Skip to Main Navigation

CENTRALIZED EMERGENCY RESPONSE SYSTEM PROJECT

Abstract*

The objective of the Centralized Emergency Response System Project for Peru is to provide a more efficient response to emergencies, urgencies, and associated help line requests from the population of Lima Metropolitan area and Callao. The project has six components. 1. Physical Infrastructure component will finance the works for the construction of a 911 Center and all the furnishings needed to operate the 911 emergency response service in the Lima...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The proposed project development objective is to provide a more efficient response to emergencies, urgencies, and associated help line requests from the population of Lima Metropolitan area and Callao.

Key Details

Project Details

  • P170658

  • Active

  • Axel Rifon Perez , Niccolo Comini

  • Republic of Peru

  • Peru

  • June 5, 2019

  • (as of board presentation)

    April 7, 2020

  • August 17, 2020

  • US$ 45.08 million

  • Programa Nacional de Telecomunicaciones (PRONATEL)

  • Latin America and Caribbean

  • 2020

  • US$ 36.32 million

  • N/A

  • December 6, 2023

  • January 7, 2026

  • No

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 36.32
Borrower/Recipient 8.76

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 36.32
IDA Commitment N/A
IBRD + IDA Commitment 36.32
Lending Instrument
Grant Amount N/A
Total Project Cost** 45.08

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 15, 2022 IBRD-90390 Int Charges 808.00
Jan 15, 2022 IBRD-90390 Int Charges 25.48
Jan 15, 2023 IBRD-90390 Int Charges 45,463.68
Jan 15, 2023 IBRD-90390 Int Charges 4,564.85
Jan 15, 2023 IBRD-90390 Int Charges 263.72
Mar 31, 2023 IBRD-90390 Loan Disb 68,119.00
Dec 15, 2023 IBRD-90390 Loan Disb 71,628.00
Apr 7, 2020 IBRD-90390 Loan Commitment 36,324,000.00
Jan 15, 2021 IBRD-90390 Int Charges 30,527.64
Oct 14, 2020 IBRD-90390 Fee Charges 90,810.00
Jul 15, 2021 IBRD-90390 Int Charges 45,006.34
Jun 29, 2021 IBRD-90390 Loan Disb 232,484.00
Jul 15, 2022 IBRD-90390 Int Charges 44,743.59
Jul 15, 2022 IBRD-90390 Int Charges 1,097.54
Dec 7, 2022 IBRD-90390 Loan Disb 80,535.00
Jan 15, 2022 IBRD-90390 Int Charges 54.09
Jan 15, 2022 IBRD-90390 Int Charges 45,485.20
Jul 18, 2023 IBRD-90390 Loan Disb 273,768.00
Jul 15, 2023 IBRD-90390 Int Charges 21.52
Jul 15, 2023 IBRD-90390 Int Charges 737.83
Jul 15, 2023 IBRD-90390 Int Charges 44,594.31
Jul 15, 2023 IBRD-90390 Int Charges 9,361.98
Jan 15, 2024 IBRD-90390 Int Charges 20,543.85
Jan 15, 2024 IBRD-90390 Int Charges 157.24
Jan 15, 2024 IBRD-90390 Int Charges 44,933.90
Jul 15, 2024 IBRD-90390 Int Charges 43,838.57
Jul 15, 2024 IBRD-90390 Int Charges 29,846.28
Jul 15, 2024 IBRD-90390 Loan Repay 125,895.14
Feb 28, 2024 IBRD-90390 Loan Disb 280,627.00
Jul 15, 2024 IBRD-90390 Int Charges 506.06
Jul 15, 2024 IBRD-90390 Int Charges 15.19
Jun 17, 2024 IBRD-90390 Loan Disb 787,313.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2024-12-16
Procurement Satisfactory 2024-12-16
Monitoring and Evaluation Moderately Satisfactory 2024-12-16
Overall Implementation Progress (IP) Moderately Satisfactory 2024-12-16
Project Management Satisfactory 2024-12-16
Financial Management Satisfactory 2024-12-16

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Average duration of the connection time in an emergency, urgency, or related information request callValue230.40230.40128.00
    DateDecember 5, 2019November 27, 2023December 5, 2023
    Comment
  • Share of calls made to the 911 emergency response service answered in less than 5 secondsValue0.000.0095.00
    DateJanuary 27, 2020November 27, 2023January 27, 2024
    Comment
  • Reduction of malicious calls received by the Integrated Platform, out of whichValue0.000.0044.00
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • Reduction of malicious calls received by the 911 emergency response service; andValue0.000.0037.00
    Date
    Comment
  • Reduction of malicious calls received by Line 100Value0.000.007.00
    Date
    Comment
  • Share of people who called the 911 emergency response service and are satisfied with the service receivedValue0.000.0080.00
    DateDecember 5, 2019November 27, 2023January 10, 2024
    Comment
  • Share of people who called Line 100 and are satisfied with the service receivedValue0.000.0070.00
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • 1.1. 911 center constructed and in operationValueNoNoYes
    DateJanuary 10, 2020November 27, 2023June 30, 2025
    Comment
  • 2.1. Interoperable Integrated Platform deployed in the 911 center and in operationValueNoNoYes
    DateDecember 5, 2019November 27, 2023July 31, 2025
    Comment
  • 5.1. 911 operators trained on the use of the 911 PlatformValue0.000.00294.00
    DateJanuary 10, 2020November 27, 2023July 31, 2025
    Comment
  • 3.1. Cooperation Agreement signed between PRONATEL, the NPP, SAMU, PCVF, and Line 100Value0.003.004.00
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 4.1. NPP video surveillance cameras interconnected with the 911 PlatformValueNoNoYes
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 2.2. Total calls received by the 911 emergency response service, including those that are malicious and not answeredValue9138520.009138520.005663392.00
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 3.2. Protocols and procedure manual on the use of the 911 Platform developed and in useValueNoYesYes
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 5.1.a. 911 operators trained in GBV issuesValue0.000.0040.00
    Date
    Comment
  • 5.2. Awareness raising campaign on the proper use of the 911 emergency response service designed and launchedValueNoYesYes
    DateDecember 5, 2019November 27, 2023December 5, 2023
    Comment
  • 3.3. GBV emergency protocol design and in use by the 911 operators, the emergency response units, and Line 100ValueNoNoYes
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 2.2.a. Share of calls from the total received by the 911 emergency response service that are automatically geolocatedValue0.000.0070.00
    Date
    Comment
  • 2.3. Total effective calls made to the 911 emergency response serviceValue813221.00813221.00994221.00
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 5.3. Awareness raising campaign on the proper use of Line 100 designed and launchedValueNoNoYes
    DateJanuary 10, 2020June 9, 2023January 10, 2024
    Comment
  • 2.3.a. Total effective calls made to Line 100Value332959.00289533.00168183.00
    DateJanuary 10, 2020November 27, 2023January 10, 2024
    Comment
  • 2.3.b. Increase of the share of effective calls made to the 911 emergency response service and transferred to two or more First Response Units or Line 100Value0.000.0050.00
    Date
    Comment
  • 2.4 Calls transferred and handled by the GBV LineValue0.000.00151145.00
    DateJanuary 27, 2020November 27, 2023January 27, 2024
    Comment