Skip to Main Navigation

Horn of Africa - Groundwater for Resilience Project

Development Objective

To increase the sustainable access and management of groundwater in the Horn of Africa's borderlands.

Key Details

Project Details

  • P174867

  • Active

  • Victor Vazquez Alvarez , Raghava Neti, Wendwosen Feleke, Nooshafarin Tayebi, Irene Rehberger Bescos

  • Republic of Kenya,Federal Republic of Somalia,Federal Democratic Republic of Ethiopia,Intergovernmental Authority on Development (IGAD)

  • Eastern and Southern Africa

  • June 29, 2021

  • (as of board presentation)

    June 1, 2022

  • July 29, 2022

  • US$ 385.00 million

  • Kenya - The Ministry of Water, Sanitation and Irrigation (MOWSI),Ethiopia - Ministry of Water and Energy (MoWE),Intergovernmental Authority on Development (IGAD),Somalia - Ministry of Energy and Water Resource (MoEWR)

  • Eastern and Southern Africa

  • 2022

  • US$ 385.00 million

  • N/A

  • February 22, 2024

  • December 31, 2028

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
IDA Credit 135.00
IDA Grant 250.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment N/A
IDA Commitment 385.00
IBRD + IDA Commitment 385.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 385.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Aug 21, 2024 IDA-E0130 Loan Disb 67,857.49
May 7, 2024 IDA-70820 Loan Disb 324,908.80
Nov 14, 2023 IDA-E0130 Loan Disb 203,097.38
May 28, 2024 IDA-E0130 Loan Disb 206,922.84
May 28, 2024 IDA-E0130 Loan Disb 233,697.47
Apr 24, 2024 IDA-E0140 Loan Disb 196,945.03
Mar 26, 2024 IDA-E0130 Loan Disb 197,793.05
Feb 2, 2024 IDA-E0130 Loan Disb 925,727.94
Jan 24, 2024 IDA-E0140 Loan Disb 219,856.08
Jul 10, 2024 IDA-E0140 Loan Disb 419,351.03
Mar 11, 2024 IDA-E0120 Loan Disb 5,330,684.00
Jun 1, 2022 IDA-70820 Loan Commitment 135,000,000.00
Jun 1, 2022 IDA-E0140 Loan Commitment 10,000,000.00
Jun 1, 2022 IDA-E0130 Loan Commitment 30,000,000.00
Jun 1, 2022 IDA-E0120 Loan Commitment 210,000,000.00
May 15, 2024 IDA-70820 Int Charges 35,442.24
May 15, 2024 IDA-70820 Int Charges 35,442.24
May 15, 2024 IDA-70820 Int Charges 6,951.32
Mar 28, 2024 IDA-70820 Loan Disb 9,920,811.00
Oct 31, 2022 IDA-E0130 Loan Disb 500,000.00
Sep 7, 2022 IDA-E0140 Loan Disb 300,000.00
Dec 1, 2022 IDA-E0130 Loan Disb 500,000.00
May 12, 2023 IDA-E0130 Loan Disb 500,000.00
Apr 17, 2023 IDA-E0130 Loan Disb 500,000.00
Jan 27, 2023 IDA-E0140 Loan Disb 209,912.56
Apr 19, 2023 IDA-E0140 Loan Disb 109,923.91
Dec 14, 2022 IDA-E0140 Loan Disb 700,000.00
Nov 16, 2022 IDA-E0120 Loan Disb 3,012,391.20
Jul 10, 2023 IDA-E0140 Loan Disb 163,061.23
Sep 11, 2023 IDA-E0120 Loan Disb 6,559,965.00
May 16, 2023 IDA-E0130 Loan Disb -500,000.00
Jun 20, 2023 IDA-E0130 Loan Disb 500,000.00
Oct 2, 2023 IDA-E0130 Loan Disb 112,687.26
Nov 17, 2023 IDA-E0130 Loan Disb 252,539.45
Oct 19, 2023 IDA-E0140 Loan Disb 132,565.52
Jun 30, 2023 IDA-70820 Loan Disb 1,447,066.20
Jul 5, 2023 IDA-70820 Loan Disb 543,900.00
Jun 30, 2023 IDA-70820 Loan Disb 2,894,133.80
Nov 15, 2023 IDA-70820 Int Charges 13,695.68
Nov 15, 2023 IDA-70820 Int Charges 13,695.68
Nov 15, 2023 IDA-70820 Int Charges 8,947.85
Dec 13, 2023 IDA-70820 Loan Disb 1,797,333.80
Dec 13, 2023 IDA-70820 Loan Disb 522,499.60
Jul 15, 2024 IDA-70820 Loan Disb 296,459.16
Aug 13, 2024 IDA-70820 Loan Disb 71,156.28
Aug 13, 2024 IDA-70820 Loan Disb 119,200.96
Feb 29, 2024 IDA-E0130 Loan Disb 210,661.95

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2025-01-31
Procurement Moderately Satisfactory 2025-01-31
Project Management Moderately Satisfactory 2025-01-31
Financial Management Moderately Satisfactory 2025-01-31
Overall Implementation Progress (IP) Moderately Unsatisfactory 2025-01-31
Monitoring and Evaluation Satisfactory 2025-01-31

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Beneficiaries provided with access to improved water supplyValue0.000.003344300.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • Kenya - 55 % WomenValue0.000.001512800.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • Somalia - 50% WomenValue0.000.00350000.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • Ethiopia - 50% WomenValue0.000.001481500.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • Water points constructed or rehabilitated under the Program that are functioning.Value0.000.0090.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • KenyaValue0.000.0090.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • SomaliaValue0.000.0090.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • EthiopiaValue0.000.0090.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • Regional groundwater institutions with increased access to improved information critical for sustainable GW management.Value0.001.004.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment
  • KenyaValue0.000.001.00
    DateJuly 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.001.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.001.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • IGADValue0.001.001.00
    DateJune 1, 2022January 10, 2024June 30, 2028
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Water supply schemes constructed or rehabilitated under the project in drought-prone areas with reliable groundwater resourceValue0.000.00610.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Grievances that have been satisfactory resolved at the GRM-levelValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • New policies, bylaws, regulations, guidelines or regional agreements prepared or adopted for sustainable groundwater management anduse in participating countriesValue0.000.0017.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.00400.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.008.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.00100.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.003.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.003.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.00110.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Investment projects prepared to pre-feasibility stage, including analysis related to genderValue0.000.00610.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Intergovernmental Authority on Development ( IGAD)Value0.000.003.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Grievances submitted by women satisfactory resolved at the GRM-levelValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.00400.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Participating countries that have prepared and/or endorsed a National Groundwater Strategy or Master PlanValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.00110.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.00110.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.0085.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Assessment on Environmental and Social Risk Management Capacity conducted and main recommendations involving program entities implementedValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Nature-based infrastructure built or rehabilitated under the projectValue0.000.0070.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.0050.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • People trained in sustainable groundwater management practices in national and regional water resources entities.Value0.0070.00400.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.005.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.00200.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.0015.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.0050.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Community institutions, committees and/or Water Resources Users Associations (WRUAs) established for operation and maintenance (O&M) of groundwater infrastructureValue0.000.00237.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.00100.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.0070.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Intergovernmental Authority on Development (IGAD)Value0.000.0050.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Professional Unit established within government (National or Federal level), or within a regional entity, with capacity to develop and manage groundwater resourcesValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.0050.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoNo
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.00117.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Number of hours per week women and girls spend collecting waterValue23.0023.005.80
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue28.0028.003.50
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue14.0014.007.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Intergovernmental Authority on Development (IGAD)ValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue28.0028.007.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Women’s share of leadership positions in agencies governing groundwater managementValue12.0012.0023.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Women’s share of leadership positions in community groundwater organizationsValue9.000.0037.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue18.0018.0030.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.0015.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue18.000.0030.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue10.000.0030.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue17.0017.0025.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.0050.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Groundwater quantity or quality monitoring points established and monitored at least quarterly.Value0.000.00154.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Hectares with sustainable water supply for irrigation provided by the projectValue0.000.00375.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.0070.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.00375.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.0025.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.0059.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Plans and studies conducted for groundwater development (in the short, medium, and/or long term) with community engagement.Value0.000.0075.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValue0.000.0013.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValue0.000.006.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValue0.000.0056.00
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Groundwater information accessible to beneficiaries/groundwater users and institutionsValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Intergovernmental Authority on Development (IGAD)ValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Country / regional groundwater mapping or assessment completedValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValueNoNoYes
    DateNovember 25, 2021January 10, 2024September 30, 2027
    Comment
  • EthiopiaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Intergovernmental Authority on Development (IGAD)ValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Horn of Africa Groundwater Information System (GWIS) established and operational.ValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • IGADValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • Regional Platform for Groundwater Collaboration (PGWC) functioning among participating countries.ValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • KenyaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • SomaliaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • EthiopiaValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment
  • IGADValueNoNoYes
    DateJune 1, 2022January 10, 2024September 30, 2027
    Comment