Matanza-Riachuelo Basin Sustainable Development Project Second Additional Financing

Development Objective

The overall development objective of the proposed APL program supports the Government's Integrated Basin Cleanup whilesimultaneously improving sanitary conditions along the banks of La Plata River and providing a long-term and cost-effectivesolution for safe disposal of wastewater from the Buenos Aires Metropolitan Area (AySAs concession area). The two stage APL programthat contributes to this objective and the allocation of works and activities under each APL has been specifically designed toensure that APL-1 can be free-standing, with no stranded assets at the end of the first stage. The project (APL-1) development objectives contribute to the overall program development objective by (i) improving sewerageservices in the M-R River Basin and other parts of the Province and City of Buenos Aires by expanding transport and treatmentcapacity; (ii) supporting a reduction of industrial discharges to the M-R River, through the provision of industrial conversiongrants to small and medium enterprises; (iii) promoting improved decision-making for environmentally-sustainable land use anddrainage planning, and piloting urban drainage and land use investments, in the M-R River Basin; and (iv) strengthening ACUMAR#sinstitutional framework for ongoing and sustainable clean-up of the M-R River Basin.

Key Details

Project Details

  • P176034

  • Active

  • Jiang Ru , Maria Ramirez

  • Argentine Republic

  • Argentina

  • April 27, 2021

  • (as of board presentation)

    June 1, 2021

  • N/A

  • US$ 265.00 million

  • Unidad Coordinadora General del Proyecto (UCGP),Ministry of Interior, Public Works and Housing

  • Latin America and Caribbean

  • 2021

  • US$ 265.00 million

  • A

  • November 16, 2023

  • September 30, 2025

  • Yes

  • BANK APPROVED

  • P105680

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 265.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 265.00
IDA Commitment N/A
IBRD + IDA Commitment 265.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 265.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)

Footnotes

Ratings

IMPLEMENTATION RATINGS

No data available.

COMPLETION RATINGS

INDICATORIMPLEMENTATION COMPLETION & RESULTS REPORT:
Outcomes
Risk to Development OutcomeSubstantial
Bank Performance
Borrower Performance
Government Performance
Implementing Agency

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

No data available.