Skip to Main Navigation

Philippines Seismic Risk Reduction and Resilience Project

Abstract*

The proposed project has four components, namely: Component 1. Improving Multi-hazard Resilience of Public Buildings and Facilities This component will finance seismic retrofitting and relevant strengthening/upgrades of public buildings to reduce damage from natural hazards (earthquakes and other adverse geophysical and climate-related events). Specifically, it is proposed that this component will invest in maximizing the number of beneficiaries...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Project Development Objectives are to enhance: (i) the safety and seismic resilience of selected public buildings in Metro Manila, and (ii) the capacity of the DPWH to prepare for and respond to emergencies.

Key Details

Project Details

  • P171419

  • Active

  • Robert Reid , Sarah Antos

  • Republic of the Philippines

  • Philippines

  • November 15, 2019

  • (as of board presentation)

    June 2, 2021

  • October 27, 2021

  • US$ 309.50 million

  • Department of Public Works and Highways

  • East Asia and Pacific

  • 2021

  • US$ 300.00 million

  • N/A

  • Substantial

  • June 30, 2026

  • TBD

  • BANK APPROVED

  • December 18, 2023

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 300.00
Borrower/Recipient 9.50

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 300.00
IDA Commitment N/A
IBRD + IDA Commitment 300.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 309.50

Summary Status of World Bank Financing (US$ Millions) as of April 30, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of April 30, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Sep 15, 2023 IBRD-92510 Int Charges 10,479.45
Mar 15, 2022 IBRD-92510 Int Charges 263,013.70
Jun 2, 2021 IBRD-92510 Loan Commitment 300,000,000.00
Sep 15, 2023 IBRD-92510 Int Charges 340,273.97
Sep 15, 2023 IBRD-92510 Int Charges 952,251.44
Jan 23, 2023 IBRD-92510 Loan Disb 30,000,000.00
Mar 15, 2023 IBRD-92510 Int Charges 361,438.38
Mar 15, 2024 IBRD-92510 Int Charges 15,392.24
Mar 15, 2024 IBRD-92510 Int Charges 330,985.40
Mar 15, 2024 IBRD-92510 Int Charges 414,108.50
Jan 16, 2024 IBRD-92510 Loan Disb 11,859,460.00
Dec 21, 2023 IBRD-92510 Loan Disb 751,699.25
Nov 24, 2023 IBRD-92510 Loan Disb -30,000,000.00
Nov 24, 2023 IBRD-92510 Loan Disb 30,000,000.00
Mar 15, 2024 IBRD-92510 Int Charges 524,533.30
Sep 15, 2022 IBRD-92510 Int Charges 378,082.20
Dec 17, 2021 IBRD-92510 Fee Charges 750,000.00
Sep 15, 2023 IBRD-92510 Int Charges 253,258.44

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Financial Management Moderately Satisfactory 2025-05-02
Overall Implementation Progress (IP) Moderately Satisfactory 2025-05-02
Progress towards achievement of PDO Moderately Satisfactory 2025-05-02
Procurement Moderately Unsatisfactory 2025-05-02
Monitoring and Evaluation Satisfactory 2025-05-02
Project Management Moderately Satisfactory 2025-05-02

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Targeted public buildings with reduced vulnerability to seismic and other natural hazards (including climate-related impacts)Value0.000.00425.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • DPWH well equipped and organized to perform its responsibilities per the requirements of the Metro Manila Earthquake Contingency Plan (Oplan Metro Yakal Plus, OMYP)ValueNoNoYes
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • Direct beneficiaries with increased safety from retrofitted buildings (disaggregated by gender)Value0.000.00290000.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • DPWH staff achieve minimum standards in operational readiness for emergency preparedness and response per its mandate under the relevant multi-hazard national response plansValue0.000.00600.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • CERC established and ready to provide access to financial resources in case of an eligible crisis or emergency (including climate- and health-related events)ValueNoYesYes
    DateOctober 19, 2020May 15, 2023June 30, 2026
    Comment
  • Detailed engineering designs incorporating relevant multi-hazard resilience measuresValue0.000.00425.00
    DateOctober 23, 2020December 7, 2023June 30, 2026
    Comment
  • Emergency response plans developed and exercised to quickly and effectively respond to disasters (including climate- and health-related events)Value0.000.004.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • Consultations/Information meetings on disaster risk reduction interventions organized at facility levelValue0.000.00425.00
    DateOctober 22, 2020May 15, 2023June 30, 2026
    Comment
  • Buildings retrofittedValue0.000.00425.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • Emergency response equipment for transportation and mobility restoration (identified in Oplan Metro Yakal Plus) commissioned and operationalValue0.0094.0070.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • People reached per facility with disaster risk reduction information meetings (disaggregated by gender)Value0.000.0070.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • Mobile Emergency Operation Centers commissioned and operationalValue0.000.005.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • Citizens per facility who have enhanced understanding of the disaster risk reduction interventions as reflected in the survey assessment (disaggregated by gender)Value0.000.0060.00
    DateOctober 22, 2020December 7, 2023June 30, 2026
    Comment
  • DPWH staff are trained and exercised in plans, procedures and emergency response operations (including addressing gendered needs), disaggregated by genderValue0.000.00600.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment
  • DPWH emergency planning and response team members who are womenValue9.600.0015.00
    DateOctober 19, 2020December 7, 2023June 30, 2026
    Comment