Yangtze River Protection and Ecological Restoration Program for Results (Hubei)

Abstract*

The development objective of the Yangtze River Protection and Ecological Restoration Program for Results for China is to improve institutional coordination, enhance ecological protection and reduce water pollution loads along the Yangtze River Basin in Hubei Province. The government program has the following themes, with specific mandatory and recommended results targets related to each thematic area: (a) land-based ecosystem protection and restoration;...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

To improve institutional coordination, enhance ecological protection and reduce water pollution loads along the Yangtze River Basin in Hubei Province.

Key Details

Project Details

  • P178338

  • Active

  • Qi Tian , Rajesh Koirala

  • Ministry of Finance

  • China

  • May 19, 2022

  • (as of board presentation)

    March 30, 2023

  • February 20, 2024

  • US$ 1074.00 million

  • Hubei Provincial Development and Reform Commission

  • East Asia and Pacific

  • 2023

  • US$ 200.00 million

  • N/A

  • June 25, 2024

  • December 31, 2028

  • No

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
Borrower/Recipient 874.00
International Bank for Reconstruction and Development 200.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 200.00
IDA Commitment N/A
IBRD + IDA Commitment 200.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 1074.00

Summary Status of World Bank Financing (US$ Millions) as of March 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of March 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Apr 15, 2024 IBRD-94990 Int Charges 115,932.36
Mar 30, 2023 IBRD-94990 Loan Commitment 200,000,000.00
Feb 20, 2024 IBRD-94990 Fee Charges 500,000.00
Feb 20, 2024 IBRD-94990 Loan Disb 500,000.00

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2024-10-29
Monitoring and Evaluation Satisfactory 2024-10-29
Overall Implementation Progress (IP) Satisfactory 2024-10-29

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • 1. Establishment of an IT platform for sharing data on Yangtze River protection and ecological restorationValueNoNoNumber of registered government agencies accessing
    DateDecember 30, 2022April 12, 2024December 31, 2027
    Comment
  • 2. Improved water environment management system in the demonstration sub-basinsValueNoNoThe Ecological Flow / Water Depth Requirements at
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 3.Reduced pollutant loads entering waterways in demonstration counties (Annual Target)Value0.000.0018.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • 6. Water allocation schemes for the demonstration sub-basinsValueYesYesYes
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 1. Hubei-Hunan-Jiangxi Tripartite Water Environment Cooperation Mechanism establishedValueNoYesYes
    DateDecember 30, 2022April 12, 2024December 31, 2028
    Comment
  • 10. Improved township domestic wastewater service systemsValueCumulative number of wastewater management strategCumulative number of wastewater management strategCumulative number of wastewater management strateg
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 7. Ecological flow / water depth requirements determined for demonstration sub-basinsValueYesYesYes
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 2. Provincial level policies, regulations and guidelines on water environment and plastic waste management issuedValue1.003.007.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 11. Plastic waste (agricultural plastic film) prevented from entering water bodiesValue1654.001654.001632.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 8. Improved sub-basin water environment monitoring network (Number of water quality monitoring stations)Value16.0017.0021.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 3. Guidance note on public participation in river and lake protection developedValueNoNoYes
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 12. Demonstration counties with integrated and market-based municipal waste management systemValue0.000.006.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 9. New Land area where sustainable land management practices with climate change considerations are implementedValue0.000.00107.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 4. People engaged in river/lake protection activitiesValue160.00160.00800.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 13. Demonstration counties meeting annual targets for manure utilizationValue0.000.006.00
    DateDecember 30, 2022April 12, 2024December 29, 2028
    Comment
  • 5. Women civil river chiefs in demonstration countiesValue13.7013.7030.00
    DateDecember 30, 2022April 12, 2024December 29, 2028