Financier | Commitments |
---|---|
IDA Credit | 352.50 |
P173830
Active
Susan Wong , Manuel Figueredo Thomson, Gertrude Coulibaly Zombre, Issa Bitang A Tiati
Republic of Mali,Republic of Niger,Burkina Faso
Western and Central Africa
October 8, 2020
(as of board presentation)
June 15, 2021
January 18, 2022
US$ 352.50 million
Republic of Mali - Ministry of National Reconciliation, Peace and National Cohesion,Burkina Faso - Ministry of Economy, Finance and Development,The States of Liptako-Gourma Integrated Development Authority,Republic of Niger - Cabinet of the Prime Minister (Executive Secretariat for the SDS Sahel Niger)
2021
US$ 352.50 million
N/A
January 25, 2024
December 31, 2026
Yes
BANK APPROVED
Financier | Commitments |
---|---|
IDA Credit | 352.50 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | N/A |
IDA Commitment | 352.50 |
IBRD + IDA Commitment | 352.50 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 352.50 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Sep 12, 2023 | IDA-D8330 | Loan Disb | 646,959.40 |
Feb 28, 2023 | IDA-D8330 | Loan Disb | 2,033,196.00 |
Jun 23, 2023 | IDA-D8300 | Loan Disb | 49,175.28 |
Jun 23, 2023 | IDA-D8300 | Loan Disb | 140,312.42 |
May 25, 2023 | IDA-D8310 | Loan Disb | 284,331.03 |
Jun 30, 2023 | IDA-D8330 | Loan Disb | 3,193,605.20 |
Sep 28, 2023 | IDA-D8300 | Loan Disb | 37,363.01 |
Jun 28, 2023 | IDA-D8330 | Loan Disb | 1,865,208.40 |
Jun 28, 2023 | IDA-D8300 | Loan Disb | 51,972.42 |
Jun 14, 2023 | IDA-D8330 | Loan Disb | 276,452.60 |
Jun 14, 2024 | IDA-D8310 | Loan Disb | 278,635.47 |
Nov 21, 2023 | IDA-D8330 | Loan Disb | 632,754.60 |
Oct 23, 2023 | IDA-D8330 | Loan Disb | 572,304.00 |
Dec 12, 2023 | IDA-D8330 | Loan Disb | 1,629,211.80 |
Sep 1, 2022 | IDA-D8310 | Loan Disb | 6,136,946.00 |
Sep 13, 2022 | IDA-D8300 | Loan Disb | 154,171.10 |
Jan 5, 2023 | IDA-D8300 | Loan Disb | 111,276.85 |
May 16, 2023 | IDA-D8330 | Loan Disb | 397,541.80 |
Jun 15, 2021 | IDA-68880 | Loan Commitment | 50,000,000.00 |
Jun 15, 2021 | IDA-D8210 | Loan Commitment | 50,000,000.00 |
Jun 15, 2021 | IDA-68990 | Loan Commitment | 50,000,000.00 |
Jun 15, 2021 | IDA-D8300 | Loan Commitment | 2,500,000.00 |
Jun 15, 2021 | IDA-D8310 | Loan Commitment | 50,000,000.00 |
Jun 15, 2021 | IDA-69050 | Loan Commitment | 75,000,000.00 |
Jun 23, 2023 | IDA-68880 | Loan Disb | 607,035.44 |
Jun 23, 2023 | IDA-68880 | Loan Disb | 90,732.22 |
Jun 16, 2023 | IDA-68880 | Int Charges | 635.43 |
Jun 16, 2023 | IDA-68880 | Int Charges | 635.43 |
Jun 16, 2023 | IDA-68880 | Int Charges | 46,564.39 |
Jun 16, 2023 | IDA-68880 | Int Charges | 46,564.39 |
Jul 6, 2023 | IDA-68880 | Loan Disb | 668,704.40 |
Nov 9, 2022 | IDA-68880 | Loan Disb | 533,927.20 |
Apr 17, 2023 | IDA-68880 | Loan Disb | 370,130.62 |
Feb 2, 2023 | IDA-68880 | Loan Disb | 595,534.94 |
Dec 15, 2022 | IDA-68880 | Int Charges | 30,483.65 |
Dec 15, 2022 | IDA-68880 | Int Charges | 30,483.65 |
Mar 21, 2023 | IDA-68880 | Loan Disb | 461,262.88 |
Mar 21, 2023 | IDA-68880 | Loan Disb | 527,762.10 |
Sep 21, 2022 | IDA-68880 | Loan Disb | 840,360.10 |
Sep 7, 2022 | IDA-68880 | Loan Disb | 296,088.22 |
Jun 13, 2024 | IDA-68880 | Loan Disb | 543,870.60 |
Apr 30, 2024 | IDA-68880 | Int Charges | 548.75 |
Apr 30, 2024 | IDA-68880 | Int Charges | 548.75 |
Apr 30, 2024 | IDA-68880 | Int Charges | 55,634.35 |
Apr 30, 2024 | IDA-68880 | Int Charges | 55,634.35 |
Jun 12, 2024 | IDA-68880 | Loan Disb | 2,363,490.80 |
Oct 16, 2023 | IDA-68990 | Int Charges | 9,283.52 |
Oct 16, 2023 | IDA-68990 | Int Charges | 9,283.52 |
Jul 25, 2024 | IDA-68880 | Loan Disb | 216,084.75 |
Apr 18, 2024 | IDA-68990 | Int Charges | 16.01 |
Mar 10, 2023 | IDA-D8310 | Loan Disb | 435,852.78 |
Mar 24, 2023 | IDA-D8310 | Loan Disb | 136,455.05 |
Apr 3, 2023 | IDA-D8330 | Loan Disb | 1,379,054.80 |
Aug 16, 2023 | IDA-D8310 | Loan Disb | 148,980.72 |
Jun 15, 2023 | IDA-D8310 | Loan Disb | 126,014.19 |
Aug 4, 2022 | IDA-D8210 | Loan Disb | 545,579.70 |
Aug 4, 2022 | IDA-D8210 | Loan Disb | 29,972.53 |
Dec 19, 2022 | IDA-D8310 | Loan Disb | 82,090.61 |
Dec 19, 2022 | IDA-D8310 | Loan Disb | 99,985.06 |
Jun 14, 2022 | IDA-D8330 | Loan Disb | 9,730,466.00 |
Aug 26, 2024 | IDA-D8330 | Loan Disb | 2,950,774.00 |
May 3, 2024 | IDA-D8310 | Loan Disb | 473,200.60 |
Mar 25, 2024 | IDA-D8330 | Loan Disb | 3,972,067.80 |
Jun 25, 2024 | IDA-D8330 | Loan Disb | 1,416,616.20 |
Apr 8, 2024 | IDA-D8310 | Loan Disb | 181,216.27 |
May 16, 2024 | IDA-D8330 | Loan Disb | 2,013,682.90 |
Aug 11, 2023 | IDA-D8330 | Loan Disb | 1,108,089.90 |
Sep 5, 2023 | IDA-D8310 | Loan Disb | 446,108.00 |
Sep 20, 2023 | IDA-D8300 | Loan Disb | 99,199.11 |
Jul 31, 2023 | IDA-D8300 | Loan Disb | 47,450.29 |
Jun 15, 2021 | IDA-D8330 | Loan Commitment | 75,000,000.00 |
Jun 17, 2024 | IDA-D8300 | Loan Disb | 47,013.89 |
Jul 1, 2024 | IDA-D8310 | Loan Disb | 175,741.89 |
Jun 11, 2024 | IDA-D8330 | Loan Disb | 1,938,497.20 |
Dec 27, 2023 | IDA-D8330 | Loan Disb | 1,163,154.10 |
Dec 11, 2023 | IDA-D8300 | Loan Disb | 56,791.81 |
Dec 7, 2023 | IDA-D8310 | Loan Disb | 495,900.56 |
Dec 7, 2023 | IDA-D8310 | Loan Disb | 305,071.06 |
Dec 7, 2023 | IDA-D8310 | Loan Disb | 178,126.02 |
Dec 22, 2023 | IDA-D8310 | Loan Disb | 498,806.56 |
Feb 23, 2024 | IDA-D8310 | Loan Disb | 322,468.66 |
Feb 15, 2024 | IDA-D8330 | Loan Disb | 1,319,541.20 |
Jan 31, 2024 | IDA-D8330 | Loan Disb | 305,591.16 |
Feb 12, 2024 | IDA-D8300 | Loan Disb | 121,967.67 |
May 15, 2024 | IDA-D8300 | Loan Disb | 115,797.12 |
Jun 4, 2024 | IDA-D8300 | Loan Disb | 100,542.43 |
Jul 23, 2024 | IDA-D8330 | Loan Disb | 374,675.22 |
Mar 8, 2024 | IDA-D8300 | Loan Disb | 53,711.66 |
Apr 18, 2024 | IDA-D8310 | Loan Disb | 882,491.50 |
Apr 18, 2024 | IDA-D8330 | Loan Disb | 939,613.90 |
Mar 18, 2024 | IDA-D8300 | Loan Disb | 135,312.84 |
Sep 6, 2022 | IDA-68880 | Loan Disb | 1,182,621.10 |
Nov 28, 2022 | IDA-68880 | Loan Disb | 539,013.94 |
Dec 29, 2022 | IDA-68880 | Loan Disb | 353,292.88 |
Oct 12, 2022 | IDA-68880 | Loan Disb | 356,374.66 |
Aug 4, 2022 | IDA-68880 | Loan Disb | 29,972.54 |
Aug 4, 2022 | IDA-68880 | Loan Disb | 533,233.25 |
Mar 23, 2022 | IDA-68880 | Loan Disb | 6,499,046.00 |
Jun 15, 2022 | IDA-68880 | Int Charges | 10,578.29 |
Jun 15, 2022 | IDA-68880 | Int Charges | 10,578.29 |
Apr 18, 2024 | IDA-68990 | Int Charges | 16.01 |
Apr 18, 2024 | IDA-68990 | Int Charges | 20,340.87 |
Apr 18, 2024 | IDA-68990 | Int Charges | 20,340.87 |
Jun 10, 2024 | IDA-68880 | Loan Disb | 2,473,753.50 |
Jun 26, 2024 | IDA-68880 | Int Charges | 55,812.82 |
Jun 26, 2024 | IDA-68880 | Int Charges | 55,812.82 |
May 31, 2023 | IDA-68880 | Loan Disb | 356,167.00 |
Jun 20, 2023 | IDA-68990 | Loan Disb | 2,317,387.50 |
Jun 23, 2023 | IDA-68990 | Loan Disb | 3,228,295.20 |
Name | Review | Date |
---|---|---|
Project Management | Moderately Satisfactory | 2024-12-06 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2024-12-06 |
Procurement | Moderately Satisfactory | 2024-12-06 |
Progress towards achievement of PDO | Moderately Satisfactory | 2024-12-06 |
Financial Management | Moderately Satisfactory | 2024-12-06 |
Monitoring and Evaluation | Moderately Satisfactory | 2024-12-06 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Beneficiaries in project target areas provided with improved access to socio-economic services (broken down by females, youth and forcibly displaced) | Value | 0.00 | 531730.00 | 2425000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Joint action plan supporting the regional harmonization of policies and investments in the Liptako-Gourma region, agreed during an annual coordination meeting with participation of the three countries | Value | 0.00 | 1.00 | 5.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Beneficiaries that report an increase in annual income (in %) as a result of project activities (broken down by females, youth and forcibly displaced) | Value | 0.00 | 0.00 | 675000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 337307.00 | 1125000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 0.00 | 225000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 900000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 150000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 194423.00 | 400000.00 |
Date | April 30, 2021 | September 30, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 0.00 | 300000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Land area where sustainable agricultural, land and water management practices, suited to local and regional agro-ecological conditions, have been adopted as a result of the project | Value | 0.00 | 346.50 | 1057.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 346.50 | 500.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 200.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 0.00 | 357.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
People provided with access to improved water sources | Value | 0.00 | 7500.00 | 800000.00 |
Date | April 30, 2021 | September 30, 2023 | December 31, 2026 | |
Comment |
Females provided with access to improved water sources | Value | 0.00 | 0.00 | 100000.00 |
Date | ||||
Comment |
Burkina Faso | Value | 0.00 | 0.00 | 280000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 200000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 7500.00 | 320000.00 |
Date | April 30, 2021 | September 30, 2023 | December 31, 2026 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Niger | Value | 0.00 | 31543.00 | 250000.00 |
Date | April 30, 2021 | September 30, 2023 | December 31, 2026 | |
Comment |
People who have participated in social cohesion activities under the project | Value | 0.00 | 18572.00 | 175000.00 |
Date | April 30, 2021 | November 30, 2023 | December 31, 2026 | |
Comment |
Individuals participating in regional knowledge exchanges and learning activities | Value | 0.00 | 228.00 | 350.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Farmers reached with agricultural assets or services (broken down by females, youth and forcibly displaced) | Value | 0.00 | 197150.00 | 600000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 146.00 | 75000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 73150.00 | 200000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 82.00 | 50000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 200000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 0.00 | 50000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Sub-projects that address the needs of female beneficiaries / youth / forcibly displaced | Value | 0.00 | 0.00 | 80.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 124000.00 | 200000.00 |
Date | April 30, 2021 | September 30, 2023 | December 31, 2026 | |
Comment |
Sub-projects that address the needs of female beneficiaries | Value | 0.00 | 0.00 | 70.00 |
Date | ||||
Comment |
Agriculture infrastructure (crop storage, livestock shelters etc.) rehabilitated with climate and disaster-resilient standards | Value | 0.00 | 0.00 | 150.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 0.00 | 50.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Sub-projects that address the needs of youth | Value | 0.00 | 0.00 | 60.00 |
Date | ||||
Comment |
Sub-projects that address the needs of forcibly displaced | Value | 0.00 | 0.00 | 50.00 |
Date | ||||
Comment |
Mali | Value | 0.00 | 0.00 | 50.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
People using the Community-Driven Development/Citizen Engagement app for feedback to be integrated in project interventions | Value | 0.00 | 0.00 | 1000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 0.00 | 50.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
People provided with access to improved sanitation services (broken down by females, youth and forcibly displaced) | Value | 0.00 | 1506.00 | 550000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Women beneficiaries reporting that they have a say in community decision-making | Value | 0.00 | 0.00 | 70.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Grievances relayed through the GRM system that are addressed in the specified timeframe | Value | 0.00 | 90.00 | 90.00 |
Date | April 30, 2021 | November 30, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 730.00 | 200000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 200000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Beneficiaries surveyed who believe that communal authorities are transparent (broken down by gender / youth and forcibly displaced) | Value | 0.00 | 0.00 | 50.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 776.00 | 150000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Beneficiaries of job-focused / cash for work interventions (broken down by females, youth and forcibly displaced) | Value | 0.00 | 0.00 | 150000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 0.00 | 50000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 50000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 0.00 | 50000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Roads rehabilitated or improved into climate resilient all-season roads (disaggregated by roads rehabilitated and improved into climate resilient all season roads) | Value | 0.00 | 0.00 | 270.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 0.00 | 90.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 90.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Niger | Value | 0.00 | 0.00 | 90.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
People who have received essential household goods (broken down by females, youth and forcibly displaced) | Value | 0.00 | 86581.00 | 528000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Establishment of digital platform for regional data sharing | Value | No | No | Yes |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |
Burkina Faso | Value | 0.00 | 55038.00 | 78000.00 |
Date | April 30, 2021 | November 23, 2023 | December 31, 2026 | |
Comment |
Regional events supporting knowledge exchange and/or the harmonization of policies and investments in the Liptako-Gourma region | Value | 0.00 | 5.00 | 15.00 |
Date | April 30, 2021 | December 19, 2023 | December 31, 2026 | |
Comment |
Mali | Value | 0.00 | 0.00 | 200000.00 |
Date | April 30, 2021 | May 31, 2023 | December 31, 2026 | |
Comment |