Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 440.00 |
Borrower/Recipient | 241.10 |
P175137
Active
Arturo Ardila Gomez , Noor Mohamed, Salma Hany Ibrahim
Arab Republic of Egypt- Ministry of International Cooperation
September 17, 2020
(as of board presentation)
March 5, 2021
August 25, 2021
US$ 681.10 million
Ministry of Transport,EGYPTIAN NATIONAL RAILWAYS
2021
US$ 440.00 million
N/A
February 7, 2024
September 30, 2027
Yes
BANK APPROVED
Financier | Commitments |
---|---|
International Bank for Reconstruction and Development | 440.00 |
Borrower/Recipient | 241.10 |
Product Line | IBRD/IDA |
---|---|
IBRD Commitment | 440.00 |
IDA Commitment | N/A |
IBRD + IDA Commitment | 440.00 |
Lending Instrument | |
---|---|
Grant Amount | N/A |
Total Project Cost** | 681.10 |
Period | Financier | Transaction Type | Amount (US$) |
---|---|---|---|
Nov 17, 2022 | IBRD-92090 | Loan Disb | 186,551.66 |
Sep 19, 2022 | IBRD-92090 | Loan Disb | 288,303.53 |
Sep 29, 2022 | IBRD-92090 | Loan Disb | 102,663.14 |
Sep 29, 2022 | IBRD-92090 | Loan Disb | 44,550.57 |
Sep 19, 2022 | IBRD-92090 | Loan Disb | 270,268.97 |
Sep 7, 2022 | IBRD-92090 | Loan Disb | 40,172.34 |
Sep 7, 2022 | IBRD-92090 | Loan Disb | 66,662.83 |
Sep 8, 2022 | IBRD-92090 | Loan Disb | 105,866.79 |
Sep 8, 2022 | IBRD-92090 | Loan Disb | 53,203.42 |
Sep 20, 2022 | IBRD-92090 | Loan Disb | 212,476.69 |
Sep 20, 2022 | IBRD-92090 | Loan Disb | 168,140.95 |
Nov 14, 2022 | IBRD-92090 | Loan Disb | 231,077.64 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 69,109.13 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 36,297.06 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 86,692.10 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 196,099.83 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 179,623.70 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 119,328.80 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 26,445.31 |
Dec 1, 2022 | IBRD-92090 | Loan Disb | 107,511.45 |
Sep 27, 2022 | IBRD-92090 | Loan Disb | 126,404.97 |
Sep 6, 2022 | IBRD-92090 | Loan Disb | 2,290,660.00 |
Nov 17, 2022 | IBRD-92090 | Loan Disb | 60,212.01 |
Nov 17, 2022 | IBRD-92090 | Loan Disb | 208,737.90 |
Mar 29, 2023 | IBRD-92090 | Loan Disb | 29,061.05 |
Feb 14, 2023 | IBRD-92090 | Loan Disb | 152,152.94 |
Mar 29, 2023 | IBRD-92090 | Loan Disb | 522,019.44 |
Mar 29, 2023 | IBRD-92090 | Loan Disb | 25,358.70 |
Mar 29, 2023 | IBRD-92090 | Loan Disb | 138,071.77 |
Mar 29, 2023 | IBRD-92090 | Loan Disb | 787,638.25 |
Mar 29, 2023 | IBRD-92090 | Loan Disb | 345,659.90 |
Mar 3, 2022 | IBRD-92090 | Loan Disb | 855,566.06 |
Mar 2, 2022 | IBRD-92090 | Loan Disb | 10,713.17 |
Mar 2, 2022 | IBRD-92090 | Loan Disb | 218,676.52 |
Mar 2, 2022 | IBRD-92090 | Loan Disb | 348,170.16 |
Jun 28, 2022 | IBRD-92090 | Loan Disb | 220,352.80 |
Jun 6, 2022 | IBRD-92090 | Loan Disb | 247,678.60 |
Apr 1, 2022 | IBRD-92090 | Int Charges | 263,825.38 |
Sep 12, 2023 | IBRD-92090 | Loan Disb | 44,395.32 |
Aug 24, 2022 | IBRD-92090 | Loan Disb | 390,229.56 |
Aug 24, 2022 | IBRD-92090 | Loan Disb | 77,657.76 |
Aug 24, 2022 | IBRD-92090 | Loan Disb | 741,572.44 |
Aug 24, 2022 | IBRD-92090 | Loan Disb | 170,139.56 |
Aug 29, 2022 | IBRD-92090 | Loan Disb | 19,512.74 |
Dec 29, 2021 | IBRD-92090 | Loan Disb | 928,255.10 |
Dec 29, 2021 | IBRD-92090 | Loan Disb | 288,544.72 |
Dec 29, 2021 | IBRD-92090 | Loan Disb | 288,940.12 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 112,825.72 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 87,440.63 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 65,030.04 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 279,606.90 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 1,027,937.75 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 83,409.50 |
Mar 25, 2022 | IBRD-92090 | Loan Disb | 43,085.07 |
Oct 1, 2022 | IBRD-92090 | Int Charges | 744.69 |
Oct 1, 2022 | IBRD-92090 | Int Charges | 1,399.65 |
Oct 1, 2022 | IBRD-92090 | Int Charges | 374,108.44 |
Sep 26, 2022 | IBRD-92090 | Loan Disb | 80,358.70 |
Sep 26, 2022 | IBRD-92090 | Loan Disb | 63,823.66 |
Sep 26, 2022 | IBRD-92090 | Loan Disb | 98,618.57 |
Oct 1, 2022 | IBRD-92090 | Int Charges | 219,502.55 |
Nov 7, 2022 | IBRD-92090 | Loan Disb | 147,441.94 |
Sep 1, 2022 | IBRD-92090 | Loan Disb | 98,899.68 |
Feb 28, 2022 | IBRD-92090 | Loan Disb | 324,339.75 |
Mar 1, 2022 | IBRD-92090 | Loan Disb | 503,131.44 |
Mar 1, 2022 | IBRD-92090 | Loan Disb | 360,133.12 |
Mar 1, 2022 | IBRD-92090 | Loan Disb | 179,884.92 |
Mar 1, 2022 | IBRD-92090 | Loan Disb | 150,437.44 |
Aug 30, 2022 | IBRD-92090 | Loan Disb | 452,756.60 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 176,194.52 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 127,372.52 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 142,956.55 |
Aug 25, 2021 | IBRD-92090 | Fee Charges | 1,065,701.20 |
Nov 24, 2021 | IBRD-92090 | Loan Disb | 8,270.09 |
Oct 7, 2021 | IBRD-92090 | Loan Disb | 1,113,116.20 |
Nov 24, 2021 | IBRD-92090 | Loan Disb | 606,300.56 |
Dec 2, 2021 | IBRD-92090 | Loan Disb | 254,913.22 |
Nov 9, 2021 | IBRD-92090 | Loan Disb | 746,031.25 |
Nov 9, 2021 | IBRD-92090 | Loan Disb | 1,498,637.50 |
Nov 2, 2021 | IBRD-92090 | Loan Disb | 3,292,697.20 |
Aug 25, 2021 | IBRD-92090 | Loan Disb | 1,065,701.20 |
Aug 18, 2022 | IBRD-92090 | Loan Disb | 351,209.16 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 35,912.78 |
Mar 3, 2022 | IBRD-92090 | Loan Disb | 598,634.00 |
Apr 1, 2022 | IBRD-92090 | Int Charges | 732.68 |
Apr 1, 2022 | IBRD-92090 | Int Charges | 456,093.84 |
Apr 1, 2022 | IBRD-92090 | Int Charges | 125,869.95 |
Dec 16, 2021 | IBRD-92090 | Loan Disb | 12,713.54 |
Dec 16, 2021 | IBRD-92090 | Loan Disb | 75,689.77 |
Jun 3, 2022 | IBRD-92090 | Loan Disb | 171,318.95 |
Jun 3, 2022 | IBRD-92090 | Loan Disb | 89,864.06 |
Jun 3, 2022 | IBRD-92090 | Loan Disb | 79,472.69 |
Jun 3, 2022 | IBRD-92090 | Loan Disb | 815,298.30 |
Jun 21, 2022 | IBRD-92090 | Loan Disb | 406,091.40 |
Jun 27, 2022 | IBRD-92090 | Loan Disb | 87,586.87 |
Jun 27, 2022 | IBRD-92090 | Loan Disb | 84,037.23 |
Jun 27, 2022 | IBRD-92090 | Loan Disb | 147,822.02 |
Mar 28, 2022 | IBRD-92090 | Loan Disb | 848,240.70 |
Mar 28, 2022 | IBRD-92090 | Loan Disb | 121,242.55 |
May 16, 2022 | IBRD-92090 | Loan Disb | 638,256.00 |
May 9, 2022 | IBRD-92090 | Loan Disb | 4,980.95 |
May 9, 2022 | IBRD-92090 | Loan Disb | 711,672.06 |
May 9, 2022 | IBRD-92090 | Loan Disb | 28,199.97 |
May 20, 2022 | IBRD-92090 | Loan Disb | 816,434.70 |
Apr 6, 2022 | IBRD-92090 | Loan Disb | 2,382,046.00 |
May 9, 2022 | IBRD-92090 | Loan Disb | 101,355.76 |
May 9, 2022 | IBRD-92090 | Loan Disb | 160,717.12 |
May 9, 2022 | IBRD-92090 | Loan Disb | 111,104.16 |
Oct 4, 2022 | IBRD-92090 | Loan Disb | 1,361,818.80 |
Oct 14, 2022 | IBRD-92090 | Loan Disb | 129,746.28 |
Dec 23, 2021 | IBRD-92090 | Loan Disb | 2,919,217.80 |
Dec 23, 2021 | IBRD-92090 | Loan Disb | 151,301.19 |
Dec 23, 2021 | IBRD-92090 | Loan Disb | 18,715.66 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 157,961.38 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 311,442.10 |
Aug 23, 2022 | IBRD-92090 | Loan Disb | 73,225.02 |
Dec 28, 2021 | IBRD-92090 | Loan Disb | 616,703.44 |
Dec 28, 2021 | IBRD-92090 | Loan Disb | 1,013,211.44 |
Dec 28, 2021 | IBRD-92090 | Loan Disb | 943,329.90 |
Feb 25, 2022 | IBRD-92090 | Loan Disb | 8,236.21 |
Sep 1, 2022 | IBRD-92090 | Loan Disb | 71,078.20 |
Sep 1, 2022 | IBRD-92090 | Loan Disb | 130,747.95 |
Jan 20, 2023 | IBRD-92090 | Loan Disb | 278,077.47 |
May 2, 2023 | IBRD-92090 | Loan Disb | 81,082.44 |
May 2, 2023 | IBRD-92090 | Loan Disb | 72,333.99 |
Feb 24, 2023 | IBRD-92090 | Loan Disb | 1,874,194.40 |
Apr 26, 2023 | IBRD-92090 | Loan Disb | 64,112.41 |
May 8, 2023 | IBRD-92090 | Loan Disb | 419,752.30 |
May 8, 2023 | IBRD-92090 | Loan Disb | 29,342.27 |
Apr 18, 2023 | IBRD-92090 | Loan Disb | 5,403.06 |
Apr 18, 2023 | IBRD-92090 | Loan Disb | 166,692.73 |
Apr 18, 2023 | IBRD-92090 | Loan Disb | 347,031.40 |
Jan 17, 2023 | IBRD-92090 | Loan Disb | 277,513.30 |
Jan 17, 2023 | IBRD-92090 | Loan Disb | 5,883.49 |
Jan 17, 2023 | IBRD-92090 | Loan Disb | 719,979.90 |
Jan 17, 2023 | IBRD-92090 | Loan Disb | 116,397.96 |
Apr 26, 2023 | IBRD-92090 | Loan Disb | 227,345.70 |
Apr 26, 2023 | IBRD-92090 | Loan Disb | 28,590.40 |
Mar 28, 2023 | IBRD-92090 | Loan Disb | 204,456.19 |
Mar 28, 2023 | IBRD-92090 | Loan Disb | 1,566,607.60 |
Jan 13, 2023 | IBRD-92090 | Loan Disb | 28,331.72 |
Feb 15, 2023 | IBRD-92090 | Loan Disb | 166,658.66 |
Feb 15, 2023 | IBRD-92090 | Loan Disb | 387,677.00 |
Apr 11, 2023 | IBRD-92090 | Loan Disb | 35,533.04 |
Jan 13, 2023 | IBRD-92090 | Loan Disb | 57,417.13 |
Jan 13, 2023 | IBRD-92090 | Loan Disb | 169,611.73 |
Jan 23, 2023 | IBRD-92090 | Loan Disb | 206,766.20 |
Mar 28, 2023 | IBRD-92090 | Loan Disb | 14,339.18 |
Aug 14, 2023 | IBRD-92090 | Loan Disb | 100,892.16 |
Aug 2, 2023 | IBRD-92090 | Loan Disb | 28,522.85 |
Sep 19, 2023 | IBRD-92090 | Loan Disb | 8,226.16 |
Sep 19, 2023 | IBRD-92090 | Loan Disb | 7,400.93 |
Sep 19, 2023 | IBRD-92090 | Loan Disb | 637,992.90 |
May 31, 2023 | IBRD-92090 | Loan Disb | 49,043.21 |
Aug 11, 2023 | IBRD-92090 | Loan Disb | 142,782.56 |
Sep 11, 2023 | IBRD-92090 | Loan Disb | 449,704.62 |
Jul 24, 2023 | IBRD-92090 | Loan Disb | 922,441.56 |
Aug 1, 2023 | IBRD-92090 | Loan Disb | 9,708.34 |
Jun 1, 2023 | IBRD-92090 | Loan Disb | 26,821.52 |
Sep 12, 2023 | IBRD-92090 | Loan Disb | 1,106,151.10 |
Oct 19, 2021 | IBRD-92090 | Loan Disb | 130,436.19 |
Nov 17, 2021 | IBRD-92090 | Loan Disb | 164,833.77 |
Nov 17, 2021 | IBRD-92090 | Loan Disb | 7,715.79 |
Oct 8, 2021 | IBRD-92090 | Loan Disb | 2,079,408.50 |
Nov 15, 2021 | IBRD-92090 | Loan Disb | 3,156,264.00 |
Nov 4, 2021 | IBRD-92090 | Loan Disb | 71,011.36 |
Nov 4, 2021 | IBRD-92090 | Loan Disb | 593,671.25 |
Oct 18, 2021 | IBRD-92090 | Loan Disb | 117,962.93 |
Oct 18, 2021 | IBRD-92090 | Loan Disb | 83,741.36 |
Oct 18, 2021 | IBRD-92090 | Loan Disb | 147,509.10 |
Jun 3, 2022 | IBRD-92090 | Loan Disb | 482,742.56 |
May 2, 2022 | IBRD-92090 | Loan Disb | 100,031.33 |
Jul 6, 2022 | IBRD-92090 | Loan Disb | 84,705.43 |
Jun 10, 2022 | IBRD-92090 | Loan Disb | 2,444,781.80 |
Apr 29, 2022 | IBRD-92090 | Loan Disb | 147,485.77 |
Apr 29, 2022 | IBRD-92090 | Loan Disb | 288,804.30 |
Jul 5, 2022 | IBRD-92090 | Loan Disb | 105,708.27 |
Jul 5, 2022 | IBRD-92090 | Loan Disb | 691,255.80 |
Apr 20, 2022 | IBRD-92090 | Loan Disb | 928,987.44 |
Mar 16, 2022 | IBRD-92090 | Loan Disb | 13,475.26 |
Mar 29, 2022 | IBRD-92090 | Loan Disb | 212,500.88 |
Dec 1, 2021 | IBRD-92090 | Loan Disb | 27,797.11 |
Dec 1, 2021 | IBRD-92090 | Loan Disb | 20,622.01 |
Dec 1, 2021 | IBRD-92090 | Loan Disb | 107,854.26 |
Nov 23, 2021 | IBRD-92090 | Loan Disb | 72,577.51 |
Nov 16, 2021 | IBRD-92090 | Loan Disb | 113,254.67 |
Nov 16, 2021 | IBRD-92090 | Loan Disb | 1,452,425.20 |
Nov 16, 2021 | IBRD-92090 | Loan Disb | 28,784.84 |
Nov 16, 2021 | IBRD-92090 | Loan Disb | 61,037.93 |
Nov 10, 2021 | IBRD-92090 | Loan Disb | 63,074.94 |
Nov 10, 2021 | IBRD-92090 | Loan Disb | 592,467.06 |
Nov 10, 2021 | IBRD-92090 | Loan Disb | 429,116.66 |
Nov 10, 2021 | IBRD-92090 | Loan Disb | 19,779,262.00 |
Oct 29, 2021 | IBRD-92090 | Loan Disb | 823,603.00 |
Oct 21, 2021 | IBRD-92090 | Loan Disb | 545,184.94 |
Oct 21, 2021 | IBRD-92090 | Loan Disb | 117,901.27 |
Oct 21, 2021 | IBRD-92090 | Loan Disb | 687,581.94 |
Oct 21, 2021 | IBRD-92090 | Loan Disb | 469,963.60 |
Mar 5, 2021 | IBRD-92090 | Loan Commitment | 440,000,000.00 |
Apr 5, 2024 | IBRD-92090 | Loan Disb | 76,010.97 |
Apr 1, 2024 | IBRD-92090 | Int Charges | 364.33 |
Apr 1, 2024 | IBRD-92090 | Int Charges | 6,210.55 |
Apr 1, 2024 | IBRD-92090 | Int Charges | 344,581.20 |
Apr 1, 2024 | IBRD-92090 | Int Charges | 3,094,962.20 |
Feb 8, 2024 | IBRD-92090 | Loan Disb | 407,684.94 |
Feb 8, 2024 | IBRD-92090 | Loan Disb | 281,791.60 |
Jan 19, 2024 | IBRD-92090 | Loan Disb | 608,414.10 |
Mar 28, 2024 | IBRD-92090 | Loan Disb | 756,690.56 |
Jan 26, 2023 | IBRD-92090 | Loan Disb | 337,829.03 |
Jun 26, 2023 | IBRD-92090 | Loan Disb | 96,424.90 |
Jun 26, 2023 | IBRD-92090 | Loan Disb | 47,009.62 |
Jun 26, 2023 | IBRD-92090 | Loan Disb | 86,448.97 |
Jun 26, 2023 | IBRD-92090 | Loan Disb | 25,029.09 |
Jun 23, 2023 | IBRD-92090 | Loan Disb | 30,717.98 |
Jun 23, 2023 | IBRD-92090 | Loan Disb | 8,893.80 |
Jul 4, 2023 | IBRD-92090 | Loan Disb | 1,069,321.80 |
Jun 8, 2023 | IBRD-92090 | Loan Disb | 2,436,982.50 |
Jun 27, 2023 | IBRD-92090 | Loan Disb | 416,798.53 |
Jun 27, 2023 | IBRD-92090 | Loan Disb | 24,271.50 |
Jun 27, 2023 | IBRD-92090 | Loan Disb | 3,587.33 |
Jun 27, 2023 | IBRD-92090 | Loan Disb | 1,047,093.00 |
Jun 15, 2023 | IBRD-92090 | Loan Disb | 99,149.10 |
Jun 15, 2023 | IBRD-92090 | Loan Disb | 67,964.69 |
Dec 8, 2023 | IBRD-92090 | Loan Disb | 17,405.69 |
Dec 8, 2023 | IBRD-92090 | Loan Disb | 29,491.82 |
Dec 18, 2023 | IBRD-92090 | Loan Disb | 94,955.67 |
Oct 31, 2023 | IBRD-92090 | Loan Disb | 90,865.81 |
Oct 31, 2023 | IBRD-92090 | Loan Disb | 64,787.82 |
Oct 17, 2023 | IBRD-92090 | Loan Disb | 54,251.46 |
Oct 1, 2023 | IBRD-92090 | Int Charges | 764.99 |
Oct 1, 2023 | IBRD-92090 | Int Charges | 8,480.21 |
Oct 1, 2023 | IBRD-92090 | Int Charges | 371,946.47 |
Oct 1, 2023 | IBRD-92090 | Int Charges | 1,989,963.90 |
Nov 14, 2023 | IBRD-92090 | Loan Disb | 13,239,439.00 |
Nov 14, 2023 | IBRD-92090 | Loan Disb | 11,824,337.00 |
Sep 28, 2023 | IBRD-92090 | Loan Disb | 28,013.72 |
Jan 2, 2024 | IBRD-92090 | Loan Disb | 179,962.90 |
Oct 16, 2023 | IBRD-92090 | Loan Disb | 155,603.95 |
Jan 2, 2024 | IBRD-92090 | Loan Disb | 213,855.75 |
Jan 17, 2024 | IBRD-92090 | Loan Disb | 357,374.80 |
Jan 17, 2024 | IBRD-92090 | Loan Disb | 20,639.94 |
Jan 17, 2024 | IBRD-92090 | Loan Disb | 115,373.92 |
Jan 17, 2024 | IBRD-92090 | Loan Disb | 227,153.52 |
Jan 17, 2024 | IBRD-92090 | Loan Disb | 66,261.05 |
Nov 16, 2023 | IBRD-92090 | Loan Disb | 147,906.62 |
Nov 16, 2023 | IBRD-92090 | Loan Disb | 35,551.15 |
Oct 10, 2023 | IBRD-92090 | Loan Disb | 111,219.13 |
Dec 8, 2023 | IBRD-92090 | Loan Disb | 129,661.90 |
Apr 5, 2024 | IBRD-92090 | Loan Disb | 14,085,500.00 |
Apr 3, 2024 | IBRD-92090 | Loan Disb | 49,821.42 |
Apr 1, 2023 | IBRD-92090 | Int Charges | 395,454.70 |
Jan 30, 2023 | IBRD-92090 | Loan Disb | 739,918.20 |
Apr 1, 2023 | IBRD-92090 | Int Charges | 3,434.44 |
Apr 1, 2023 | IBRD-92090 | Int Charges | 1,153,909.40 |
Apr 1, 2023 | IBRD-92090 | Int Charges | 1,558.37 |
Jan 24, 2023 | IBRD-92090 | Loan Disb | 238,881.11 |
Name | Review | Date |
---|---|---|
Progress towards achievement of PDO | Satisfactory | 2024-12-18 |
Financial Management | Moderately Satisfactory | 2024-12-18 |
Monitoring and Evaluation | Satisfactory | 2024-12-18 |
Overall Implementation Progress (IP) | Satisfactory | 2024-12-18 |
Project Management | Satisfactory | 2024-12-18 |
Procurement | Satisfactory | 2024-12-18 |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
1. Railway Accident Risk | Value | 0.56 | 0.56 | 0.44 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
3. Train Punctuality | Value | 75.00 | 81.00 | 90.00 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
1.1 FWSI per billion passenger km caused by train colliding with another train or fixed structure | Value | 0.45 | 0.45 | 0.35 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
3.1 Train Punctuality Passenger Long Distance Cairo Alexandria and Cairo - Nag Hammadi | Value | 75.00 | 75.00 | 0.00 |
Date | ||||
Comment |
1.2 FWSI per billion passenger km caused by train colliding with a pedestrian | Value | 0.08 | 0.08 | 0.06 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
3.2 Train Punctuality Passenger Short Distance Cairo Alexandria and Cairo - Nag Hammadi. | Value | 75.00 | 75.00 | 0.00 |
Date | ||||
Comment |
4. User Satisfaction with ENR passenger services | Value | 60.00 | 60.00 | 80.00 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
1.3 FWSI per billion passenger km caused by train colliding with a road vehicle | Value | 0.04 | 0.04 | 0.03 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
2. Occupational Health & Safety Risk for ENR employees along the Alexandria - Nag Hammadi line | Value | 0.30 | 0.30 | 0.24 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
4.1 User satisfaction female users of ENR services | Value | 60.00 | 60.00 | 0.00 |
Date | ||||
Comment |
5. Performance-based funding for ENR | Value | No | No | Yes |
Date | December 16, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
INDICATOR | BASELINE | CURRENT | TARGET |
---|
Functioning GRM for project related complaints | Value | 0.00 | 0.00 | 0.00 |
Date | December 31, 2020 | December 14, 2023 | June 30, 2021 | |
Comment |
Female graduates recruited in ENR in a wide range of engineering roles | Value | 215.00 | 215.00 | 240.00 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
Signaling towers commissioned in Alexandria – Cairo – Nag Hammadi | Value | 21.00 | 50.00 | 70.00 |
Date | December 31, 2020 | December 14, 2023 | December 30, 2026 | |
Comment |
Design and deployment of the Safety Management System (SMS) at ENR. | Value | 0.00 | 30.00 | 80.00 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
Centralized Traffic Control Centers (CTC) commissioned in Alexandria-Cairo-Nag Hammadi | Value | 0.00 | 0.00 | 4.00 |
Date | December 31, 2020 | December 14, 2023 | December 30, 2026 | |
Comment |
Steering Committee established and meets periodically | Value | No | Yes | Yes |
Date | October 23, 2020 | December 14, 2023 | May 31, 2022 | |
Comment |
GHG emissions from transport on the Alexandria – Nag Hammadi corridor | Value | 0.00 | 0.00 | -6.90 |
Date | January 1, 2021 | December 14, 2023 | March 31, 2027 | |
Comment |
Policy Reform Preparatory Analysis for PSOC and MAIC | Value | No | No | Yes |
Date | December 2, 2020 | December 14, 2023 | June 30, 2023 | |
Comment |
Fire safety at stations | Value | 0.00 | 0.00 | 10.00 |
Date | January 20, 2021 | December 14, 2023 | March 31, 2027 | |
Comment |
Pedestrian barriered level crossings installed and operational | Value | 0.00 | 0.00 | 10.00 |
Date | November 4, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
Precursors to Incidents Reported by ENR Staff | Value | 0.00 | 0.00 | 1000.00 |
Date | December 2, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |
Length of Cairo-Giza-Beni Suef corridor segment served by signaling system with mitigation measures to identified climate and disaster risks | Value | 0.00 | 0.00 | 125.00 |
Date | December 31, 2020 | December 14, 2023 | March 31, 2027 | |
Comment |