Clean Air Through Greening Residential Heating Program

Abstract*

The development objectives of the Clean Air through Greening Residential Heating Program-for-Results (PforR) Project for Poland are to reduce energy use and air pollution emissions from heating sources in Single Family Buildings. The PforR will take into account major planned enhancements to the clean air priority program (CAPP), such as the inclusion of commercial banks and the launch of a low-income component, as they are introduced and become fully...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Program Development Objectives are to reduce energy use and air pollution emissions from heating sources in Single Family Buildings.

Key Details

Project Details

  • P170131

  • Active

  • Ferhat Esen , Reena Badiani-Magnusson, Piotr Charewicz

  • Republic of Poland

  • Poland

  • March 20, 2019

  • (as of board presentation)

    December 8, 2021

  • July 5, 2024

  • US$ 11428.22 million

  • National Fund for Environment Protection and Water Management (NFOSiGW),Ministry of Finance,Ministry of Climate and Environment

  • Europe and Central Asia

  • 2022

  • US$ 291.30 million

  • N/A

  • June 28, 2024

  • March 31, 2027

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 291.30
Local Beneficiaries 971.91
Borrower/Recipient 2993.60

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 291.30
IDA Commitment N/A
IBRD + IDA Commitment 291.30
Lending Instrument
Grant Amount N/A
Total Project Cost** 11428.22

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Sep 2, 2024 IBRD-93100 Fee Charges 691,656.25
Dec 8, 2021 IBRD-93100 Loan Commitment 291,300,000.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2025-01-17
Monitoring and Evaluation Moderately Satisfactory 2025-01-17
Overall Implementation Progress (IP) Moderately Satisfactory 2025-01-17

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Projected energy or fuel savingsValue0.00365730962400.001125000000000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • Projected lifetime reduction of particulate matter 10 emissions (ton PM10) (Metric ton)Value0.00188379.00433000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • Projected lifetime reduction of particulate matter 2.5 emissions (ton PM2.5)Value0.00162353.000.00
    Date
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Projected lifetime emissions reductions as a result of the energy savings (ton CO2e)Value0.0042882288.0063000000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • Number of CAPP applications submittedValue0.00874589.001460000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • Cumulative loan amount provided by commercial banks participating in CAPPValue0.0076282126.001500000000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • DLI 2: Adoption and operationalization at the national level of the low-income program under CAPPValueNo nationally available low-income program in placDLR 2.1: Completed but not yet verified: First phaDLR 2.2: NFOSiGW has announced the second phase of
    DateNovember 20, 2020June 14, 2024June 30, 2023
    Comment
  • Number of regions that have adopted anti-smog resolutionsValue14.0014.0016.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • Number of commercial banks participating in CAPPValue0.005.003.00
    DateNovember 20, 2020May 31, 2024June 15, 2022
    Comment
  • Number of applications submitted under Part 1 of CAPPValue0.00478206.00660000.00
    DateSeptember 18, 2020May 31, 2024March 31, 2027
    Comment
  • DLI 3: Publication and dissemination by NFOSiGW of a consolidated CAPP progress report based on the centralized CAPP MIS and submission of the said report to the Coordination CommitteeValueNo centralized program management information systDelayed: NFOSiGW is currently developing the IT daPublication and dissemination by the NFOSiGW of a
    DateNovember 20, 2020June 14, 2024June 30, 2023
    Comment
  • Percentage of SFB owners that are beneficiaries of CAPP who report that engagement processes were effective and met their needsValue0.0056.0050.00
    DateNovember 20, 2020December 20, 2024March 31, 2027
    Comment
  • Number of applications submitted under Part 2 of CAPPValue0.00201853.00510000.00
    DateSeptember 18, 2020May 31, 2024March 31, 2027
    Comment
  • DLI 4: Mobilization of commercial financing under CAPP, with a one-stop shop provided by eligible financial institutions for loans and subsidy paymentsValueNo formal commercial bank lending or one-stop shopCompleted but not yet verified: Seven participatinMobilization of commercial financing under the CAP
    DateNovember 20, 2020June 14, 2024June 15, 2022
    Comment
  • Number of (virtual or in-person) town hall consultations held to elicit feedback from social partners and the publicValue0.002.004.00
    DateNovember 20, 2020December 19, 2024March 31, 2027
    Comment
  • Number of applications submitted under Part 3 of CAPPValue0.00194531.00290000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • DLI 5: Increased awareness of CAPP based on expanded program outreach campaignValueRolling 3-month average of number of applications DLR 5.1: Completed but not yet verified: Pace overRolling 3-month average of number of applications
    DateNovember 20, 2020June 14, 2024June 30, 2026
    Comment
  • Number of CAPP applications approvedValue0.00715952.001220000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • DLI 6: Number of SFBs that have completed thermal renovations with Eligible Equipment and Materials under the CAPPValue0.00144742.00600000.00
    DateNovember 20, 2020April 30, 2024March 31, 2027
    Comment
  • Number of beneficiaries in SFBs in which boilers were replaced and/or thermal renovation measures applied (exclusive of SFBs with coal boiler upgrades only)Value0.001243776.002800000.00
    DateNovember 20, 2020May 31, 2024March 31, 2027
    Comment
  • DLI 7: Number of inefficient and solid fuel boilers replaced with efficient, clean, non-coal heating systems with Eligible Equipment and Materials under the CAPPValue0.00355365.00630000.00
    DateNovember 20, 2020April 30, 2024March 31, 2027
    Comment
  • DLI 1: Adoption of the Act of 28 October 2020 Amending the Act on Supporting Thermo-modernization and Renovation and Certain Other ActsValueAmendment is not adopted.Completed but not yet verified: January 1, 2021 (pAdoption of the Act of 28 October 2020 amending th
    DateNovember 20, 2020May 27, 2021January 1, 2021
    Comment
  • Share of beneficiaries that are female headed households that implement energy efficiency measures (boiler, window replacement, thermal insulation) in their homes.Value0.0024.0015.00
    DateNovember 20, 2020December 20, 2024March 31, 2027
    Comment