TP-FUNDAMENTAL SCHOOL QUALITY PROJECT

Resumo*

The Fundamental School Quality Project, as the second phase of the Trust Fund for East Timor (TFET), will specifically support the United Nations Transitional Administration in East Timor (UNTAET) in maintaining the level of primary education enrollment, restore junior secondary enrollment, and, pursue the quality education recovery, through physical rehabilitation of facilities, and provision of textbooks and instructional material. The project's...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

1. To support the Government's efforts to maintain the existing level of primary education enrollment (185,000 students, estimated at 95% of gross enrollment) and presecondary enrollment(i.e., junior secondary education, 30,000 students, estimated at 60% of gross enrollment), with the possibility of increase due to return of refugees and growth of school-age population.2. To continue to recover quality of primary and junior education by rehabilitating physical facilities, and by providing textbooks and instructional materials.

Chave Detalhes

Projeto Detalhes

  • P072647

  • Closed

  • Jerry G. Strudwick

  • N/A

  • Timor-Leste

  • (conforme apresentação da Diretoria Executiva)

    28 de setembro de 2001

  • US$ 14.10 milhões

  • N/A

  • 5 de agosto de 2024

  • 31 de dezembro de 2006

  • BANK APPROVED

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
Borrower/Recipient 0.20
Special Financing 13.90

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD N/A
Compromissos da AID N/A
Compromisso do BIRD + AID N/A
Instrumento de empréstimo
Montante do subsídio 13.90
Custo total do projeto** 14.10

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de novembro de 2024

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de novembro de 2024

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Overall Safeguards Rating Satisfactory 2006-12-27
Counterpart Funding Satisfactory 2006-12-27
Procurement Highly Satisfactory 2006-12-27
Project Management Satisfactory 2006-12-27
Progress towards achievement of PDO Satisfactory 2006-12-27
Financial Management Satisfactory 2006-12-27
Monitoring and Evaluation Satisfactory 2006-12-27
Overall Implementation Progress (IP) Satisfactory 2006-12-27

CLASSIFICAÇÕES DAS CONCLUSÕES

INDICADORRELATÓRIO SOBRE A CONCLUSÃO E RESULTADOS DA IMPLEMENTAÇÃO: 06-28-2007
ResultadosSubstantial
Risco para o resultado de desenvolvimentoNegligible
Desempenho do Banco MundialSubstantial
Desempenho do mutuárioSubstantial
Desempenho do governoSubstantial
Entidade ExecutoraSubstantial

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

INDICADORREVISÃO DA RCI: 09-21-2007RELATÓRIO SOBRE AVALIAÇÃO DO DESEMPENHO DO PROJETO:
Classificação De ResultadosModerately Unsatisfactory N/a
Risco Para O Resultado De DesenvolvimentoSignificantN/a
Desempenho Do Banco MundialModerately SatisfactoryN/a
Desempenho Do MutuárioModerately SatisfactoryN/a
Desempenho Do GovernoModerately UnsatisfactoryN/a
Entidade ExecutoraModerately SatisfactoryN/a
Qualidade Da RciUnsatisfactoryN/a
Qualidade M&eNegligibleN/a

Estrutura de Resultados

Não há dados disponíveis