Additional Financing for Mekong Integrated Water Resources Management (Lao PDR)

Development Objective

The Project Development Objective is to to improve water resource and fisheries management in selected areas of the Lower Mekong Basin.

Key Details

Project Details

  • P159447

  • Closed

  • Greg Browder , Eileen Burke

  • Ministry of Finance, Lao PDR,Mekong River Commission,Ministry of Natural Resources and Environment

  • US$ 25.00 million

  • B

  • April 22, 2024

  • February 28, 2022

  • Yes

  • BANK APPROVED

  • P104806

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Local Beneficiaries 0.50
Borrower/Recipient 0.50
IDA Credit 25.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 25.00
IBRD + IDA Commitment 25.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 18.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)

Footnotes

Ratings

IMPLEMENTATION RATINGS

No data available.

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Area provided with irrigation and drainage services - Improved (ha)Value0.0014163.000.00
    DateMay 1, 2012October 26, 2016March 31, 2021
    Comment
  • Joint Action Plan for addressing a priority transboundary integrated water resources management issues in the Mekong Basin.Value0.000.003.00
    DateMay 1, 2012May 9, 2017March 31, 2018
    CommentJoint Issues Papers completed, and preparation of Action Plans underway.
  • Number of water resource management instruments applied by MONRE in priority basins located in the Lao PDR.Value0.002.008.00
    DateMay 1, 2012May 4, 2017March 31, 2021
    Comment2 Instruments under preparation: Framework basin plans have been prepared for XBH and XBF, and a River Basin Action Plan has beenprepared for Nam Ngum basin.
  • Number of new or upgraded DMH hydromet stations that produce information that is applied for water resources management.Value0.0020.0050.00
    DateMay 1, 2012May 9, 2017March 31, 2021
    CommentHydromet stations include monitoring of hydrological parameters (water level and discharge) and meteorological parameters(rainfall, temperature, wind speed and etc). Near-real time hydromet information will be transferred to the central database atDepartment of Meteorology and Hydrology. The data must be published in an accessible manner and available to other agencies and thepublic. The Project is supporting 60 stations, but considering that there may be technical difficulties at some stations, thetarget is 50.
  • Area provided with irrigation and drainage services (ha)Value0.005415.007815.00
    DateMay 1, 2012May 9, 2017March 31, 2021
    CommentThere are 40 rehabilitated irrigation schemes covering 5,415 ha.
  • Number of functional Fishery Management Committees (FMC).Value0.000.0010.00
    DateMay 1, 2012May 9, 2017March 31, 2021
    Comment10 FMCs have been legally constituted, and development of fishery management plans are in progress.

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Number of new or rehabilitated, functioning fishery hatcheriesValue0.000.004.00
    DateMay 1, 2012May 10, 2017March 31, 2021
    CommentConsruction for the rehabilitation of three hatcheries is on-going. The final design and Environmental Management Plan (EMP) forthe new hatchery in Attepeu province is underway.
  • Number of Fisheries Management committee in the target area establishedValue0.0030.0050.00
    DateMay 1, 2012May 9, 2017March 31, 2018
    Comment
  • Number of Fisheries Management Committees functionalValue0.0030.0050.00
    DateMay 1, 2012May 9, 2017March 31, 2018
    Comment
  • Area provided with improved flood protection.Value0.0011148.0014500.00
    DateMay 1, 2012May 30, 2017March 31, 2021
    CommentCurrent Value: There are 10 flood gates with a total command area of 11,148 has
  • Number of functioning Irrigation Water User AssociationsValue0.0040.000.00
    DateMay 1, 2012May 30, 2017
    CommentCurrent Value: 40. There are currently 40 functioning WUAs.
  • Farmers reached with agricultural assets or services - FemaleValue0.0024000.0063000.00
    DateMay 1, 2012May 30, 2017March 31, 2021
    Comment
  • Number of people engaged in the formulation of Fisheries Management Plans (Citizen Engagement)Value0.00110.00165.00
    DateMay 1, 2012May 30, 2017March 31, 2021
    CommentTen FMCs have created with a total of 110 members, of which 18 are women (16%).
  • Number of villages receiving livelihood support under the Fisheries component.Value0.0054.00100.00
    DateMay 1, 2012May 30, 2017March 31, 2021
    Comment54 villages
  • Number of Joint Issues Paper prepared and endorsed for identified priority transboundary IWRM issues in the Mekong Basin.Value0.003.003.00
    DateMay 1, 2012May 9, 2017March 31, 2018
    Comment3 Joint Issues Papers have been finalized and endorsed by the NMC working group and will published shortly.
  • Number of regulations piloted at the basin level.Value0.000.002.00
    DateMay 1, 2012May 30, 2017May 31, 2021
    CommentCurrent Value: 0. The implementing regulations have not been issued yet.
  • Farmers reached with agricultural assets or servicesValue0.0048786.00126500.00
    DateMay 1, 2012May 30, 2017March 31, 2021
    CommentCurrent Value: 48,786. There are 40 rehabilitated irrigation schemes covering 5,415 has and benefiting 31,007 people. There are 10flood gates with a total command area of 11,148 has benefiting 17,779 people.
  • Number of communication products produced and disseminated by the MRCS related to IWRM.Value0.0026.0027.00
    DateMay 1, 2012May 9, 2017March 31, 2018
    Comment26 communication products: Posters (2); Quarterly E-Newsletter (6); MRC Webpages (5); MRC 20th Anniversary Magazine Articles (2);On-Line News Channel (1); Facebook Page (1: 111 postings); Brochures (3); Videos (5); T-Shirts (1).
  • Submission of the revised Water Law to the National Assembly.Value0.001.001.00
    DateMay 1, 2012May 9, 2017March 31, 2021
    CommentWater Law submitted to and approved by NA in May 2017
  • Number of sites in priority river basins where NREI conducts water quality monitoring and information is applied for river basin management.Value0.000.0015.00
    DateMay 1, 2012May 9, 2017March 31, 2021
    CommentCurrent Value: 0. Water quality monitoring are currently carried out 4 times per year at 11 sites spreading across 3 river basins:Xekong, Xechamphone wetland and Lower Nam Ngum. However, number of parameters limited as laboratory not fully functional yet, andinformation is not published.
  • Number of priority river basins where MONRE has applied water resource model packages.Value0.000.007.00
    DateMay 1, 2012May 9, 2016March 31, 2021
    CommentCurrent Value: 0. NREI finished updating the rainfall-runoff (SWAT) and flood (ISIS) models in Xe Bang Fai, Xe Bang Hieng, Xedoneand Xekong. HEC-RAS (flood) models were developed based on the existing ISIS models available in NREI for XBF, XBH, Xedone andXekong. The basin simulation (IQQM) model is not updated yet due to license expiration. The modelling packages have not yet beenapplied to support WRM activities.
  • Number of tributaries where new hydromet stations are properly installed, operated data used, and shared with other LMB countriesValue0.006.008.00
    DateMay 1, 2012October 26, 2016March 31, 2018
    Comment
  • Number of Flood Gates rehabilitated and modified in XBF and XBH for environmental benefitsValue0.0010.0010.00
    DateMay 1, 2012October 26, 2016March 31, 2018
    Comment
  • Number of functioning River Basin Coordinating Committees (RBCC).Value0.000.003.00
    DateMay 1, 2012May 9, 2017March 31, 2021
    CommentCurrent Value 0: The Nam Ngum RBCC has been established by the provincial Government but does not meet the functionality criteria.