Türkiye Water Circularity and Efficiency Improvement Project

Abstract*

The objectives of the Water Circularity and Efficiency Improvement Project are: (a) to improve wastewater services and reuse; (b) to increase irrigation services and efficiency; and (c) to strengthen institutional capacity and coordination for managing water circularity and point source pollution reduction in selected water-stressed areas in Turkiye. There are four components to the project. The first component being wastewater collection, treatment...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Project Development Objectives (PDOs) are: (a) to improve wastewater services and reuse; (b) to increase irrigation services and efficiency; and (c) to strengthen institutional capacity and coordination for managing water circularity and point source pollution reduction in selected water-stressed areas in Türkiye.

Key Details

Project Details

  • P174915

  • Active

  • Ahmed Abdelghany , Canan Yildiz Uz

  • Iller Bankasi Anonim Sirketi (ILBANK),Republic of Turkiye (represented by the Ministry of Treasury and Finance),ILLER BANKASI ANONIM SIRKETI (ILBANK)

  • Turkiye

  • October 14, 2021

  • (as of board presentation)

    May 23, 2023

  • January 18, 2024

  • US$ 490.00 million

  • Devlet Su Isleri,ILLER BANKASI ANONIM SIRKETI (ILBANK)

  • Europe and Central Asia

  • 2023

  • US$ 434.60 million

  • N/A

  • January 11, 2024

  • December 31, 2030

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 434.60

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 434.60
IDA Commitment N/A
IBRD + IDA Commitment 434.60
Lending Instrument
Grant Amount N/A
Total Project Cost** 490.00

Summary Status of World Bank Financing (US$ Millions) as of January 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of January 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Aug 15, 2024 IBRD-95320 Int Charges 102,446.48
Aug 15, 2024 IBRD-95320 Int Charges 4,381.36
Dec 18, 2023 IBRD-95320 Fee Charges -204,590.62
Dec 18, 2023 IBRD-95320 Loan Disb -204,590.62
Jan 18, 2024 IBRD-95320 Loan Disb 204,168.75
May 23, 2023 IBRD-95330 Loan Commitment 352,224,000.00
Feb 1, 2024 IBRD-95330 Fee Charges 866,746.70
Dec 18, 2023 IBRD-95320 Loan Disb 204,590.62
Dec 18, 2023 IBRD-95320 Fee Charges 204,590.62
Aug 30, 2024 IBRD-95330 Loan Disb 166,192.50
Jan 18, 2024 IBRD-95320 Fee Charges 204,168.75
May 23, 2023 IBRD-95320 Loan Commitment 82,372,496.00
Apr 15, 2024 IBRD-95330 Int Charges 345,834.10
Aug 15, 2024 IBRD-95320 Int Charges 49,620.70
Aug 15, 2024 IBRD-95320 Int Charges 1,732.31

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2024-11-26
Monitoring and Evaluation Satisfactory 2024-11-26
Overall Implementation Progress (IP) Satisfactory 2024-11-26
Procurement Satisfactory 2024-11-26
Project Management Satisfactory 2024-11-26
Financial Management Satisfactory 2024-11-26

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Volume of treated wastewater to be generated (m3/day)Value200000.000.00400000.00
    DateMarch 29, 2023September 27, 2023December 31, 2030
    Comment
  • Water users provided with new/improved irrigation and drainage services under the projectValue0.000.004880.00
    DateNovember 18, 2022September 27, 2023December 31, 2030
    Comment
  • Template for protocol for wastewater re-use between participating SKI and DSI developedValueNoNoYes
    DateOctober 20, 2022September 27, 2023December 31, 2030
    Comment
  • People provided with access to safely managed sanitation services under the projectValue0.000.001000000.00
    DateMarch 29, 2023September 27, 2023December 31, 2030
    Comment
  • Water users provided with new/improved irrigation and drainage services under the project (Female)Value0.000.00520.00
    DateNovember 18, 2022September 27, 2023December 31, 2030
    Comment
  • People provided with access to safely managed sanitation services under the project (Female)Value0.000.0050.00
    DateMarch 29, 2023September 27, 2023December 31, 2030
    Comment
  • Irrigation efficiencyValue55.000.0070.00
    DateOctober 20, 2022September 27, 2023December 31, 2030
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Wastewater treatment capacity constructed or rehabilitated - cubic meter per dayValue0.000.00200000.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Area provided with new/improved irrigation or drainage servicesValue0.000.0030396.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Volume -mass BOD pollution load removed by treatment plants supported under projectValue0.000.0055000.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Area provided with improved irrigation or drainage servicesValue0.000.0030396.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Study and Roadmap for Strengthening Reused Wastewater Financing and Regulatory Mechanisms completedValueNoNoYes
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • SKIs with Performance Improvement Action Plans for sustainable O&M and climate resilient wastewater systems developedValue0.000.001.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Feasibility studies and technical designs for reuse of treated wastewater for irrigation’ under the project completedValueNoNoYes
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Technical staff trained on wastewater reuse and other aspects under the project for DSI and WUAsValue0.000.00100.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • -Technical staff trained on wastewater reuse and other aspects under the project – (Female)Value0.000.0020.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Share of women in design and supervision consultancies contracted under the project who are technical staff - ILBANKValue0.000.0020.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Smart water meters installed for irrigationValue0.000.0050000.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • PPP in irrigation appraised for pilot testingValueNoNoYes
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Reduction in energy use in pumped irrigation systemsValue6.550.004.40
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Technical staff trained on wastewater reuse and other aspects under the Project for Ilbank and SKIs (Number)Value0.000.0050.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Operational Water User Associations strengthened and reporting on water useValue0.000.003.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Energy audit conducted for irrigation schemesValueNoNoYes
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Energy Audit conducted for wastewater treatment plantValueNoNoYes
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Information campaign on water scarcity and wastewater reuse implementedValueNoNoYes
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Grievances addressed by SKI in accordance with the stipulated service standards (%)Value0.000.0090.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Water-users who report that the Project has established effective citizen engagement processes/ toolsValue0.000.0075.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Grievances addressed by DSI in accordance with the stipulated service standards (%)Value0.000.0090.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment
  • Share of new staff positions created in WUAs held by womenValue0.000.005.00
    DateMay 18, 2023September 27, 2023December 31, 2030
    Comment