Vietnam - Dynamic Cities Integrated Development Project

Abstract*

The objective of the Dynamic Cities Integrated Development Project for Vietnam is to increase access to urban infrastructure and to improve integrated urban planning in the Project Cities. There are two components to the project, the first component being structural investments - rehabilitation and construction of resilient urban infrastructure. This component includes four subcomponents: urban drainage, urban environmental sanitation, urban transport...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To increase access to urban infrastructure and to improve integrated urban planning in the Project Cities.

Key Details

Project Details

  • P168290

  • Active

  • Dzung Nguyen , Steven Rubinyi

  • Socialist Republic of Vietnam

  • Viet Nam

  • October 5, 2018

  • (as of board presentation)

    June 11, 2019

  • May 21, 2020

  • US$ 276.17 million

  • Thanh Hoa Project Management Unit,Yen Bai Project Management Unit,Ky Anh Project Management Unit,Hai Duong City Project Management Unit

  • East Asia and Pacific

  • 2019

  • US$ 194.36 million

  • B

  • February 8, 2024

  • June 30, 2025

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 194.36
Borrower/Recipient 81.81

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 194.36
IBRD + IDA Commitment 194.36
Lending Instrument
Grant Amount N/A
Total Project Cost** 276.17

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Oct 30, 2023 IDA-64280 Loan Disb 2,698,000.00
Nov 27, 2023 IDA-64290 Loan Disb 2,239,410.50
Nov 27, 2023 IDA-64290 Loan Disb 147,812.90
Nov 27, 2023 IDA-64290 Loan Disb 473,229.84
Oct 20, 2023 IDA-64290 Loan Disb 408,407.94
Nov 3, 2023 IDA-64290 Loan Disb 222,508.56
Jul 24, 2024 IDA-64290 Loan Disb 540,527.40
Jul 24, 2024 IDA-64290 Loan Disb 114,418.29
Jul 26, 2024 IDA-64270 Loan Disb 813,444.44
Jul 24, 2024 IDA-64290 Loan Disb 172,944.20
Jul 24, 2024 IDA-64290 Loan Disb 890,749.25
Aug 13, 2024 IDA-64280 Loan Disb 971,987.00
Mar 1, 2022 IDA-64260 Int Charges 12,018.91
Mar 1, 2022 IDA-64280 Int Charges 49,490.19
Mar 1, 2022 IDA-64280 Int Charges 16,150.10
Mar 1, 2022 IDA-64270 Int Charges 3,447.97
Mar 1, 2022 IDA-64270 Int Charges 51,047.47
Mar 1, 2022 IDA-64270 Int Charges 74,270.84
Feb 8, 2022 IDA-64270 Loan Disb 1,062,117.00
Jan 22, 2024 IDA-64290 Loan Disb 2,012,725.10
Jan 22, 2024 IDA-64290 Loan Disb 614,368.10
Jan 22, 2024 IDA-64290 Loan Disb 184,497.22
Jan 18, 2022 IDA-64260 Loan Disb 2,311,000.00
Dec 30, 2021 IDA-64270 Loan Disb 784,878.94
Dec 23, 2021 IDA-64280 Loan Disb 3,552,173.00
Dec 5, 2023 IDA-64290 Loan Disb 812,486.80
Dec 5, 2023 IDA-64290 Loan Disb 495,309.30
Dec 5, 2023 IDA-64290 Loan Disb 126,123.24
Dec 18, 2023 IDA-64290 Loan Disb 465,000.00
Dec 18, 2023 IDA-64270 Loan Disb 1,870,368.00
Dec 7, 2023 IDA-64290 Loan Disb 127,222.82
Oct 11, 2023 IDA-64270 Loan Disb 1,692,558.60
Jan 16, 2024 IDA-64280 Loan Disb 1,922,862.00
Jan 17, 2024 IDA-64270 Loan Disb 1,389,372.10
Sep 1, 2021 IDA-64270 Int Charges 21,717.64
Sep 1, 2021 IDA-64270 Int Charges 1,007.42
Sep 1, 2021 IDA-64270 Int Charges 4,753.38
Aug 5, 2021 IDA-64270 Loan Disb 4,364,150.00
Oct 1, 2021 IDA-64260 Loan Disb 242,718.00
Sep 1, 2021 IDA-64260 Int Charges 201.94
Sep 1, 2021 IDA-64260 Int Charges 952.88
Sep 1, 2021 IDA-64260 Int Charges 48,272.77
Sep 1, 2021 IDA-64260 Int Charges 7,685.08
Sep 30, 2021 IDA-64270 Loan Disb 4,668,460.00
Sep 17, 2021 IDA-64280 Loan Disb 1,355,000.00
Jun 15, 2022 IDA-64270 Loan Disb 91,740.22
Jul 27, 2022 IDA-64270 Loan Disb 674,299.56
Jul 11, 2022 IDA-64270 Loan Disb 783,299.94
May 20, 2022 IDA-64260 Loan Disb 2,516,000.00
Jun 29, 2022 IDA-64270 Loan Disb 399,925.56
Jun 13, 2022 IDA-64290 Loan Disb 1,921,000.00
May 18, 2022 IDA-64270 Loan Disb 137,158.06
Mar 1, 2022 IDA-64270 Int Charges 807.07
Mar 1, 2022 IDA-64290 Int Charges 72,324.96
Mar 1, 2022 IDA-64290 Int Charges 4,905.50
Mar 1, 2022 IDA-64260 Int Charges 45,883.92
Jan 19, 2022 IDA-64270 Loan Disb 762,323.56
Dec 20, 2021 IDA-64290 Loan Disb 1,989,837.00
Nov 22, 2022 IDA-64290 Loan Disb 270,906.20
Nov 22, 2022 IDA-64290 Loan Disb 292,923.22
Nov 22, 2022 IDA-64290 Loan Disb 744,526.30
Nov 23, 2022 IDA-64290 Loan Disb 2,232,015.80
Dec 21, 2022 IDA-64280 Loan Disb 3,081,000.00
Dec 20, 2022 IDA-64260 Loan Disb 3,550,000.00
Dec 1, 2022 IDA-64290 Loan Disb 1,179,111.00
Nov 28, 2022 IDA-64290 Loan Disb 139,860.00
Nov 28, 2022 IDA-64270 Loan Disb 724,526.80
Nov 9, 2022 IDA-64280 Loan Disb 2,600,000.00
Nov 14, 2022 IDA-64290 Loan Disb 206,602.50
Nov 15, 2022 IDA-64290 Loan Disb 299,935.60
Sep 1, 2022 IDA-64260 Int Charges 42,564.84
Sep 1, 2022 IDA-64260 Int Charges 56,086.43
Sep 1, 2022 IDA-64260 Int Charges 664.80
Sep 1, 2022 IDA-64270 Int Charges 149,618.75
Sep 1, 2022 IDA-64280 Int Charges 48,406.54
Sep 1, 2022 IDA-64280 Int Charges 47,364.68
Sep 1, 2022 IDA-64260 Int Charges 2,705.40
Sep 1, 2022 IDA-64270 Int Charges 366.85
Sep 1, 2022 IDA-64270 Int Charges 1,492.86
Sep 1, 2022 IDA-64270 Int Charges 47,599.57
Sep 1, 2022 IDA-64290 Int Charges 70,947.05
Sep 1, 2022 IDA-64290 Int Charges 27,867.59
Sep 14, 2022 IDA-64280 Loan Disb 2,788,781.00
Jan 9, 2023 IDA-64290 Loan Disb 688,028.70
Jan 9, 2023 IDA-64290 Loan Disb 292,215.62
Dec 13, 2022 IDA-64290 Loan Disb 248,875.10
Dec 20, 2022 IDA-64270 Loan Disb 821,735.40
Aug 12, 2021 IDA-64290 Fee Charges 147,800.00
Apr 21, 2023 IDA-64260 Loan Disb 4,920,000.00
Mar 1, 2023 IDA-64260 Int Charges 38,788.34
Mar 1, 2023 IDA-64260 Int Charges 193,112.90
Mar 1, 2023 IDA-64270 Int Charges 445.26
Mar 1, 2023 IDA-64270 Int Charges 3,039.81
Mar 1, 2023 IDA-64270 Int Charges 43,718.11
Mar 1, 2023 IDA-64270 Int Charges 418,059.97
Mar 1, 2023 IDA-64280 Int Charges 243,301.19
Mar 1, 2023 IDA-64290 Int Charges 63,137.13
Mar 1, 2023 IDA-64290 Int Charges 163,007.10
Jan 15, 2021 IDA-64270 Loan Disb 3,268,539.00
Jul 14, 2021 IDA-64280 Fee Charges 106,225.00
Jun 18, 2021 IDA-64260 Loan Disb 934,000.00
Sep 1, 2021 IDA-64280 Int Charges 53,549.04
Sep 1, 2021 IDA-64290 Int Charges 74,507.42
Mar 1, 2024 IDA-64290 Int Charges 56.11
Jul 31, 2024 IDA-64290 Loan Disb 164,638.30
May 28, 2024 IDA-64290 Loan Disb 40,000.00
Feb 5, 2024 IDA-64260 Loan Disb 4,127,000.00
May 6, 2024 IDA-64290 Loan Disb 125,076.45
Sep 1, 2023 IDA-64270 Int Charges 721,112.75
Jun 29, 2023 IDA-64270 Loan Disb 1,094,036.20
May 17, 2023 IDA-64270 Loan Disb 1,150,185.90
Aug 14, 2024 IDA-64290 Loan Disb 139,572.70
Aug 14, 2024 IDA-64290 Loan Disb 150,716.89
Aug 9, 2024 IDA-64290 Loan Disb 140,000.00
Jan 29, 2024 IDA-64290 Loan Disb 565,000.00
Jan 22, 2024 IDA-64290 Loan Disb 308,519.38
Jan 22, 2024 IDA-64290 Loan Disb 139,594.05
Apr 20, 2023 IDA-64270 Loan Disb 963,319.40
Apr 4, 2023 IDA-64270 Loan Disb 696,339.10
Jul 28, 2023 IDA-64290 Loan Disb 234,038.69
Aug 1, 2023 IDA-64280 Loan Disb 2,265,000.00
Aug 25, 2023 IDA-64270 Loan Disb 945,726.00
Sep 1, 2023 IDA-64280 Int Charges 36,209.49
Sep 1, 2023 IDA-64280 Int Charges 435,523.90
Sep 1, 2023 IDA-64290 Int Charges 56,273.47
Sep 1, 2023 IDA-64290 Int Charges 28,963.57
Sep 1, 2023 IDA-64290 Int Charges 469,603.60
Sep 1, 2023 IDA-64290 Int Charges 1,603.66
Sep 7, 2023 IDA-64290 Loan Disb 122,092.71
Sep 7, 2023 IDA-64290 Loan Disb 635,340.06
Sep 7, 2023 IDA-64290 Loan Disb 454,570.88
Sep 1, 2023 IDA-64260 Int Charges 452,095.12
Sep 1, 2023 IDA-64260 Int Charges 32,230.33
Sep 1, 2023 IDA-64270 Int Charges 414.28
Sep 1, 2023 IDA-64270 Int Charges 7,482.57
Sep 1, 2023 IDA-64270 Int Charges 39,201.22
Sep 1, 2021 IDA-64270 Int Charges 62,233.69
Jan 22, 2024 IDA-64290 Loan Disb 286,760.06
Feb 2, 2024 IDA-64280 Loan Disb 1,292,894.00
Jan 24, 2024 IDA-64290 Loan Disb 279,256.03
Jan 24, 2024 IDA-64290 Loan Disb 414,229.53
Jan 24, 2024 IDA-64290 Loan Disb 743,607.56
Aug 2, 2024 IDA-64290 Loan Disb 254,719.27
Mar 1, 2024 IDA-64260 Int Charges 29,448.12
Mar 1, 2024 IDA-64260 Int Charges 531,100.00
Mar 1, 2024 IDA-64280 Int Charges 480.93
Jul 31, 2024 IDA-64290 Loan Disb 328,861.30
Mar 1, 2024 IDA-64270 Int Charges 1,126.05
Mar 1, 2024 IDA-64270 Int Charges 32,625.01
Mar 1, 2024 IDA-64270 Int Charges 931,904.70
Mar 1, 2024 IDA-64290 Int Charges 1,393.29
Mar 1, 2024 IDA-64290 Int Charges 48,911.81
Mar 1, 2024 IDA-64290 Int Charges 651,119.56
Mar 1, 2024 IDA-64280 Int Charges 11,943.22
Mar 1, 2024 IDA-64280 Int Charges 30,329.71
Mar 1, 2024 IDA-64280 Int Charges 608,181.90
Mar 1, 2024 IDA-64270 Int Charges 45.34
Jul 31, 2024 IDA-64290 Loan Disb 273,313.72
Jun 11, 2019 IDA-64260 Loan Commitment 39,460,000.00
Jun 11, 2019 IDA-64270 Loan Commitment 53,290,000.00
Jun 11, 2019 IDA-64280 Loan Commitment 42,490,000.00
Jun 11, 2019 IDA-64290 Loan Commitment 59,120,000.00
Jan 13, 2023 IDA-64270 Loan Disb 1,286,946.80
Mar 1, 2023 IDA-64280 Int Charges 39,911.69
Jan 13, 2023 IDA-64290 Loan Disb 3,917,862.00
Sep 1, 2020 IDA-64260 Int Charges 58,489.21
Sep 1, 2020 IDA-64270 Int Charges 78,988.57
Sep 1, 2020 IDA-64280 Int Charges 62,980.40
Sep 1, 2020 IDA-64290 Int Charges 87,630.05
Mar 1, 2021 IDA-64270 Int Charges 64,935.90
Dec 23, 2020 IDA-64260 Fee Charges 98,650.00
Dec 28, 2020 IDA-64270 Fee Charges 133,225.00
Mar 1, 2021 IDA-64260 Int Charges 48,627.56
Mar 1, 2021 IDA-64290 Int Charges 73,157.62
Mar 1, 2021 IDA-64280 Int Charges 52,578.96
Jan 22, 2021 IDA-64260 Loan Disb 775,910.50

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Project Management Moderately Unsatisfactory 2024-10-03
Progress towards achievement of PDO Moderately Unsatisfactory 2024-10-03
Financial Management Moderately Unsatisfactory 2024-10-03
Procurement Satisfactory 2024-10-03
Monitoring and Evaluation Moderately Satisfactory 2024-10-03
Overall Implementation Progress (IP) Moderately Unsatisfactory 2024-10-03

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Area prone to floods in the area covered by the project interventionsValue1485.901406.50407.90
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Cities with improved livability, sustainability, and/or managementValue0.000.004.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • People provided with improved urban living conditionsValue0.0061387.00239793.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Integrated urban development plan – including public transport plan and adequate provision of childcare services – approved for implementationValue0.000.001.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • People provided with improved urban living conditions - Female (RMS requirement)Value0.000.000.00
    Date
    Comment
  • Urban asset management plans approved with approved annual budgets for O&MValue0.000.002.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • People benefiting from improved drainage in the area covered by the project interventionsValue0.0021407.00206964.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Of which Female beneficiariesValue0.000.000.00
    Date
    Comment
  • Of which Bottom 40% beneficiariesValue0.000.000.00
    Date
    Comment
  • People provided with access to improved sanitation provided by the projectValue0.000.00103400.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Of which Female beneficiariesValue0.000.000.00
    Date
    Comment
  • Of which Bottom 40% beneficiariesValue0.000.000.00
    Date
    Comment
  • People who have access to new or improved roads under the projectValue0.0033800.0083600.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Of which Female beneficiariesValue0.000.000.00
    Date
    Comment
  • Of which Bottom 40% beneficiariesValue0.000.000.00
    Date
    Comment
  • Users satisfied with the new or improved roads under the projectValue0.0092.7080.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Female users satisfactionValue0.000.0080.00
    Date
    Comment
  • Bottom 40% users satisfactionValue0.000.000.00
    Date
    Comment
  • People provided with access to new or improved public spacesValue0.0023785.00110050.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Of which Female beneficiariesValue0.000.000.00
    Date
    Comment
  • Of which Bottom 40% beneficiariesValue0.000.000.00
    Date
    Comment
  • Users satisfied with the new or improved public spacesValue0.0094.3080.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Female users satisfactionValue0.000.000.00
    Date
    Comment
  • Bottom 40% users satisfactionValue0.000.000.00
    Date
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Length of drains improved or constructedValue0.0022.6650.13
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Beneficiaries involved in consultations for project planning/ implementation/ evaluationValue0.003632.004100.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Length of waste water pipeline laidValue0.0086.40277.30
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Of which Female beneficiariesValue0.000.0050.60
    Date
    Comment
  • Additional waste-water treatment capacity providedValue0.000.0014600.00
    DateMarch 25, 2018January 1, 2024June 30, 2025
    Comment
  • Of which Bottom 40% beneficiariesValue0.000.0050.00
    Date
    Comment
  • Households connected to new or improved wastewater treatment systemsValue0.000.0031900.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Stakeholder consultation sessions and training activities conducted in integrated urban development planningValue0.003.0012.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Length of roads and bridges constructed or improved, non-rural (Core)Value0.0019.6830.29
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Area of new or improved walkable public spaceValue0.00130986.00418861.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Average difference in the amount of time spent by local women as compared to local men on caring for children aged 3-72 monthsValue51.0051.0030.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Strategic integrated plan developedValue0.000.001.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Public transport plan developedValue0.000.001.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment
  • Asset management plan developedValue0.000.002.00
    DateMarch 25, 2019January 1, 2024June 30, 2025
    Comment