Skip to Main Navigation

Climate Resilient Water Services Project

Abstract*

The project will improve the coverage and quality of water supply, sanitation, and irrigation services, and strengthen capacity for improved integrated water resources management and of relevant service providers in selected river basins. At national level the project will increase institutional capacities for climate-resilient water management. Climate resilient water services are defined as water services that achieve coverage and quality standards...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The project development objective is to (i) increase access to climate-resilient water services in selected river basins, and (ii) strengthen institutional capacities for climate-resilient water management at the local and national levels.

Key Details

Project Details

  • P173734

  • Active

  • Odete Muximpua , Abdulhamid Azad, Aidai Bayalieva

  • Ministry of Finance

  • Kyrgyz Republic

  • June 28, 2021

  • (as of board presentation)

    April 15, 2022

  • October 31, 2022

  • US$ 100.00 million

  • State Institution for Development of Drinking Water Supply and Wastewater Disposal,Water Resource Service (WRS)

  • Europe and Central Asia

  • 2022

  • US$ 100.00 million

  • N/A

  • January 18, 2024

  • December 31, 2028

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 50.00
IDA Grant 50.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 100.00
IBRD + IDA Commitment 100.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 100.00

Summary Status of World Bank Financing (US$ Millions) as of February 28, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of February 28, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jan 30, 2023 IDA-E0090 Loan Disb 1,000,000.00
Jul 29, 2024 IDA-E0090 Loan Disb 394,672.47
Mar 15, 2024 IDA-70810 Loan Disb 310,902.34
Aug 15, 2024 IDA-70810 Int Charges 4,696.31
Aug 15, 2024 IDA-70810 Int Charges 4,696.31
Aug 15, 2024 IDA-70810 Int Charges 33.71
Aug 15, 2024 IDA-70810 Int Charges 33.71
Feb 15, 2024 IDA-70810 Int Charges 2,480.31
Feb 15, 2024 IDA-70810 Int Charges 2,480.31
Oct 17, 2023 IDA-70810 Loan Disb 1,000,000.00
Apr 15, 2022 IDA-70810 Loan Commitment 50,000,000.00
Apr 15, 2022 IDA-E0090 Loan Commitment 50,000,000.00
Jun 10, 2024 IDA-E0090 Loan Disb 460,702.10
May 24, 2024 IDA-E0090 Loan Disb 685,445.25
Jan 26, 2024 IDA-E0090 Loan Disb 1,082,311.20
May 28, 2024 IDA-E0090 Loan Disb 490,864.20
Aug 26, 2024 IDA-E0090 Loan Disb 416,175.80
Feb 6, 2024 IDA-E0090 Loan Disb 456,359.22
Nov 27, 2023 IDA-E0090 Loan Disb 500,000.00
Dec 21, 2023 IDA-E0090 Loan Disb 337,655.20
Dec 18, 2023 IDA-E0090 Loan Disb 300,000.00
Feb 2, 2023 IDA-E0090 Loan Disb 1,500,000.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2025-01-21
Project Management Satisfactory 2025-01-21
Financial Management Satisfactory 2025-01-21
Monitoring and Evaluation Satisfactory 2025-01-21
Procurement Satisfactory 2025-01-21
Overall Implementation Progress (IP) Moderately Satisfactory 2025-01-21

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • People provided with access to safely managed water supply servicesValue0.000.0095000.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • National Program for climate resilient water services developed and aligned with National Water Resources Strategy 2040ValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Reduction in the specific energy consumption of water supply deliveryValue0.000.0030.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Out of which femaleValue0.000.000.00
    Date
    Comment
  • People provided with access to safely managed sanitation servicesValue0.000.0043000.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Out of which femaleValue0.000.000.00
    Date
    Comment
  • Farmers provided with improved irrigation and drainage servicesValue0.000.0016800.00
    DateNovember 15, 2021January 18, 2024December 31, 2028
    Comment
  • Out of which femaleValue0.000.000.00
    Date
    Comment
  • Area provided with new/improved irrigation or drainage servicesValue0.000.0028000.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Area provided with improved irrigation or drainage servicesValue0.000.0028000.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Digital Water Information System and Monitoring StrengthenedValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Water supply systems rehabilitated with climate-resilient design standardsValue0.000.0037.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Customer satisfaction with the quality of water supply services (percentage of customers)ValuetbdTBD70
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • State of the Sector Annual Reports prepared and publicly disclosedValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Continuity of water supply in participating water utilitiesValue4.000.0020.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Share of water users satisfied with WUA managerial and operational performanceValue0.000.0090.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Operational Water User Associations strengthenedValue0.000.0021.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Wastewater treatment facilities constructedValue0.000.003.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Share of beneficiaries who report that the project has established effective engagement processesValue0.000.0075.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Management of dams improvedValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Of which femaleValue0.000.0075.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Wastewater collection and treatment capacityValue0.000.001500000.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Social institutions with functional safely managed drinking water supply and/or sanitation facilitiesValue0.000.0093.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Communication and citizen engagement strategy developed and adoptedValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • WSS Sector-wide monitoring and benchmarking system established and operationalValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Development of WSS medium-term investment planValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Water meters installedValue0.000.0019000.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Development of pro-poor tariff setting procedures, modelling and institutionalizationValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • WSS service providers benefitting from improved institutional capacity for improved service deliveryValue0.000.0030.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Improved billing and collection efficiencyValue30.0030.0090.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Irrigation and drainage schemes rehabilitated with climate-resilient design standardsValue0.000.003.00
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Operation cost ratio improvedValue0.000.001.00
    DateDecember 31, 2028January 18, 2024December 31, 2028
    Comment
  • Development of energy efficiency improvement plan for priority utilitiesValueNoNoYes
    DateDecember 31, 2021January 18, 2024December 31, 2028
    Comment
  • Share of decision-making positions in WUA decision-making bodies held by womenValue7.007.0012.00
    DateDecember 31, 2021January 18, 2024December 28, 2028
    Comment