Himachal Pradesh Power Sector Development Program

Abstract*

The development objective of the Himachal Pradesh (HP) Power Sector Development Program (HPPSDP) Program-for-Results for India is to increase renewable energy (RE) penetration and strengthen the power sector institutions in HP. The program envisages to increase penetration of RE resources through optimization of the state’s current and present generation base. This includes bundling hydropower with variable non-hydro RE (such as solar and wind) and...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Program Development Objective is to increase renewable energy penetration and strengthen the power sector institutions in Himachal Pradesh.

Key Details

Project Details

  • P176032

  • Active

  • Surbhi Goyal , Pyush Dogra

  • India

  • India

  • August 11, 2021

  • (as of board presentation)

    June 27, 2023

  • November 29, 2023

  • US$ 250.00 million

  • HPPCL (Himachal Pradesh Power Corporation Limited),HPSEBL (Himachal Pradesh State Electricity Board Limited),Directorate of Energy,HPPTCL (Himachal Pradesh Power Transmission Corporation Limited),HPSLDC (Himachal Pradesh State Load Despatch Centre),HimUrja

  • South Asia

  • 2023

  • US$ 200.00 million

  • N/A

  • March 5, 2024

  • March 31, 2028

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 200.00
Borrower/Recipient 50.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 200.00
IDA Commitment N/A
IBRD + IDA Commitment 200.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 250.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Jun 15, 2024 IBRD-95660 Int Charges 1,417.74
Nov 29, 2023 IBRD-95660 Fee Charges 500,000.00
Jun 15, 2024 IBRD-95660 Int Charges 204,663.45
Feb 13, 2024 IBRD-95660 Loan Disb 19,156,668.00
Jun 27, 2023 IBRD-95660 Loan Commitment 200,000,000.00
Jun 15, 2024 IBRD-95660 Int Charges 433,406.00
Nov 29, 2023 IBRD-95660 Loan Disb 500,000.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2024-10-03
Monitoring and Evaluation Satisfactory 2024-10-03
Overall Implementation Progress (IP) Satisfactory 2024-10-03

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • Government order issued for state level adoption of basin wide E&S protocolsValueNoNoYes
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Increase in renewable energy generatedValue0.000.00182353.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Cumulative GHG emission reductionValue0.000.00189300.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Availability of green power to the identified offtaker(s) through the bundled Renewable Energy productValueNoNoYes
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Pilot for Demand Response System LaunchedValueNoNoYes
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Improved Redundancy through availability of (n-1) supply at the major EHV substationsValue0.000.003.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Adopt web-based Monitoring and Evaluation (M&E) systems to monitor E&S risk managementValueNoNoYes
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Single Energy Trading Desk OperationalValueNoNoYes
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Transformation Capacity AddedValue0.000.00440000.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Percentage share of women in technical and managerial positions among annual new sector recruitsValue7.007.0010.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Transmission System AddedValue0.000.0090.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Number of women professionals trained as apprentices, with reporting on subsequent sector job applications and sector technical employment outcomes one year post-apprenticeshipValue0.000.00150.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Average percent reduction of outages (in KVA of installed distribution transformers) during fault in the selected townsValue0.000.0065.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Citizen's Feedback Survey conducted by HPSEBL, HPPCL, HPPTCL, and HimUrjaValueNoNoYes
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Capacity Added in Distribution SubstationsValue0.000.00179000.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Percent of the grievances to be resolved within 45 days from their receipt by HPSEBL, HPPCL, HPPTCL, HimUrja, and DoEValue0.000.0080.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Capacity Added in Distribution TransformersValue0.000.00160000.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Cumulative allocated budget for training utilized annuallyValue0.00100.00100.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Distribution Network (33 kV, 11 kV and 400 Volts network added) addedValue0.000.001301.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment
  • Percentage of total tenders valued more than INR 10 million have used standard bidding document(s)Value0.00100.0080.00
    DateAugust 1, 2022March 15, 2024March 31, 2028
    Comment