Skip to Main Navigation

Improving Learning and Empowering Girls in Mozambique

Development Objective

Increase learning readiness and girls’ retention in upper grades of basic education prioritizing underserved areas of Mozambique.

Key Details

Project Details

  • P172657

  • Active

  • Lucia Nhampossa , Andre Loureiro

  • Republic of Mozambique

  • Mozambique

  • April 21, 2020

  • (as of board presentation)

    March 26, 2021

  • June 30, 2021

  • US$ 299.00 million

  • Ministry of Education and Human Development

  • Eastern and Southern Africa

  • 2021

  • US$ 299.00 million

  • N/A

  • March 26, 2024

  • December 31, 2025

  • No

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
EFA-FTI Education Program Development Fund 139.00
IDA Grant 160.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 160.00
IBRD + IDA Commitment 160.00
Lending Instrument
Grant Amount 139.00
Total Project Cost** 299.00

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
May 16, 2024 IDA-D7930 Loan Disb 3,569.70
May 16, 2024 IDA-D7930 Loan Disb 3,568.59
May 16, 2024 IDA-D7930 Loan Disb 3,058.34
Mar 25, 2024 IDA-D7930 Loan Disb 3,059.75
May 16, 2024 IDA-D7930 Loan Disb 3,569.15
May 16, 2024 IDA-D7930 Loan Disb 3,569.15
May 16, 2024 IDA-D7930 Loan Disb 13,568.42
Jun 24, 2024 IDA-D7930 Loan Disb 10,605.25
Jun 24, 2024 IDA-D7930 Loan Disb 159,123.60
Mar 26, 2021 IDA-D7930 Loan Commitment 160,000,000.00
Oct 4, 2023 IDA-D7930 Loan Disb 10,113.58
Aug 20, 2024 IDA-D7930 Loan Disb 12,519.21
Nov 27, 2023 IDA-D7930 Loan Disb 10,113.61
Feb 7, 2024 IDA-D7930 Loan Disb 3,569.70
Feb 7, 2024 IDA-D7930 Loan Disb 8,412.65
Feb 7, 2024 IDA-D7930 Loan Disb 1,311.25
Feb 7, 2024 IDA-D7930 Loan Disb 51,879.75
Feb 7, 2024 IDA-D7930 Loan Disb 27,810.66
Feb 21, 2024 IDA-D7930 Loan Disb 12,519.26
Jan 26, 2024 IDA-D7930 Loan Disb 1,311.25
Jan 26, 2024 IDA-D7930 Loan Disb 7,500,000.00
Apr 22, 2024 IDA-D7930 Loan Disb 35,157.99
Apr 25, 2024 IDA-D7930 Loan Disb 3,569.69
Apr 22, 2024 IDA-D7930 Loan Disb 12,519.26
Apr 25, 2024 IDA-D7930 Loan Disb 10,605.28
May 31, 2024 IDA-D7930 Loan Disb 34,884.66
Feb 29, 2024 IDA-D7930 Loan Disb 5,747.64
Feb 29, 2024 IDA-D7930 Loan Disb 3,569.70
Mar 29, 2024 IDA-D7930 Loan Disb 10,605.28
Feb 29, 2024 IDA-D7930 Loan Disb 3,569.70
Feb 29, 2024 IDA-D7930 Loan Disb 5,097.99
May 31, 2024 IDA-D7930 Loan Disb 7,139.40
Feb 29, 2024 IDA-D7930 Loan Disb 47,208.29
Jun 24, 2024 IDA-D7930 Loan Disb 20,000,000.00
Jun 24, 2024 IDA-D7930 Loan Disb 222,242.48
May 28, 2024 IDA-D7930 Loan Disb 12,519.21
Apr 17, 2024 IDA-D7930 Loan Disb 3,569.69
May 16, 2024 IDA-D7930 Loan Disb 5,099.58
Apr 11, 2024 IDA-D7930 Loan Disb 5,000,000.00
Mar 14, 2024 IDA-D7930 Loan Disb 3,569.15
Apr 3, 2024 IDA-D7930 Loan Disb 3,569.70
Apr 9, 2024 IDA-D7930 Loan Disb 3,569.17
Mar 14, 2024 IDA-D7930 Loan Disb 19,662.47
Apr 9, 2024 IDA-D7930 Loan Disb 13,735.86
Apr 12, 2024 IDA-D7930 Loan Disb 3,569.71
Mar 14, 2024 IDA-D7930 Loan Disb 3,569.69
Apr 12, 2024 IDA-D7930 Loan Disb 3,569.71
Aug 20, 2024 IDA-D7930 Loan Disb 92,038.32
Apr 12, 2024 IDA-D7930 Loan Disb 3,059.74
Aug 20, 2024 IDA-D7930 Loan Disb 188,961.12
Nov 14, 2023 IDA-D7930 Loan Disb 5,667.45
Nov 14, 2023 IDA-D7930 Loan Disb 33,799.48
Nov 14, 2023 IDA-D7930 Loan Disb 71,932.97
Oct 4, 2023 IDA-D7930 Loan Disb 10,113.61
Oct 4, 2023 IDA-D7930 Loan Disb 10,113.58
Oct 4, 2023 IDA-D7930 Loan Disb 10,113.55
Oct 4, 2023 IDA-D7930 Loan Disb 10,113.56
Dec 6, 2021 IDA-D7930 Loan Disb 15,000,000.00
Jun 30, 2021 IDA-D7930 Loan Disb 3,077,960.00
Sep 23, 2022 IDA-D7930 Loan Disb 3,675,347.00
Aug 29, 2023 IDA-D7930 Loan Disb 5,002.92
Aug 29, 2023 IDA-D7930 Loan Disb 48,792.32
Aug 29, 2023 IDA-D7930 Loan Disb 10,564.71
Sep 5, 2023 IDA-D7930 Loan Disb 88,967.21
Sep 5, 2023 IDA-D7930 Loan Disb 29,563.87
Sep 12, 2023 IDA-D7930 Loan Disb 5,749.01
Sep 12, 2023 IDA-D7930 Loan Disb 73,252.24
Sep 12, 2023 IDA-D7930 Loan Disb 50,840.17
Sep 12, 2023 IDA-D7930 Loan Disb 2,713.87
Jul 31, 2023 IDA-D7930 Loan Disb 18,931.08
Sep 12, 2023 IDA-D7930 Loan Disb 50,840.17
Jul 31, 2023 IDA-D7930 Loan Disb 2,723.84
Jul 19, 2023 IDA-D7930 Loan Disb 61,653.29
Jul 19, 2023 IDA-D7930 Loan Disb 17,772.74
Jul 19, 2023 IDA-D7930 Loan Disb 7,673.26
Jun 29, 2023 IDA-D7930 Loan Disb 31,398.69
Jul 19, 2023 IDA-D7930 Loan Disb 3,815.42
Jul 19, 2023 IDA-D7930 Loan Disb 26,993.67
Sep 28, 2023 IDA-D7930 Loan Disb 5,749.01
May 16, 2024 IDA-D7930 Loan Disb 4,042.68
Apr 17, 2024 IDA-D7930 Loan Disb 5,099.58
Feb 8, 2024 IDA-D7930 Loan Disb 4,042.68
Dec 28, 2023 IDA-D7930 Loan Disb 41,415.31
Dec 14, 2023 IDA-D7930 Loan Disb 16,599.30
Jan 11, 2024 IDA-D7930 Loan Disb 67,167.13
Nov 13, 2023 IDA-D7930 Loan Disb 27,986.73
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Jan 11, 2024 IDA-D7930 Loan Disb 31,586.47
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.14
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Dec 21, 2023 IDA-D7930 Loan Disb 3,569.70
Dec 21, 2023 IDA-D7930 Loan Disb 3,569.71
Jan 11, 2024 IDA-D7930 Loan Disb 7,139.40
Nov 30, 2023 IDA-D7930 Loan Disb 5,748.11
Nov 13, 2023 IDA-D7930 Loan Disb 9,957.64
Nov 13, 2023 IDA-D7930 Loan Disb 15,538.57
Jan 11, 2024 IDA-D7930 Loan Disb 7,138.30
Jan 11, 2024 IDA-D7930 Loan Disb 7,139.40
Jan 11, 2024 IDA-D7930 Loan Disb 3,568.03
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Jan 11, 2024 IDA-D7930 Loan Disb 5,099.57
Dec 20, 2023 IDA-D7930 Loan Disb 9,094.51
Nov 20, 2023 IDA-D7930 Loan Disb 3,569.71
Oct 25, 2023 IDA-D7930 Loan Disb 10,113.61
Jan 11, 2024 IDA-D7930 Loan Disb 5,099.57
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.14
Dec 20, 2023 IDA-D7930 Loan Disb 5,747.64
Nov 2, 2023 IDA-D7930 Loan Disb 3,569.71
Dec 21, 2023 IDA-D7930 Loan Disb 7,073.49
Mar 20, 2024 IDA-D7930 Loan Disb 12,519.25
Apr 3, 2024 IDA-D7930 Loan Disb 3,569.70
Mar 14, 2024 IDA-D7930 Loan Disb 3,569.69
Mar 14, 2024 IDA-D7930 Loan Disb 3,569.15
Mar 14, 2024 IDA-D7930 Loan Disb 4,042.68
Apr 9, 2024 IDA-D7930 Loan Disb 3,569.70
Mar 14, 2024 IDA-D7930 Loan Disb 6,119.49
Mar 14, 2024 IDA-D7930 Loan Disb 3,569.69
Sep 28, 2023 IDA-D7930 Loan Disb 43,822.19
Sep 14, 2023 IDA-D7930 Loan Disb 15,423.86
Sep 28, 2023 IDA-D7930 Loan Disb 3,570.27
Sep 22, 2023 IDA-D7930 Loan Disb 15,244.33
Sep 1, 2023 IDA-D7930 Loan Disb 44,880.82
Aug 8, 2023 IDA-D7930 Loan Disb 2,713.88
Aug 8, 2023 IDA-D7930 Loan Disb 5,749.01
Jun 28, 2023 IDA-D7930 Loan Disb 9,771,097.00
Aug 8, 2023 IDA-D7930 Loan Disb 5,749.01
Aug 8, 2023 IDA-D7930 Loan Disb 5,749.01
Aug 8, 2023 IDA-D7930 Loan Disb 5,749.01
Aug 8, 2023 IDA-D7930 Loan Disb 2,713.50
Jan 11, 2024 IDA-D7930 Loan Disb 5,098.78
Dec 15, 2023 IDA-D7930 Loan Disb 10,113.57
Oct 10, 2023 IDA-D7930 Loan Disb 5,533.70
Oct 27, 2023 IDA-D7930 Loan Disb 40,205.76
Oct 27, 2023 IDA-D7930 Loan Disb 30,057.95
Oct 27, 2023 IDA-D7930 Loan Disb 5,748.11
Oct 10, 2023 IDA-D7930 Loan Disb 13,596.66
Oct 10, 2023 IDA-D7930 Loan Disb 34,597.44
Oct 10, 2023 IDA-D7930 Loan Disb 37,476.48
Oct 11, 2023 IDA-D7930 Loan Disb 5,002.93
Dec 8, 2023 IDA-D7930 Loan Disb 4,953.92
Oct 27, 2023 IDA-D7930 Loan Disb 27,815.06
Oct 27, 2023 IDA-D7930 Loan Disb 46,632.95
Dec 13, 2023 IDA-D7930 Loan Disb 8,650.93
Dec 18, 2023 IDA-D7930 Loan Disb 25,038.50
Dec 18, 2023 IDA-D7930 Loan Disb 6,504.27
Aug 29, 2022 IDA-D7930 Loan Disb 123,891.66
Aug 24, 2022 IDA-D7930 Loan Disb 56,112.20
Aug 18, 2022 IDA-D7930 Loan Disb 51,009.57
Aug 18, 2022 IDA-D7930 Loan Disb 66,313.56
Feb 8, 2024 IDA-D7930 Loan Disb 3,569.15
Feb 8, 2024 IDA-D7930 Loan Disb 2,365.04
Feb 8, 2024 IDA-D7930 Loan Disb 3,569.15
Feb 8, 2024 IDA-D7930 Loan Disb 3,569.70
Jun 24, 2024 IDA-D7930 Loan Disb 12,519.22
Apr 17, 2024 IDA-D7930 Loan Disb 1,311.26
Apr 17, 2024 IDA-D7930 Loan Disb 21,418.21
Apr 17, 2024 IDA-D7930 Loan Disb 3,569.69
Apr 17, 2024 IDA-D7930 Loan Disb 4,042.68
Feb 26, 2024 IDA-D7930 Loan Disb 10,605.28
Apr 17, 2024 IDA-D7930 Loan Disb 3,569.69
Apr 17, 2024 IDA-D7930 Loan Disb 3,569.16
Mar 22, 2024 IDA-D7930 Loan Disb 3,569.70
Mar 22, 2024 IDA-D7930 Loan Disb 15,664.68
Mar 22, 2024 IDA-D7930 Loan Disb 6,894.22
Mar 22, 2024 IDA-D7930 Loan Disb 3,569.70
Mar 21, 2024 IDA-D7930 Loan Disb 3,569.70
Mar 22, 2024 IDA-D7930 Loan Disb 1,311.25
Feb 23, 2024 IDA-D7930 Loan Disb 3,535.06
Feb 15, 2024 IDA-D7930 Loan Disb 18,540.43
Mar 21, 2024 IDA-D7930 Loan Disb 5,099.57
Jan 24, 2024 IDA-D7930 Loan Disb 22,127.82
Feb 15, 2024 IDA-D7930 Loan Disb 50,418.16
Jan 30, 2024 IDA-D7930 Loan Disb 5,747.63
Jan 30, 2024 IDA-D7930 Loan Disb 1,311.25
Feb 5, 2024 IDA-D7930 Loan Disb 10,605.28
Jul 30, 2024 IDA-D7930 Loan Disb 10,605.24
Jun 3, 2024 IDA-D7930 Loan Disb 526,848.80
Mar 25, 2024 IDA-D7930 Loan Disb 3,569.70
Oct 18, 2023 IDA-D7930 Loan Disb 11,767.16
Dec 6, 2023 IDA-D7930 Loan Disb 35,158.00
Nov 14, 2023 IDA-D7930 Loan Disb 10,459.99
Jan 11, 2024 IDA-D7930 Loan Disb 3,569.71
Oct 23, 2023 IDA-D7930 Loan Disb 7,285.10
Jan 11, 2024 IDA-D7930 Loan Disb 13,750.59
Jan 9, 2024 IDA-D7930 Loan Disb 12,519.24

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Procurement Moderately Satisfactory 2024-12-20
Financial Management Satisfactory 2024-12-20
Monitoring and Evaluation Satisfactory 2024-12-20
Progress towards achievement of PDO Moderately Satisfactory 2024-12-20
Overall Implementation Progress (IP) Moderately Unsatisfactory 2024-12-20
Project Management Moderately Satisfactory 2024-12-20

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Retention up to grade 3 among children benefiting from ECD interventions and literacy package in communities with low educational attainment (disaggregated by gender)Value75.0080.5088.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Retention up to grade 3 among girls benefiting from ECD interventions and literacy package in communities with low educational attainmentValue74.0074.0076.00
    Date
    Comment
  • Literacy proficiency at grade 3 in schools implementing the literacy package in communities with low educational attainment (disaggregated by gender)Value5.005.0080.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Literacy proficiency among girls at grade 3 in schools implementing the literacy package in communities with low educational attainmentValue5.005.0030.00
    Date
    Comment
  • Girls’ retention in upper grades of basic education in upgraded schoolsValue64.4097.9074.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Basic Education teachers trained in GBV prevention (disaggregated by gender)Value0.0033.0030.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • National Learning Assessment conducted every three years for basic education and results disseminated at all levelsValueNLA implemented in Primary Education (2013 and 201The NLA evaluation instruments were produced and dReport documenting usage of the NLAs results in in
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Project Monitoring Report, including lesson learned producedValueNoYesYes
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Additional functional ECD Centers (cumulative)Value0.000.00100.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • of which are female teachersValue0.000.0040.00
    Date
    Comment
  • Share of teachers who reported receiving pedagogical guidance based on students’ performance on the NLA and annualValue0.000.0060.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Level of satisfaction of upper primary and lower secondary female students with reporting mechanism (Citizen Engagement indicator and part of Grievance Redress Mechanism)ValueNoNoYes
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Proportion of community based pre-school facilitators receiving in-service training on the new curriculumValue0.000.0050.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Primary schools using lessons plans and with support of structured pedagogyValue0.003.0060.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Share of schools using report cards to inform parents and teachers on students’ performance on the NLA and Annual School Census.Value0.000.0090.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • DL centers with equipment and technology (cumulative)Value0.0060.00480.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Students with all subjects' textbooks in grades 1-3 (disaggregated by gender)Value76.0084.0095.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Additional primary schools upgraded to offer lower secondary with gender friendly WASH facilities (Cumulative)Value0.000.00250.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Share of eligible districts implementing Result-based financing scheme.Value0.00100.0075.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Secondary schools with GBV addressing mechanismValue0.0020.0090.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Reduced Teachers' absenteeismValueAbsenteeism is monitored though district supervisiThe monitoring platform for teachers absenteeism iTeachers’ absenteeism reduced at least 10 Percenta
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Girls with all subjects' textbooks in grades 1-3Value76.0076.0079.00
    Date
    Comment
  • Knowledge and information on sexual and reproductive health education among girls and boys in schools participating in the SRH education programValueNot available.ToRs for the firm to conduct the base line study hReduction in 50% (cumulative) of students without
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • MINEDH staff at all administrative levels trained on statistics collection, processing, and use for managementValue0.0050.00200.00
    DateMarch 26, 2021November 16, 2023December 30, 2025
    Comment
  • Gender Based Violence risk factors identified and monitoredValueNot available.ToRs for the firm to conduct the base line study hAction plan for combating risk of GBV and SEA in s
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Percentage of primary female teachers in upgraded schools who comply with the requisites to teach in lower secondary provided with trainingValueNot available.100% of the 3,074 female teachers with the require100 percent (cumulative) of primary female teacher
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Students benefiting from direct interventions to enhance learningValue0.0055953.003835000.00
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Students benefiting from direct interventions to enhance learning - FemaleValue0.000.001770000.00
    Date
    Comment
  • Teachers recruited or trainedValue0.005155.004000.00
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Number of teachers recruitedValue0.000.000.00
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment
  • Teachers recruited or trained - Female (RMS requirement)Value0.000.00371.00
    Date
    Comment
  • Number of teachers trainedValue0.005155.004000.00
    DateMarch 26, 2021November 16, 2023December 31, 2025
    Comment