Xinjiang Turfan Water Conservation Project

Resumo*

The objective of the Xinjiang Turfan Water Conservation Project for China is to mitigate the risk of flooding, reduce groundwater overdraft, increase industrial and domestic water supply, and raise farmers' income from irrigated agriculture in the arid Turpan basin of Xinjiang Uyghur autonomous region. There are five components to the project, the first component being Evapotranspiration (ET), based integrated water management in the Turpan Basin...

* Os resumos dos projetos são tirados do PAD, SAR ou PGD e talvez não reflitam com exatidão a natureza atual do projeto

Ver mais

Objetivo de Desenvolvimento

The Project Development Objective (PDO) is to mitigate the risk of flooding, reduce groundwater overdraft, increase industrial and domestic water supply, and raise farmers' income from irrigated agriculture in the arid Turpan Basin of Xinjiang Uygur Autonomous Region.

Chave Detalhes

Projeto Detalhes

  • P111163

  • Closed

  • Liping Jiang

  • The People's Republic of China

  • China

  • 12 de setembro de 2008

  • (conforme apresentação da Diretoria Executiva)

    17 de junho de 2010

  • 28 de outubro de 2010

  • US$ 204.08 milhões

  • Turpan Prefecure Water Bureau

  • Leste Asiático e Pacífico

  • 2010

  • US$ 100.00 milhões

  • A

  • Não aplicável

  • 31 de março de 2017

  • BANK APPROVED

  • 22 de abril de 2024

  • Notes

Finanças

Plano De Financiamento (US$ Milhões)

Não há dados disponíveis
Financiador Compromissos
Borrower/Recipient 104.08
International Bank for Reconstruction and Development 100.00

Financiamento total do projeto (US$ milhões)

Linha de produtos BIRD/AID
Compromisso do BIRD 100.00
Compromissos da AID N/A
Compromisso do BIRD + AID 100.00
Instrumento de empréstimo
Montante do subsídio N/A
Custo total do projeto** 204.08

Resumo da situação do financiamento do Banco Mundial (em US$ milhões) em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Financiador Data Da Aprovação Data De Encerramento Principal Desembolsado Pagamentos Juros, Custos E Taxas

Atividade financeira detalhada em 30 de abril de 2025

Baixar:
Não há dados disponíveis
Período Financiador Tipo De Transção Montante (US$)

Footnotes

Ratings

CLASSIFICAÇÕES DA IMPLEMENTAÇÃO

Name Review Date
Procurement Satisfactory 2017-08-06
Project Management Satisfactory 2017-08-06
Overall Safeguards Rating Satisfactory 2017-08-06
Counterpart Funding Satisfactory 2017-08-06
Progress towards achievement of PDO Satisfactory 2017-08-06
Financial Management Satisfactory 2017-08-06
Monitoring and Evaluation Satisfactory 2017-08-06
Overall Implementation Progress (IP) Satisfactory 2017-08-06

CLASSIFICAÇÕES DAS CONCLUSÕES

INDICADORRELATÓRIO SOBRE A CONCLUSÃO E RESULTADOS DA IMPLEMENTAÇÃO: 10-13-2017
ResultadosHighly Satisfactory
Risco para o resultado de desenvolvimentoModest
Desempenho do Banco MundialSubstantial
Desempenho do mutuárioSubstantial
Desempenho do governoHighly Satisfactory
Entidade ExecutoraSubstantial

CLASSIFICAÇÕES DA AVALIAÇÃO INDEPENDENTE

INDICADORREVISÃO DA RCI: 11-22-2017RELATÓRIO SOBRE AVALIAÇÃO DO DESEMPENHO DO PROJETO:
Classificação De ResultadosHighly Satisfactory N/a
Risco Para O Resultado De DesenvolvimentoModestN/a
Desempenho Do Banco MundialSatisfactoryN/a
Desempenho Do MutuárioSatisfactoryN/a
Desempenho Do GovernoSatisfactoryN/a
Entidade ExecutoraHighly SatisfactoryN/a
Qualidade Da RciSubstantialN/a
Qualidade M&eSubstantialN/a

Estrutura de Resultados

INDICADORES DO OBJETIVO DE DESENVOLVIMENTO DO PROJETO

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • PO1: Number of the people with improved flood protection increasedValor0260, 000About 260,000 people will have been protected by t
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • PO2: Economic losses from flooding mitigatedValorRMB15.48 million0.000.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • PO3: Groundwater overdraft reduced in project irrigation areas, and the basin.Valor017.38 million m33.75 million m3
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • PO4: Water supply capacity for industrial and domestic uses in consumptive use terms increased in project irrigation areas, and thebasinValor05.15 million m33.25 million m3 per year
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • PO5: Water productivity in irrigated agriculture, measured in terms of evapotranspiration (ET), increased in project irrigation areasValor0.8 Yuan per m311.58 Yuan per m38.8 Yuan per m3
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • PO6: Farmers# per-capita net income from irrigated agriculture increased in the project irrigation areasValorRMB 4,742 Yuan per year11,266 yuan per yearRMB 5,942 Yuan per year
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário

INDICADORES DE RESULTADOS INTERMEDIÁRIOS

INDICADORLINHA DE REFERÊNCIAATUALALVO
  • Operational water user associations created and/or strengthened (number)Valor0.0043.0043.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO1: ET management center established and staffed, and ET management and knowledge management systems set upValor0100%100%
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO2: Number of water user associations (WUAs) achieving targets for reductions in ETValor04343
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO3: Number of contracts for the three upstream dams and related works satisfactorily completedValor02929
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO4: Non-beneficial evaporation from water surfaces reduced in the basin, particularly during the flood seasonValor013.03 million m34.20 million m3
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO5: Length of irrigation canals rehabilitatedValor048.62 KM48.60 KM
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO6: Amount of irrigated area with improved irrigation technologies installedValor0162,000 mu162,000 mu
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO7: Amount of ET reduction in project irrigation areas, and the basinValor092 million m3 per year6.55 million m3 per year
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO8: Length of the Karez system rehabilitated according to the requirements of the Prefecture Cultural Relics BureauValor02.88 km2.88 km
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO9: Number of government officials familiarized with the ET management conceptValor0323180
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • IO10: Number of members of WUAs familiarized with the ET-based irrigation water rights systemValor021,0212,650
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • Client days of training provided (number)Valor0.00600.00600.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • Area provided with irrigation and drainage services (ha)Valor0.00162000.00162000.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • Client days of training provided - Female (number)Valor0.00300.00300.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • Area provided with irrigation and drainage services - New (ha)Valor0.00162000.00162000.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário
  • Area provided with irrigation and drainage services - Improved (ha)Valor0.00162000.00162000.00
    Data15 de junho de 200930 de junho de 201731 de março de 2017
    Comentário