Financier | Commitments |
---|---|
IDA Credit | 70.00 |
Local Beneficiaries | 5.00 |
P164536
Closed
Sagita Muco , Cristian Quijada Torres
Republic of Madagascar
November 6, 2017
(as of board presentation)
September 18, 2018
May 8, 2019
US$ 75.00 million
PIC National Project Secretariat
2019
US$ 70.00 million
B
May 24, 2024
December 18, 2023
Yes
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 70.00 |
Local Beneficiaries | 5.00 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 70.00 |
IBRD + IDA Commitment | 70.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 75.00 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Dec 22, 2022 | IDA-68170 | Loan Disb | 865,864.50 |
Dec 13, 2022 | IDA-68170 | Loan Disb | 67,183.51 |
Sep 14, 2022 | IDA-68170 | Loan Disb | 23,260.23 |
Oct 13, 2022 | IDA-68170 | Loan Disb | 600,808.56 |
Mar 28, 2023 | IDA-63150 | Loan Disb | -16,713.02 |
Jan 25, 2023 | IDA-68170 | Loan Disb | 209,417.95 |
Feb 21, 2023 | IDA-63150 | Int Charges | 246,218.10 |
Feb 21, 2023 | IDA-63150 | Int Charges | 246,218.10 |
Feb 27, 2023 | IDA-68170 | Loan Disb | 1,617,834.10 |
Feb 15, 2023 | IDA-63150 | Loan Disb | -11,725.47 |
Apr 21, 2023 | IDA-68170 | Loan Disb | 909,919.44 |
Oct 12, 2022 | IDA-68170 | Loan Disb | 553,515.80 |
Dec 21, 2022 | IDA-68170 | Loan Disb | 200,701.30 |
Dec 5, 2022 | IDA-68170 | Loan Disb | 570,048.40 |
Dec 5, 2022 | IDA-68170 | Loan Disb | 811,915.44 |
Aug 15, 2020 | IDA-63150 | Int Charges | 186.11 |
Aug 15, 2020 | IDA-63150 | Int Charges | 186.11 |
Aug 15, 2020 | IDA-63150 | Int Charges | 27,415.64 |
Aug 15, 2020 | IDA-63150 | Int Charges | 27,415.64 |
Dec 22, 2020 | IDA-63150 | Loan Disb | 576,249.20 |
Dec 23, 2020 | IDA-63150 | Loan Disb | 461,577.20 |
Feb 15, 2021 | IDA-63150 | Int Charges | 729.67 |
Feb 15, 2021 | IDA-63150 | Int Charges | 729.67 |
Feb 15, 2021 | IDA-63150 | Int Charges | 82,702.02 |
Feb 15, 2021 | IDA-63150 | Int Charges | 82,702.02 |
Nov 30, 2020 | IDA-63150 | Loan Disb | 18,000,000.00 |
Feb 26, 2020 | IDA-63150 | Int Charges | 20,237.61 |
Feb 26, 2020 | IDA-63150 | Int Charges | 1,152.11 |
Feb 26, 2020 | IDA-63150 | Int Charges | 1,152.11 |
Feb 26, 2020 | IDA-63150 | Int Charges | 20,237.61 |
May 27, 2020 | IDA-63150 | Loan Disb | 1,733,848.10 |
Jul 27, 2020 | IDA-63150 | Loan Disb | 284,368.03 |
Aug 28, 2020 | IDA-63150 | Loan Disb | 163,706.81 |
Jun 8, 2020 | IDA-63150 | Loan Disb | 193,632.34 |
Oct 13, 2020 | IDA-63150 | Loan Disb | 397,332.62 |
Oct 6, 2020 | IDA-63150 | Loan Disb | 936,467.60 |
May 15, 2019 | IDA-63150 | Loan Disb | 621,295.50 |
Aug 21, 2019 | IDA-63150 | Loan Disb | 152,770.77 |
Aug 19, 2019 | IDA-63150 | Loan Disb | 4,500,000.00 |
Aug 19, 2019 | IDA-63150 | Loan Disb | 69,505.22 |
Aug 19, 2019 | IDA-63150 | Loan Disb | 41,594.04 |
Nov 22, 2019 | IDA-63150 | Loan Disb | 37,806.68 |
Oct 15, 2019 | IDA-63150 | Loan Disb | 83,752.62 |
Mar 3, 2020 | IDA-63150 | Loan Disb | 186,759.84 |
Apr 1, 2020 | IDA-63150 | Loan Disb | 208,129.77 |
Feb 14, 2020 | IDA-63150 | Loan Disb | 238,413.33 |
Dec 20, 2019 | IDA-63150 | Loan Disb | 178,546.90 |
Dec 20, 2019 | IDA-63150 | Loan Disb | 206,468.78 |
Oct 28, 2022 | IDA-63150 | Loan Disb | 580,000.00 |
Oct 28, 2022 | IDA-68170 | Loan Disb | 140,148.77 |
Sep 14, 2022 | IDA-63150 | Loan Disb | 253,547.77 |
Feb 23, 2022 | IDA-68170 | Loan Disb | 75,264.73 |
Jul 20, 2022 | IDA-68170 | Loan Disb | 60,558.58 |
May 10, 2022 | IDA-68170 | Loan Disb | 11,097.74 |
Aug 15, 2022 | IDA-68170 | Int Charges | 441.51 |
Aug 15, 2022 | IDA-68170 | Int Charges | 441.51 |
Aug 15, 2022 | IDA-68170 | Int Charges | 4,054.77 |
Aug 15, 2022 | IDA-68170 | Int Charges | 4,054.77 |
Aug 15, 2022 | IDA-63150 | Int Charges | 1,808.38 |
Aug 15, 2022 | IDA-63150 | Int Charges | 1,808.38 |
Aug 15, 2022 | IDA-63150 | Int Charges | 222,481.95 |
Aug 15, 2022 | IDA-63150 | Int Charges | 222,481.95 |
Aug 3, 2022 | IDA-63150 | Loan Disb | 1,418,235.60 |
Sep 2, 2022 | IDA-68170 | Loan Disb | 4,500,000.00 |
Jan 11, 2022 | IDA-63150 | Loan Disb | 1,404,510.80 |
Jan 11, 2022 | IDA-68170 | Loan Disb | 176,656.38 |
Dec 30, 2021 | IDA-68170 | Loan Disb | 70,514.61 |
Dec 30, 2021 | IDA-68170 | Loan Disb | 291,767.22 |
May 20, 2022 | IDA-63150 | Loan Disb | 5,000,000.00 |
May 20, 2022 | IDA-68170 | Loan Disb | 26,020.07 |
Dec 8, 2021 | IDA-63150 | Loan Disb | 581,313.06 |
Dec 8, 2021 | IDA-63150 | Loan Disb | 334,944.75 |
Dec 13, 2021 | IDA-68170 | Loan Disb | 403,471.16 |
Feb 17, 2022 | IDA-68170 | Int Charges | 699.42 |
Feb 17, 2022 | IDA-68170 | Int Charges | 699.42 |
Feb 17, 2022 | IDA-63150 | Int Charges | 195,803.45 |
Apr 7, 2022 | IDA-63150 | Loan Disb | 869,329.70 |
Feb 15, 2022 | IDA-63150 | Int Charges | 298.45 |
Feb 15, 2022 | IDA-63150 | Int Charges | 298.45 |
Feb 17, 2022 | IDA-63150 | Int Charges | 195,803.45 |
Feb 23, 2022 | IDA-63150 | Loan Disb | 1,816,566.00 |
Feb 17, 2022 | IDA-68170 | Int Charges | -699.42 |
Feb 17, 2022 | IDA-68170 | Int Charges | -699.42 |
Feb 17, 2022 | IDA-68170 | Int Charges | 699.42 |
Feb 17, 2022 | IDA-68170 | Int Charges | 699.42 |
May 19, 2022 | IDA-68170 | Loan Disb | 10,084.52 |
Apr 14, 2022 | IDA-63150 | Loan Disb | 1,068,595.10 |
Jul 27, 2022 | IDA-63150 | Loan Disb | 1,091,352.60 |
Jul 27, 2022 | IDA-68170 | Loan Disb | 52,772.63 |
Jul 21, 2022 | IDA-68170 | Loan Disb | 96,063.82 |
Jun 22, 2021 | IDA-63150 | Loan Disb | 1,384,955.40 |
Oct 1, 2021 | IDA-63150 | Loan Disb | 1,200,862.40 |
Sep 13, 2021 | IDA-63150 | Loan Disb | 818,694.90 |
Aug 15, 2021 | IDA-63150 | Int Charges | 170,309.86 |
Aug 15, 2021 | IDA-63150 | Int Charges | 170,309.86 |
Nov 30, 2021 | IDA-63150 | Loan Disb | 1,065,687.60 |
Aug 15, 2021 | IDA-63150 | Int Charges | 1,521.11 |
Aug 15, 2021 | IDA-63150 | Int Charges | 1,521.11 |
Dec 3, 2021 | IDA-63150 | Loan Disb | 2,795,425.20 |
Nov 16, 2021 | IDA-68170 | Loan Disb | 96,528.83 |
Feb 5, 2021 | IDA-63150 | Loan Disb | 1,176,166.90 |
Mar 9, 2021 | IDA-63150 | Loan Disb | 818,957.94 |
Dec 1, 2020 | IDA-63150 | Loan Disb | 10,000,000.00 |
Mar 24, 2021 | IDA-63150 | Loan Disb | 455,695.44 |
Mar 24, 2021 | IDA-63150 | Loan Disb | 1,677,181.20 |
Jul 27, 2021 | IDA-63150 | Loan Disb | 1,146,895.50 |
May 14, 2021 | IDA-63150 | Loan Disb | 1,212,960.50 |
May 17, 2021 | IDA-63150 | Loan Disb | 86,982.64 |
Apr 8, 2021 | IDA-63150 | Loan Disb | 596,702.80 |
May 4, 2021 | IDA-63150 | Loan Disb | 575,321.60 |
Jun 7, 2021 | IDA-63150 | Loan Disb | 997,199.90 |
Nov 10, 2020 | IDA-63150 | Loan Disb | 216,420.48 |
Sep 18, 2018 | IDA-63150 | Loan Commitment | 70,000,000.00 |
Dec 10, 2020 | IDA-68170 | Loan Commitment | 33,000,000.00 |
Apr 18, 2024 | IDA-63150 | Loan Cancel | 1,212,265.00 |
May 31, 2024 | IDA-68170 | Loan Disb | -46,083.70 |
Feb 16, 2024 | IDA-63150 | Int Charges | 242,292.14 |
Feb 16, 2024 | IDA-63150 | Int Charges | 242,292.14 |
Feb 16, 2024 | IDA-68170 | Int Charges | 1,687.48 |
Feb 16, 2024 | IDA-68170 | Int Charges | 1,687.48 |
Feb 16, 2024 | IDA-68170 | Int Charges | 76,388.71 |
Feb 16, 2024 | IDA-68170 | Int Charges | 76,388.71 |
Feb 15, 2024 | IDA-63150 | Int Charges | 532.88 |
Feb 15, 2024 | IDA-63150 | Int Charges | 532.88 |
Aug 20, 2024 | IDA-68170 | Int Charges | 79,555.98 |
Aug 20, 2024 | IDA-68170 | Int Charges | 79,555.98 |
Aug 15, 2024 | IDA-68170 | Int Charges | 944.74 |
Aug 15, 2024 | IDA-68170 | Int Charges | 944.74 |
Aug 20, 2024 | IDA-63150 | Int Charges | 238,578.02 |
Aug 20, 2024 | IDA-63150 | Int Charges | 238,578.02 |
Aug 15, 2024 | IDA-63150 | Int Charges | 2,939.04 |
Aug 15, 2024 | IDA-63150 | Int Charges | 2,939.04 |
Oct 26, 2023 | IDA-68170 | Loan Disb | 866,950.50 |
Oct 6, 2023 | IDA-68170 | Loan Disb | 1,083,440.20 |
Oct 3, 2023 | IDA-68170 | Loan Disb | 2,286.14 |
Aug 2, 2023 | IDA-68170 | Loan Disb | 1,171,748.40 |
Jun 8, 2023 | IDA-68170 | Loan Disb | 533,224.60 |
Jun 23, 2023 | IDA-68170 | Loan Disb | 1,287,440.80 |
Nov 10, 2023 | IDA-68170 | Loan Disb | 487,203.60 |
Aug 16, 2023 | IDA-63150 | Int Charges | 503.82 |
Aug 16, 2023 | IDA-63150 | Int Charges | 503.82 |
Sep 18, 2023 | IDA-68170 | Loan Disb | 1,555,416.20 |
Aug 16, 2023 | IDA-68170 | Int Charges | 1,329.68 |
Aug 16, 2023 | IDA-68170 | Int Charges | 1,329.68 |
Aug 16, 2023 | IDA-68170 | Int Charges | 48,660.62 |
Aug 16, 2023 | IDA-68170 | Int Charges | 48,660.62 |
Jul 20, 2023 | IDA-68170 | Loan Disb | 174,626.27 |
May 31, 2023 | IDA-68170 | Loan Disb | 349,394.34 |
Aug 16, 2023 | IDA-63150 | Int Charges | 245,053.28 |
Aug 16, 2023 | IDA-63150 | Int Charges | 245,053.28 |
Jul 27, 2023 | IDA-68170 | Loan Disb | 17,162.18 |
Feb 21, 2023 | IDA-68170 | Int Charges | 61.73 |
Feb 21, 2023 | IDA-68170 | Int Charges | 61.73 |
Feb 21, 2023 | IDA-68170 | Int Charges | 26,158.62 |
Feb 21, 2023 | IDA-68170 | Int Charges | 26,158.62 |
Jan 17, 2023 | IDA-63150 | Loan Disb | -138,999.90 |
Apr 11, 2023 | IDA-68170 | Loan Disb | 720,479.50 |
Feb 15, 2023 | IDA-63150 | Int Charges | 1,170.19 |
Feb 15, 2023 | IDA-63150 | Int Charges | 1,170.19 |
Mar 28, 2023 | IDA-63150 | Loan Disb | -1,051,855.10 |
Aug 23, 2023 | IDA-68170 | Loan Disb | 859,781.40 |
Name | Review | Date |
---|---|---|
Procurement | Satisfactory | 2023-12-18 |
Overall Implementation Progress (IP) | Satisfactory | 2023-12-18 |
Progress towards achievement of PDO | Satisfactory | 2023-12-18 |
Monitoring and Evaluation | Satisfactory | 2023-12-18 |
Counterpart Funding | Satisfactory | 2023-12-18 |
Project Management | Satisfactory | 2023-12-18 |
Financial Management | Moderately Unsatisfactory | 2023-12-18 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Number of formal jobs created in Target Regions | Value | 2170.00 | 17800.00 | 8278.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which in tourism | Value | 763.00 | 7300.00 | 2941.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which in agribusiness | Value | 1407.00 | 10500.00 | 5337.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Value of private investment enabled by the project (in million) | Value | 0.00 | 25.00 | 25.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Number of businesses benefiting from at least one COVID response activity | Value | 0.00 | 1.34 | 1.00 |
Date | November 30, 2020 | October 31, 2023 | December 31, 2021 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Percentage of registered complaints that have been addressed by the project | Value | 0.00 | 90.00 | 90.00 |
Date | December 31, 2018 | December 29, 2023 | December 29, 2023 | |
Comment |
Value of exports of the selected crops in the Target Regions (US$ million) | Value | 27.50 | 11.00 | 36.90 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Number of people benefitting from at least one training in the tourism or related sectors | Value | 0.00 | 22.48 | 10.00 |
Date | November 30, 2020 | October 31, 2023 | December 31, 2021 | |
Comment |
Number of formal businesses newly registered in the Target Regions | Value | 0.00 | 25000.00 | 13591.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Passengers traffic by air per annum | Value | 1432.00 | 1735.00 | 515.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Increase in annual sales revenue for MBIF BPC recipient enterprises (MGA million) | Value | 0.00 | 3000.00 | 3000.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which at Ivato | Value | 1005.00 | 1215.00 | 361.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Revenues from target cash crop production for smallholders in the Target Regions (MGA billion) | Value | 10.50 | 8.00 | 16.46 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which in Target Regions | Value | 427.00 | 520.00 | 154.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which increase in annual sales revenue for women-owned enterprises (MGA million) | Value | 0.00 | 1200.00 | 900.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Kilometers of rural roads rehabilitated | Value | 0.00 | 55.00 | 55.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Number of structuring institutions reinforced or created | Value | 0.00 | 16.00 | 9.00 |
Date | December 31, 2018 | October 31, 2023 | December 31, 2023 | |
Comment |
Hotel rooms available in the Target Regions | Value | 6487.00 | 7000.00 | 2737.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Kilometers of urban roads rehabilitated | Value | 0.00 | 50.00 | 38.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Number of people provided with access to improved water sources | Value | 0.00 | 325.00 | 75.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Percentage of municipal budgets executed for investment by targeted municipalities | Value | 2.60 | 7.00 | 6.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Annual municipal revenues collected in the supported municipalities (MGA billion) | Value | 12.93 | 6.85 | 15.63 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which urban | Value | 8.86 | 4.60 | 11.00 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Of which rural | Value | 4.07 | 2.25 | 4.63 |
Date | December 31, 2018 | December 31, 2023 | December 31, 2023 | |
Comment |
Number of visitors in tourism sites enabled by the project | Value | 133.00 | 28.62 | 45.88 |
Date | December 31, 2018 | October 31, 2023 | December 31, 2023 | |
Comment |