Railway Improvement and Safety for Egypt Project

Abstract*

The project has three components. Component 1. Safe System Signaling Modernization: Modernizing the signaling system along the railway corridor Alexandria - Nag Hammadi consisting of: (a) an automatic block signaling system (on an open line); (b) electronic interlocking systems (in stations); (c) a level-crossing protection system, (d) installation of additional automatic train control wayside equipment as needed, and execution of track upgrades...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To improve safety and service quality of the railway services along the Alexandria-Cairo-Nag Hammadi corridor.

Key Details

Project Details

  • P175137

  • Active

  • Arturo Ardila Gomez , Noor Mohamed, Salma Hany Ibrahim

  • Arab Republic of Egypt- Ministry of International Cooperation

  • Egypt, Arab Republic of

  • September 17, 2020

  • (as of board presentation)

    March 5, 2021

  • August 25, 2021

  • US$ 681.10 million

  • Ministry of Transport,EGYPTIAN NATIONAL RAILWAYS

  • Middle East and North Africa

  • 2021

  • US$ 440.00 million

  • N/A

  • February 7, 2024

  • September 30, 2027

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 440.00
Borrower/Recipient 241.10

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 440.00
IDA Commitment N/A
IBRD + IDA Commitment 440.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 681.10

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Nov 17, 2022 IBRD-92090 Loan Disb 186,551.66
Sep 19, 2022 IBRD-92090 Loan Disb 288,303.53
Sep 29, 2022 IBRD-92090 Loan Disb 102,663.14
Sep 29, 2022 IBRD-92090 Loan Disb 44,550.57
Sep 19, 2022 IBRD-92090 Loan Disb 270,268.97
Sep 7, 2022 IBRD-92090 Loan Disb 40,172.34
Sep 7, 2022 IBRD-92090 Loan Disb 66,662.83
Sep 8, 2022 IBRD-92090 Loan Disb 105,866.79
Sep 8, 2022 IBRD-92090 Loan Disb 53,203.42
Sep 20, 2022 IBRD-92090 Loan Disb 212,476.69
Sep 20, 2022 IBRD-92090 Loan Disb 168,140.95
Nov 14, 2022 IBRD-92090 Loan Disb 231,077.64
Dec 1, 2022 IBRD-92090 Loan Disb 69,109.13
Dec 1, 2022 IBRD-92090 Loan Disb 36,297.06
Dec 1, 2022 IBRD-92090 Loan Disb 86,692.10
Dec 1, 2022 IBRD-92090 Loan Disb 196,099.83
Dec 1, 2022 IBRD-92090 Loan Disb 179,623.70
Dec 1, 2022 IBRD-92090 Loan Disb 119,328.80
Dec 1, 2022 IBRD-92090 Loan Disb 26,445.31
Dec 1, 2022 IBRD-92090 Loan Disb 107,511.45
Sep 27, 2022 IBRD-92090 Loan Disb 126,404.97
Sep 6, 2022 IBRD-92090 Loan Disb 2,290,660.00
Nov 17, 2022 IBRD-92090 Loan Disb 60,212.01
Nov 17, 2022 IBRD-92090 Loan Disb 208,737.90
Mar 29, 2023 IBRD-92090 Loan Disb 29,061.05
Feb 14, 2023 IBRD-92090 Loan Disb 152,152.94
Mar 29, 2023 IBRD-92090 Loan Disb 522,019.44
Mar 29, 2023 IBRD-92090 Loan Disb 25,358.70
Mar 29, 2023 IBRD-92090 Loan Disb 138,071.77
Mar 29, 2023 IBRD-92090 Loan Disb 787,638.25
Mar 29, 2023 IBRD-92090 Loan Disb 345,659.90
Mar 3, 2022 IBRD-92090 Loan Disb 855,566.06
Mar 2, 2022 IBRD-92090 Loan Disb 10,713.17
Mar 2, 2022 IBRD-92090 Loan Disb 218,676.52
Mar 2, 2022 IBRD-92090 Loan Disb 348,170.16
Jun 28, 2022 IBRD-92090 Loan Disb 220,352.80
Jun 6, 2022 IBRD-92090 Loan Disb 247,678.60
Apr 1, 2022 IBRD-92090 Int Charges 263,825.38
Sep 12, 2023 IBRD-92090 Loan Disb 44,395.32
Aug 24, 2022 IBRD-92090 Loan Disb 390,229.56
Aug 24, 2022 IBRD-92090 Loan Disb 77,657.76
Aug 24, 2022 IBRD-92090 Loan Disb 741,572.44
Aug 24, 2022 IBRD-92090 Loan Disb 170,139.56
Aug 29, 2022 IBRD-92090 Loan Disb 19,512.74
Dec 29, 2021 IBRD-92090 Loan Disb 928,255.10
Dec 29, 2021 IBRD-92090 Loan Disb 288,544.72
Dec 29, 2021 IBRD-92090 Loan Disb 288,940.12
Mar 25, 2022 IBRD-92090 Loan Disb 112,825.72
Mar 25, 2022 IBRD-92090 Loan Disb 87,440.63
Mar 25, 2022 IBRD-92090 Loan Disb 65,030.04
Mar 25, 2022 IBRD-92090 Loan Disb 279,606.90
Mar 25, 2022 IBRD-92090 Loan Disb 1,027,937.75
Mar 25, 2022 IBRD-92090 Loan Disb 83,409.50
Mar 25, 2022 IBRD-92090 Loan Disb 43,085.07
Oct 1, 2022 IBRD-92090 Int Charges 744.69
Oct 1, 2022 IBRD-92090 Int Charges 1,399.65
Oct 1, 2022 IBRD-92090 Int Charges 374,108.44
Sep 26, 2022 IBRD-92090 Loan Disb 80,358.70
Sep 26, 2022 IBRD-92090 Loan Disb 63,823.66
Sep 26, 2022 IBRD-92090 Loan Disb 98,618.57
Oct 1, 2022 IBRD-92090 Int Charges 219,502.55
Nov 7, 2022 IBRD-92090 Loan Disb 147,441.94
Sep 1, 2022 IBRD-92090 Loan Disb 98,899.68
Feb 28, 2022 IBRD-92090 Loan Disb 324,339.75
Mar 1, 2022 IBRD-92090 Loan Disb 503,131.44
Mar 1, 2022 IBRD-92090 Loan Disb 360,133.12
Mar 1, 2022 IBRD-92090 Loan Disb 179,884.92
Mar 1, 2022 IBRD-92090 Loan Disb 150,437.44
Aug 30, 2022 IBRD-92090 Loan Disb 452,756.60
Aug 23, 2022 IBRD-92090 Loan Disb 176,194.52
Aug 23, 2022 IBRD-92090 Loan Disb 127,372.52
Aug 23, 2022 IBRD-92090 Loan Disb 142,956.55
Aug 25, 2021 IBRD-92090 Fee Charges 1,065,701.20
Nov 24, 2021 IBRD-92090 Loan Disb 8,270.09
Oct 7, 2021 IBRD-92090 Loan Disb 1,113,116.20
Nov 24, 2021 IBRD-92090 Loan Disb 606,300.56
Dec 2, 2021 IBRD-92090 Loan Disb 254,913.22
Nov 9, 2021 IBRD-92090 Loan Disb 746,031.25
Nov 9, 2021 IBRD-92090 Loan Disb 1,498,637.50
Nov 2, 2021 IBRD-92090 Loan Disb 3,292,697.20
Aug 25, 2021 IBRD-92090 Loan Disb 1,065,701.20
Aug 18, 2022 IBRD-92090 Loan Disb 351,209.16
Aug 23, 2022 IBRD-92090 Loan Disb 35,912.78
Mar 3, 2022 IBRD-92090 Loan Disb 598,634.00
Apr 1, 2022 IBRD-92090 Int Charges 732.68
Apr 1, 2022 IBRD-92090 Int Charges 456,093.84
Apr 1, 2022 IBRD-92090 Int Charges 125,869.95
Dec 16, 2021 IBRD-92090 Loan Disb 12,713.54
Dec 16, 2021 IBRD-92090 Loan Disb 75,689.77
Jun 3, 2022 IBRD-92090 Loan Disb 171,318.95
Jun 3, 2022 IBRD-92090 Loan Disb 89,864.06
Jun 3, 2022 IBRD-92090 Loan Disb 79,472.69
Jun 3, 2022 IBRD-92090 Loan Disb 815,298.30
Jun 21, 2022 IBRD-92090 Loan Disb 406,091.40
Jun 27, 2022 IBRD-92090 Loan Disb 87,586.87
Jun 27, 2022 IBRD-92090 Loan Disb 84,037.23
Jun 27, 2022 IBRD-92090 Loan Disb 147,822.02
Mar 28, 2022 IBRD-92090 Loan Disb 848,240.70
Mar 28, 2022 IBRD-92090 Loan Disb 121,242.55
May 16, 2022 IBRD-92090 Loan Disb 638,256.00
May 9, 2022 IBRD-92090 Loan Disb 4,980.95
May 9, 2022 IBRD-92090 Loan Disb 711,672.06
May 9, 2022 IBRD-92090 Loan Disb 28,199.97
May 20, 2022 IBRD-92090 Loan Disb 816,434.70
Apr 6, 2022 IBRD-92090 Loan Disb 2,382,046.00
May 9, 2022 IBRD-92090 Loan Disb 101,355.76
May 9, 2022 IBRD-92090 Loan Disb 160,717.12
May 9, 2022 IBRD-92090 Loan Disb 111,104.16
Oct 4, 2022 IBRD-92090 Loan Disb 1,361,818.80
Oct 14, 2022 IBRD-92090 Loan Disb 129,746.28
Dec 23, 2021 IBRD-92090 Loan Disb 2,919,217.80
Dec 23, 2021 IBRD-92090 Loan Disb 151,301.19
Dec 23, 2021 IBRD-92090 Loan Disb 18,715.66
Aug 23, 2022 IBRD-92090 Loan Disb 157,961.38
Aug 23, 2022 IBRD-92090 Loan Disb 311,442.10
Aug 23, 2022 IBRD-92090 Loan Disb 73,225.02
Dec 28, 2021 IBRD-92090 Loan Disb 616,703.44
Dec 28, 2021 IBRD-92090 Loan Disb 1,013,211.44
Dec 28, 2021 IBRD-92090 Loan Disb 943,329.90
Feb 25, 2022 IBRD-92090 Loan Disb 8,236.21
Sep 1, 2022 IBRD-92090 Loan Disb 71,078.20
Sep 1, 2022 IBRD-92090 Loan Disb 130,747.95
Jan 20, 2023 IBRD-92090 Loan Disb 278,077.47
May 2, 2023 IBRD-92090 Loan Disb 81,082.44
May 2, 2023 IBRD-92090 Loan Disb 72,333.99
Feb 24, 2023 IBRD-92090 Loan Disb 1,874,194.40
Apr 26, 2023 IBRD-92090 Loan Disb 64,112.41
May 8, 2023 IBRD-92090 Loan Disb 419,752.30
May 8, 2023 IBRD-92090 Loan Disb 29,342.27
Apr 18, 2023 IBRD-92090 Loan Disb 5,403.06
Apr 18, 2023 IBRD-92090 Loan Disb 166,692.73
Apr 18, 2023 IBRD-92090 Loan Disb 347,031.40
Jan 17, 2023 IBRD-92090 Loan Disb 277,513.30
Jan 17, 2023 IBRD-92090 Loan Disb 5,883.49
Jan 17, 2023 IBRD-92090 Loan Disb 719,979.90
Jan 17, 2023 IBRD-92090 Loan Disb 116,397.96
Apr 26, 2023 IBRD-92090 Loan Disb 227,345.70
Apr 26, 2023 IBRD-92090 Loan Disb 28,590.40
Mar 28, 2023 IBRD-92090 Loan Disb 204,456.19
Mar 28, 2023 IBRD-92090 Loan Disb 1,566,607.60
Jan 13, 2023 IBRD-92090 Loan Disb 28,331.72
Feb 15, 2023 IBRD-92090 Loan Disb 166,658.66
Feb 15, 2023 IBRD-92090 Loan Disb 387,677.00
Apr 11, 2023 IBRD-92090 Loan Disb 35,533.04
Jan 13, 2023 IBRD-92090 Loan Disb 57,417.13
Jan 13, 2023 IBRD-92090 Loan Disb 169,611.73
Jan 23, 2023 IBRD-92090 Loan Disb 206,766.20
Mar 28, 2023 IBRD-92090 Loan Disb 14,339.18
Aug 14, 2023 IBRD-92090 Loan Disb 100,892.16
Aug 2, 2023 IBRD-92090 Loan Disb 28,522.85
Sep 19, 2023 IBRD-92090 Loan Disb 8,226.16
Sep 19, 2023 IBRD-92090 Loan Disb 7,400.93
Sep 19, 2023 IBRD-92090 Loan Disb 637,992.90
May 31, 2023 IBRD-92090 Loan Disb 49,043.21
Aug 11, 2023 IBRD-92090 Loan Disb 142,782.56
Sep 11, 2023 IBRD-92090 Loan Disb 449,704.62
Jul 24, 2023 IBRD-92090 Loan Disb 922,441.56
Aug 1, 2023 IBRD-92090 Loan Disb 9,708.34
Jun 1, 2023 IBRD-92090 Loan Disb 26,821.52
Sep 12, 2023 IBRD-92090 Loan Disb 1,106,151.10
Oct 19, 2021 IBRD-92090 Loan Disb 130,436.19
Nov 17, 2021 IBRD-92090 Loan Disb 164,833.77
Nov 17, 2021 IBRD-92090 Loan Disb 7,715.79
Oct 8, 2021 IBRD-92090 Loan Disb 2,079,408.50
Nov 15, 2021 IBRD-92090 Loan Disb 3,156,264.00
Nov 4, 2021 IBRD-92090 Loan Disb 71,011.36
Nov 4, 2021 IBRD-92090 Loan Disb 593,671.25
Oct 18, 2021 IBRD-92090 Loan Disb 117,962.93
Oct 18, 2021 IBRD-92090 Loan Disb 83,741.36
Oct 18, 2021 IBRD-92090 Loan Disb 147,509.10
Jun 3, 2022 IBRD-92090 Loan Disb 482,742.56
May 2, 2022 IBRD-92090 Loan Disb 100,031.33
Jul 6, 2022 IBRD-92090 Loan Disb 84,705.43
Jun 10, 2022 IBRD-92090 Loan Disb 2,444,781.80
Apr 29, 2022 IBRD-92090 Loan Disb 147,485.77
Apr 29, 2022 IBRD-92090 Loan Disb 288,804.30
Jul 5, 2022 IBRD-92090 Loan Disb 105,708.27
Jul 5, 2022 IBRD-92090 Loan Disb 691,255.80
Apr 20, 2022 IBRD-92090 Loan Disb 928,987.44
Mar 16, 2022 IBRD-92090 Loan Disb 13,475.26
Mar 29, 2022 IBRD-92090 Loan Disb 212,500.88
Dec 1, 2021 IBRD-92090 Loan Disb 27,797.11
Dec 1, 2021 IBRD-92090 Loan Disb 20,622.01
Dec 1, 2021 IBRD-92090 Loan Disb 107,854.26
Nov 23, 2021 IBRD-92090 Loan Disb 72,577.51
Nov 16, 2021 IBRD-92090 Loan Disb 113,254.67
Nov 16, 2021 IBRD-92090 Loan Disb 1,452,425.20
Nov 16, 2021 IBRD-92090 Loan Disb 28,784.84
Nov 16, 2021 IBRD-92090 Loan Disb 61,037.93
Nov 10, 2021 IBRD-92090 Loan Disb 63,074.94
Nov 10, 2021 IBRD-92090 Loan Disb 592,467.06
Nov 10, 2021 IBRD-92090 Loan Disb 429,116.66
Nov 10, 2021 IBRD-92090 Loan Disb 19,779,262.00
Oct 29, 2021 IBRD-92090 Loan Disb 823,603.00
Oct 21, 2021 IBRD-92090 Loan Disb 545,184.94
Oct 21, 2021 IBRD-92090 Loan Disb 117,901.27
Oct 21, 2021 IBRD-92090 Loan Disb 687,581.94
Oct 21, 2021 IBRD-92090 Loan Disb 469,963.60
Mar 5, 2021 IBRD-92090 Loan Commitment 440,000,000.00
Apr 5, 2024 IBRD-92090 Loan Disb 76,010.97
Apr 1, 2024 IBRD-92090 Int Charges 364.33
Apr 1, 2024 IBRD-92090 Int Charges 6,210.55
Apr 1, 2024 IBRD-92090 Int Charges 344,581.20
Apr 1, 2024 IBRD-92090 Int Charges 3,094,962.20
Feb 8, 2024 IBRD-92090 Loan Disb 407,684.94
Feb 8, 2024 IBRD-92090 Loan Disb 281,791.60
Jan 19, 2024 IBRD-92090 Loan Disb 608,414.10
Mar 28, 2024 IBRD-92090 Loan Disb 756,690.56
Jan 26, 2023 IBRD-92090 Loan Disb 337,829.03
Jun 26, 2023 IBRD-92090 Loan Disb 96,424.90
Jun 26, 2023 IBRD-92090 Loan Disb 47,009.62
Jun 26, 2023 IBRD-92090 Loan Disb 86,448.97
Jun 26, 2023 IBRD-92090 Loan Disb 25,029.09
Jun 23, 2023 IBRD-92090 Loan Disb 30,717.98
Jun 23, 2023 IBRD-92090 Loan Disb 8,893.80
Jul 4, 2023 IBRD-92090 Loan Disb 1,069,321.80
Jun 8, 2023 IBRD-92090 Loan Disb 2,436,982.50
Jun 27, 2023 IBRD-92090 Loan Disb 416,798.53
Jun 27, 2023 IBRD-92090 Loan Disb 24,271.50
Jun 27, 2023 IBRD-92090 Loan Disb 3,587.33
Jun 27, 2023 IBRD-92090 Loan Disb 1,047,093.00
Jun 15, 2023 IBRD-92090 Loan Disb 99,149.10
Jun 15, 2023 IBRD-92090 Loan Disb 67,964.69
Dec 8, 2023 IBRD-92090 Loan Disb 17,405.69
Dec 8, 2023 IBRD-92090 Loan Disb 29,491.82
Dec 18, 2023 IBRD-92090 Loan Disb 94,955.67
Oct 31, 2023 IBRD-92090 Loan Disb 90,865.81
Oct 31, 2023 IBRD-92090 Loan Disb 64,787.82
Oct 17, 2023 IBRD-92090 Loan Disb 54,251.46
Oct 1, 2023 IBRD-92090 Int Charges 764.99
Oct 1, 2023 IBRD-92090 Int Charges 8,480.21
Oct 1, 2023 IBRD-92090 Int Charges 371,946.47
Oct 1, 2023 IBRD-92090 Int Charges 1,989,963.90
Nov 14, 2023 IBRD-92090 Loan Disb 13,239,439.00
Nov 14, 2023 IBRD-92090 Loan Disb 11,824,337.00
Sep 28, 2023 IBRD-92090 Loan Disb 28,013.72
Jan 2, 2024 IBRD-92090 Loan Disb 179,962.90
Oct 16, 2023 IBRD-92090 Loan Disb 155,603.95
Jan 2, 2024 IBRD-92090 Loan Disb 213,855.75
Jan 17, 2024 IBRD-92090 Loan Disb 357,374.80
Jan 17, 2024 IBRD-92090 Loan Disb 20,639.94
Jan 17, 2024 IBRD-92090 Loan Disb 115,373.92
Jan 17, 2024 IBRD-92090 Loan Disb 227,153.52
Jan 17, 2024 IBRD-92090 Loan Disb 66,261.05
Nov 16, 2023 IBRD-92090 Loan Disb 147,906.62
Nov 16, 2023 IBRD-92090 Loan Disb 35,551.15
Oct 10, 2023 IBRD-92090 Loan Disb 111,219.13
Dec 8, 2023 IBRD-92090 Loan Disb 129,661.90
Apr 5, 2024 IBRD-92090 Loan Disb 14,085,500.00
Apr 3, 2024 IBRD-92090 Loan Disb 49,821.42
Apr 1, 2023 IBRD-92090 Int Charges 395,454.70
Jan 30, 2023 IBRD-92090 Loan Disb 739,918.20
Apr 1, 2023 IBRD-92090 Int Charges 3,434.44
Apr 1, 2023 IBRD-92090 Int Charges 1,153,909.40
Apr 1, 2023 IBRD-92090 Int Charges 1,558.37
Jan 24, 2023 IBRD-92090 Loan Disb 238,881.11

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2024-12-18
Financial Management Moderately Satisfactory 2024-12-18
Monitoring and Evaluation Satisfactory 2024-12-18
Overall Implementation Progress (IP) Satisfactory 2024-12-18
Project Management Satisfactory 2024-12-18
Procurement Satisfactory 2024-12-18

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • 1. Railway Accident RiskValue0.560.560.44
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 3. Train PunctualityValue75.0081.0090.00
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 1.1 FWSI per billion passenger km caused by train colliding with another train or fixed structureValue0.450.450.35
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 3.1 Train Punctuality Passenger Long Distance Cairo Alexandria and Cairo - Nag HammadiValue75.0075.000.00
    Date
    Comment
  • 1.2 FWSI per billion passenger km caused by train colliding with a pedestrianValue0.080.080.06
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 3.2 Train Punctuality Passenger Short Distance Cairo Alexandria and Cairo - Nag Hammadi.Value75.0075.000.00
    Date
    Comment
  • 4. User Satisfaction with ENR passenger servicesValue60.0060.0080.00
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 1.3 FWSI per billion passenger km caused by train colliding with a road vehicleValue0.040.040.03
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 2. Occupational Health & Safety Risk for ENR employees along the Alexandria - Nag Hammadi lineValue0.300.300.24
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • 4.1 User satisfaction female users of ENR servicesValue60.0060.000.00
    Date
    Comment
  • 5. Performance-based funding for ENRValueNoNoYes
    DateDecember 16, 2020December 14, 2023March 31, 2027
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Functioning GRM for project related complaintsValue0.000.000.00
    DateDecember 31, 2020December 14, 2023June 30, 2021
    Comment
  • Female graduates recruited in ENR in a wide range of engineering rolesValue215.00215.00240.00
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • Signaling towers commissioned in Alexandria – Cairo – Nag HammadiValue21.0050.0070.00
    DateDecember 31, 2020December 14, 2023December 30, 2026
    Comment
  • Design and deployment of the Safety Management System (SMS) at ENR.Value0.0030.0080.00
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment
  • Centralized Traffic Control Centers (CTC) commissioned in Alexandria-Cairo-Nag HammadiValue0.000.004.00
    DateDecember 31, 2020December 14, 2023December 30, 2026
    Comment
  • Steering Committee established and meets periodicallyValueNoYesYes
    DateOctober 23, 2020December 14, 2023May 31, 2022
    Comment
  • GHG emissions from transport on the Alexandria – Nag Hammadi corridorValue0.000.00-6.90
    DateJanuary 1, 2021December 14, 2023March 31, 2027
    Comment
  • Policy Reform Preparatory Analysis for PSOC and MAICValueNoNoYes
    DateDecember 2, 2020December 14, 2023June 30, 2023
    Comment
  • Fire safety at stationsValue0.000.0010.00
    DateJanuary 20, 2021December 14, 2023March 31, 2027
    Comment
  • Pedestrian barriered level crossings installed and operationalValue0.000.0010.00
    DateNovember 4, 2020December 14, 2023March 31, 2027
    Comment
  • Precursors to Incidents Reported by ENR StaffValue0.000.001000.00
    DateDecember 2, 2020December 14, 2023March 31, 2027
    Comment
  • Length of Cairo-Giza-Beni Suef corridor segment served by signaling system with mitigation measures to identified climate and disaster risksValue0.000.00125.00
    DateDecember 31, 2020December 14, 2023March 31, 2027
    Comment