The project's global environmental objective and its development objective are the same: to contribute to the preservation, conservation, and sustainable management of the biodiversity of the Caatinga in the states of Bahia and Ceara, while improving the quality of life of its inhabitants, through the introduction of sustainable development practices. There are 2 components to the project. Component 1, Institutional and Policy Support for Integrated...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The project’s Development Objective is to contribute to the preservation, conservation, and sustainable management of the biodiversity of the Caatinga in the states of Bahia and Ceará, while improving the quality of life of its inhabitants, through the introduction of sustainable development practices.

Chave Detalhes

Projeto Detalhes

  • P070867

  • Closed

  • Maria Lange

  • N/A

  • Brasil

  • 1 de agosto de 2005

  • (conforme apresentação da Diretoria Executiva)

    26 de junho de 2007

  • 25 de setembro de 2007

  • US$ 10.06 milhões

  • B

  • Não aplicável

  • 31 de outubro de 2013

  • BANK APPROVED

  • 15 de março de 2022

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
Local Communities 0.80
Global Environment Facility (GEF) 10.00
UN Food and Agriculture Organization (FAO) 0.06
Borrower/Recipient 12.20

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID N/A
Compromisso do BIRD + AID N/A
Instrumento de empréstimo
Montante do subsídio 10.06
Custo total do projeto** 23.06

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Counterpart Funding Satisfactory 2013-07-09
Project Management Satisfactory 2013-07-09
Financial Management Satisfactory 2013-07-09
Monitoring and Evaluation Satisfactory 2013-07-09
Overall Implementation Progress (IP) Moderately Satisfactory 2013-07-09
Summary Global Objective Rating Moderately Satisfactory 2013-07-09
Procurement Satisfactory 2013-07-09

CLASSIFICAÇÕES DAS CONCLUSÕES

INDICADORRELATÓRIO SOBRE A CONCLUSÃO E RESULTADOS DA IMPLEMENTAÇÃO: 06-27-2014
ResultadosModerately Satisfactory
Risco para o resultado de desenvolvimentoSubstantial
Desempenho do Banco MundialModerately Unsatisfactory
Desempenho do mutuárioModerately Satisfactory
Desempenho do governoSubstantial
Entidade ExecutoraModerately Satisfactory

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

INDICADORREVISÃO DA RCI: 09-21-2015RELATÓRIO SOBRE AVALIAÇÃO DO DESEMPENHO DO PROJETO:
Classificação De ResultadosUnsatisfactory N/a
Risco Para O Resultado De DesenvolvimentoSignificantN/a
Desempenho Do Banco MundialModerately UnsatisfactoryN/a
Desempenho Do MutuárioModerately UnsatisfactoryN/a
Desempenho Do GovernoModerately UnsatisfactoryN/a
Entidade ExecutoraModerately UnsatisfactoryN/a
Qualidade Da RciSatisfactoryN/a
Qualidade M&eModestN/a

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Strategic environmental assessment completed with at least 2 workshops and 6 assessments carried out.ValorzeroSEA completed in Ceara.completed strategic assessment
    Data19 de dezembro de 200719 de junho de 201319 de dezembro de 2009
    ComentárioCeara carried out the entire SEA process. Bahia after some delay, it is being underway.
  • Hectares of rehabilitated areas with riparian vegetation in the subproject area increased by 50% compared to baseline.Valorto be determined50% increase of riparian vegetation in target area
    Data19 de dezembro de 200731 de outubro de 201331 de outubro de 2013
    Comentário24 subprojects focused on rehabilitation of riparian vegetation (2 concluded and 22 underway). An estimated 105 ha rehabilitatedto date (56 ha in Ceara and 49 ha in Bahia.
  • 150 subprojects using integrated ecosystem management (IEM) strategies are under implementation.Valorzero132132 subprojects
    Data19 de dezembro de 200731 de outubro de 201331 de outubro de 2013
    Comentário132 subprojects supported (72 in Ceara and 60 in Bahia)88% of the target
  • At least 2 new RPPNs (Private Natural Heritage Reserve) established in Ceara.Valorzero22 RPPNs
    Data19 de dezembro de 200731 de outubro de 201331 de outubro de 2013
    ComentárioTwo created comprising 283 ha. Actively supporting the creation of others.100% of the target
  • Integrated ecosystem management and biodiversity conservation considerations mainstreamed in at least 6 sectoral policies or plans by participating states (GEF SP2 tracking tool)Valorzero8 or 133%8 or 133% of the target
    Data19 de dezembro de 200731 de outubro de 201331 de outubro de 2013
    ComentárioSeven policies mainstreamed in Ceara and one in Bahia. Ceara policies include: new state protected area law, new state policy tocombat desertification, strengthened state policy for environment at municipal level (Selo Verde), strengthened fire preventionprogram (PREVINA), new state policy of integrated management of solid waste, new state forest policy, new state policy forenvironmental services. In Bahia a new municipal environmental law (Itatim) and 4 municipal environmental councils created.
  • 20% of degraded lands as measured by vegetation cover, in the project area have been rehabilitated when compared with the baseline.Valorto be determined -to be determinated
    Data19 de dezembro de 200731 de outubro de 201331 de outubro de 2013
    ComentárioIn Ceara, 52 subprojects for rehabilitation of degraded areas are underway, to recover 690 ha, involving 1,295 family farmers. InBahia, 12subprojects for rehabilitation of degraded lands are underway with 1,225 family farmers. In 2012, Brazil's northeaststruggles with the worst drought in 30 years, prompting authorities to declare a state of emergency. This has negatively affectedsuccess of subprojects for rehabilitation of degraded areas, as well as the domestic water supplies and productive subprojects.the end target will be measured by the project completion report.
  • Communities implementing production related sub-projects show 15% improvement in their lincome compared to similar rural productiveactivities.Valorto be determinedThe survey is under development
    Data19 de dezembro de 200719 de junho de 201331 de outubro de 2013
    ComentárioSubprojects expected to improve incomes include 60 subprojects in Ceara and in Bahia. The survey to monitor the improvementstartedin June 2013.
  • 6 existing PROBIO protected areas (150,184 hectares) have improved management effectiveness compared to baseline (GEF SP2 tracking tool).Valorto be determined5 or 83%6 protected areas with improved management
    Data19 de dezembro de 200730 de novembro de 201219 de setembro de 2012
    ComentárioIn Bahia: (1) for APA Serra Branca (67,237 ha) the management plan will be completed in 2013; (2) for FLONA Contendas do Sincoré(11,000 ha) various activities including capacity building center created and tree nursery subprojects; (3) for State Par Morro doChapeu contracting for environmentale ducation activities; In Ceara: (1) RPPN Serra das Almas equipment for monitoring fauna; (2)Municipal Park Themistocles Lins Fialho - implementation of management counsel.The target is 100%
  • 2 new PROBIO priority areas created by Bahia under SNUC/IUCN criteria,Valorzero1 new area proposed1 new ares proposed in Bahia
    Data19 de dezembro de 200731 de outubro de 201331 de outubro de 2013
    ComentárioBahia completed the environmental/biological diagnostics, socio-economic assessment, and proposed the Decree for one newconservation unit in Curaca. Ceara supported the creation of 2 new areas, preliminary s for one, and studies for another, AguasEmendadas between Taua and Pedra Branca.