Morocco Water Security and Resilience Program

Abstract*

The development objective of the Water Security and Resilience Program for Morocco is to strengthen water sector institutions and increase water availability in selected areas in Morocco. The program is structured around three results areas (RA) that provide mutually reinforcing incentives for the completion of activities needed to achieve the program development objective (PDO): RA 1: strengthening water sector governance; RA 2: improving financial...

* The project abstract is drawn from the PAD, SAR or PGD and may not accurately reflect the project's current nature

Show More

Development Objective

The Program Development Objective is to strengthen water sector institutions and increase water availability in selected areas in Morocco

Key Details

Project Details

  • P179192

  • Active

  • Yoro Sidibe , Safaa Bahije

  • Kingdom of Morocco

  • Morocco

  • June 6, 2023

  • (as of board presentation)

    July 18, 2023

  • January 5, 2024

  • US$ 1500.00 million

  • Ministry of Interior (MoI),Ministry of Equipment and Water (MEE)

  • Middle East and North Africa

  • 2024

  • US$ 350.00 million

  • N/A

  • January 18, 2024

  • December 31, 2028

  • Yes

  • BANK APPROVED

  • Notes

Finances

Financing Plan (US$ Millions)

No data available.
Financier Commitments
International Bank for Reconstruction and Development 350.00

Total Project Financing (US$ Millions)

Product Line IBRD/IDA
IBRD Commitment 350.00
IDA Commitment N/A
IBRD + IDA Commitment 350.00
Lending Instrument
Grant Amount N/A
Total Project Cost** 1500.00

Summary Status of World Bank Financing (US$ Millions) as of January 31, 2025

Download:
No data available.
Financier Approval Date Closing Date Principal Disbursed Repayments Interest, Charges & Fees

Detailed Financial Activity as of January 31, 2025

Download:
No data available.
Period Financier Transaction Type Amount (US$)
Feb 13, 2024 IBRD-95810 Loan Disb 88,352,656.00
Aug 15, 2024 IBRD-95810 Int Charges 29,849.01
Aug 15, 2024 IBRD-95810 Int Charges 109,487.84
Jul 18, 2023 IBRD-95810 Loan Commitment 350,000,000.00
Aug 15, 2024 IBRD-95810 Int Charges 335,498.03
Jan 5, 2024 IBRD-95810 Loan Disb 894,716.10
Aug 15, 2024 IBRD-95810 Int Charges 2,198,351.50
Jan 5, 2024 IBRD-95810 Fee Charges 894,716.10

Footnotes

Ratings

IMPLEMENTATION RATINGS

Name Review Date
Progress towards achievement of PDO Satisfactory 2025-01-02
Monitoring and Evaluation Satisfactory 2025-01-02
Overall Implementation Progress (IP) Satisfactory 2025-01-02

COMPLETION RATINGS

No data available.

INDEPENDENT EVALUATION RATINGS

No data available.

Results Framework

PROJECT DEVELOPMENT OBJECTIVE INDICATORS

INDICATORBASELINECURRENTTARGET
  • National Water Plan (PNE) AdoptedValueA revised draft of the National Water Plan incorpoNot yet dueThe draft National Water Plan incorporating climat
    DateMay 26, 2023December 31, 2023December 31, 2027
    Comment
  • Volume of potable water savings in distribution water supply networks (Volume m3)Value6,500,000 m3 of potable water savings in distributNot yet due3,500,000
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Water information systems operationalizedValueBADRE21 is the water resources information system Not yet dueThe SNIEAU is partially accessible to the public p
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Volume of treated wastewater made available for reuse under the Program (Volume m3)Value0 m3 of treated wastewater made available for reusNot yet due25,000,000
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment

INTERMEDIATE RESULTS INDICATORS

INDICATORBASELINECURRENTTARGET
  • Participatory groundwater management improvedValueThe Agreement between the MEE and MAPMDREF for manNot yet dueThree (03) participatory groundwater management co
    DateMay 29, 2023December 31, 2023December 29, 2028
    Comment
  • Financial sustainability framework of the water sector improvedValueThere is no financial model for the water sector, Not yet dueThe financial sustainability action plan for the w
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Enabling environment for integration of desalinated water improvedValueThe Water Law 36-15 includes provisions for the deNot yet dueThe decree on seawater desalination adopted
    DateMay 26, 2023December 31, 2023December 31, 2026
    Comment
  • Smart meters for monitoring groundwater withdrawals by large users installed under the ProgramValue0 smart meters for monitoring of groundwater withdNot yet due10
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Communication campaigns for the reduction of water consumption implementedValueThe PNAEPI communication strategy was adopted in 2Not yet dueThe impact evaluation of communication campaigns c
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Enabling environment for integration of wastewater reuse improvedValueThe Decree No. 2-97-875 of 1998 on the modalities Not yet dueThe draft decree on the modalities for wastewater
    DateMay 26, 2023December 31, 2023December 31, 2026
    Comment
  • ABH performance framework adopted and ABH performance improvedValueThere is no ABH performance framework in placeNot yet dueAn annual action plan for performance improvement
    DateMay 26, 2023December 31, 2023December 31, 2028
    Comment
  • Number of District Metered Areas established in potable water distribution networksValue400 District Metered Areas (DMAs) established as oNot yet due50
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Number of agreements for wastewater reuse projects signedValue0 agreements for treated wastewater reuse projects03
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • ABH gender performance score improvedValueWomen are underrepresented in leadership roles andNot yet dueThe adopted annual action plan for performance imp
    Date
    Comment
  • Decree on water information systems adoptedValueThe Water Law 36-15 provided for the establishmentNot yet dueThe Decree establishing the SNIEAU and ABHs' water
    DateMay 26, 2023December 31, 2023December 31, 2026
    Comment
  • Users’ feedback on water information systems and servicesValueNo users’ feedback mechanism is available in protoNot yet due10 percent increase in users’ satisfaction on wate
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Hydrological and hydrogeological data quality improvedValueHydrological stations and piezometers are installeNot yet dueThe Quality and Control Assurance Plan for hydrolo
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Number of stations and piezometers reporting dataValueHydrological stations and piezometers are installeNot yet due12 new or existing stations reporting data automat
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment
  • Multiservice operators' performance information system operationalizedValueAbsence of minimum service standards for electriciNot yet dueAn annual report produced by the MoI on multiservi
    DateMay 26, 2023December 31, 2023December 29, 2028
    Comment