Skip to Main Navigation

Second Dam Rehabilitation and Improvement Project

Abstract*

The development objective of Second Dam Rehabilitation and Improvement Project is to increase the safety of selected dams in participating States and to strengthen dam safety management in India. This project has five components. 1) The first component, Rehabilitation and Management Planning for Dams and Associated Appurtenances, aims to reduce the likelihood and consequences of dam failure by improving dam safety planning, management and rehabilitation...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The project development objective (PDO) is to increase the safety of selected dams in participating States and to strengthen dam safety management in India.

Key Details

Project Details

  • P170873

  • Active

  • Chabungbam Singh , Joop Stoutjesdijk

  • Ministry of Finance, Department of Economic Affairs

  • India

  • August 27, 2019

  • (as of board presentation)

    December 15, 2020

  • October 12, 2021

  • US$ 713.41 million

  • Government of Rajasthan, Water Resources Department,Government of West Bengal, Irrigation and Waterways Department,Uttarakhand Jal Vidyut Nigam Ltd.,Government of Gujarat, Water Resources Department,Government of Kerala, Water Resources Department,Government of Uttar Pradesh, Irrigation and Water Resources Department,Government of Karnataka, Water Resources Department,Andhra Pradesh WRD,Kerala State Electricity Board (KSEB),Meghalaya Power Generation Corporation Ltd. (MePGCL),Punjab WRD,Telangana Irrigation and Command Area Development Department,Government of Manipur, Water Resources Department,Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO),Damodar Valley Corporation,Government of Madhya Pradesh, Water Resources Department,Government of Chhattisgarh, Water Resources Department,Government of Tamil Nadu, Water Resources Department,Government of Odisha, Water Resources Department,Bhakra Beas Management Board,Government of Maharasthra, Water Resources Department,Central Water Commission (CWC), Ministry of Jal Shakti,Goa water Resources Department

  • South Asia

  • 2021

  • US$ 500.00 million

  • N/A

  • June 19, 2024

  • December 31, 2027

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 213.41
Asian Infrastructure Investment Bank 250.00
International Bank for Reconstruction and Development 250.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 250.00
IDA Commitment N/A
IBRD + IDA Commitment 250.00
Lending Instrument
Grant Amount 250.00
Total Project Cost** 713.41

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Mar 18, 2024 IBRD-91810 Loan Disb 68,946.37
Aug 12, 2024 IBRD-91810 Loan Disb 3,283,779.00
Feb 6, 2024 IBRD-91810 Loan Disb 941,950.00
Jun 1, 2024 IBRD-91810 Int Charges 44,110.80
Jun 1, 2024 IBRD-91810 Int Charges 1,913,633.00
Jun 1, 2024 IBRD-91810 Int Charges 223,388.42
Jun 1, 2024 IBRD-91810 Int Charges 1,404.65
Jun 1, 2024 IBRD-91810 Int Charges 405,768.75
Jun 24, 2024 IBRD-91810 Loan Disb 7,968,809.00
Dec 15, 2020 IBRD-91810 Loan Commitment 250,000,000.00
Oct 12, 2021 IBRD-91810 Loan Disb 625,000.00
Oct 12, 2021 IBRD-91810 Fee Charges 625,000.00
Jun 1, 2022 IBRD-91810 Int Charges 100,813.36
Jun 1, 2022 IBRD-91810 Int Charges 677.08
Jun 1, 2022 IBRD-91810 Int Charges 305,234.28
Jun 1, 2022 IBRD-91810 Int Charges 21,064.08
May 24, 2022 IBRD-91810 Loan Disb 9,260,269.00
Mar 15, 2022 IBRD-91810 Loan Disb 5,207,131.00
Mar 15, 2022 IBRD-91810 Loan Disb 4,382,133.00
Mar 3, 2023 IBRD-91810 Loan Disb 10,001,356.00
Dec 1, 2022 IBRD-91810 Int Charges 1,303.49
Dec 1, 2022 IBRD-91810 Int Charges 286,187.70
Dec 1, 2022 IBRD-91810 Int Charges 363,579.60
Dec 1, 2022 IBRD-91810 Int Charges 507.41
Sep 7, 2022 IBRD-91810 Loan Disb 4,738,351.00
Mar 21, 2023 IBRD-91810 Loan Disb 10,672,038.00
Jun 1, 2023 IBRD-91810 Int Charges 269,988.94
Jun 1, 2023 IBRD-91810 Int Charges 37,743.13
Mar 6, 2023 IBRD-91810 Loan Disb 73,089.01
Jun 1, 2023 IBRD-91810 Int Charges 877,501.00
Jul 19, 2023 IBRD-91810 Loan Disb 15,741,042.00
Oct 10, 2023 IBRD-91810 Loan Disb 3,907,733.20
Dec 18, 2023 IBRD-91810 Loan Disb 2,976,586.00
Dec 1, 2023 IBRD-91810 Int Charges 26,661.73
Dec 1, 2023 IBRD-91810 Int Charges 241,043.27
Dec 1, 2023 IBRD-91810 Int Charges 1,728,990.40
Nov 29, 2023 IBRD-91810 Loan Disb 937,833.40
Mar 19, 2024 IBRD-91810 Loan Disb 1,230,623.40
Mar 14, 2024 IBRD-91810 Loan Disb 3,922,454.20
Mar 14, 2024 IBRD-91810 Loan Disb 722,584.70

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2024-11-20
Progress towards achievement of PDO Satisfactory 2024-11-20
Overall Implementation Progress (IP) Moderately Satisfactory 2024-11-20
Procurement Moderately Satisfactory 2024-11-20
Financial Management Moderately Satisfactory 2024-11-20
Project Management Satisfactory 2024-11-20
Financial Management Moderately Satisfactory 2024-11-20
Monitoring and Evaluation Moderately Satisfactory 2024-11-20
Procurement Moderately Satisfactory 2024-11-20
Project Management Satisfactory 2024-11-20
Monitoring and Evaluation Moderately Satisfactory 2024-11-20
Overall Implementation Progress (IP) Moderately Satisfactory 2024-11-20

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Project dams with a satisfactory post-intervention inspection by a third party Quality Assurance and Quality Control TeamValue0.000.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Project States with full score in Institutional Modernization IndexValue0.000.0060.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Project dams with an Emergency Action Plan prepared in consultation with communities and disseminatedValue13.0030.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Grievances received by implementing agencies responded and/or resolved within the stipulated service standards for response timesValue0.0060.0085.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • National Dam Asset Management System establishedValueNoNoYes
    DateJune 24, 2020April 15, 2024June 23, 2023
    Comment
  • Project dams with requisite instrumentation in placeValue0.000.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Center of Excellence functionalValueNoYesYes
    DateJune 24, 2020April 15, 2024June 24, 2025
    Comment
  • Project Dams with Asset Management Plans preparedValue0.000.0050.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Project dams with updated O&M manualsValue13.0030.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Improvement in the mean score of targeted DSOs on the Women in Water Organizations Index during implementation relative to the meanscore in the five years prior to implementation.Value0.002.0012.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Participating States with a dedicated dam financing budget lineValue6.2514.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Active participants in a women's professional engineering networkValue0.000.0040.00
    DateJune 24, 2020April 15, 2024June 24, 2024
    Comment
  • Large dams in participating States that have been categorized using the Tier RACFValue0.000.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Project dams with operational rule curves operationalizedValue0.000.0050.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Project dams with annual maintenance budget developed based on asset management system and planValue0.000.0050.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • improved ability (structural or non-structural) to safely cater for the design flood.Value0.000.00100.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • People trained on dam safetyValue0.001593.002500.00
    DateJune 24, 2020April 15, 2024December 31, 2027
    Comment
  • Project Dams with full data entry in DHARMAValue5.0060.00100.00
    DateJune 24, 2020April 15, 2024June 24, 2024
    Comment
  • Project dams with revised dam flood hydrology assessedValue0.00100.00100.00
    DateJanuary 1, 2019April 15, 2024June 24, 2025
    Comment