Fiji Recovery and Resilience First Development Policy Operation with a Catastrophe-Deferred Drawdown Option

Abstract*

The development objectives of the Recovery and Resilience First Development Policy Operation with a Catastrophe-Deferred Drawdown Option in Fiji are to: i) promote private sector-led economic recovery; ii) enhance climate, disaster, and social resilience; and iii) strengthen debt and public financial management. The development policy operation supports the Government’s efforts to address short- and long-term challenges associated with climate and...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The development objective is to: i) promote private sector-led economic recovery; ii) enhance climate, disaster and social resilience; and iii) strengthen debt and public financial management.

Key Details

Project Details

  • P173558

  • Active

  • Mehwish Ashraf , Simone Esler

  • Republic of Fiji

  • Fiji

  • October 20, 2020

  • (as of board presentation)

    March 25, 2021

  • April 29, 2021

  • US$ 0.00 million

  • Ministry of Finance

  • East Asia and Pacific

  • 2021

  • US$ 145.00 million

  • N/A

  • October 19, 2023

  • March 24, 2027

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 25.00
IDA Credit 120.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 25.00
IDA Commitment 120.00
IBRD + IDA Commitment 145.00
Lending Instrument
Grant Amount N/A
Total Project Cost** N/A

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Aug 15, 2022 IBRD-92110 Int Charges 237,562.50
Feb 15, 2022 IBRD-92110 Int Charges 154,611.10
Aug 15, 2021 IBRD-92110 Int Charges 91,731.03
May 3, 2021 IBRD-92110 Loan Disb 24,937,500.00
Apr 29, 2021 IBRD-92110 Loan Disb 62,500.00
Apr 29, 2021 IBRD-92110 Fee Charges 62,500.00
Feb 15, 2024 IBRD-92110 Int Charges 872,859.00
Aug 15, 2024 IBRD-92110 Int Charges 863,335.10
Aug 15, 2024 IBRD-92110 Int Charges 4,594.46
Mar 25, 2021 IDA-68420 Loan Commitment 10,000,000.00
Mar 25, 2021 IDA-68430 Loan Commitment 110,000,000.00
Mar 25, 2021 IBRD-92110 Loan Commitment 25,000,000.00
Aug 15, 2023 IBRD-92110 Int Charges 779,305.56
Feb 15, 2023 IBRD-92110 Int Charges 580,111.10
Aug 15, 2021 IDA-68430 Int Charges 230,593.81
Aug 15, 2021 IDA-68430 Int Charges 230,593.81
May 3, 2021 IDA-68430 Loan Disb 109,537,736.00
Aug 15, 2022 IDA-68430 Int Charges 1,161.20
Feb 15, 2022 IDA-68430 Int Charges 397,053.28
Feb 15, 2022 IDA-68430 Int Charges 397,053.28
Feb 15, 2022 IDA-68430 Int Charges 3,055.43
Feb 15, 2022 IDA-68430 Int Charges 3,055.43
Aug 15, 2022 IDA-68430 Int Charges 378,291.75
Aug 15, 2022 IDA-68430 Int Charges 378,291.75
Aug 15, 2022 IDA-68430 Int Charges 1,161.20
Aug 15, 2023 IDA-68430 Int Charges 1,875.22
Aug 15, 2023 IDA-68430 Int Charges 1,875.22
Aug 15, 2023 IDA-68430 Int Charges 381,718.28
Aug 15, 2023 IDA-68430 Int Charges 381,718.28
Feb 15, 2023 IDA-68430 Int Charges 377,992.30
Feb 15, 2023 IDA-68430 Int Charges 377,992.30
Feb 15, 2023 IDA-68430 Int Charges 3,284.75
Feb 15, 2023 IDA-68430 Int Charges 3,284.75
Aug 15, 2024 IDA-68430 Int Charges 5,148.39
Aug 15, 2024 IDA-68430 Int Charges 5,148.39
Aug 15, 2024 IDA-68430 Int Charges 372,349.75
Aug 15, 2024 IDA-68430 Int Charges 372,349.75
Feb 15, 2024 IDA-68430 Int Charges 378,331.50
Feb 15, 2024 IDA-68430 Int Charges 378,331.50
Feb 15, 2024 IDA-68430 Int Charges 656.42
Feb 15, 2024 IDA-68430 Int Charges 656.42

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Program Management Moderately Unsatisfactory 2025-01-07
Overall Implementation Progress (IP) Moderately Satisfactory 2025-01-07
Monitoring and Evaluation Moderately Unsatisfactory 2025-01-07
Progress towards achievement of PDO Moderately Satisfactory 2025-01-07

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Results Indicator 5: Share of 150 funded activities implemented by women community groupsValue0.0040.0050.00
    DateJune 30, 2021June 30, 2023June 30, 2023
    Comment
  • Results Indicator 8: Share of social assistance programs that include gender-sensitive and disaster responsiveness criteria for determining assistanceValue0.00100.0050.00
    DateJune 30, 2021June 30, 2023June 30, 2024
    Comment
  • Results Indicator 9: (i) external (FX) debt as percent of total public debt; and (ii) the number of instrumentsValue(i) 26 percent (ii) 396(i) 36.9 (ii) 363(i) 30 percent (+/-5%) (ii) 320
    DateJune 30, 2020June 30, 2023June 30, 2024
    Comment
  • Results Indicator 10: Number of programs across budget agencies performing gender impact assessments and collecting sex-disaggregated data for monitoring and evaluationValueNone1635 out of 200
    DateJune 30, 2020June 30, 2023June 30, 2024
    Comment
  • Results Indicator 11: The value added tax as percent of GDPValue4.807.507.10
    DateJune 30, 2021June 30, 2023June 30, 2024
    Comment
  • Results Indicator 12: The annual revenue impact of the film rebate reductionValue00.30.4 percent of GDP
    DateJune 30, 2020June 30, 2023June 30, 2024
    Comment
  • Results Indicator 1: The annual volume of payments made electronically through the Real-Time Gross Settlement SystemValue148786.001482412.00185930.00
    DateJune 30, 2019June 30, 2023June 30, 2024
    Comment
  • Results Indicator 6:Percentage of import permits for steel reinforcement material being manufactured in accordance with the revisedstandard, or suitable equivalent standardValue0.00100.00100.00
    DateJune 30, 2019June 30, 2023June 30, 2024
    Comment
  • Results Indicator 7: Implementation plan for developing and piloting/testing impact-based multi-hazard early warningValueNoNoYes
    DateJune 30, 2022June 30, 2023June 30, 2024
    Comment
  • Results Indicator 2: Number of outstanding corporate bond issuancesValue0.001.002.00
    DateJune 30, 2019June 30, 2023June 30, 2024
    Comment
  • Results Indicator 3: Volume of foreign investment commitmentsValue24300000.0032800000.0027900000.00
    DateJune 30, 2019June 30, 2023June 30, 2024
    Comment
  • Results Indicator 4: Percentage of area within the national jurisdiction legally designated as Marine Protected Areas that contribute to climate resilience & establishment of the Adaptation RegistryValue(i) 1 (ii) None (i) 1 (ii) None(i) 5 (ii) Established and made publicly available
    DateJune 30, 2021June 30, 2023June 30, 2024
    Comment