | 175,162.12 |
Apr 2, 2020 | IDA-58270 | Int Charges | 2,178.53 |
Apr 2, 2020 | IDA-58270 | Int Charges | 107,219.83 |
Apr 2, 2020 | IDA-58270 | Int Charges | 107,219.83 |
Apr 2, 2020 | IDA-58270 | Int Charges | 178,699.70 |
Jun 30, 2020 | IDA-65060 | Loan Disb | 2,000,000.00 |
Jun 16, 2017 | IDA-58270 | Loan Disb | 622,469.94 |
Jun 28, 2017 | IDA-58270 | Loan Disb | 514,451.00 |
Oct 11, 2017 | IDA-58270 | Loan Disb | 1,004,118.90 |
Oct 3, 2017 | IDA-58270 | Int Charges | 26,968.02 |
Oct 3, 2017 | IDA-58270 | Int Charges | 3,336.84 |
Oct 3, 2017 | IDA-58270 | Int Charges | 3,336.84 |
Oct 3, 2017 | IDA-58270 | Int Charges | 5,561.41 |
Oct 3, 2017 | IDA-58270 | Int Charges | 17,871.16 |
Oct 3, 2017 | IDA-58270 | Int Charges | 17,871.16 |
Feb 17, 2017 | IDA-58270 | Loan Disb | 3,500,000.00 |
Aug 31, 2017 | IDA-58270 | Loan Disb | 1,081,518.50 |
Dec 1, 2017 | IDA-58270 | Loan Disb | 710,893.70 |
Oct 18, 2017 | IDA-58270 | Loan Disb | 1,674,745.60 |
Aug 10, 2017 | IDA-58270 | Loan Disb | 375,935.75 |
Jul 20, 2017 | IDA-58270 | Loan Disb | 483,624.62 |
Mar 28, 2018 | IDA-58270 | Loan Disb | 524,701.25 |
Feb 9, 2018 | IDA-58270 | Loan Disb | 1,371,461.50 |
Apr 1, 2018 | IDA-58270 | Int Charges | 2,906.66 |
Apr 1, 2018 | IDA-58270 | Int Charges | 42,609.58 |
Apr 1, 2018 | IDA-58270 | Int Charges | 42,609.58 |
Dec 21, 2017 | IDA-58270 | Loan Disb | 1,708,940.60 |
Apr 1, 2018 | IDA-58270 | Int Charges | 67,067.54 |
May 30, 2018 | IDA-58270 | Loan Disb | 790,538.00 |
Sep 5, 2018 | IDA-58270 | Loan Disb | 1,704,537.60 |
May 18, 2018 | IDA-58270 | Loan Disb | 530,762.25 |
May 24, 2018 | IDA-58270 | Loan Disb | 515,040.78 |
Jul 13, 2018 | IDA-58270 | Loan Disb | 1,540,286.90 |
Aug 9, 2018 | IDA-58270 | Loan Disb | 1,396,310.50 |
Jan 10, 2019 | IDA-58270 | Loan Disb | 796,036.20 |
Oct 1, 2018 | IDA-58270 | Int Charges | 95,087.15 |
Oct 1, 2018 | IDA-58270 | Int Charges | 3,790.70 |
Oct 1, 2018 | IDA-58270 | Int Charges | 60,446.99 |
Oct 1, 2018 | IDA-58270 | Int Charges | 60,446.99 |
Oct 17, 2018 | IDA-58270 | Loan Disb | 1,031,868.25 |
Oct 4, 2023 | IDA-65060 | Int Charges | 53,427.20 |
Oct 4, 2023 | IDA-65060 | Int Charges | 88,438.11 |
Oct 1, 2023 | IDA-58270 | Loan Repay | 3,495.76 |
Oct 3, 2023 | IDA-58270 | Int Charges | 162,523.14 |
May 8, 2024 | IDA-65060 | Loan Disb | 1,279,989.90 |
May 8, 2024 | IDA-65060 | Loan Disb | 470,778.44 |
Apr 1, 2024 | IDA-65060 | Int Charges | 65,942.75 |
Apr 1, 2024 | IDA-65060 | Int Charges | 65,942.75 |
Apr 1, 2024 | IDA-58270 | Int Charges | 97,006.31 |
Apr 1, 2024 | IDA-58270 | Int Charges | 97,006.31 |
Apr 1, 2024 | IDA-58270 | Int Charges | 161,677.16 |
Apr 1, 2024 | IDA-58270 | Loan Repay | 205,452.22 |
Apr 1, 2024 | IDA-58270 | Int Charges | 19.25 |
Apr 1, 2024 | IDA-58270 | Int Charges | 19.25 |
Apr 1, 2024 | IDA-58270 | Int Charges | 32.06 |
Apr 1, 2024 | IDA-58270 | Loan Repay | 241,827.77 |
Apr 1, 2024 | IDA-65060 | Int Charges | 109,904.57 |
Apr 1, 2024 | IDA-65060 | Int Charges | 613.92 |
Name | Review | Date |
---|---|---|
Project Management | Satisfactory | 2024-06-28 |
Procurement | Satisfactory | 2024-06-28 |
Counterpart Funding | Satisfactory | 2024-06-28 |
Overall Implementation Progress (IP) | Satisfactory | 2024-06-28 |
Progress towards achievement of PDO | Satisfactory | 2024-06-28 |
Financial Management | Satisfactory | 2024-06-28 |
Monitoring and Evaluation | Satisfactory | 2024-06-28 |
INDICATOR | IMPLEMENTATION COMPLETION & RESULTS REPORT: 12-16-2024 |
---|---|
Outcomes | |
Risk to Development Outcome | |
Bank Performance | |
Borrower Performance | |
Government Performance | |
Implementing Agency |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Direct project beneficiaries | Value | 567762.00 | 906803.00 | 640000.00 |
Date | March 7, 2016 | December 30, 2022 | ||
Comment |
Female beneficiaries | Value | 50.00 | 48.90 | 50.00 |
Date | March 7, 2016 | |||
Comment |
Ethnic Beneficiaries | Value | 70.00 | 82.90 | 70.00 |
Date | March 7, 2016 | |||
Comment |
% reduction in time to access a health facility | Value | 0.00 | 88.00 | 0.00 |
Date | September 30, 2015 | June 1, 2021 | ||
Comment |
% reduction in time to access safe water sources | Value | 0.00 | 82.00 | 0.00 |
Date | September 30, 2015 | July 1, 2021 | ||
Comment |
% reduction in travel time from village center to kumban center due to road improvements | Value | 0.00 | 52.23 | 0.00 |
Date | September 30, 2015 | December 30, 2022 | ||
Comment |
% reduction in time to access improved schools | Value | 0.00 | 83.90 | 0.00 |
Date | September 30, 2015 | June 3, 2019 | ||
Comment |
Percentage of children 6–23 months from Farmer Nutrition Group households consuming foods from four or more recommended food groups | Value | 37.50 | 37.50 | 0.00 |
Date | October 29, 2019 | June 1, 2021 | ||
Comment |
Kilograms of animal meat produced | Value | 0.00 | 1800840.00 | 527219.00 |
Date | October 29, 2019 | December 30, 2022 | ||
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
% Households in PRF beneficiary villages voting for village priorities | Value | 60.00 | 88.50 | 70.00 |
Date | November 30, 2015 | December 30, 2022 | ||
Comment |
% of registered grievances that are addressed according to agreed procedures | Value | 90.00 | 100.00 | 90.00 |
Date | November 30, 2015 | December 30, 2022 | ||
Comment |
% of PRF Kumbans participating in DSEDP process promoting PRF KBPs and/or Village Development Plans | Value | 0.00 | 80.60 | 50.00 |
Date | March 16, 2016 | September 30, 2021 | ||
Comment |
% of sub-projects of high technical quality | Value | 85.00 | 93.00 | 0.00 |
Date | November 30, 2015 | December 30, 2022 | ||
Comment |
# of individuals using loans from Self Help Groups | Value | 4054.00 | 20972.00 | 8000.00 |
Date | December 15, 2015 | December 30, 2022 | ||
Comment |
% of households in PRF beneficiary villages satisfied with the participatory planning process supported by PRF III | Value | 75.00 | 98.40 | 0.00 |
Date | November 30, 2015 | April 30, 2023 | ||
Comment |
% of PRF built infrastructure of functioning quality | Value | 80.00 | 92.00 | 80.00 |
Date | November 30, 2015 | December 30, 2022 | ||
Comment |
% of Village Self-Help Group Management Committee (VSMC) members that are female | Value | 0.00 | 80.00 | 0.00 |
Date | October 29, 2019 | December 30, 2022 | ||
Comment |
% of PRF III sub-project prioritized by women | Value | 91.00 | 93.70 | 90.00 |
Date | November 30, 2015 | December 30, 2022 | ||
Comment |
# of sub projects implemented (by type) | Value | 1426.00 | 3561.00 | 2100.00 |
Date | September 30, 2015 | December 30, 2022 | ||
Comment |
Number of households who are members of Farmer Nutrition Groups | Value | 0.00 | 9578.00 | 0.00 |
Date | October 29, 2019 | December 30, 2022 | ||
Comment |
% of PRF III sub-projects prioritized by ethnic group | Value | 70.00 | 83.50 | 70.00 |
Date | November 30, 2015 | June 30, 2022 | ||
Comment |
% of Village Implementation Team (VIT) members that are female | Value | 31.00 | 50.90 | 0.00 |
Date | October 29, 2019 | December 30, 2022 | ||
Comment |
% of Self Help Group members who take at least two loans | Value | 0.00 | 24.62 | 35.00 |
Date | October 29, 2019 | December 30, 2022 | ||
Comment |
# of communities able to plan, implement and monitor their Village Development Plans | Value | 1124.00 | 1765.00 | 1508.00 |
Date | November 30, 2015 | December 30, 2022 | ||
Comment |
Number of women selected for Road Maintenance Groups who earn an income, as a % of the number of poor households in village | Value | 8.00 | 20.40 | 0.00 |
Date | October 29, 2019 | February 12, 2023 | ||
Comment |
Increase in hectares of irrigated area | Value | 0.00 | 49.32 | 0.00 |
Date | October 29, 2019 | December 30, 2022 | ||
Comment |