CN-Wanjiazhai Water

Resumo*

The Wanjiazhai Water Transfer Project is part of a phased development program to expand the water supply and improve the land and water environment in the northern Shanxi province. Specific objectives include: a) reducing water supply infrastructure bottlenecks; b) increasing employment and incomes; reducing the urban distress caused by insufficient and intermittent water supplies; d) environmental improvement by ending the over extraction of groundwater...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

1. Reducing the severe infrastructure bottlenec ks in water supply that impede economic growth in order (a) to increase employment and incomes by eliminating the paramount constraint to development; and (b) to reduce the distress of the urban population caused by in sufficient and intermittent water supplies, which are barely enough to meet their basic needs;2. Improving the environment by ending the over-extraction of grou ndwater and the subsequent drying of surface streams and land subsidence, and by treating all waste, so as to reduce water pollution downstream; and3. Promoting integrated management and financial independence for water institutions in order to create a system to rati onalize water use, by sector, and reduce water shortages by managing demand.

Chave Detalhes

Projeto Detalhes

  • P036405

  • Closed

  • Liping Jiang

  • N/A

  • China

  • 21 de outubro de 1996

  • (conforme apresentação da Diretoria Executiva)

    3 de junho de 1997

  • 21 de novembro de 1997

  • US$ 355.00 milhões

  • A

  • 15 de janeiro de 2013

  • 30 de junho de 2007

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
International Bank for Reconstruction and Development 325.00
Bilateral Agencies (unidentified) 30.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 325.00
Compromissos da AID N/A
Compromisso do BIRD + AID 325.00
Instrumento de empréstimo
Montante do subsídio 30.00
Custo total do projeto** 1351.00

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 28 de fevereiro de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 28 de fevereiro de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Overall Safeguards Rating Unsatisfactory 2007-06-24
Financial Management Moderately Satisfactory 2007-06-24
Progress towards achievement of PDO Unsatisfactory 2007-06-24
Counterpart Funding Satisfactory 2007-06-24
Overall Implementation Progress (IP) Unsatisfactory 2007-06-24
Procurement Satisfactory 2007-06-24
Project Management Unsatisfactory 2007-06-24
Monitoring and Evaluation Satisfactory 2007-06-24

CLASSIFICAÇÕES DAS CONCLUSÕES

INDICADORRELATÓRIO SOBRE A CONCLUSÃO E RESULTADOS DA IMPLEMENTAÇÃO: 04-16-2008
ResultadosModerately Unsatisfactory
Risco para o resultado de desenvolvimentoSubstantial
Desempenho do Banco MundialModerately Unsatisfactory
Desempenho do mutuárioModerately Satisfactory
Desempenho do governoModerately Satisfactory
Entidade ExecutoraModerately Satisfactory

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

INDICADORREVISÃO DA RCI: 07-23-2008RELATÓRIO SOBRE AVALIAÇÃO DO DESEMPENHO DO PROJETO:
Classificação De ResultadosModerately Unsatisfactory N/a
Risco Para O Resultado De DesenvolvimentoModerateN/a
Desempenho Do Banco MundialModerately UnsatisfactoryN/a
Desempenho Do MutuárioModerately UnsatisfactoryN/a
Desempenho Do GovernoModerately UnsatisfactoryN/a
Entidade ExecutoraModerately UnsatisfactoryN/a
Qualidade Da RciSatisfactoryN/a
Qualidade M&eNegligibleN/a

Estrutura de Resultados

Não há dados disponíveis